Anda di halaman 1dari 4

E1 Log Report

KATARA HOTEL - Substructure & Basement Works


Material Submittal
Action Code:
A = Approved As Submitted
B = Approved as Noted
Subject : SUBMITTAL LOG C = Revise & Resubmit
Contractor : HBK CONTRACTING D = Rejected
Report Date : JULY 06, 2017

ACTION COLOR

Updated Action
REVISION 0 REVISION 1 REVISION 2

NO RESPONSE
CODE

SUBMITTED
Item No.

P6 P6

Code
SUBCON / MANUFACTURER / Date

Action

Action

Action
DISCIPLINE DESCRIPTION SUBMITTAL NO. LOCATION FOR USE Submittal Approval Rev No. Planned Date Notes
SUPPLIER Actual Date Date Returned Actual Date Actual Date Returned
Activity ID Activity ID Submission Returned by A B C D
Submitted by Consultant Submitted Submitted by
date Consultant
Consultant

MATERIALS SUBMITTAL A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1

Steel Reinforcement Materials


Reinforcement for Ramp on Slab,
1 CV Welded Wire Mesh KH-TP2-HBK-MAT-CV-0021 Cicon Building Materials Plinth on solid Slab and fill KAT.E.1570 KAT.E.1630 1 25-Jul-15 28-Jul-15 B 8-Sep-15 14-Sep-15 A 1 0 A - - - A
concrete
2 CV Steel Reinforcement KH-TP2-HBK-MAT-CV-0023 Qatar Steel / Mokaskco Express Concrete Reinforcement Bars KAT.E.1570 KAT.E.1630 0 26-Jul-15 29-Jul-15 B 1 0 - B - - B

3 CV Bartec Mechanical Couplers KH-TP2-HBK-MAT-CV-0024 Dextra / Mokaskco Express Rebar Splice KAT.E.1570 KAT.E.1630 0 27-Jul-15 30-Jul-15 B 1 0 - B - - B
Reinforcement for Ramp on Slab,
Middle East Building
4 CV Welded Wire Mesh KH-TP2-HBK-MAT-CV-0026 Plinth on solid Slab and fill KAT.E.1570 KAT.E.1630 1 29-Jul-15 3-Aug-15 C 23-Aug-15 6-Sep-15 A 1 0 A - - - A
MaterialsMEBCO)
concrete

LENTON THREADED COUPLERS-Threaded Rebar Erico manufacturing / Bardawil


5 CV KH-TP2-HBK-MAT-CV-0034 Rebar Splice KAT.E.1570 KAT.E.1630 0 16-Aug-15 18-Aug-15 B 1 0 - B - - B
Splicing System Specialities Qatar WLL
Emirates steel / Khalifa Steel
6 CV Concrete Reinforcing Bars KH-TP2-HBK-MAT-CV-0036 Concrete Reinforcing Bars KAT.E.1570 KAT.E.1630 0 16-Aug-15 24-Aug-15 B 1 0 - B - - B
Industries
7 CV Repair Grip Coupler - Mechanical Splicing System KH-TP2-HBK-MAT-CV-0037 Mokasco- Dextra Steel Coupler KAT.E.1570 KAT.E.1630 0 24-Aug-15 3-Sep-15 B 1 0 - B - - B

8 CV Black Annealed Bling Wire 16G KH-TP2-HBK-MAT-CV-0038 Al Feroz Intl Trading WLL Qatar Tie Wire KAT.E.1570 KAT.E.1630 2 25-Aug-15 6-Sep-15 C 11-Oct-15 15-Oct-15 C 27-Oct-15 3-Nov-15 B 1 0 - B - - B
9 CV Welded Wire Mesh, A142 KH-TP2-HBK-MAT-CV-0040 Cicon Building Materials Shotcrete Reinforcement KAT.E.1570 KAT.E.1630 0 6-Sep-15 9-Sep-15 A 1 0 A - - - A
Rev 0 Superseded; Rev 1
10 CV ReCon Rebar Coupler KH-TP2-HBK-MAT-CV-0043 Khalifa Steel Industries Rebar Splice KAT.E.1570 KAT.E.1630 1 10-Sep-15 13-Sep-15 D 7-Nov-15 11-Nov-15 D 1 0 - - - D D Pending

NASA ( BBR) Structural System Suspended Slabs -250mm thick,


11 CV Slab Post- Tensioning Materials KH-TP2-HBK-MAT-CV-0047 KAT.E.3350 KAT.E.3360 1 8-Oct-15 15-Oct-15 B 27-Jan-16 16-Feb-16 A 1 0 A - - - A
LLC 260mm thick,300mm thick

