Items No Description Unit

1 Structutal Excavation in Common Material. Upto one chain (30 m) and


lif upto 2.5 f. (1.5 m ) in ordinary Cf
2 Back Fill with Sand (Ravi) & Stone Aggrigate. Under Footing With Leveling
& Compaction Minimum 95 % Cf
3 Back Fill with Sand (Ravi), Gasu, Ordinary Soil Under PCC Floor With
Leveling & Compaction Minimum 95 % Sf
4 Laying damp proof course of cement concrete 1:2:4 (DPC) with one coat.
Bitumen and one coat polythene sheet 2" thick (50mm) Rf
5 Sheet Plate Shittring Work for Roof Slab, Prapit/Shade, Lintel & Beams,
Wood Suporting etc Sf
6 Plain Cement Concrete (Flooring) including placing, compacting, finishing
and curing complete (PCC) 1:4:8 Sf
7 Plain Reinforced cement concrete finishing exposed surface, complete
type B (Nominal mix 1: 1.5: 3) lintal and beams Rf
8 Laying RCC and finishing Exposed Surface complete type C (Nominal mix
1: 2: 4 ) Roof Slab Sf
9 Pacca Brick Work in foundation and plinth below DPC 9", 13", 18" etc
Cement and sand morter 1: 4 High Level = 5 f Sf
10 Pacca Brick Work upto DPC 9" , 4.5" Cement and sand morter 1:4
(Ground floor) height = 12 f Sf
11 Pacca Brick Work upto DPC 9" , 4.5" Cement and sand morter 1:4 (1st
floor) height = 12-20 f Sf
12
Plaster Work for roof. Sf
13
Plaster Work for Walls (inner and outer )side. Sf
14
Floor tile Work Sf
15
Floor Granite Sf
16 Wall Tile Work with finishing 7 f height and kitchen tile work upto Slab 2
f height Sf
17
Steel Reinforcement G-60 cutting bending and fixing (Labour only) Kgs
Rate Remarks