Attachment 2
Accepted? Accepted?
NO NO
YES YES
Defective material NO
rejected Accepted?
YES
Material capacity
NO Appropriate material
factor & design
revised capacity factor used?
YES
NO
YES
NO
Is redesign required? Accepted?
YES
PE inspection
NO
Accepted?
YES
PE issues COS for formwork structure
(1) for reinforcement to be installed
CONTRACT RD276
TOR-APP F-6
Attachment 2
Installation of reinforcement
Adjustments NO
made Accepted?
REBAR FIXING
YES &
PE re-inspection (<24 hrs before concreting)
RE-INSPECTION
NO
Accepted?
YES
PE issues COS for formwork structure (2) for
concreting to commence
NO Leaks
End or adjustments required?
YES
NO
<300mm depth poured?
YES
Formwork Supervisor/
PE/QP(S)/Contractor/LTA(PD)
to assess if safe to enter
YES
Safe to enter?
Concreting stops for minor
repairs & adjustments
CONCRETING
NO
&
No entry allowed.
MONITORING
No repairs allowed.
Formwork Supervisor/
PE/QP(S)/Contractor/LTA(PD)
to advise on whether safe to
continue concreting
YES Safe to
continue concreting?
NO
Concreting stops.
PE to advise on way
forward (concrete to be
washed out?)
CONTRACT RD276