Protection and Anti-corrosion


coating for starter bar
12 CV PACTORep EZP- Epoxy Based Zinc Rich Primer KH-TP2-HBK-MAT-CV-0063 HBK Trading Co. W.L.L. KAT.E.1570 KAT.E.1630 0 21-Feb-16 25-Feb-16 B 1 0 - B - - B
reinforcemenrt at Promenade
Floor Level
Site Wide Reinforcement
13 CV Steel Reinforcement of Concrete KH-TP2-HBK-MAT-CV-0073 Khalifa Steel Industries KAT.E.1570 KAT.E.1630 0 11-May-16 15-May-16 A 1 0 A - - - A
Concrete
NASA ( BBR) Structural System Side Wide Post Tension
14 CV PT Slab Duct Support Chairs( Additional Source) KH-TP2-HBK-MAT-CV-0075 KAT.E.1570 KAT.E.1630 0 9-Jun-16 19-Jun-16 B 1 0 - B - - B
LLC Reinforcement Fromwork
1.6mm (16 GAUGE) BLACK Annealed Binding Wire
15 CV KH-TP2-HBK-MAT-CV-0080 Castle for Building Materials All Reinforcement Work 0 27-Aug-16 1-Sep-16 A 1 0 A - - - A
(Alternative)
PC Strands ( Seven-Wire Low relaxation steel strand,
16 CV grade 1860 (270) with nominal diameter -12.7mm)- KH-TP2-HBK-MAT-CV-0095 NASA Structural System LLC Post Tension Slab 0 5-Mar-17 8-Mar-17 B 1 0 - B - - B
Alterrnative

A1 A1 A1
Concrete Materials
17 CV Mix Design ID-HHKH01R0, Grade: C20 SRC KH-TP2-HBK-MAT-CV-0001 HBK Remix Blinding Concrete KAT.E.1550 KAT.E.1610 1 13-Jul-15 26-Jul-15 C 11-Aug-15 17-Aug-15 B 1 0 - B - - B
18 CV Mix Design ID-HHKH02R0, Grade: C20 OPC (Screed) KH-TP2-HBK-MAT-CV-0002 HBK Remix Blinding Concrete KAT.E.1550 KAT.E.1610 1 13-Jul-15 26-Jul-15 C 11-Aug-15 17-Aug-15 B 1 0 - B - - B
Mix Design ID-HHKH03R0, Grade: C50
19 CV KH-TP2-HBK-MAT-CV-0003 HBK Remix Blinding Concrete KAT.E.1550 KAT.E.1610 1 13-Jul-15 26-Jul-15 C 11-Aug-15 17-Aug-15 B 1 0 - B - - B
OPC+GGBS+WPA (Foundation Basement Raft)
Mix Design ID-HHKH04R0, Grade: C50
20 CV KH-TP2-HBK-MAT-CV-0004 HBK Remix Blinding Concrete KAT.E.1550 KAT.E.1610 1 13-Jul-15 26-Jul-15 C 12-Aug-15 17-Aug-15 B 1 0 - B - - B
OPC+GGBS+MS (Beams)
Mix Design ID-HHKH05R0, Grade: C60
21 CV KH-TP2-HBK-MAT-CV-0005 HBK Remix Blinding Concrete KAT.E.1550 KAT.E.1610 1 13-Jul-15 26-Jul-15 C 11-Aug-15 17-Aug-15 B 1 0 - B - - B
OPC+GGBS+MS+WPA (Retaining Wall)
Mix Design ID-HHKH06R0, Grade: C60 OPC (Shear
22 CV KH-TP2-HBK-MAT-CV-0006 HBK Remix Blinding Concrete KAT.E.1550 KAT.E.1610 1 13-Jul-15 26-Jul-15 C 11-Aug-15 17-Aug-15 B 1 0 - B - - B
Wall)
Mix Design ID-HHKH07R0, Grade: C75 OPC+MS Blinding Concrete / Main Cores
23 CV KH-TP2-HBK-MAT-CV-0007 HBK Remix KAT.E.1550 KAT.E.1610 1 13-Jul-15 26-Jul-15 C 11-Aug-15 17-Aug-15 B 1 0 - B - - B
(Main Core T2.0 grid 8-9/G-L and 12-14/H-J) T2.0 Grid 8-9/G-L and 12-14/H-J

Blinding Concrete / Main Cores


Mix Design ID-HHKH08R0, Grade: C85 OPC+MS
24 CV KH-TP2-HBK-MAT-CV-0008 HBK Remix T4.0 Grid 31-32/F-K and 26- KAT.E.1550 KAT.E.1610 1 13-Jul-15 26-Jul-15 C 11-Aug-15 17-Aug-15 B 1 0 - B - - B
(Main Core T4.0 grid 31-32/F-K and 26-28/G-H)
28/G-H
25 CV Shotcrte ( Wet Mix) C30 OPC +PPF KH-TP2-HBK-MAT-CV-0025 HBK Remix Shotcrete at Diaphragm Wall KAT.E.1550 KAT.E.1610 1 28-Jul-15 3-Aug-15 C 12-Aug-15 17-Aug-15 B 1 0 - B - - B
Nevoga -Germany / Specialized
26 CV Concrete Spacers for Concrete Works KH-TP2-HBK-MAT-CV-0029 Concrete Spacer 0 4-Aug-15 20-Aug-15 B 1 0 - B - - B
Import & Trading Company

