Anda di halaman 1dari 5

Tahun 2014 2015 2016 2017 2018 2019 2020

Puncak Malam (KW) 14,100 15,651 17,373 19,284 21,405 23,759 26,373
Puncak Malam (KVA) 17,625 19,564 21,716 24,104 26,756 169 29,699 187 32,966
Puncak Siang (KW) 8,460 9,391 10,424 11,570 12,843 14,256 15,824

Rincian beban 15 111 16.65 123.21 18.48 136.76 20.51 151.81 22.77 168.51 25.28 187.04 28.06
16 111 17.76 123.21 19.71 136.76 21.88 151.81 24.29 168.51 26.96 187.04 29.93
25 111 27.75 123.21 30.80 136.76 34.19 151.81 37.95 168.51 42.13 187.04 46.76
50 111 55.50 123.21 61.61 136.76 68.38 151.81 75.90 168.51 84.25 187.04 93.52
100 111 111.00 123.21 123.21 136.76 136.76 151.81 151.81 168.51 168.51 187.04 187.04
125 111 138.75 123.21 154.01 136.76 170.95 151.81 189.76 168.51 210.63 187.04 233.80
140 111 155.40 123.21 172.49 136.76 191.47 151.81 212.53 168.51 235.91 187.04 261.86
150 111 166.50 123.21 184.82 136.76 205.14 151.81 227.71 168.51 252.76 187.04 280.56
160 111 177.60 123.21 197.14 136.76 218.82 151.81 242.89 168.51 269.61 187.04 299.27
200 111 222.00 123.21 246.42 136.76 273.53 151.81 303.61 168.51 337.01 187.04 374.08
250 111 277.50 123.21 308.03 136.76 341.91 151.81 379.52 168.51 421.26 187.04 467.60
OPERASI GI POLMAS 30 MVA PERIOD APRIL 2015 Hasil Simulasi Jatuh Tegangan Sistem dan Operasi GI Polmas
Beban Puncak Beban Puncak Rata-rata 2018 (Kasus 2018 (Kasus
Tanggal Tahun Proyeksi 2014 2015 2016 2017
Malam (MW) Siang (MW) Harian (MW) 1) 2)
1-Apr-15 11.43 9.98 10.71 Proyeksi Beban Puncak Malam (MW) 14.10 15.65 17.37 19.28 21.41 21.41 25.00
2-Apr-15 12.8 9.21 11.01 Operasi GI Polmas 30 MVA (Amper) 472.9 528.6 591.2 676.1 737.9 591.1
3-Apr-15 12.69 8.36 10.53 FLA Trafo 30 MVA (Amper) 866 866 866 866 866 866
4-Apr-15 12.77 8.53 10.65 Jatuh Tegangan Terendah (kV) 18.361 18.075 17.729 17.331 16.95 18.094 20.00
5-Apr-15 12.72 8.56 10.64 Jumlah Tegangan Sistem < 18 kV 0 0 37 84 93 0
6-Apr-15 12.99 9.11 11.05 Standar PLN (-10%) Nominal kV 18 18 18 18 18 18
7-Apr-15 13.46 9.35 11.41 15.00
8-Apr-15 13.83 9.35 11.59

(MW)
9-Apr-15 13.57 12 12.79 Operasi GI Polmas 30 MVA Berdasarkan Beban Proyeksi
10-Apr-15 13.29 9.57 11.43 10.00
11-Apr-15 13.18 9.01 11.10
12-Apr-15 12.86 8.65 10.76 25.00 1000
13-Apr-15 14.7 8.98 11.84 5.00
14-Apr-15 15.17 10.26 12.72 900 FLA Trafo
866 Ampere
15-Apr-15 13.86 9.71 11.79 20.00 800
737.9
16-Apr-15 12.98 9.19 11.09 676.1 0.00
700
17-Apr-15 13.06 9.39 11.23
591.2
18-Apr-15 13.35 10.59 11.97 15.00 600
528.6
19-Apr-15 12.81 8.8 10.81

