Project Code: P23001

Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I


EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0034 R-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0035 Y-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0036 B-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Unbalanced CT cable 23-10-HWSG-4301 0%
0008 33kV GIS Switchgear Bus-A
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Door Interlocking Cable 23-10-HWSG-4301 0%
0071 33kV GIS Switchgear Bus-A
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Filter Trip from F&G system 23-10-HWSG- 0%
0309 4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Container Over Temp/ Alarm & Trip from AC 0%
0317 Control Panel 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0037 R-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0038 Y-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0039 B-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Unbalanced CT cable 23-10-HWSG-4301 0%
0009 33kV GIS Switchgear Bus-A
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Door Interlocking Cable 23-10-HWSG-4301 0%
0072 33kV GIS Switchgear Bus-A
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Filter Trip from F&G system 23-10-HWSG- 0%
0310 4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Container Over Temp/ Alarm & Trip from AC 0%
0318 Control Panel 23-10-HWSG-4301
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-HV- Power Cable 23-10-HWSG-4301 0%
distribution 0019 33kV GIS Switchgear Bus-A
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Trip And Alarm Signals from transformer 0%
distribution 0003 marshalling box 23-10-HWSG-4301
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HWSG-4301 0%
distribution 0002 33kV GIS Switchgear Bus-A
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Neutral CT cable 23-10-HWSG-4301 0%
distribution 0001 33kV GIS Switchgear Bus-A
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-HV- Earthing Cable 23-10-TP-4303 0%
distribution 0020 33kV 400A Neutral Earthing Transformer TO
010-14-08 SCMS E-Electrical 23-10-EC- 4-20mA Signal cable from OTI 23-10-TP- 0%
0232 4303
010-14-08 SCMS E-Electrical 23-10-EC- 4-20mA Signal cable from WTI 23-10-TP- 0%
0233 4303
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-HV- Power Cable 23-10-HWSG-4301 0%
distribution 0021 33kV GIS Switchgear Bus-A
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- Trip And Alarm Signals from transformer 0%
distribution 0005 marshalling box 23-10-HWSG-4301
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HWSG-4301 0%
distribution 0004 33kV GIS Switchgear Bus-A
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0055 R-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0056 Y-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0057 B-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Unbalanced CT cable 23-10-HWSG-4301 0%
0017 33kV GIS Switchgear Bus-B
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Door Interlocking Cable 23-10-HWSG-4301 0%
0073 33kV GIS Switchgear Bus-B
Page 1 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Filter Trip from F&G system 23-10-HWSG- 0%
0311 4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Container Over Temp/ Alarm & Trip from AC 0%
0319 Control Panel 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0058 R-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0059 Y-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-HV- Power Cable 0%
0060 B-Phase 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Unbalanced CT cable 23-10-HWSG-4301 0%
0018 33kV GIS Switchgear Bus-B
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Door Interlocking Cable 23-10-HWSG-4301 0%
0074 33kV GIS Switchgear Bus-B
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Filter Trip from F&G system 23-10-HWSG- 0%
0312 4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Container Over Temp/ Alarm & Trip from AC 0%
0320 Control Panel 23-10-HWSG-4301
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-HV- Power cable 23-10-HWSG-4301 0%
distribution 0053 33kV GIS Switchgear Bus-B
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Trip And Alarm Signals from transformer 0%
distribution 0016 marshalling box 23-10-HWSG-4301
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HWSG-4301 0%
distribution 0015 33kV GIS Switchgear Bus-B
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Neutral CT cable 23-10-HWSG-4301 0%
distribution 0014 33kV GIS Switchgear Bus-B
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-HV- Earthing Cable 23-10-TP-4304 0%
distribution 0054 33kV 400A Neutral Earthing Transformer TO
010-14-08 SCMS E-Electrical 23-10-EC- 4-20mA Signal cable from OTI 23-10-TP- 0%
0234 4304
010-14-08 SCMS E-Electrical 23-10-EC- 4-20mA Signal cable from WTI 23-10-TP- 0%
0235 4304
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-HV- Power Cable 23-10-HWSG-4301 0%
distribution 0052 33kV GIS Switchgear Bus-B
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- Trip And Alarm Signals from transformer 0%
distribution 0013 marshalling box 23-10-HWSG-4301
