Anda di halaman 1dari 20

SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Manter o custo varivel abaixo de 5,18% at Dezembro 2006. Atualizar Grfico
CUSTO VARIVEL UNITRIO - BARRA
R$ de Insumos / Kg Produzidos

10.00

8.00

6.00
4.95
4.74
4.08 4.24
4.00

2.00

0.00
Feb-06

Mar-06

May-06

Jul-06

Oct-06
Jan-06

Apr-06

Jun-06

Aug-06

Sep-06

Nov-06

Dec-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 4.74 4.95 4.08 4.24 4.50
Projetado 4.74 4.95 4.08 4.24 4.16
Meta 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18
Desvio Absoluto -0.44 -0.23 -1.10 -0.94 -5.18 -5.18 -5.18 -5.18 -5.18 -5.18 -5.18 -5.18 -4.35
Desvio % -8.49% -4.44% -21.24% -18.15% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -83.94%
Atualizado em: 9-Feb 7-Mar 11-Apr 8-May
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Manter o custo varivel abaixo de 0,79% at Dezembro 2006. Atualizar Grfico
CUSTO VARIVEL UNITRIO - EXTRUSORA
R$ de Insumos / Kg Produzidos
10.00

8.00

6.00

4.00

2.00
0.93 0.85 0.94 0.88

0.00
Feb-06

May-06

Jul-06

Aug-06

Oct-06

Nov-06
Jan-06

Mar-06

Apr-06

Jun-06

Sep-06

Dec-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 0.93 0.85 0.94 0.88 0.90
Projetado 0.93 0.85 0.94 0.88 0.91
Meta 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Desvio Absoluto 0.14 0.06 0.15 0.09 -0.79 -0.79 -0.79 -0.79 -0.79 -0.79 -0.79 -0.79 -0.61
Desvio % 17.72% 7.59% 18.99% 11.39% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -76.96%
Atualizado em: 9-Feb 7-Mar 11-Apr 8-May
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Manter o custo varivel abaixo de 5,18% at Dezembro 2006. Atualizar Grfico
CUSTO VARIVEL UNITRIO - COBERTURA
R$ de Insumos / Kg Produzidos
10.00

8.00

6.00

4.00

2.00
1.48
0.76
0.39 0.42
0.00
Feb-06

Sep-06
Jan-06

Mar-06

Apr-06

May-06

Jun-06

Jul-06

Aug-06

Oct-06

Nov-06

Dec-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 1.48 0.39 0.76 0.42 0.76
Projetado 1.48 0.39 0.76 0.42 0.59
Meta 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
Desvio Absoluto -0.02 -1.11 -0.74 -1.08 -1.50 -1.50 -1.50 -1.50 -1.50 -1.50 -1.50 -1.50 -1.38
Desvio % -1.33% -74.00% -49.33% -72.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -92.13%
Atualizado em: 9-Feb 7-Mar 11-Apr 8-May
SISTEMA DE GESTO INSTITUCIONAL - UNESP JABOTICABAL

Unidade:
Resp.:
Meta: Atingir a nota 5S de 7,0 at Dez/2014 Atualizar Grfico
NOTA 5S
(Nmero de CONFORMIDADES / Nmero total de conformidades possveis do Checklist de Auditoria Interna)
10.00

MELHOR
9.00

8.00

7.00

6.00
5.00 5.00 5.00
5.00
4.00
4.00

3.00
2.00
2.00
1.00
1.00
0.40
0.00
Feb-14

May-14

Aug-14

Nov-14

Dec-14
Jan-14

Mar-14

Apr-14

Jun-14

Jul-14

Sep-14

Oct-14
Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Mdia anual
Real 0.40 1.00 2.00 4.00 5.00 5.00 5.00 3.20
Meta 2.00 3.00 3.50 4.00 4.50 5.00 5.00 5.50 6.00 6.50 7.00 7.00 5.40
Atualizado em:
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Aumentar eficincia para 99% at dezembro/2006 Atualizar Grfico
EFICINCIA -EXTRUSORA %
(Quantidade produzida x 100 /Standart)

