3. Beneficiaries may be residing either in slums or Individual applicants for assistance shall not be
outside the slums. considered. Such Projects would be approved by
States in SLSMC.
4. Beneficiaries in slums which are not being rede-
veloped can be covered under this component While approving projects for individual house
if beneficiaries have a Kutcha or Semi-Pucca construction, ULBs and States/UTs should en-
house. sure that required finance for constructing the
planned house is available to the beneficiary
Benefit from different sources including his own con- Allowed: Yes Allowed: No
Allowed: Yes Allowed: No
To individual eligible families belonging to EWS tribution, GoI assistance, State Government as- Reason: Complies with Reason: Proposed Reason: Complies with all Reason: Enhancement
categories, to either construct a new house or sistance etc. In no case, GoI assistance will be all criteria Enhancement is less than criteria must include at least One
enhance existing house on their own to cover released for house where balance cost of con- 9 Sq Mt room
the beneficiaries, who are not able to take ad- struction is not tied up, as otherwise release of
vantage of other components of the mission. GoI assistance may result into half constructed
houses.
Such families may avail of central assistance of
Rs. 1.50 lakhs for construction of new house or States/UTs or cities may also contribute finan-
for enhancement of existing house under the cially for such individual house construction.
mission. Central assistance will be released to the Aadhar
linked bank accounts of beneficiaries identified
Implementation through ULBs in projects by the States/UTs as per recommen-
dations of ULBs/implementing agency.
Beneficiaries desirous of availing this assistance
Though the funds from Central Government to In case, there is not enough space on the ground
shall approach the ULBs with adequate docu-
State Governments would be released in lump- floor, enhancement can also be carried out on
mentation regarding availability of land owned
sum including assistance for this component, the first floor; provided that the Structural Safety
by them.
State Government should release financial as- is ensured.
The ULBs shall validate the information given by sistance to the beneficiaries in 3-4 installments
Allowed: No Allowed: Yes
the beneficiary and building plan for the house Reason: Enhancement proposed Reason: Complies
depending on progress of construction of the must be at least 9 Sq Mt with all criteria # Illustrations shown are not to scale.
house.