Anda di halaman 1dari 1

CONTENTS

S# DESCRIPTION PAGE NO.

1. INTRODUCTION 1

2. BRIEF DESCRIPTION OF EXISTING SYSTEM 2

02.01 BRIEF POWER PROFILE 3

02.02 EXISTING CONDITION OF EQUIPMENTS AT TDS-1 & 3


TDS-2

3. PROPOSED 132/33 KV MSDS-VII &33/11 KV SUBSTATION 4


AND RING MAIN SYSTEM

4. SUBSTATION AUTOMATION & SCADA SYSTEM 7

5. VENTILATION SYSTEM 7

6. CIVIL WORKS 7

7. IMPLEMENTATION PLAN 8

8. BILL OF QUANTITIES / VOLUME OF WORK 10

9. ESTIMATED CAPITAL COST 17

10 RECOMMENDATION / CONCLUSION 17

11. LIST OF DRAWINGS 18

MECON Limited. All rights reserved

Anda mungkin juga menyukai