OE 02.01.00.00 MOVIMIENTO DE TIERRAS
OE 02.01.01.00 NIVELACIN DE TERRENO
OE 02.01.01.01 NIVELACION APISONADO MANUAL
OE 02.01.02.00 EXCAVACIONES
OE 02.01.02.01 EXCAVACIONES PARA ZAPATAS
Z3(1.30x1.10) : EJE 4-4, 6-6, 8-8: ENTRE EJE A-A, C-C, E- 1.30 1.10 1.60 7.00
E
Z4(1.50x1.30) : EJE 5-7: ENTRE EJE A-A Y E-E 1.50 1.30 1.60 4.00
Z5(1.50x1.10) : EJE 6-6: ENTRE EJE E-E 1.50 1.10 1.60 1.00
Z6(1.60x1.10) : EJE 6-6: ENTRE EJE A-A 1.60 1.10 1.60 1.00
TOTAL
TOTAL
TOTAL
OE 02.01.03.00 CORTES
OE 02.01.03.01 CORTE EN TERRENO NATURAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
PARTIDA: 08.02. MONTANTE PARA BAJADA DE AGUA DE LLUVIA PVC SAL 4"
CANTIDAD VECES QUE
DESCRIPCION SE REPITE
1 2
Pabellon Nuevo 2.00 1.00
TOTAL
METRADO
( m2 )
(4) = (1) x (2) x (3)
12.00
12.00
METRADO
( m2 )
(4) = (1) x (2) x (3)
30.00
30.00
METRADO
( m2 )
(4) = (1) x (2) x (3)
8.00
8.00
METRADO
( DIA )
(4) = (1) x (2) x (3)
105.00
105.00
METRADO
(UND )
(4) = (1) x (2) x (3)
1.00
1.00
METRADO
(GLOBAL )
(4) = (1) x (2) x (3)
1.00
1.00
METRADO
( m2 )
(5) = (1)x(2)x(3)x(4)
202.58
202.58
METRADO
( GLOBAL )
(5) = (1)x(2)x(3)x(4)
1.00
1.00
METRADO
( M2 )
(5) = (1)x(2)x(3)x(4)
202.58
202.58
METRADO
( GLB )
(5) = (1)x(2)x(3)x(4)
1.00
1.00
METRADO
( UND )
(5) = (1)x(2)x(3)x(4)
50.00
50.00
METRADO
( GLB )
(5) = (1)x(2)x(3)x(4)
1.00
1.00
METRADO
( GLB )
(5) = (1)x(2)x(3)x(4)
1.00
1.00
METRADO
( GLB )
(5) = (1)x(2)x(3)x(4)
1.00
1.00
METRADO
( GLB )
(5) = (1)x(2)x(3)x(4)
1.00
1.00
METRADO
( M2 )
(5) = (1)x(2)x(3)x(4)
202.58
202.58
METRADO
( M3 )
(5) = (1)x(2)x(3)x(4)
2.89
6.69
16.02
12.48
2.64
2.82
43.53
METRADO
( M3 )
(5) = (1)x(2)x(3)x(4)
1.76
1.76
3.53
METRADO
( M3 )
(5) = (1)x(2)x(3)x(4)
1.21
1.21
0.65
2.54
3.65
2.54
4.66
4.72
2.55
2.51
2.55
28.78
METRADO
( M3 )
(5) = (3+3)x(2)x(1)/2
28.63
28.63
AREA
( m2 )
(4) = (1) x (2) x (3)
119.23
62.08
181.31
AREA
( m2 )
(4) = (1) x (2) x (3)
119.23
62.08
181.31
AREA
( m3 )
(4) = (1)x(2)x(3)
95.45
23.81
119.26
VOLUMEN
( m3 )
(4) = (1)x(2)x(3)
38.82
38.82
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
1.99
4.60
11.01
8.58
1.82
1.94
29.93
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
1.51
1.51
3.03
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
1.75
0.79
3.65
1.75
0.79
2.55
2.51
2.55
1.21
0.99
1.27
1.13
1.28
1.21
0.99
1.22
1.23
1.28
28.14
AREA
