Size of team

Experience has shown us to use 5 people per tower


4 painters, one per tower-leg
1 assistant on the ground
to mix paint, supply water, clean bases etc.

We do 4 adjacent towers at a time using 20 people in a team.


By doing this 1 overseer can have visual contact using
binoculars over the entire team.

Page 2
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Attributes Required


for Staff to Work on Towers

Can be Male or Female


(bear in mind doubling of ablution facilities)

Preferable age 20 to 45 years


(old enough to be mature, young enough to be agile)

Must be literate enough to understand safety instructions and


acknowledge same by signature at daily tool-box talk
(see form 001 page 1 and 2)

Page 3
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Attributes Required of Staff to


Work on Towers

Experience of brush painting is highly desirable but not


compulsory

Must be medically fit and not overweight


(to ensure agility)

Must have good hearing ability and understand all


commands in the language of the Supervisor

Page 4
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Attributes Required of Staff to


Work on Towers

Must have good eyesight and not require prescription spectacles


(safety goggles must be worn)

Must be comfortable wearing all personal protective equipment


required

Must not have any fear of working in an elevated position

Must not abuse Alcohol or drugs before or during working in


elevated position.

Page 5
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Protective Equipment

Long sleeves and long


legged overalls
(to prevent sunburn)

Page 6
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Protective Equipment

Reflective Vest
(for high visibility)

Page 7
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Protective Equipment

Hard hat complete


with chin strap
(to prevent loss of
hat)

Page 8
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Protective Equipment

Firm soled footwear


(to support
persons weight on
narrow steel)

Page 9
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Protective Equipment

Full body harness with a


minimum of two
attachment lanyards (to
be permanently secured
to steel tower structure)
(see Form 002 page 1 to 4)

Page 10
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Protective Equipment

Soft protective hand gloves


(to allow sense of feel)

Dust fume mask


(to prevent inhalation of paint
fumes)

Page 11
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Protective Equipment

Soft type eye protection (to


protect from paint
splashes and dust)

Page 12
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Personal Protective Equipment

All hand tools used must be


secured by lanyards to
the body harness

Page 13
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Equipment required at each Pylon

Single light rope tackle to feed


equipment and material to
painters

Water for drinking

Adequate supply of potable water


with booster pump to wash
down the steelwork

Page 14
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Equipment required at each worksite

Full first aid kit


Rescue kit
Fire Extinguisher

Page 15
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Safety requirements at the beginning of


each shift

Supervisor will ensure that electrical To be


staff has isolated and earthed done by
all conductors before anyone is Electrical
allowed to ascent the tower Engineer
(to be confirmed in writing)
(see Form 003 page 1 and 2)

Page 16
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Safety requirements at the


beginning of each shift

Supervisor will lead a tool-box


safety talk and invite
questions from workers
(see attached Form 001)

Each worker will sign that he is


familiar with the safety
requirements

Page 17
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Safety requirements at the


beginning of each shift

Each worker will inspect


and ensure that all
P.P.E. is in good
condition and
working correctly

Page 18
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Form 001 Page 1 Tool Box Talk

Page 19
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Form 001 Page 2 Tool Box Talk

Page 20
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Form 002 WORKING ELEVATED


AREAS Safe working procedures

Page 21
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Form 003 Risk Assessment

Page 22
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Form 004 010


Appointment Forms

Form 004 Appointment of Supervisor


Form 005 Appointment of First Aid Co-Ordinator
Form 006 Appointment of First Aider
Form 007 Appointment of Health and Safety Representative
Form 008 Appointment of Safety Harness Survey Officer
Form 009 Appointment of Pollution Survey Officer
Form 010 Appointment of Fire Fighting Co-Ordinator

Page 23
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Scope of work to be done

The scope of work shall be the painting and


refurbishment of galvanized steel and
previously painted overhead transmission line
towers, plus the replacement of a number of
the structural steel supports that are too badly
rusted to repaint and the replacement of bolts
and nuts where necessary

Page 24
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Scope of work to be done

Pre-inspection team to specify the number of


steel supports as well as bolts and nuts
necessary

The scope of work covers the requirements for the


furnishing of materials, labor, tools,
equipment and all other services necessary to
provide for the requirements of this
maintenance work

Page 25
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Site Access and Delivery Details

Site : HV overhead lines as indicated


Access to site: Surfaced road and off-road sections and
mountainous areas
Site office: The team shall provide their own site office
if required
Offloading: The team is responsible for all offloading
Storage facilities: The team shall provide their own storage
facilities
Electricity: Portable unit if required
Toilet facilities: Team to provide

Page 26
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Site Conditions

Altitude: No more than 800m above mean sea


level
Temperature: Ambient temperature between 15C and
35C
Average daily
maximum ambient: 32C
Cyclone: Cyclone Conditions at times
Pollution: The area is located near salt water and
is subject to industrial / agricultural
pollution.