100.00 98.11 97.89 97.66 97.82 97.88 97.92

80.00

60.00

40.00

20.00

0.00

Sep-06

Dec-06
Jan-06

Feb-06

Mar-06

Apr-06

May-06

Jun-06

Jul-06

Aug-06

Oct-06

Nov-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 98.11 97.89 97.66 97.82 97.88 97.92 97.88
Projetado 98.11 97.89 97.66 97.82 97.80 97.76
Meta 97.00 97.18 97.36 97.54 97.72 97.90 98.08 98.26 98.44 98.62 98.80 98.98 98.17
Desvio Absoluto 1.11 0.71 0.30 0.28 0.08 -97.90 -98.08 -98.26 -98.44 -98.62 -98.80 -98.98 -68.84
Desvio % 1.14% 0.73% 0.31% 0.29% 0.08% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -70.13%
Atualizado em: 1-Feb 20-Feb 1-Apr 2-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Aumentar eficincia para 99% at dezembro/2006 Atualizar Grfico
EFICINCIA - Bekaua %
(Total produzido (unid.) x 100 /Soma Metas Dirias )

100.00%
89.46% 89.00%
87.19%
81.99%
80.00%
74.51%
67.42%

60.00%

40.00%

20.00%

0.00%
Feb-06

May-06

Aug-06

Sep-06

Nov-06

Dec-06
Jan-06

Mar-06

Apr-06

Jun-06

Jul-06

Oct-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 67.42% 87.19% 89.46% 81.99% 89.00% 74.51% 81.60%
Projetado 67.42 87.19 89.46 81.99 90.00 8715.00%
Meta 90.00% 90.75% 91.50% 92.25% 93.00% 93.75% 94.50% 95.25% 96.00% 96.75% 97.50% 99.00% 94.95%
Desvio Absoluto 6652.00% 8628.25% 8854.50% 8106.75% 8907.00% -93.75% -94.50% -95.25% -96.00% -96.75% -97.50% -99.00% 2519.55%
Desvio % 7391.11% 9507.71% 9677.05% 8787.80% 9577.42% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% 2653.55%
Atualizado em: 1-Feb 1-Mar 4-Apr 24-Apr 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Reduzir perda de MP para 0,5% at dezembro/2006 Atualizar Grfico
PERDA DE MP - PROCESSO %
(Kg descartados x 100/ Kg Produzidos)
1.50

1.20

0.90

0.63 0.64
0.60 0.56

0.36 0.35
0.31
0.30

0.00
Feb-06

Jul-06

Sep-06

Oct-06
Jan-06

Mar-06

Apr-06

May-06

Jun-06

Aug-06

Nov-06

Dec-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 0.36 0.31 0.35 0.56 0.63 0.64 0.48
Projetado 0.36 0.31 0.35 0.56 0.55 0.49
Meta 0.72 0.70 0.68 0.66 0.64 0.62 0.60 0.58 0.56 0.54 0.52 0.50 0.59
Desvio Absoluto -36.00% -39.00% -33.00% -10.00% -9.00% -62.00% -60.00% -58.00% -56.00% -54.00% -52.00% -50.00% -44.40%
Desvio % -50.00% -55.71% -48.53% -15.15% -14.06% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -75.25%
Atualizado em: 1-Feb 1-Mar 4-Apr 2-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Reduzir perda de MP para 0,5% at dezembro/2006 Atualizar Grfico
PERDA MP - EXTRUSORA %
(Kg descartados x 100/ Kg Produzidos)
1.50

1.20

1.01
0.95
0.90
0.81
0.77
0.68
0.59
0.60

0.30

0.00
Feb-06

Jul-06

Sep-06

Oct-06
Jan-06

Mar-06

Apr-06

May-06

Jun-06

Aug-06

Nov-06

Dec-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 0.59 0.77 0.68 1.01 0.81 0.95 0.80
Projetado 0.59 0.77 0.68 1.01 0.64 0.78
Meta 0.72 0.70 0.68 0.66 0.64 0.62 0.60 0.58 0.56 0.54 0.52 0.50 0.59
Desvio Absoluto -13.00% 7.00% 0.00% 35.00% 0.00% -62.00% -60.00% -58.00% -56.00% -54.00% -52.00% -50.00% -35.70%
Desvio % -18.06% 10.00% 0.00% 53.03% 0.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -60.51%
Atualizado em: 1-Feb 1-Mar 1-Apr 2-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Elevar OEE para 85% at dezembro/2006 Atualizar Grfico
OEE - BARRA (Overall Equipment Effectiveness) %
(Eficincia de Produo x Disponibilidade de Mquina x Eficincia da Qualidade)