( m2 )
(4) = (1) x (2) x (3)
32.00
15.12
14.93
62.05
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
7.48
7.48
VOLUMEN
( m3 )
(4) = (1) x (2) x (3)
0.19
0.15
0.14
0.16
0.16
0.11
0.23
0.31
0.23
0.59
0.59
0.39
0.33
0.35
0.59
0.59
0.31
0.31
0.31
6.04
AREA
( m2 )
(4) = (1) x (2) x (3)
41.76
1.43
0.17
41.76
1.43
0.17
86.70
VOLUMEN
( m3 )
(3) = (1) x (2)
14.91
48.53
37.41
3.78
35.17
7.76
9.35
-7.56
149.34
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
1.51
0.68
0.15
0.20
0.14
3.15
1.51
0.68
0.15
0.19
0.14
2.20
0.15
0.21
2.17
0.16
0.21
2.20
0.15
0.21
2.09
0.86
1.09
0.97
1.11
0.33
0.03
0.06
0.16
0.25
0.23
0.25
1.05
0.86
1.05
1.06
1.11
0.03
0.06
0.49
0.13
29.42
AREA
( m2 )
(4) = (1) x (2) x (3)
41.76
1.43
0.17
41.76
1.43
0.17
86.70
AREA
( m2 )
(4) = (1) x (2) x (3)
32.00
15.12
14.93
62.05
AREA
( m2 )
(4) = (1) x (2) x (3)
32.00
15.12
14.93
62.05
LONGITUD
( m. )
(4) = (2) x (3)
10.50
2.40
4.90
17.80
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
0.90
0.90
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
4.88
4.88
AREA
( m2 )
(4) = (1) x (2) x (3)
30.53
30.53
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
1.08
2.51
6.01
4.68
0.99
1.06
16.32
PESO
( kg )
(3) = (1) x (2)
360.93
360.93
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
0.83
0.83
1.65
PESO
( kg )
(3) = (1) x (2)
117.89
117.89
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
0.54
0.31
0.41
0.20
0.54
0.31
0.90
0.89
0.90
0.20
0.13
0.16
0.24
0.26
0.32
0.53
0.48
7.32
AREA
( m2 )
(4) = (1) x (2) x (3)
4.36
2.47
3.25
1.60
4.36
2.47
7.22
7.09
7.22
2.60
1.76
2.15
3.21
3.51
4.23
7.02
6.42
70.91
PESO
( kg )
(3) = (1) x (2)
568.75
568.75
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
3.11
0.89
4.15
0.75
0.45
0.33
0.46
2.47
0.50
0.82
3.84
0.63
0.33
0.56
0.30
0.42
0.20
0.60
0.48
1.68
1.52
24.49
AREA
( m2 )
(4) = (1) x (2) x (3)
38.71
52.14
16.00
9.60
5.53
7.31
30.74
6.22
48.31
13.44
7.04
12.00
5.12
6.77
3.19
9.52
7.75
21.84
19.71
320.94
PESO
( kg )
(3) = (1) x (2)
3547.83
3547.83
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
0.15
0.34
0.19
0.15
0.34
0.19
0.30
0.56
0.56
0.38
1.43
0.15
0.27
0.27
0.10
0.63
0.33
0.65
1.21
0.02
0.07
0.04
0.30
0.33
0.65
0.61
0.08
0.07
0.34
0.19
0.34
0.19
0.56
0.56
1.45
0.27
0.27
0.65
1.21
0.02
0.07
0.04
0.65
0.61
0.08
0.07
0.13
0.16
18.19
AREA