Gurbetciler- Turkey / Specialized Spacer and Support for


27 CV Plastic Rebar Spacers (Wheel and Chair) KH-TP2-HBK-MAT-CV-0030 0 4-Aug-15 20-Aug-15 B 1 0 - B - - B
Import & Trading Company Reinforced Concrete
Concrete Mix Design ,C50 OPC +CGBS 60% +MS 5%
28 CV KH-TP2-HBK-MAT-CV-0033 HBK Remix Promenade Slabs KAT.E.1550 KAT.E.1610 0 12-Aug-15 17-Aug-15 B 1 0 - B - - B
+WPA (HHKH10R0)
29 CV Concrete Mix Designs KH-TP2-HBK-MAT-CV-0035 Smeet Remix All KAT.E.1550 KAT.E.1610 2 19-Aug-15 24-Aug-15 D 13-Sep-15 15-Sep-15 C 7-Oct-15 11-Oct-15 B 1 0 - B - - B
30 CV Concrete Mix Designs for Piles and Shotcrete KH-TP2-HBK-MAT-CV-0049 Sweet Remix Site Wide KAT.E.1550 KAT.E.1610 0 21-Oct-15 2-Nov-15 B 1 0 - B - - B

STRUCTURAL MATERIAL LOG PAGE 1 OF 4


ACTION COLOR

Updated Action
REVISION 0 REVISION 1 REVISION 2

NO RESPONSE
CODE

SUBMITTED
Item No.

P6 P6

Code
SUBCON / MANUFACTURER / Date

Action

Action

Action
DISCIPLINE DESCRIPTION SUBMITTAL NO. LOCATION FOR USE Submittal Approval Rev No. Planned Date Notes
SUPPLIER Actual Date Date Returned Actual Date Actual Date Returned
Activity ID Activity ID Submission Returned by A B C D
Submitted by Consultant Submitted Submitted by
date Consultant
Consultant

Sonitec Tube ST50 (OD 50mm wall thickness 1mm x Cast-in situ Bored Piles subject
31 CV KH-TP2-HBK-MAT-CV-0055 Swissboring Qatar WLL 0 28-Dec-15 7-Jan-16 B 1 0 - B - - B
5.8mL) for Cross-hole Sonic Logging

Grout materials to fill the


NanoGrout CFG - Pre mixed grout ready to use, hight
veertical access tube for Cross-
32 CV strength, highly flowable, non - shrink cementitious KH-TP2-HBK-MAT-CV-0062 Swissboring Qatar WLL 0 8-Feb-16 17-Feb-16 B 1 0 - B - - B
Hole Sonic Logging ( CSL) after
grout
the pile had been tested for CSL

Concrete Mix Design -C50/20 42% OPC +50%


33 CV GGBFS +8% MS with Hydrophobic Pore-blocking & KH-TP2-HBK-MAT-CV-0078 Smeet Remix Long term Shrinkage corridor 0 1-Aug-16 6-Aug-16 B 1 0 - B - - B
Shrinkage reducing Admixtures
S3845-17 - Promenade Slab
Concrete Mix Designs (Mix ID #S3845-17 & S3850-
34 CV KH-TP2-HBK-MAT-CV-0091 Smeet Remix S3850-17 Retaining Wall & Water 0 21-Jan-17 30-Jan-17 B 1 0 - B - - B
17)
Tanks
C60 OPC+60% GGBS+MS 5% +WPA+Mix Code
35 CV KH-TP2-HBK-MAT-CV-0093 HBK Remix Retaining Wall , Water Tanks 0 9-Feb-17 21-Feb-17 B 1 0 - B - - B
HHKH05R2 ( Alternative)
C50 OPC+60% GGBS+MS 5% +WPA+SRA -Mix Code
36 CV KH-TP2-HBK-MAT-CV-0094 HBK Remix Promenade Slab 0 9-Feb-17 21-Feb-17 B 1 0 - B - - B
HHKH10R2 ( Alternative)
High Strength FreeFlowing Micro concrete - PATCO Large repair at C75 and C85
37 CV KH-TP2-HBK-MAT-CV-0096 HBK Trading 1 18-Mar-17 22-Mar-17 B 30-Mar-17 6-Apr-17 B 1 0 - B - - B
Grout HS Grade Structures ( If Any)
All Types of Slabs & All Vertical
38 CV Concrete Mix Designs : S3974 -17 & S3957-17 KH-TP2-HBK-MAT-CV-0097 Smeet Remix Elements except C75 & C85 0 2-May-17 16-May-17 B 1 0 - B - - B
Grade Core Walls
C50/10 OPC+25%PFA+MS 6% +WPA -Mix Code
39 CV KH-TP2-HBK-MAT-CV-0099 HBK Remix All Types of Slabs 0 14-May-17 20-May-17 B 1 0 - B - - B
HHKH13R0 ( Alternative)
C60/10 OPC+25%PFA+MS 6% +WPA -Mix Code All Vertical Elements except C75
40 CV KH-TP2-HBK-MAT-CV-0100 HBK Remix 1 14-May-17 20-May-17 B 4-Jul-17 20-Jul-17 B 1 0 - B - - B
HHKH14R0 ( Alternative) & C85 Grade Core Walls

Formworks
41 Geoplast -Modular Formwork for Columns KH-TP2-HBK-MAT-CV-0054 Geoplast S.p.a Side Wide Fromwork for Columns 0 21-Dec-15 19-Jan-16 B 1 0 - B - - B