100.00%

83.33%
79.58%
80.00%
74.91%
68.35% 70.00%
63.00%
60.00%

40.00%

20.00%

0.00%
Jan-06

Feb-06

Mar-06

Apr-06

May-06

Jun-06

Aug-06

Dec-06
Jul-06

Sep-06

Oct-06

Nov-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 68.35% 70.00% 74.91% 63.00% 79.58% 83.33% 73.20%
Projetado 68.35% 70.00% 74.91% 63.00% 75.00% 70.97%
Meta 75.00% 75.91% 76.82% 77.73% 78.64% 79.55% 80.45% 81.36% 82.27% 83.18% 84.09% 85.00% 80.91%
Desvio Absoluto -6.65% -5.91% -1.91% -14.73% -3.64% -79.55% -80.45% -81.36% -82.27% -83.18% -84.09% -85.00% -59.62%
Desvio % -8.87% -7.79% -2.49% -18.95% -4.63% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -73.69%
Atualizado em: 1-Feb 1-Mar 4-Apr 2-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Elevar OEE para 90% at dezembro/2006 Atualizar Grfico
OEE - EXTRUSORA (Overall Equipment Effectiveness) %
(Eficincia de Produo x Disponibilidade de Mquina x Eficincia da Qualidade)
100.00%
89.17%
86.00% 86.20%
83.50% 83.00%
80.00% 75.35%

60.00%

40.00%

20.00%

0.00%
Jan-06

Feb-06

Jul-06

Sep-06

Nov-06

Dec-06
Mar-06

Apr-06

May-06

Jun-06

Aug-06

Oct-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 89.17% 83.50% 83.00% 86.00% 75.35% 86.20% 83.87%
Projetado 89.17% 83.50% 83.00% 86.00% 87.00% 85.33%
Meta 85.00% 85.45% 85.91% 86.36% 86.82% 87.27% 87.73% 88.18% 88.64% 89.09% 89.55% 90.00% 87.96%
Desvio Absoluto 4.17% -1.95% -2.91% -0.36% 0.18% -87.27% -87.73% -88.18% -88.64% -89.09% -89.55% -90.00% -62.36%
Desvio % 4.91% -2.28% -3.39% -0.42% 0.21% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -70.89%
Atualizado em: 1-Feb 1-Mar 4-Apr 2-May 2-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Reduzir o sobrepeso para 2,0% at dezembro/2006 Atualizar Grfico
SOBREPESO %
((Peso mdio excedente no ms x 100 / Peso Nominal do Produto)-100)

10.00

8.00

6.00

4.00 3.73
3.40 3.30 3.32
3.00 3.08

2.00

0.00

Aug-06
Jan-06

Feb-06

Mar-06

Apr-06

May-06

Jun-06

Jul-06

Oct-06

Dec-06
Sep-06

Nov-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 3.40 3.30 3.73 3.32 3.00 3.08 3.31
Projetado 3.40 3.30 3.73 3.32 3.35 3.47
Meta 4.30 4.09 3.88 3.67 3.46 3.26 3.05 2.84 2.63 2.42 2.21 2.00 2.94
Desvio Absoluto -0.90 -0.79 -0.15 -0.35 -0.11 -3.26 -3.05 -2.84 -2.63 -2.42 -2.21 -2.00 -1.90
Desvio % 79.07% -19.32% -3.87% -9.54% -3.18% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -64.65%
Atualizado em: 1-Feb 1-Mar 4-Apr 2-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Aumentar para 1.200 observaes de segurana at dezembro/2006 Atualizar Grfico

OBSERVAES DE SEGURANA
1500
1400
1300
1200
1100
1000
900
800
700
600
500
390 398
400 367
314
300 230
200 150
100
0
Feb-06

Mar-06

May-06

Sep-06

Nov-06

Dec-06
Jan-06

Apr-06

Jun-06

Jul-06

Aug-06

Oct-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 150.00 230.00 314.00 367.00 390.00 398.00 308.17
Projetado 150.00 230.00 314.00 367.00 390.00 357.00
Meta 100 200 300 400 500 600 700 800 900 1000 1100 1200 750.00
Desvio Absoluto 50 30 14 -33 -110 -600 -700 -800 -900 -1000 -1100 -1200 -642.90
Desvio % 50.00% 15.00% 4.67% -8.25% -22.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -85.72%
Atualizado em: 1-Feb 1-Mar 4-Apr 2-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Reduzir perda de MP para 0,5% at dezembro/2006 Atualizar Grfico
PERDA DE MP - POLLILO %
(Kg descartados x 100/ Kg Produzidos)
5.00