( m2 )
(5) = (1)x(2+3)x(4)
1.58
3.52
2.00
1.58
3.52
2.00
3.15
5.84
5.84
3.75
14.25
1.58
2.87
2.87
1.14
7.30
2.11
4.23
7.87
0.33
0.99
0.48
1.95
2.11
4.23
3.93
1.08
0.99
3.52
2.00
3.52
2.00
5.84
5.84
14.50
2.87
2.87
4.23
7.87
0.33
0.99
0.48
4.23
3.93
1.08
0.99
0.20
0.24
160.53
PESO
( kg )
(3) = (1) x (2)
2738.21
2738.21
VOLUMEN
( m3 )
(5) = (1)x(2)x(3)x(4)
1.64
14.11
0.38
16.13
AREA
( m2 )
(4) = (1) x (2) x (3)
18.77
161.24
4.39
184.39
PESO
( kg )
(3) = (1) x (2)
1161.45
1161.45
N LADRILLOS
( und )
(4) = (1) x (2) x (3)
1499.44
36.55
1535.99
VOLUMEN
( m3 )
(4) = (1)x(2)x(3)
1.05
1.24
0.95
3.23
AREA
( m2 )
(4) = (1) x (2) x (3)
4.01
2.36
6.18
4.19
2.10
18.83
PESO
( kg )
(3) = (1) x (2)
225.60
225.60
VOLUMEN
( m3 )
(3) = (1) x (2)
0.03
0.03
AREA
( m2 )
(3) = (1) + (2)
1.74
1.74
PESO
( kg )
(3) = (1) x (2)
2.67
2.67
LONGITUD
(m)
3= 1x2
39.46
39.46
PUNTO
(pto)
3= 1x2
2.00
2.00
ARQUITECTURA
TOTAL 149.88
PARTIDA 04.01 CONTRAZOCALO CEMENTO PULIDO EN INTERIOR, h=0.10m, e=1.5cm C:A, 1:5
LONGITUD VECES QUE LONGITUD
DESCRIPCION ( m. ) SE REPITE (m)
(1) (2) (3) = (1) x (2)
PRIMER PISO
Eje 4 6.00 1.00 6.00
Eje 6 6.00 2.00 12.00
Eje 8 6.00 1.00 6.00
Eje A 0.77 1.00 0.77
5.60 2.00 11.20
0.80 1.00 0.80
Eje E 7.50 2.00 15.00
SEGUNDO PISO
Eje 4 6.00 1.00 6.00
Eje 6 6.00 2.00 12.00
Eje 8 6.00 1.00 6.00
Inferior a Eje A 21.33 1.00 21.33
Eje A 0.77 1.00 0.77
5.60 2.00 11.20
0.80 1.00 0.80
Eje E 7.50 2.00 15.00
ESCALERA
Eje 1 7.73 1.00 7.73
Eje 2 4.75 1.00 4.75
4.58 1.00 4.58
Eje 3 7.90 1.00 7.90
Eje E 3.25 1.00 3.25
TOTAL 153.08
PARTIDA 04.02 CONTRAZOCALO CEMENTO PULIDO EN EXTERIOR, h=0.20m, e=1.5cm C:A, 1:5
LONGITUD VECES QUE LONGITUD
DESCRIPCION ( m. ) SE REPITE (m)
(1) (2) (3) = (1) x (2)
PRIMER PISO
Eje 1 6.30 1.00 6.30
Eje 8 6.30 1.00 6.30
Eje A 0.25 1.00 0.25
1.33 1.00 1.33
6.35 1.00 6.35
5.55 1.00 5.55
Eje E 18.93 1.00 18.93
SEGUNDO PISO
Eje A 0.25 1.00 0.25
1.33 1.00 1.33
6.35 1.00 6.35
5.55 1.00 5.55
TOTAL 58.48
PARTIDA 05.01 REVESTIMIENTO DE ESCALERA CON CEMENTO PULIDO PASO Y CONTRAPASO INC. FORJADO
LONGITUD VECES QUE LONGITUD
DESCRIPCION ( m. ) SE REPITE (m)
(1) (2) (3) = (1) x (2)
Pasos 1.50 19.00 28.50
Descanso 1.50 1.00 1.50
Contrapasos 1.50 19.00 28.50
TOTAL 58.50
TOTAL 50.65
SEGUNDO PISO
Aula N 03 1.00 1.00 1.00
Aula N 04 1.00 1.00 1.00
TOTAL 4.00
INSTALACIONES ELECTRICAS