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HWSG-4301 0%
distribution 0012 33kV GIS Switchgear Bus-B
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-BD- 23-10-TP-4301 0%
distribution 4401 33/0.433kV 2MVA
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- For 51G Trip 23-10-TP-4301 0%
distribution 0039 33/0.433kV 2MVA
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- For 64REF 23-10-TP-4301 0%
distribution 0040 33/0.433kV 2MVA
010-14-08 SCMS E-Electrical 23-10-EC- 4-20mA Signal cable from WTI 23-10-TP- 0%
0037 4301
010-14-08 SCMS E-Electrical 23-10-EC- 4-20mA Signal cable from OTI 23-10-TP- 0%
0038 4301
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-BD- 23-10-TP-4302 0%
distribution 4402 33/0.433kV 2MVA
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- For 51G Trip 23-10-TP-4302 0%
distribution 0043 33/0.433kV 2MVA
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- For 64REF 23-10-TP-4302 0%
distribution 0044 33/0.433kV 2MVA
010-14-08 SCMS E-Electrical 23-10-EC- 4-20mA Signal cable from OTI 23-10-TP- 0%
0041 4302
010-14-08 SCMS E-Electrical 23-10-EC- 4-20mA Signal cable from WTI 23-10-TP- 0%
0042 4302
Page 2 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
Injection Piping 0021 415V Switchgear Bus-A TO 23-10-PM-6202-
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
Injection Piping 0021 415V Switchgear Bus-A TO 23-10-MC-6202-
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
Injection Piping 0075 415V Switchgear Bus-A TO 23-10-IRP-7201
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
Injection Piping 0076 23-10-MSWG-4401
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
Injection Piping 0077 415V Switchgear Bus-A TO 23-10-IRP-7201
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
Injection Piping 0022 415V Switchgear Bus-B TO 23-10-PM-6202-
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
Injection Piping 0022 415V Switchgear Bus-B TO 23-10-MC-6202-
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
Injection Piping 0078 415V Switchgear Bus-B TO 23-10-IRP-7201
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
Injection Piping 0079 23-10-MSWG-4401
010-08-01 Biocide Injection Skid (U-6202) and E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
Injection Piping 0080 415V Switchgear Bus-B TO 23-10-IRP-7201
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
Injection Piping 0023 415V Switchgear Bus-A TO 23-10-PM-6201-
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
Injection Piping 0023 415V Switchgear Bus-A TO 23-10-MC-6201-
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
Injection Piping 0084 415V Switchgear Bus-A TO 23-10-IRP-7201
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
Injection Piping 0085 23-10-MSWG-4401
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
Injection Piping 0086 415V Switchgear Bus-A TO 23-10-IRP-7201
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
Injection Piping 0024 415V Switchgear Bus-B TO 23-10-PM-6201-
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
Injection Piping 0024 415V Switchgear Bus-B TO 23-10-MC-6201-
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
Injection Piping 0087 415V Switchgear Bus-B TO 23-10-IRP-7201
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
Injection Piping 0088 23-10-MSWG-4401
010-09-01 Chemical Injection Skid (U-6201) and E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
Injection Piping 0089 415V Switchgear Bus-B TO 23-10-IRP-7201
010-06-01 Closed Drain System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0025 415V Switchgear Bus-A TO 23-10-PM-6701-
010-06-01 Closed Drain System E-Electrical 23-10-LV- Space Heater Cable 23-10-MSWG-4401 0%
0025 415V Switchgear Bus-A TO 23-10-ISL-6701-
010-06-01 Closed Drain System E-Electrical 23-10-LV- Space Heater Cable 23-10-ISL-6701-01 0%
0185 Space Heater Safety Switch for Closed Drain
010-06-01 Closed Drain System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0025 415V Switchgear Bus-A TO 23-10-MC-6701-
010-06-01 Closed Drain System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0090 415V Switchgear TO 23-10-IRP-7201
010-06-01 Closed Drain System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0091 23-10-MSWG-4401
010-06-01 Closed Drain System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0092 415V Switchgear TO 23-10-IRP-7201
010-06-01 Closed Drain System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0026 415V Switchgear Bus-B TO 23-10-PM-6701-
010-06-01 Closed Drain System E-Electrical 23-10-LV- Space Heater Cable 23-10-MSWG-4401 0%
0026 415V Switchgear Bus-B TO 23-10-ISL-6701-
Page 3 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-06-01 Closed Drain System E-Electrical 23-10-LV- Space Heater Cable 23-10-ISL-6701-02 0%
0191 Space Heater Safety Switch for Closed Drain
010-06-01 Closed Drain System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0026 415V Switchgear Bus-B TO 23-10-MC-6701-
010-06-01 Closed Drain System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0093 415V Switchgear Bus-B TO 23-10-IRP-7201