4.50

4.00

3.50

3.00

2.50

2.00

1.50 1.29
1.17 1.18 1.25 1.17 1.16
1.00

0.50

0.00
Feb-06

Mar-06

Oct-06

Nov-06
Jan-06

Apr-06

May-06

Jun-06

Jul-06

Aug-06

Sep-06

Dec-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 1.17 1.29 1.18 1.25 1.17 1.16 1.20
Projetado 1.17 1.29 1.18 1.25 1.00 1.14
Meta 0.81 0.78 0.75 0.73 0.70 0.67 0.64 0.61 0.59 0.56 0.53 0.50 0.63
Desvio Absoluto 0.36 0.51 0.43 0.52 0.30 -0.67 -0.64 -0.61 -0.59 -0.56 -0.53 -0.50 -0.29
Desvio % -44.44% -64.96% -56.50% -72.18% -43.27% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Atualizado em: 1-Feb 1-Mar 4-Apr 2-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Reduzir perda de MP para 4,01% at dezembro/2006 Atualizar Grfico
PERDA DE ME - POLLILO %
(Kg de envoltrio descartados x 100/ Kg envoltrios utilizados)
20.00

18.00

16.00

14.00
12.39 12.25
12.00 11.07
10.45 10.27
10.04
10.00

8.00

6.00

4.00

2.00

0.00
Jan-06

Apr-06
Feb-06

May-06

Jun-06

Aug-06

Sep-06

Oct-06

Nov-06

Dec-06
Mar-06

Jul-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 12.39 10.04 10.45 10.27 11.07 12.25 11.08
Projetado 12.39 10.04 10.45 10.22 10.50 10.39
Meta 6.80 6.55 6.29 6.04 5.78 5.53 5.28 5.02 4.77 4.51 4.26 4.01 5.15
Desvio Absoluto 5.59 3.49 4.16 4.18 4.72 -5.53 -5.28 -5.02 -4.77 -4.51 -4.26 -4.01 -2.03
Desvio % 0.4511703 34.80% 39.79% 40.92% 44.91% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Atualizado em: 1-Feb 1-Mar 4-Apr 2-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Reduzir perda de MP para 5,8% at dezembro/2006 Atualizar Grfico
Perda de ME - Bekaua %
(Kg de envoltrio descartados x 100/ Kg envoltrios utilizados)
20.00

15.00

10.00
8.36

6.45

5.00 4.64
3.26 3.17

0.00
0.00
Jan-06

Feb-06

Apr-06

May-06

Jun-06

Aug-06

Sep-06

Oct-06

Nov-06

Dec-06
Mar-06

Jul-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 0.00 8.36 3.26 3.17 4.64 6.45 4.31
Projetado 8.87 8.36 3.26 3.17 4.50 3.64
Meta 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.80
Desvio Absoluto 3.1 2.6 -2.5 -2.6 -1.3 -5.8 -5.8 -5.8 -5.8 -5.8 -5.8 -5.8 -4.71
Desvio % 34.61% 30.62% -77.91% -82.97% -28.89% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Atualizado em: 1-Feb 1-Mar 4-Apr 8-May 2-Jun 12-Jun
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Atualizar Grfico
CUSTO FUNCIONRIO/ KG PRODUZIDO %

100

90

80

70

60

50

40

30

20

10

0
Jan-06

Jun-06

Oct-06
Feb-06

Mar-06

Apr-06

May-06

Jul-06

Aug-06

Sep-06

Nov-06

Dec-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial #DIV/0!
Projetado #DIV/0!
Meta #DIV/0!
Desvio Absoluto 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
Desvio % #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Atualizado em:
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Atualizar Grfico
TAXA DE OCUPAO - EXTRUSORA%
(Quantidade produzida x 100/ Capacidade Instalada)
100.00

90.00

80.00

70.00

60.00

50.00
41.51
40.00 36.46
34.26 34.15
30.00 27.65

20.00

10.00

0.00
Jan-06

Oct-06

Nov-06
Mar-06

Apr-06

Jun-06

Jul-06

Aug-06

Sep-06

Dec-06
Feb-06

May-06

Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 41.51 34.26 27.65 34.15 36.46 34.81
Projetado 41.51 45.00 27.65 27.65
Meta 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.00
Desvio Absoluto -58.5 -55.0 -72.4 -100.0 -100.0 -100.0 -100.0 -100.0 -100.0 -100.0 -100.0 -100.0 -97.24
Desvio % -140.91% -122.22% -261.66% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Atualizado em: 1-Feb 1-Mar 8-May
SISTEMA DE GESTO EMPRESARIAL

