Anda di halaman 1dari 10

6.

3 Hasil Akhir

6.3.1. Final Pit

Top View SW Isometric View

SE Isometric View Front View


6.3.2. Volume Sumberdaya

Top View SW Isometric View

SE Isometric View Front View


Volume sumberdaya : 4.710.496 m3
6.3.3. Volume Bahan Galian Tertambang dan Lapisan Tanah Penutup

Top View SW Isometric View

SE Isometric View Front View


Volume bahan galian tertambang dan lapisan tanah penutup : 912.996,9121 m3
6.3.4. Volume Lapisan Tanah Penutup

Top View SW Isometric View

SE Isometric View Front View


Volume lapisan tanah penutup : 88.446,5052 m3
6.3.5. Volume Bahan Galian Tertambang

Top View SW Isometric View

SE Isometric View Front View


Volume bahan galian tertambang : 824.530,4069 m3 .
6.3.6. Perhitungan Mining Recovery

Diketahui :

Volume Sumberdaya = : 4.710.496 m3

Tonase Sumberdaya = : 4.710.496 m3 x 2,8 Ton/m3 = 13.189.388,8 Ton

Volume Bahan Galian = 824.530,4069 m3

Tonase Bahan Galian = 824.530,4069 m3 x 2,8 Ton/m3 = 2.308.685,14 Ton


MR = 100%

2.308 .685 ,14 Ton


= 100%
13 .189.388,8 Ton

= 17.504 %

Anda mungkin juga menyukai