010-06-01 Closed Drain System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0094 23-10-MSWG-4401
010-06-01 Closed Drain System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0095 415V Switchgear Bus-B TO 23-10-IRP-7201
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0027 415V Switchgear Bus-A TO 23-10-PM-6702-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-LV- Space Heater Cable 23-10-MSWG-4401 0%
0027 415V Switchgear Bus-A TO 23-10-ISL-6702-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-LV- Space Heater Cable 23-10-ISL-6702-01 0%
0182 Space Heater Safety Switch for Closed Drain
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0027 415V Switchgear Bus-A TO 23-10-MC-6702-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0096 415V Switchgear TO 23-10-IRP-7201
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0097 23-10-MSWG-4401
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0098 415V Switchgear TO 23-10-IRP-7201
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0151 415V Switchgear Bus-A TO 23-10-PXM-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0242 415V Switchgear Bus-A TO 23-10-MC-6702-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0222 415V Switchgear Bus-A TO 23-10-IRP-7201
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0223 23-10-MSWG-4401
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0224 415V Switchgear Bus-A TO 23-10-IRP-7201
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0028 415V Switchgear Bus-B TO 23-10-PM-6702-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-LV- Space Heater Cable 23-10-MSWG-4401 0%
0028 415V Switchgear Bus-B TO 23-10-ISL-6702-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-LV- Space Heater Cable 23-10-ISL-6702-02 0%
0188 Space Heater Safety Switch for Closed Drain
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0028 415V Switchgear Bus-B TO 23-10-MC-6702-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0099 415V Switchgear Bus-B TO 23-10-IRP-7201
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0100 23-10-MSWG-4401
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0101 415V Switchgear Bus-B TO 23-10-IRP-7201
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0152 415V Switchgear Bus-B TO 23-10-PXM-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0243 415V Switchgear Bus-B TO 23-10-MC-6702-
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0244 415V Switchgear Bus-B TO 23-10-IRP-7201
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0245 23-10-MSWG-4401
010-06-02 Closed Drain Booster Pump E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0246 415V Switchgear Bus-B TO 23-10-IRP-7201
Page 4 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-07-01 Potable Water System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0029 415V Switchgear Bus-A TO 23-10-PM-2301
010-07-01 Potable Water System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0029 415V Switchgear Bus-A TO 23-10-MC-2301
010-07-01 Potable Water System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0102 415V Switchgear TO 23-10-IRP-7201
010-07-01 Potable Water System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0103 23-10-MSWG-4401
010-07-01 Potable Water System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0104 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0031 415V Switchgear TO 23-10-KM-6101
010-11-01 Instrument Air Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0032 415V Switchgear TO 23-10-KM-6101
010-11-01 Instrument Air Distribution System E-Electrical 23-10-LV- Space Heater Cable 23-10-MSWG-4401 0%
0031 415V Switchgear TO 23-10-ISL-6101
010-11-01 Instrument Air Distribution System E-Electrical 23-10-LV- Space Heater Cable 23-10-ISL-6101 0%
0186 Space Heater Safety Switch for Air
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0031 415V Switchgear TO 23-10-MC-6101
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0105 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0106 23-10-MSWG-4401
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0107 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0035 415V Switchgear Bus-A TO 23-10-FM-6101-
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0035 415V Switchgear Bus-A TO 23-10-MC-6101-
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0108 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0109 23-10-MSWG-4401
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0110 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0149 415V Switchgear Bus-A TO 23-10-FM-6101-
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0236 415V Switchgear Bus-A TO 23-10-MC-6101-
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0226 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0227 23-10-MSWG-4401
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0228 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0033 415V Switchgear Bus-B TO 23-10-KM-6102
010-11-01 Instrument Air Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0034 415V Switchgear Bus-B TO 23-10-KM-6102
010-11-01 Instrument Air Distribution System E-Electrical 23-10-LV- Space Heater Cable 23-10-MSWG-4401 0%