Unidade: Industrial
Resp.: Argeu Brunetto
Meta: Atualizar Grfico
TAXA DE OCUPAO - BARRA %
(Quantidade produzida x 100/ Capacidade Instalada 2 Linhas)
100.00

90.00

80.00

70.00
58.88 59.94
60.00
52.84
50.00

40.00
30.20 28.95
30.00

20.00

10.00

0.00
Jan-06

Mar-06

Jun-06

Sep-06

Oct-06
Apr-06

Jul-06

Nov-06

Dec-06
Feb-06

May-06

Aug-06
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Mdia anual
Parcial 30.20 28.95 58.88 59.94 52.84 46.17
Projetado 30.20 35.00 58.88 59.94 68.19 62.34
Meta 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.00
Desvio Absoluto -69.8 -65.0 -41.1 -40.1 -31.8 -100.0 -100.0 -100.0 -100.0 -100.0 -100.0 -100.0 -81.30
Desvio % -231.13% -185.71% -69.84% -66.83% -46.65% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Atualizado em: 1-Feb 1-Mar 8-May 1-May 22-May
8/17/2017 19/20

PLANO DE EXECUO
GANHO DA AO
SITUAO ATUAL QUANDO
ITEM (assunto/tema META CAUSA INVESTIMENTO (quanto a ao PREVENTIVA (P) STATUS PARCIAL
(valor presente / no- AO PROPOSTA (contra-medida) RESPONSVEL (prazo de STATUS DE CONCLUSO
relacionado) (padro / objetivo) (causa-raz) (recurso em R$) contribuir no CORRETIVA (C) (o que foi feito at esta data)
conformidade) concluso)
resultado/meta)
Ajustes inadequados na troca
Perda de ME (Kaizen) 10.89% 2.00% Implantar troca automtica de bobina zero 0.25% Carolina Descontinuada Corretiva
de bobina
Falha na alimentao na Ao ser finalizada dia
Perda de ME (Kaizen) 10.89% 2.00% esteira de entrada para o Treinamento operacional Polillo zero 0.25% Carolina 30-Jan Corretiva
cachorrinho 28/02

Parada de emergncia Treinamento operacional Polillo para


Perda de ME (Kaizen) 10.89% 2.00% acionada inadequadamente deixar mordente na posio correta zero 0.25% Carolina 30-Jan Corretiva
(boto stop) (comando manual)

Falta de controle formalizado


Inserir campo no Formulrio de Barras e
Perda de ME (Kaizen) 10.89% 2.00% das dimenses do produto zero 0.25% Carolina Descontinuada Corretiva
dar treinamento.
(operacional)
Melhora da
qualidade do
produto e do
Normas de BPF/Segurana no Criar uma forte cultura Inexistncia de programa de Semanalmente ocorre a
Implementar conversa semanal sobre ambientes de
Planejamento Estratgico fixadas totalmente pelos de BPF / Segurana na treinamento focando estes zero Carolina 10-Jan Preventiva conversao sobre
Segurana / Qualidade ; trabalhos agregando
funcionrios unidade produtiva assuntos; segurana e qualidade
valor a
operao(funcionri
os envolvidos) OK

Melhora do
Falta de disciplina/interesse no Desdobrado indicador por
Baixo ndice de observaes de Implantar indicador de n ambiente de
Programa Observador 100 / ms programa observador (falta zero Argeu 10-Jan Corretiva encarregado. Janeiro 150
segurana/ms observaes/encarregado trabalho + reduo
treinamento) observaes
acidentes
OK

Diminuir perda de MP na linha de barra


zero R$ 5.000,00 / ms Argeu 30-Jan Corretiva
potencial R$ 20.000/ ms;

Planejamento Estratgico: Eficincia de Barra 92% (barras / Atingir 94,98% Eficincia Perdas de produto (Varredura + OK
Eficincia Barra xarope); barra; Descarte + doao + reprocesso)

Sobrepeso de Maro 2006


Dimimuir sobrepeso 4,3 para 2,0% R$ 50,000.00 R$ 15000,00 / ms Carolina 30-Jun Corretiva
3,73 %

Montar uma base em excel para Reduo 2,0% no CV Base para controle de
Controlar por produo Falta de controle eficaz para
Controle no eficaz dos acompanhamento de todas as OPs da linha barra / extrusora custos
(OP) os custos dos acompanhamento dos zero Argeu 9-Jan Corretiva
custos/produto de barra e extrusora focando diminuir devido a montada.Acompanhamento
produtos custos/produtos
complementos; complemento; de OP por OP
OK