Construction Chemicals
PACTO Finish WB-Water Based Mould and Shutter
42 CV KH-TP2-HBK-MAT-CV-0009 HBK Trading Form Works 0 13-Jul-15 5-Aug-15 B 1 0 - B - - B
Release Agent
PACTORep PG-Q-High Performance Pourable Grade
43 CV KH-TP2-HBK-MAT-CV-0010 HBK Trading Concrete Large repair 1 13-Jul-15 27-Jul-15 C 1-Aug-15 3-Aug-15 B 1 0 - B - - B
Repair Mortar/Micro Concrete

PACTORep HB 70-High Strength Repair Moratar/Fibre


44 CV KH-TP2-HBK-MAT-CV-0011 HBK Trading Concrete repair on small areas 1 13-Jul-15 27-Jul-15 C 1-Aug-15 3-Aug-15 B 1 0 - B - - B
Reinforced /Non shrink

PACTO Rep FCF-Polymer Modified Fairing Coat Repair


45 CV KH-TP2-HBK-MAT-CV-0012 HBK Trading Honey comb / spalling 1 13-Jul-15 27-Jul-15 C 1-Aug-15 3-Aug-15 B 1 0 - B - - B
Mortar

46 CV PACTO Cure RB Resin Based curing Compound KH-TP2-HBK-MAT-CV-0013 HBK Trading ConcreteCuring 0 13-Jul-15 5-Aug-15 B 1 0 - B - - B

47 CV PACTO Grout GP-General Purpose KH-TP2-HBK-MAT-CV-0014 HBK Trading Non shrink Grout 1 13-Jul-15 27-Jul-15 C 1-Aug-15 3-Aug-15 B 1 0 - B - - B

Extruded Polystyrene (Polyfoam Super ND Fire Below the concrete slab (T2.0-
48 CV KH-TP2-HBK-MAT-CV-0015 Quality Insulation Factory 1 14-Jul-15 3-Aug-15 D 30-Aug-15 17-Sep-15 B 1 0 - B - - B
Retardant) T4.0)
Stieco / Specialized Import &
49 CV Expansion Joints Fiberboards ( 35% Bitumen) KH-TP2-HBK-MAT-CV-0016 Expansion Joints & Other Joints 1 21-Jul-15 12-Aug-15 D 19-Oct-15 5-Nov-15 D 1 0 - - - D D
Trading Company
Stieco / Specialized Import &
50 CV Expansion Joints Fiberboards ( 35% Bitumen) KH-TP2-HBK-MAT-CV-0016 Expansion Joints & Other Joints 1 21-Jul-15 12-Aug-15 D 19-Oct-15 5-Nov-15 D 1 0 - - - D D
Trading Company
Post and Pre-construction of
51 CV TREMEX (Imidacloprid) 350 sc KH-TP2-HBK-MAT-CV-0017 National Pest Control Company KAT.E.1555 KAT.E.1615 0 21-Jul-15 5-Aug-15 B 1 0 - B - - B
termits
52 CV Polyurethane Sealant - Flexseal PU425 KH-TP2-HBK-MAT-CV-0018 Don Construction Products Site Wide Joints 1 21-Jul-15 12-Aug-15 C 14-Oct-15 2-Nov-15 C 1 0 - - C - C
Setseal 22 Water Based Dispersion Concrete Curing Don Construction Product- Qatar
53 CV KH-TP2-HBK-MAT-CV-0020 Concrete Curing 0 21-Jul-15 26-Jul-15 A 1 0 A - - - A
Compound WLL
54 CV Pile Head Treatment -Supercast PC & Supercast EPT KH-TP2-HBK-MAT-CV-0022 FORSOC Pile Head Treatment 0 26-Jul-15 30-Jul-15 B 1 0 - B - - B
Injection of wet or dry cracks in
Polyurethane Resin Based Injection System Don Construction Product(DCP)-
55 CV KH-TP2-HBK-MAT-CV-0039 all types of structural concrete 0 3-Sep-15 9-Sep-15 C 1 0 - - C - C PENDING
( QuickMast 110 & QuickMast120) Qatar WLL
elements
56 CV Concrete Bonding Agent-PATCO BOND PVA KH-TP2-HBK-MAT-CV-0048 HBK Trading Site Wide Concrete Joints KAT.E.1580 KAT.E.1640 0 19-Oct-15 25-Oct-15 B 1 0 - B - - B
Specialized Import & Trading
57 CV Expansion Joints Fiberboards ( 35% Bitumen) KH-TP2-HBK-MAT-CV-0050 Expansion Joints & Other Joints KAT.E.1580 KAT.E.1640 0 7-Nov-15 11-Nov-15 B 1 0 - B - - B
Company
58 CV Polyurethane Sealant - Flexseal PU425 KH-TP2-HBK-MAT-CV-0051 Don Construction Products Site Wide Joints KAT.E.1580 KAT.E.1640 0 8-Nov-15 15-Nov-15 B 1 0 - B - - B
As Post Installed Connection for
59 CV Injection Adhesive System-Hilti HIT-RE 500 KH-TP2-HBK-MAT-CV-0052 Hilti Qatar W.L.L. 0 17-Nov-15 24-Nov-15 B 1 0 - B - - B
Reinforcement Rebar ( if any)
National Pest Control Company- Pre and Post - Construction
60 CV Real 5sc ( Fipronil) - Anti Termaite( Alternative) KH-TP2-HBK-MAT-CV-0053 KAT.E.1555 KAT.E.1615 0 15-Dec-15 21-Dec-15 B 1 0 - B - - B
Qatar Control of termites
61 CV PVC Cracker Inducer KH-TP2-HBK-MAT-CV-0064 Castle for Building Materials External Wall Control Joint 0 14-Mar-16 21-Mar-16 B 1 0 - B - - B
PVC -P Cracker Inducer Joint Tube M1 (66mm) - Specialized Import & Trading
62 CV KH-TP2-HBK-MAT-CV-0065 External Wall Control Joint 0 24-Mar-16 30-Mar-16 A 1 0 A - - - A
( Alternative) Company