(Ampere)
472.9

(MW)
500
20-Apr-15 13.16 10.24 11.70
21-Apr-15 12.85 9.22 11.04 21.41
10.00 19.28 400
22-Apr-15 13.16 9.2 11.18 17.37
15.65 300
23-Apr-15 13.59 9.34 11.47 14.10
24-Apr-15 13.25 9.1 11.18 5.00 200
25-Apr-15 12.2 8.78 10.49
100
26-Apr-15 12.9 8.54 10.72
27-Apr-15 13.24 9.16 11.20 0.00 0
28-Apr-15 13.39 9.36 11.38 2014 2015 2016 2017 2018 (Kasus 1)
29-Apr-15 13.64 9.53 11.59 Proyeksi Beban Puncak Malam (MW) Operasi GI Polmas 30 MVA (Amper) FLA Trafo 30 MVA (Amper)
30-Apr-15 13.66 9.2 11.43
Rata-rata Bulanan 13.22 9.34 11.28

Beban Harian GI. Polmas 30 MVA Periode April 2015


16 15.17

14
12.79 12.72
1211.43 11.84 11.79 11.97 11.70
11.59
11.41 12 11.43 11.47 11.59
11.38 11.43Rata-rata Bulanan 11,28 MW
11.01 11.05 11.10 11.23
11.09 11.18
11.04 11.18
10.71 10.53 10.6510.64 10.76 10.81
10.59 10.72
10.49 11.20
10 9.98 10.26 10.24
9.57 9.71 9.53
9.21 9.119.359.35 9.01 8.98 9.199.39 9.229.2 9.349.1 9.169.36 9.2
8.538.56 8.65 8.8 8.788.54
8.36
8
MW

4 Beban Puncak Malam (MW)


11.41 12 11.43 11.23 11.47
11.18 11.18 11.38 11.43
11.01 11.05 11.10 11.09 10.81 11.04
10.71 10.65
10.53 10.64 10.76 10.59 10.72
10.49 11.20
10 9.98 10.26 10.24
9.57 9.71 9.53
9.21 9.119.359.35 9.01 8.98 9.199.39 9.229.2 9.349.1 9.169.36 9.2
8.538.56 8.65 8.8 8.788.54
8.36
8

MW 6 Jatuh Tegangan S
4 Beban Puncak Malam (MW)
Beban Puncak Siang (MW) 18.5
2 Rata-rata Harian (MW) 18.361

18.075
0 18
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1 pr-1
A A A A A -A -A -A -A -A -A -A -A -A -A
1- 3- 5- 7- 9- 11 13 15 17 19 21 23 25 27 29
17.5

(kV)
17

16.5

0 0
16
2014 2015

Jatuh Tegangan Terendah (kV)


Operasi GI Polmas 30 MVA Berdasarkan Beban Proyeksi

25.00 1000

900 FLA Trafo


866 Ampere
20.00 737.9 800
676.1
700
591.2 591.1
15.00 600
528.6

(Ampere)
472.9
(MW)

500
21.41 21.41
10.00 19.28 400
17.37
15.65 PLTM Pongbembe 2x5 300
MW
14.10
Beroperasi
5.00 200

100

0.00 0
2014 2015 2016 2017 2018 (Kasus 1) 2018 (Kasus 2)
Proyeksi Beban Puncak Malam (MW) Operasi GI Polmas 30 MVA (Amper) FLA Trafo 30 MVA (Amper)

Jatuh Tegangan Sistem Berdasarkan Beban Proyeksi

18.5 93 100
18.361
84 90
18.075 Drop Tegangan
18.094
18 80 kV S-PLN
18
17.729 70

17.5 60

(Titk Bus)
17.331
50
(kV)

37
17 16.95 40

PLTM Pongbembe 2x5 MW 30


Beroperasi
16.5 20

10
0 0 0
16 0
2014 2015 2016 2017 2018 (Kasus 1) 2018 (Kasus 2)

Jatuh Tegangan Terendah (kV) Standar PLN (-10%) Nominal kV Jumlah Tegangan Sistem < 18 kV
atuh Tegangan Sistem Berdasarkan Beban Proyeksi

93 100
84 90
18.075 Drop Tegangan
80 kV S-PLN
18
17.729 70

60

(Titk Bus)
17.331
50
37
16.9540
30

20

10
0
0
2015 2016 2017 2018 (Kasus 1)

Tegangan Terendah (kV) Standar PLN (-10%) Nominal kV Jumlah Tegangan Sistem < 18 kV