Annual average of 4-6 working days per month is lost due


to inclement weather.

Page 27
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Paint Specifications

Scope: This section covers the application of coating to


the structural steelwork and also the concrete
foundations.

Requirement: Surface preparation and application of coatings

Page 28
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Weathered Galvanised Steel

Remove all oil and grease by


washing with a water
emulsifying solvent
degreaser and rinsing with
potable water to a water
break free surface

Page 29
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Weathered Galvanised Steel

Remove all loose rust, rust scale and


loose or flaking paint by scraping
with flat scrapers followed by wire
brushing of the rusty areas to St2
of the International Standard ISO
8501-1:1988 followed by
sandpapering the existing paint
with medium *80 grit) sandpaper
to feather edge sharp edges,
remove chalking and provide a key.

Page 30
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Weathered Galvanised Steel

The use of small power tools fitted with medium to


coarse grinding discs combined with wire
brushing and sanding will speed up surface
cleaning. Thoroughly wash all cleaned steel with
running potable water (use hose pipe) and
scrubbing brushes to remove salts.
PH must be 7. Allow to dry 30 minutes and prime.

Page 31
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Weathered Galvanised Steel

Coating System
1st coat - (Prime coat)
Material - Sigmacover Aluprimer
Generic type - Aluminium pigmented polymine cured
modified epoxy primer/coating
Application - By brush & roller
Theoretical cover - 7,2m/Lt @ 125(micron)
Film Thickness - Wet = 140, Dry = 125
Minimum time between coats - 24hrs @ 25C

Page 32
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Weathered Galvanised Steel

Coating System
2nd coat - (Intermediate coat)
Material - Sigma Cover 630 Grey 5177 (multimastic)
Generic type Highbuild polymine cured epoxy coating
Application- By brush & roller
Theoretical cover - 7,2m/Lt @ 125(micron)
Film Thickness - Wet = 150, Dry = 125
Minimum time between coats - 24hrs @ 25C

Page 33
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Weathered Galvanised Steel

Coating System
3rd coat - (Finish coat)
Material - Sigmadur Gloss 550 (colour of choice)
Generic type Aliphatic acrylic polyurethane finish coating
Application - By brush & roller
Theoretical cover 6.9m/Lt @ 80 (micron)
Film Thickness - Wet = 150, Dry = 80
Minimum curing time - 24hrs @ 25C
Total Dry Film Thickness ( DFT ) 330

Page 34
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


NEW Galvanised Steel

Includes:

structural members
bolts and nuts
for the Overhead Power Lines.

Page 35
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


NEW Galvanised Steel

Remove all traces of protective storage oil by scrubbing


with AEROWASH or equivalent followed by thorough
rinsing with potable running water (use hose pipe) to
obtain a water break-free surface. If necessary,
repeat above until water break free. Follow this by
scrubbing with GALVANISED IRON CLEANER or
equivalent and rinsing with potable running water.
Allow to dry before priming.
Note: Failure to achieve a water break-free surface will
result in determination of the primer. It is essential to
do the surface preparation of a small area (a few m).

Page 36
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


NEW Galvanised Steel

Coating System
1st coat - (Prime coat)
Material - Sigmarite Sealer 522 Red-Brown
Generic type - Epoxy Polymide Primer
Application - By brush & roller
Theoretical cover - 8.0m/Lt @ 70 (micron)
Film Thickness - Wet = 120, Dry = 70
Minimum time between coats - 24hrs @ 25C

Page 37
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


NEW Galvanised Steel

Coating System
2nd coat - (Intermediate coat)
Material - Sigma Cover 630 Grey 5177 (multimastic)
Generic type Highbuild polymine cured epoxy coating
Application- By brush & roller
Theoretical cover - 7,2m/Lt @ 125(micron)
Film Thickness - Wet = 150, Dry = 125
Minimum time between coats - 24hrs @ 25C

Page 38
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


NEW Galvanised Steel

Coating System
3rd coat - (Finish coat)
Material - Sigmadur Gloss 550 (colour of choice)
Generic type Aliphatic acrylic polyurethane finish coating
Application - By brush & roller
Theoretical cover 6.9m/Lt @ 80 (micron)
Film Thickness - Wet = 150, Dry = 80
Minimum curing time - 24hrs @ 25C
Total Dry Film Thickness ( DFT ) 275

Page 39
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Concrete Bases

Surface Preparation
Clean concrete surfaces with Biocidal Masonery Wall Wash or
equivalent, to remove all Algae.
Rinse with clean potable water and allow to dry for 24hrs.