STRUCTURAL MATERIAL LOG PAGE 2 OF 4


ACTION COLOR

Updated Action
REVISION 0 REVISION 1 REVISION 2

NO RESPONSE
CODE

SUBMITTED
Item No.

P6 P6

Code
SUBCON / MANUFACTURER / Date

Action

Action

Action
DISCIPLINE DESCRIPTION SUBMITTAL NO. LOCATION FOR USE Submittal Approval Rev No. Planned Date Notes
SUPPLIER Actual Date Date Returned Actual Date Actual Date Returned
Activity ID Activity ID Submission Returned by A B C D
Submitted by Consultant Submitted Submitted by
date Consultant
Consultant

PVC-P Crack Inducer Pipe H3 ( Outer Dia 110mm &


63 CV KH-TP2-HBK-MAT-CV-0066 Hidroplasto Srl External Wall Control Joint 0 28-Mar-16 2-Apr-16 B 1 0 - B - - B
Inner Dia 60mm)-( Alternative)
National Pest Control Company- Pre and Post - Construction
64 CV SICOFIDOR 30.5SC -Anti termite (Alternative) KH-TP2-HBK-MAT-CV-0077 0 31-Jul-16 6-Aug-16 B 1 0 - B - - B
Qatar Control of termites
Adhesive for Bearing Pads At
65 CV Nitofix-Solvent Free Epoxy Adhesive KH-TP2-HBK-MAT-CV-0092 Fosroc/Tadmur Trading 1 21-Jan-17 28-Jan-17 C 30-Jan-17 30-Jan-17 B 1 0 - B - - B
Corbel Area
All Types of Slabs & All Vertical
High Strength Cementitious Repair Mortar- Fosroc Al Gurg Fosroc LLC/ Tadmur
66 CV KH-TP2-HBK-MAT-CV-0098 Elements except C75 & C85 0 9-May-17 13-May-17 B 1 0 - B - - B
Renderroc HSXtra Trading W.L.L.
Grade Core Walls
PACTOPROOF INJECT PU- Wet Crack polyurethane
67 CV KH-TP2-HBK-MAT-CV-0101 PAC TECHNOLOGIES All Water Retaining Structures 0 24-Jul-17 27-Jul-17 B 1 0 - B - - B
injection resin
LANKO SEALER -W ( Hydro phobic concrete Promenade Slab concrete
68 CV KH-TP2-HBK-MAT-CV-0102 PAREX GROUP 0 27-Jul-17 1-Aug-17 B 1 0 - B - - B
impregnations) surface
69 CV CIKOjoint PLYFLEX1200-PU joint sealant KH-TP2-HBK-MAT-CV-0103 CIKO MIDDLE EAST Expansion Joints 0 27-Jul-17 1-Aug-17 B 1 0 - B - - B
70 CV LANKO CG60- Cable Grout KH-TP2-HBK-MAT-CV-0104 PAREX GROUP PT Slab Duct Grout 0 29-Jul-17 2-Aug-17 B 1 0 - B - - B
WEBREP 360 FFR - Cementatious filler for fair face SODAMCO WEBER SAINT- Minor/ fair face concrete repair &
71 CV KH-TP2-HBK-MAT-CV-0105 0 31-Jul-17 8-Aug-17 B 1 0 - B - - B
repair GOBAIN fairing coat
SODAMCO WEBER SAINT- Major Concrete repairs including
72 CV WEBRTEC 304 VHS - High Strength Shrinkage Grout KH-TP2-HBK-MAT-CV-0106 0 31-Jul-17 8-Aug-17 B 1 0 - B - - B
GOBAIN core areas
Protective & Anticorrosive
WEBREP 501 ZRP - Heavy duty Anticorrosive Zinc SODAMCO WEBER SAINT-
73 CV KH-TP2-HBK-MAT-CV-0107 coating for promenade slab 0 31-Jul-17 6-Aug-17 B 1 0 - B - - B
rich coat GOBAIN
exposed starter rebars

Bonding for fresh concrete on


hardened concrete ,additive in
joit grouts, spatter dash key
SODAMCO WEBER SAINT-
74 CV Weber .ad 220 SBR (Latex Based Bonding Agent) KH-TP2-HBK-MAT-CV-0108 slurries , plasters,rebar and 0 9-Aug-17 UR 1 1 - - - - UR
GOBAIN
mortar screeds , additive in
mortars for the patching and
repair of concrete