Desdobrar os indicadores
Valor dos indicadores da Desdobrar indicadores da rea/turno de
Planejamento Estratgico: CV por turno, para focar a Falta de desdobramento dos
Manufatura com base nos 3 maneira a cobrar separadamente cada um zero Argeu 14-Jan Preventiva Ser desdobrado em Abril
Barra / Extrusora / Cobertura melhoria necessria indicadores / turno
turnos visando aumentar a eficincia e reduzir o CV; Aumento de 2,5%
separadamente;
eficincia das linhas de
barra e maior
comprometimento dos
Baixo entendimento dos Melhorar o entendimento funcionrios;
Realizar treinamento / reunio mensal para
indicadores e falta de dos indicadores e fixar
Falta treinamento a manufatura visualizao das melhorias necessrias no zero Carolina 15-Jan Corretiva Fixado indicadores/ paretos
conhecimento sobre as melhorias quais as melhorias
produtivo/qualidade/segurana
necessrias necessrias
OK
Aumentar de 80- 90%
Melhorar a produtividade o OEE da Extrusora,
Falta de controle integrado da Falta de um indicador para Implantado. Reunio para
OEE Extrusora e disponibilidade de Implantar OEE de Extrusora; zero aumentando Argeu 9-Jan Corretiva
reas MNF, CQ e MNT monitorar MNF / GQ / MNT; visualizao dos dados.
mquina das extrusoras consequentemente a
produtividade;
OK
Aumentar de 75- 85%
Melhorar a produtividade o OEE da Barra,
Falta de controle integrado da Falta de um indicador para Implantado. Reunio diria
OEE Barra e disponibilidade de Implantar OEE de Barra; zero aumentando Argeu 9-Jan Corretiva
reas MNF, CQ e MNT monitorar MNF / GQ / MNT; para visualizao dos dados.
barra; consequentemente a
produtividade;
OK
Falta de treinamento /
envolvimento dos funcionrios Treinar e Envolver os funcionrios da Pollilo Teirnamento realizado com
Perda MP Pollilo 1.17% 0.81% com as metas e com as principais com as metas de 2006 e os problemas zero 0.40% Carolina 10-Feb Corretiva todos os funcionrios da
causas do no atingimento dos gerados durante o ms Pollilo.
indicadores
OK

Alto custo do processo de Rever contrato com a La Rondine, visando


zero 3.00% Argeu 28-Feb Corretiva
embalamento / aquisio de ME atribuir a compra de ME a terceirizada

Perda ME Pollilo 12.39% 6.80%


Falta de treinamento /
envolvimento dos funcionrios Treinar e Envolver os funcionrios da Pollilo Treinamento realizado com
com as metas e com as principais com as metas de 2006 e os problemas zero 3.00% Carolina 10-Feb Corretiva todos os funcionrios da
causas do no atingimento dos gerados durante o ms Pollilo.
indicadores
OK
20/20
Equipamento no atende as
necessidades atuais (altas taxas Adquirir novo equipamento de embalagem
Perda ME Bekaua 8.36% 5.80% R$ 55,000.00 4.00% Argeu 20-Feb Corretiva
de perda de ME e mquina (PK 100)
parada)

Falta de treinamento /
envolvimento dos funcionrios Treinar e Envolver os funcionrios da Bekaua
Perda ME Bekaua 8.36% 5.80% com as metas e com as principais com as metas de 2006 e os problemas zero 3.00% Carolina 15-Apr Corretiva
causas do no atingimento dos gerados durante o ms
indicadores

Baixo volume produzido / dia,


Aumentar volume de vendas institucional; zero 0.13% Joana Silva 15-Apr Corretiva
ocisiodade extrusora;

ok
Perda MP Extrusora 0.77% 0.70%

Produes Baixas que geram Produzir no mnimo 2600 kg de cada produto


perda de tempo (set-up) e perda (independente de ser intermedirio ou zero 0.13% Jos Carlos 10-Apr Corretiva
de MP (partida e parada) vendas)
ok

Alta perda na barras Mousse e P.


Amendoim, devido sistema de Otimizar aplicao do recheio do Mousse e
Eficincia Barrras 92.71% 93.36% R$ 11,000.00 1.00% Narciso 30-Apr Corretiva
aplicao de recheio no Protein Amendoim
adequado