Anda di halaman 1dari 3

KAPASITAS PRODUKSI EXTRUDER AUTOMOBILE

WAKTU 1 SHIFT productivity efisiensi % efisiensi % efisiensi %


MESIN SPEED (meter/menit) ISTIRAHAT (DETIK) TOTAL (DETIK) PANJANG (METER) SIZE defect % 1 shift 2 shift 3 shift
(DETIK) % shift 1 shift 2 shift 3
1 5.4 28800 3600 25200 1.6 750-16 85% 44% 59% 75% 20% 422 1145 2169

TARGET DEFECT 20%


1 SHIFT
EXTRUDER 0.09
TOTAL PRODUKSI TOTAL PRODUKSI
JAM ACTIVITY DURASI (JAM) EFISIENSI
(JAM) (MENIT)
07:00-09:00 PREPARE EXTRUDER 2
09:00-11:30 PRODUKSI 2.5
11:30-12:00 STOP PRODUKSI 0.5
12:00-13:00 ISTIRAHAT 1 3.5 210 44%
13:00-13:30 SETTING 0.5
13:30-14:30 PRODUKSI 1
14:30-15:00 CLEANING EXTRUDER 0.5
TOTAL 8

2 SHIFT
EXTRUDER
TOTAL PRODUKSI TOTAL PRODUKSI
JAM ACTIVITY DURASI (JAM) EFISIENSI
(JAM) (MENIT)
07:00-09:00 PREPARE EXTRUDER 2
09:00-11:30 PRODUKSI 2.5
11:30-12:00 STOP PRODUKSI 0.5
12:00-13:00 ISTIRAHAT 1
13:00-13:30 SETTING 0.5
13:30-15:00 PRODUKSI 1.5
9.5 570 59%
15:00-17:30 PRODUKSI 2.5
17:30-18:00 STOP PRODUKSI 0.5
18:00-19:00 ISTIRAHAT 1
19:00-19:30 SETTING 0.5
19:30-22:30 PRODUKSI 3
22:30-23:00 CLEANING EXTRUDER 0.5
TOTTAL 16

3 SHIFT
EXTRUDER
TOTAL PRODUKSI TOTAL PRODUKSI
JAM ACTIVITY DURASI (JAM) EFISIENSI
(JAM) (MENIT)
07:00-11:30 PRODUKSI 4.5
11:30-12:00 STOP PRODUKSI 0.5
12:00-13:00 ISTIRAHAT 1
13:00-13:30 SETTING 0.5
13:30-15:00 PRODUKSI 1.5
15:00-17:30 PRODUKSI 2.5
17:30-18:00 STOP PRODUKSI 0.5
18:00-19:00 ISTIRAHAT 1 18 1080 75%
19:00-19:30 SETTING 0.5
19:30-23:00 PRODUKSI 3.5
23:00-03:30 PRODUKSI 4.5
03:30-04:00 STOP PRODUKSI 0.5
04:00-05:00 ISTIRAHAT 1
05:00-05:30 SETTING 0.5
05:30-07:00 PRODUKSI 1.5
TOTAL 24
KAPASITAS PRODUKSI SPLICER AUTOMOBILE
CYCLE TIME PRODUCTIVITY EFISIENSI DEFECT
SPLICER 1 SHIFT (DETIK) SIZE 1 SHIFT 2 SHIFT 3 SHIFT
(DETIK) (%) (%) (%)
1 25200 86 85% 94.0% 30% 164 328 492
2 25200 86 85% 94.0% 30% 164 328 492
750-16
3 25200 110 85% 94.0% 30% 128 256 385
4 25200 110 85% 94.0% 30% 128 256 385
TOTAL 584 1169 1753

ACTIVITY DETIK % loss time


prepare awal shift 300 1.2%
celaning sebelum istirahat 300 1.2%
Prepare setelah istirahat 300 1.2%
cleaning akhir shift 600 2.4%
total 1500 6.0%
KAPASITAS PRODUKSI VULCANIZER AUTOMOBILE
1 SHIFT CYCLE TIME EFISIENSI DEFECT PCS/ MOLD PCS/ MOLD PCS/ MOLD
SIZE PRODUCTIVITY %
(Detik) (Detik) % % 1 SHIFT 2 SHIFT 3 SHIFT
550-13 25200 387 85% 90.5% 10% 45 90 135
600-14 25200 387 85% 90.5% 10% 45 90 135
700-15 25200 417 85% 90.5% 10% 42 84 125
750-16 25200 417 85% 90.5% 10% 42 84 125
900-20 25200 647 85% 90.5% 10% 27 54 81
1200-20 25200 747 85% 90.5% 10% 23 47 70

ACTIVITY DETIK % loss time


Prepare awal shift 600 2.4%
Stop Line sebelum istirahat 600 2.4%
Prepare awal setelah istirahat 600 2.4%
Stop Line sebelum pulang 600 2.4%
total 2400 9.5%