Anda di halaman 1dari 4

ALBAILERA ESTRUCTURAL-TALLER NUMERO 3

DENSIDAD DE MURO

PRIMER PISO

LXX LYY
X1 2.6 Y1 1.68
X2 3.75 Y2 1.95
X3 2.45 Y3 1.688
X4 2.37 Y4 2.65
X5 3 Y5 4.4
X6 2.85 Y6 1.6
X7 2.5 Y7 2.64
X8 2.7 Y8 2.15
X9 1.6 Y9 2.15
X10 1.95 Y10 2.3
X11 1.45 Y11 2.3
X12 3.95 Y12 3.69
X13 2.625 Y13 3.25
X14 1.4 Y14 4.299
X15 2.45 Y15 3.39
X16 2.45 Y16 3.25

TOTAL 40.095 TOTAL 43.387

EJE XX EJE XX
AREA 121.29 AREA 121.29

Z= 0.45 Z= 0.45
U= 1 U= 1
S= 1.05 S= 1.05
N= 4 N= 4

ZUSN/56= 0.03375 ZUSN/56= 0.03375


L*t/AP= 0.0495857 L*t/AP= 0.05365694
A ESTRUCTURAL-TALLER NUMERO 3

DENSIDAD DE MURO

SEGUNDO PISO

LXX LYY
X1 2.6 Y1 1.68
X2 3.75 Y2 1.95
X3 2.45 Y3 1.688
X4 2.37 Y4 2.65
X5 3 Y6 4.4
X6 1.3 Y7 1.6
X7 1.4 Y8 2.64
X8 2.5 Y9 2.149
X9 1.15 Y10 2.3
X10 0.55 Y11 2.3
X11 0.749 Y12 2.149
X12 1.45 Y13 3.69
X13 0.6 Y14 3.25
X14 0.6 Y15 4.299
X15 3.95 Y16 3.25
X16 2.65
X17 1.4
X18 5.05

TOTAL 37.519 39.995

EJE XX EJE XX
AREA 121.29 AREA 121.29

Z= 0.45 Z= 0.45
U= 1 U= 1
S= 1.05 S= 1.05
N= 4 N= 4

ZUSN/56= 0.03375 ZUSN/56= 0.03375


L*t/AP= 0.04639995 L*t/AP= 0.04946203
ALBAILERA ESTRUCTURAL-TALLER NUMERO 3

METRADO DE CARGAS

PRIMER PISO

MURO AREA PESO MURO AREA PESO


X1 2.6 Y1 1.68
X2 3.75 Y2 1.95
X3 2.45 Y3 1.688
X4 2.37 Y4 2.65
X5 3 Y5 4.4
X6 2.85 Y6 1.6
X7 2.5 Y7 2.64
X8 2.7 Y8 2.15
X9 1.6 Y9 2.15
X10 1.95 Y10 2.3
X11 1.45 Y11 2.3
X12 3.95 Y12 3.69
X13 2.625 Y13 3.25
X14 1.4 Y14 4.299
X15 2.45 Y15 3.39
X16 2.45 Y16 3.25

TOTAL 40.095 TOTAL 43.387


AL-TALLER NUMERO 3

METRADO DE CARGAS

SEGUNDO PISO

MURO AREA PESO MURO AREA PESO


X1 2.6 Y1 1.68
X2 3.75 Y2 1.95
X3 2.45 Y3 1.688
X4 2.37 Y4 2.65
X5 3 Y6 4.4
X6 1.3 Y7 1.6
X7 1.4 Y8 2.64
X8 2.5 Y9 2.149
X9 1.15 Y10 2.3
X10 0.55 Y11 2.3
X11 0.749 Y12 2.149
X12 1.45 Y13 3.69
X13 0.6 Y14 3.25
X14 0.6 Y15 4.299
X15 3.95 Y16 3.25
X16 2.65
X17 1.4
X18 5.05

TOTAL 37.519 39.995

Anda mungkin juga menyukai