Page 40
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Concrete Bases
Coating System
1st coat - (Prime coat)
Material - Sigma cover 300 (Brown)
Generic type High build polyamine adduct cured coaltar
epoxy coating
Application - By brush & roller
Theoretical cover - 3.9m/Lt @ 200(micron)
Film Thickness - Wet = 265, Dry = 200
Minimum curing time - 18hrs @ 25C
Maximum curing time - 36hrs @ 25C
Before over coating

Page 41
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Corrosion Protection System for


Concrete Bases

Coating System
2nd coat :- (Finish coat)
Material:- Sigma cover 300 (black)
Generic type High build polyamine adduct cured coaltar
epoxy coating
Application:- By brush & roller
Theoretical cover:- 3.9m/Lt @ 200(micron)
Film Thickness:- Wet = 265, Dry = 200
Minimum curing time :- 18hrs @ 25C
Total Dry Film Thickness ( DFT ) 400

Page 42
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Quality Assurance provisions


Storage
The Supervisor shall be responsible for the delivery,
unloading and storage of the necessary materials to
ensure progress of the works in accordance to
the programme.
All materials shall be stored under cover and clear of
the ground.
Every care shall be taken during mixing of materials
to ensure the least possible spillage occurs and
the Supervisor shall take steps to clear up the
spillage immediately.
All materials shall be stored so as to ensure that
materials are used on a first in first out basis.

Page 43
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Quality Assurance provisions

Scaffolding
The Supervisor shall provide and erect his own
scaffolding and rigging as may be required.
All scaffolding and rigging shall meet the
requirements of both the Occupational Health
and Safety Act and Owners Operating
Regulations for High Voltage Systems.
At the end of every shift, the Supervisor shall
ensure that all scaffolding and rigging are
removed to allow for a minimum clearance
from each conductor of 2,5 meters.

Page 44
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Quality Assurance provisions

Coating Application
The following parameters shall be strictly adhered to during
the application of the coatings.
Ensure mixing of multi-pack products in the correct ratio.
Ensure that all induction periods for multi-pack products are
achieved as called for in the manufacturers data sheet.

Page 45
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Quality Assurance provisions

Inspections
The Engineer may check the Dry Thickness of each coat
prior to over coating, If it is found that insufficient coating
thickness has been achieved, the Supervisor will be
instructed to apply further coats to the Engineers
satisfaction.
All testing of Dry Film Thickness will be accordance to SABS
141. In the case of a dispute the permascope MK E 58
fully electronic instrument shall be the unit of final
determination.

Page 46
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Quality Assurance provisions

Inspections
A minimum of 90% of all thickness shall comply with the
requirements of this specification. A maximum tolerance
of 10% will be allowed on the balance of the measured
thickness. Any coatings not complying with these
requirements will be rejected.
Where the coating system is excessively thick, the Engineer
may instruct the Supervisor to remove the coating system
and reapply to the correct thickness

Page 47
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Quality Assurance provisions

Crevices
Crevices in overlapping joints, such as between mating
surfaces of bolted connections and similar narrow gaps,
shall be caulked with material suitable for out door use
and be over coatable such as acrylic silicone sealer.

Page 48
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Nuts, Bolts and Washers

All bolts, nuts, studs, pins and washers shall be hot dip
galvanized in accordance with ISO 1461 and painted
according to the system for new galvanized iron.

Page 49
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Replacement Structural Steel Members

All replacement members shall be hot dip galvanized in


accordance with ISO 1461 and painted according to paint
specification for new galvanized iron structural members.
Maximum of one member to be replaced at a time to prevent
undue weakening of the tower.

Page 50
ERIC O. ALERS - Training Course for the Corrosion protection of High Voltage Pylons
S.R.N. Business Consulting CC - CENTRAL ELECTRICITY BOARD - Mauritius

Thank You

We hope you have enjoyed this theoretical course.

Now, lets move out into the field and put into practice what
you have learnt.

Page 51

Anda mungkin juga menyukai