Waterproofing Materials
Waterproofing for Basement and
75 CV Plastisell PVC Substructure Waterproofing System KH-TP2-HBK-MAT-CV-0019 Tadmur Roofs & Pools W.L.L. KAT.E.1560 KAT.E.1620 1 25-Jul-15 29-Jul-15 D 11-Aug-15 20-Aug-15 D 1 0 - - - D D
Similar
76 CV Polyethylene Sheet (1200 Guage) KH-TP2-HBK-MAT-CV-0027 Petrofoam for Plastic Production Moisture Barrier Under Blinding KAT.E.1560 KAT.E.1620 0 3-Aug-15 20-Aug-15 B 1 0 - B - - B

77 CV Polyethylene Sheet (1200 Guage) KH-TP2-HBK-MAT-CV-0028 Uniplast Plastic Industries Moisture Barrier Under Blinding KAT.E.1560 KAT.E.1620 0 3-Aug-15 20-Aug-15 B 1 0 - B - - B

78 CV Polyethylene Sheet (1200 Guage) KH-TP2-HBK-MAT-CV-0031 Al Vivid Kings Trading Moisture Barrier Under Blinding KAT.E.1560 KAT.E.1620 0 6-Aug-15 20-Aug-15 B 1 0 - B - - B
Waterproofing for Basement and
79 CV Substructure Waterproofing System-BASF KH-TP2-HBK-MAT-CV-0045 Tadmur Roofs & Pools W.L.L. KAT.E.1540 KAT.E.1620 2 22-Sep-15 6-Oct-15 C 15-Oct-15 2-Nov-15 B 3-Feb-16 13-Mar-16 B 1 0 - B - - B Rev 1 Superseded
Similar
BASF Qatar/ Tadmur Roofs and Raft and wall Construction Joints
80 CV Masterseal 901-Vinyl Methacrylate Resin KH-TP2-HBK-MAT-CV-0056 KAT.E.1560 KAT.E.1620 1 27-Jan-16 7-Feb-16 C 16-Feb-16 25-Feb-16 B 1 0 - B - - B
Pools & Wall and Slab Expansion Joints

MasterBraceADH-2200 ( Formally Known as BASF Qatar/ Tadmur Roofs and Repair Material for Epoxy topped
81 CV KH-TP2-HBK-MAT-CV-0057 KAT.E.1560 KAT.E.1620 0 27-Jan-16 21-Feb-16 B 1 0 - B - - B
Concresive 2200)- High Strength Epoxy Repair Motor Pools areas

Masterseal GG470-High Performance Elastomeric , BASF Qatar/ Tadmur Roofs and Expansion Joint Area and
82 CV KH-TP2-HBK-MAT-CV-0058 KAT.E.1560 KAT.E.1620 0 27-Jan-16 25-Feb-16 B 1 0 - B - - B
Polysulphide based sealant with primer Pools Waterproofing Termination Area
Masterseal 910-Swellable Water bar with Masterseal BASF Qatar/ Tadmur Roofs and
83 CV KH-TP2-HBK-MAT-CV-0059 Internal Watertanks KAT.E.1560 KAT.E.1620 0 31-Jan-16 21-Feb-16 B 1 0 - B - - B
911 Pools
Below Water level Pipe
BASF Qatar/ Tadmur Roofs and
84 CV Masterseal 912-Swellable Gasket in Paste Form KH-TP2-HBK-MAT-CV-0060 penetration Area & Dewatering KAT.E.1560 KAT.E.1620 0 1-Feb-16 25-Feb-16 B 1 0 - B - - B
Pools
Well Area
Masterseal Joint Sealing System - Masterseal 930 & BASF Qatar/ Tadmur Roofs and Repair material for Waterstops
85 CV KH-TP2-HBK-MAT-CV-0061 KAT.E.1560 KAT.E.1620 0 1-Feb-16 5-Mar-16 B 1 0 - B - - B
MasterBrace ADH 2200 Pools ( if required)
Pipe Penetration Waterproofing
86 CV Stainless Steel Worm Gear Clamp ( Jubilee Clip) KH-TP2-HBK-MAT-CV-0067 Tadmur Roofs & Pools W.L.L. KAT.E.1560 KAT.E.1620 0 2-Apr-16 10-Apr-16 A 1 0 A - - - A
Works
MasterRoc FLC 100 ( Non - Shrink & High Strength
87 CV KH-TP2-HBK-MAT-CV-0068 BASF Construction Chemicals Post Tension tendon Grouting KAT.E.1560 KAT.E.1620 0 11-Apr-16 16-Apr-16 B 1 0 - B - - B
Grout for Post tensioned Slabs
Forsoc Cebex Cable Grout ( Non - Shrink &
88 CV Cementitious Grout for Post tensioned Cables )- KH-TP2-HBK-MAT-CV-0069 Tadmur Trading W.L.L. Post Tension tendon Grouting KAT.E.1560 KAT.E.1620 0 11-Apr-16 16-Apr-16 B 1 0 - B - - B
Alternative
Protection Board for PVC
89 CV 4mm Thick N-1500 CARTONAL Protection Board KH-TP2-HBK-MAT-CV-0070 Tadmur Roofs & Pools W.L.L. KAT.E.1560 KAT.E.1620 0 12-Apr-16 21-Apr-16 B 1 0 - B - - B
Waterprofing membrane
Waterprrofing Termiantion at
90 CV Aluminium Flashing (0.69mm Thickness) KH-TP2-HBK-MAT-CV-0071 Tadmur Roofs & Pools W.L.L. KAT.E.1560 KAT.E.1620 0 13-Apr-16 18-May-16 D 1 0 - - - D D
above Desing Water level
Site Wide Seperation &
BONTEC Nonwoven Geotextile ( SNW 46) for
91 CV KH-TP2-HBK-MAT-CV-0074 Al Bwakir unicon Co. WLL protection layer for KAT.E.1560 KAT.E.1620 0 5-Jun-16 14-Jun-16 A 1 0 A - - - A
waterproofing works ( Alternative)
waterproofing works
Polyurethene Pipe & Push fitting for flanges of Elorra Group/ Al bawakir Unicon
92 CV KH-TP2-HBK-MAT-CV-0076 Side Wide Waterproofing Works KAT.E.1560 KAT.E.1620 0 11-Jun-16 20-Jun-16 B 1 0 - B - - B
waterproofing system Co. W.L.L.
Pueumics Automation FZC / Al
93 CV Polyurethane Pipe for Flanges in Waterproofing KH-TP2-HBK-MAT-CV-0090 Waterproofing Area 1 27-Dec-16 3-Jan-17 D 9-Jan-17 17-Jan-17 A 1 0 A - - - A
Bawakir Unicon

