Rp 1,872,281
Rp 36,556,485
Rp 2,936,500
Rp 138,250,231
Rp 183,699
Rp 179,799,197
1 Perataan Tanah m2
Upah:
Mandor 0.0075 O.H 85,000 637.50
Pekerja / Buruh Tak Terampil 0.1875 O.H 60,000 11,250.00
Jumlah: 11,887.50
Harga satuan 11,887.50
2 m3
Upah:
Mandor 0.0149 O.H 85,000 1,266.50
Jumlah: 24,078.50
Bahan:
Batu Kali Pecah 15/20 cm 1.2000 m3 125,000 150,000.00
Jumlah: 150,000.00
Harga Satuan 174,078.50
Onderlah / m2 34,815.70
4 Aspalt penetrasi m
Upah:
Tukang aspal 0.1500 O.H 75,000 11,250.00
Pekerja 0.1300 O.H 60,000 7,800.00
Mandor 0.1100 O.H 85,000 9,350.00
Masinis 0.0100 O.H 85,000 850.00
Wales 0.0010 Hari 500,000 500.00
Jumlah: 29,750.00
Bahan/Material:
Batu pecah 5/7 0.0600 m3 175,000 10,500.00
Batu pecah 3/5 0.0400 m3 210,000 8,400.00
Batu pecah 2/3 0.0300 m3 252,000 7,560.00
Split 1/2 - 0,5 /0,5 0.0150 m3 302,400 4,536.00
Abu batu 0.0010 m3 122,500 122.50
Aspal 60/70 4.5000 kg 9,677 43,548.39
Minyak tanah 2.0000 lt 12,500 25,000.00
Kayu bakar 0.0100 m3 225,000 2,250.00
Jumlah: 101,916.89
Harga satuan 131,666.89
Lebar 1 m' 131,666.89
Lebar 3 m x 3 395,000.66