A Tenaga Kerja
1 Mandor OH OH OH 0.0100 129,399.76 1,294.00
2 Pekerja OH 0.1000 90,454.83 9,045.48
3 Kepala Tukang Kayu 0.0100 129,399.76 1,294.00
4 Tukang Kayu 0.0100 114,324.57 1,143.25
B Bahan
1 Kayu Papan Meranti Kayu Usuk Meranti Paku M3 0.0070 2,412,916.57 16,890.42
2 Campur M3 0.0130 2,412,916.57 31,367.92
3 Kg 0.0200 37,851.84 757.04
C Peralatan
A Tenaga Kerja
B Bahan
C Peralatan
1 Topi Pelindung (Safety Helmet) Sarung Tangan Bh Psg Psg 25.00 80,000.00 2,000,000.00
2 Sepatu Bot (Safety Shoes) Peralatan P3K Ls Bh 25.00 8,000.00 200,000.00
3 Alat Pemadam Api Ringan 25.00 350,000.00 8,750,000.00
4 1.00 1,000,000.00 1,000,000.00
5 1.00 750,000.00 750,000.00