0033 415V Switchgear Bus-B TO 23-10-ISL-6102
010-11-01 Instrument Air Distribution System E-Electrical 23-10-LV- Space Heater Cable 23-10-ISL-6102 0%
0192 Space Heater Safety Switch for Air
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0033 415V Switchgear Bus-B TO 23-10-MC-6102
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0111 415V Switchgear TO 23-10-IRP-7201
Page 5 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0112 23-10-MSWG-4401
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0113 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0036 415V Switchgear Bus-B TO 23-10-FM-6102-
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0036 415V Switchgear Bus-B TO 23-10-MC-6102-
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0114 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0115 23-10-MSWG-4401
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0116 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0150 415V Switchgear Bus-B TO 23-10-FM-6102-
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- LCS Cable 23-10-MSWG-4401 0%
0237 415V Switchgear Bus-B TO 23-10-MC-6102-
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Start Stop from DCS 23-10-MSWG-4401 0%
0229 415V Switchgear TO 23-10-IRP-7201
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- Run & Available to start status signal to DCS 0%
0230 23-10-MSWG-4401
010-11-01 Instrument Air Distribution System E-Electrical 23-10-EC- ESD Interface 23-10-MSWG-4401 0%
0231 415V Switchgear TO 23-10-IRP-7201
010-10-01 Nitrogen Distribution System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0037 415V Switchgear Bus-A
010-10-01 Nitrogen Distribution System E-Electrical 23-10-MV- Power Cable 23-10-ECP-4407 0%
0133 Thyrister Control Panel TO 23-10-H-6901
010-10-01 Nitrogen Distribution System E-Electrical 23-10-LV- Space Heater Cable 23-10-ECP-4407 0%
0237 Thyrister Control Panel TO 23-10-H-6901
010-10-01 Nitrogen Distribution System E-Electrical 23-10-MV- Power Cable 23-10-ECP-4407 0%
0127 Thyrister Control Panel TO 23-10-H-6902
010-10-01 Nitrogen Distribution System E-Electrical 23-10-LV- Space Heater Cable 23-10-ECP-4407 0%
0238 Thyrister Control Panel TO 23-10-H-6902
010-10-01 Nitrogen Distribution System E-Electrical 23-10-EC- Ammeter Cable 23-10-ECP-4407 0%
0061 Thyrister Control Panel TO 23-10-JB-ID-055
010-10-01 Nitrogen Distribution System E-Electrical 23-10-EC- Ammeter Cable 23-10-ECP-4407 0%
0172 Thyrister Control Panel TO 23-10-JB-ID-055
010-14-05 HVAC System (substation) E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0038 415V Switchgear Bus-B
010-14-05 HVAC System (substation) E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0039 415V Switchgear Bus-B
010-15-01 HVAC System (control building) E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0040 415V Switchgear Bus-B
010-15-01 HVAC System (control building) E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0041 415V Switchgear Bus-B
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0001 R-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0002 R-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0003 R-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0004 R-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0005 Y-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0006 Y-Phase 23-10-G-4201
Page 6 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0007 Y-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0008 Y-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0009 B-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0010 B-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0011 B-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Power Cable 0%
0012 B-Phase 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Neutral Cable 23-10-G-4201 0%
0013 Emergency Diesel Generator TO 23-10-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Neutral Cable 23-10-G-4201 0%
0014 Emergency Diesel Generator TO 23-10-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Neutral Cable 23-10-G-4201 0%
0015 Emergency Diesel Generator TO 23-10-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Neutral Cable 23-10-G-4201 0%
0016 Emergency Diesel Generator TO 23-10-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for CT Input 0%
0117 (87G Protection) 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for CT Input 0%
0118 (87G Protection) 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for CT Input 0%
0120 (51G Protection) 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for RTD Input 0%
0122 (winding & bearing temp) 23-10-G-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for PT Input (Bus-A) 23-10- 0%
0123 MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for PT Input (Bus-B) 23-10- 0%
0124 MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for Line PT -2 Input 23-10- 0%
0285 MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for Line PT -2 Input 23-10- 0%
0286 GCP-4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control Cable for EDG PT Input 23-10-GCP- 0%