STRUCTURAL MATERIAL LOG PAGE 3 OF 4


ACTION COLOR

Updated Action
REVISION 0 REVISION 1 REVISION 2

NO RESPONSE
CODE

SUBMITTED
Item No.

P6 P6

Code
SUBCON / MANUFACTURER / Date

Action

Action

Action
DISCIPLINE DESCRIPTION SUBMITTAL NO. LOCATION FOR USE Submittal Approval Rev No. Planned Date Notes
SUPPLIER Actual Date Date Returned Actual Date Actual Date Returned
Activity ID Activity ID Submission Returned by A B C D
Submitted by Consultant Submitted Submitted by
date Consultant
Consultant

Masonry Materials
Below ground , prior for
94 CV Sulfate Resisting Solid Block KH-TP2-HBK-MAT-CV-0032 Midmac Block Factory installation of waterproofing 0 12-Aug-15 3-Sep-15 B 1 0 - B - - B
membrane
Below ground , prior for
95 CV Sulfate Resisting Block ( Alternative) KH-TP2-HBK-MAT-CV-0046 Al Sehmiah installation of waterproofing 0 4-Oct-15 12-Oct-15 B 1 0 - B - - B
membrane

Time Lapse Camera


96 CV 12M Octagpnal CCTV Pole KH-TP2-HBK-MAT-CV-0072 Premier Space Design Site Wide Time Lapse Camera 1 5-May-16 15-May-16 C 26-May-16 2-Jun-16 B 1 0 - B - - B

MEP Materials
Pre-fabricated Site Building, Lightings , Plumbing
97 MC KH-TP2-HBK-MAT-CV-0041 Vekon Gulf Engineer's Site Offices 0 9-Sep-15 16-Sep-15 B 1 0 - B - - B
Fixtures and Accessories
Plumbing system Below raft
98 MC Drainage Pipes & Fittings KH-TP2-HBK-MAT-MC-0001 Hepworth , Qatar KAT.E.2380 KAT.E.2460 1 3-Aug-15 6-Aug-15 C 13-Sep-15 17-Sep-15 B 1 0 - B - - B
Foundation
Superseded (Resubmit
99 MC Floor Clean Out Cover KH-TP2-HBK-MAT-MC-0002 KBAS Trading Qatar In the Raft 0 28-Oct-15 3-Nov-15 C 1 0 - - C - C MC06)
KAT.E.2440/ KAT.E.2520/
2390/2420/ 2490/2510/
100 MC Upvc Puddle Flanges KH-TP2-HBK-MAT-MC-0003 Hepworth , Qatar Wall Crossings 2430/2400/ 2500/2470/
0 1-Nov-15 4-Nov-15 B 1 0 - B - - B
2410 2480
KAT.E.2440/ KAT.E.2520/
2390/2420/ 2490/2510/
101 MC HDPE Puddle Flange KH-TP2-HBK-MAT-MC-0004 Hepworth , Qatar Wall Crossings 2430/2400/ 2500/2470/
0 1-Nov-15 4-Nov-15 B 1 0 - B - - B
2410 2480
KAT.E.2440/ KAT.E.2520/
2390/2420/ 2490/2510/
102 MC Upvc Dry Gully Trap KH-TP2-HBK-MAT-MC-0005 Hepworth , Qatar Wall Crossings 2430/2400/ 2500/2470/
0 2-Nov-15 23-Nov-15 B 1 0 - B - - B
2410 2480

103 MC Floor Clean Out Cover KH-TP2-HBK-MAT-MC-0006 New Star Trading WLL In the Raft 0 25-Jan-16 3-Feb-16 A 1 0 A - - - A

