PT.

WASKITA BETON PRECAST


PLANT KARAWANG

SCHEDULLE PRODUKSI

Periode : 17-Jul-17 s/d 31-Dec-17


TANGGAL

10-Aug

11-Aug

12-Aug

13-Aug

14-Aug

15-Aug

16-Aug

17-Aug

18-Aug

19-Aug

20-Aug

31-Aug
Vol Sat

1-Aug

2-Aug

3-Aug

4-Aug

5-Aug

6-Aug

7-Aug

8-Aug

9-Aug
17-Jul

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul

1-Sep
NO URAIAN 21-30 KET
Agst

Sn Sl Rb Km Jm Sb Mg Sn Sl Rb Km Jm Sb Mg Sn Sl Rb Km Jm Sb Mg Sn Sl Rb Km Jm Sb Mg Sn Sl Rb Km Jm Sb Mg O==> Km Jm

A BJR 900 Pcs


I Persiapan
I.1 CETAKAN 25 Set

II II.1 PRODUKSI
- Tahap 1 6 Set 12
- Tahap 2 11 Set 22 22 22 22 22 - 22 22 22 22 22 22 - 22
- Tahap 3 16 Set 32 32 32 32 32 -
- Tahap 4 21 Set 42 42 42 42 42 42 -
- Tahap 5 25 Set 50 50 50 - 50 12

- Komulatif 12 34 56 78 100 122 122 144 166 188 210 232 254 254 276 308 340 372 404 436 436 478 520 562 604 646 688 688 738 788 838 838 888 900
II.2 SDM
- Pekerja ( Shift 1 ) 12 Org

- Pekerja ( Shift 2 ) 12 Org 12 22 22 22 44 44 - 44 44 44 44 44 44 - 44 64 64 64 64 64 - 84 12


- Komulatif 12 34 56 78 122 166 166 210 254 298 342 386 430 430 474 538 602 666 730 794 794 878 890
II.3 ALAT
- Pompa power team ( Pinjam subang ) 1 Unit
- Pompa power team ( Beli - High Pressure ) 1 Unit
- Cutting whell + Mal potong ( Beli ) Alt. 1 Unit Menggunakan cutting bar Spun Pile
- Keranjang PC-Bar ( Buat baru ) Alt. 1 Unit Menggunakan keranjang Spun Pile
- Plat pengunci Pandrol 50 Unit 1 ( proses uji )

II.4 METODE PRODUKSI

- Demoulding modifikasi kepala baut, untuk


1 ls
memudahkan mendorong produk BJR

II.5 LAHAN PRODUKSI


- Perluasan area kerja WS-2 450 m2

II.5 MATERIAL
- Coupler Heading ( Menambah suplayer untuk
5,400 pcs
memenuhi kebutuhan produksi )

III III.1 Distribusi


- Digelar
- Dipasang / Instal

C:\Users\mariana\Downloads\5. Schedulle Review Produksi BJR - 17-07-175. Schedulle Review Produksi BJR - 17-07-17BJR (2)