104 MC UPVC Catch Basin with GRP Basket KH-TP2-HBK-MAT-MC-0007 SERVETECH In the Raft 0 14-Mar-16 23-Mar-16 D 1 0 - - - D D Pending

Athab Qatar Engineering & Drainage Syatem- Manholes,


105 MC DI Manhole covers & Frames and Gully Gratings KH-TP2-HBK-MAT-MC-0008 0 14-Mar-16 23-Mar-16 D 1 0 - - - D D Pending
Contracting Co. WLL Catchbasins and Gully traps
106 MC Gully Trap Cover (HDDI)-300X300mm size KH-TP2-HBK-MAT-MC-0009 New Star Trading WLL Basement 2 1 31-Mar-16 7-Apr-16 B 1-May-16 10-May-16 A 1 0 A - - - A

107 MC HDPE Pipe for Water Supply-Utility Service Extension KH-TP2-HBK-MAT-MC-0010 Hepworth , Qatar Basement 1 0 3-Apr-16 17-Apr-16 B 1 0 - B - - B

108 MC Manhole Cover and Gratings KH-TP2-HBK-MAT-MC-0011 BC Trading and Contracting Basement 1 0 19-Apr-16 23-Apr-16 B 1 0 - B - - B
Techno Gulf Trading and Basement 1, Basement 2,
109 MC UPVC Catch Basin KH-TP2-HBK-MAT-MC-0012 1 28-Apr-16 15-May-16 C 21-Jun-16 26-Jun-16 B 1 0 - B - - B
Contracting Promenade
Pre-insulated Chilled water pipe for utility service
110 MC KH-TP2-HBK-MAT-MC-0013 Perma Pipe Basement 1 1 1-May-16 10-May-16 C 18-Jul-16 26-Jul-16 B 1 0 - B - - B
extension
Butterfly valve for Chilled water pipe for utility
111 MC KH-TP2-HBK-MAT-MC-0014 Econsoto Middle East Basement 1 1 1-May-16 10-May-16 C 30-May-16 9-Jun-16 B 1 0 - B - - B
service extension
112 EL Electrical Conduits accessories & fittings KH-TP2-HBK-MAT-EL-0001 Interplast ( Decoduct) Emboded In Concrete KAT.E.2450 KAT.E.2530 2 26-Aug-15 7-Sep-15 C 11-Oct-15 13-Oct-15 B 13-Jun-17 18-Jun-17 A 1 0 A - - - A
Test Link ( Earth Point) for Lightning Protection
113 EL KH-TP2-HBK-MAT-EL-0002 Trade House , Qatar Co Basement 2 0 26-Nov-15 3-Dec-15 D 1 0 - - - D D Pending
System
Laffan Trading / Outukumpu/ Basement 2, Basement 1 &
114 EL Lightning Protection KH-TP2-HBK-MAT-EL-0003 1 17-Mar-16 23-Mar-16 C 10-Apr-16 24-Apr-16 B 1 0 - B - - B
Elsewedy ( Doha Cable) Promenade

115 MC SS pipe for PWC pipe line extension ( Utililty Service) KH-TP2-HBK-MAT-MC-0015 Ventare Engineering Basement 1 2 2-Jun-16 21-Jun-16 C 16-Jul-16 23-Jul-16 C 7-Sep-16 25-Oct-16 B 1 0 - B - - B

116 MC 1000 x 1000 mm Double triangular MH cover KH-TP2-HBK-MAT-MC-0016 BC Trading and Contracting Basement 2 2 1-Oct-16 3-Oct-16 C 22-Oct-16 25-Oct-16 A 14-Jan-17 19-Jan-17 B 1 0 A - - - B
Bufferfly valve of chilled water pipe for utility
117 MC KH-TP2-HBK-MAT-MC-0017 Al-Riyadh Trading & Contracting P1 Area B1 0 15-Dec-16 26-Dec-16 C 1 0 - - C - C
service extension ( Alternative)
Servetech trading and
118 MC UPVC Sand trap basket for sump pits KH-TP2-HBK-MAT-MC-0018 Raft 1 21-Jan-17 7-Feb-17 D 1-Jul-17 20-Jul-17 B 1 0 - B - - B
contracting
Ball valves for chilled water pipe for utility service
119 MC KH-TP2-HBK-MAT-MC-0019 JGB CO. Doha Basement 1 0 9-Feb-17 9-Apr-17 D 1 0 - - - D D Not in scope
extension
Basement 2- T1 & T5 area inside
120 MC Floor Drain Cover KH-TP2-HBK-MAT-MC-0020 Al Gurg Co. QATAR 0 24-Jul-17 27-Jul-17 B 1 0 - B - - B
the pump rooms

Temporary Facilities
119 CV Banner for Hoarding KH-TP2-HBK-MAT-CV-0042 Fanar Neon and Advertising Temporary Site Hoarding 0 9-Sep-15 14-Sep-15 B 1 0 - B - - B
120 CV Banner for Signboard KH-TP2-HBK-MAT-CV-0044 Signmax Trading WLL Project Sign Board 0 7-Sep-15 21-Sep-15 B 1 0 - B - - B