0287 4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Command signals from GCP to LV 0%
0125 Switchgear 23-10-MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Status signals from LV Switchgear to GCP 0%
0126 23-10-MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Start EDG from ATS 0%
0127 Logic 23-10-MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Status signals from LV Switchgear to GCP 0%
0288 23-10-MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Command signals from GCP to LV 0%
0289 Switchgear 23-10-MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Status signals from LV Switchgear to GCP 0%
0290 23-10-MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Command signals from GCP to LV 0%
0291 Switchgear 23-10-MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Status signals from LV Switchgear to GCP 0%
0292 23-10-MSWG-4401
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control & Interlocking cable 23-10-GCP- 0%
0183 4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control & Interlocking cable 23-10-GCP- 0%
0184 4201
Page 7 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control & Interlocking cable 23-10-GCP- 0%
0293 4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control & Interlocking cable 23-10-GCP- 0%
0294 4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- Control & Interlocking cable 23-10-GCP- 0%
0295 4201
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- For Excitor control 23-10-GCP-4201 0%
0296 Generator Control Panel TO 23-10-GCP-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- CAN BUS CABLE 23-10-GCP-4201 0%
0297 Generator Control Panel TO 23-10-GCP-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-EC- CAN BUS CABLE 23-10-GCP-4201 0%
0298 Generator Control Panel TO 23-10-GCP-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-LV- 24V power supply to LCB 0%
0386 For Excitor Control 23-10-GCP-4201
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
Power Distribution 0045 415V Switchgear Bus-A
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0060 415V Switchgear Bus-A
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0061 415V Switchgear Bus-A
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
Power Distribution 0058 415V Switchgear Bus-A
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
Power Distribution 0059 415V Switchgear Bus-A
010-14-11 240V AC UPS System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0046 415V Switchgear Bus-A
010-14-11 240V AC UPS System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0047 415V Switchgear Bus-B
010-14-11 240V AC UPS System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0048 415V Switchgear Bus-B
010-14-12 110V DC UPS System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0049 415V Switchgear Bus-A
010-14-12 110V DC UPS System E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0050 415V Switchgear Bus-B
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0057 415V Switchgear Bus-A
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-WS-4401-03 0%
0129 Welding Socket Outlet (Field) TO 23-10-WS-
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-MSWG-4401 0%
0056 415V Switchgear Bus-A
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-WS-4401-05 0%
0130 Welding Socket Outlet (Field) TO 23-10-WS-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-MV- Auxiliary Power Cable 23-10-MSWG-4401 0%
0044 415V Switchgear Bus-B
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-EC- U/V Status to ICSS System 23-10-MSWG- 0%
distribution 0277 4401
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
Power Distribution 0081 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
Power Distribution 0082 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
Power Distribution 0083 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
Power Distribution 0084 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
Power Distribution 0085 Main Distribution Board
030-10-01 Cathodic protection for 14" Export Line E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
from CGS to QW CDS 0086 Main Distribution Board
Page 8 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- #NAME? 0%
Power Distribution 0087
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- #NAME? 0%
Power Distribution 0088
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
Power Distribution 0089 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- #NAME? 0%
Power Distribution 0090
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
0091 Main Distribution Board
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
0092 Main Distribution Board
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
0093 Main Distribution Board
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
0094 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-MDB-4401 0%
Power Distribution 0153 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-EC- HVAC Trip from F&G 23-10-MDB-4401 0%
Power Distribution 0313 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-EC- HVAC Trip from F&G 23-10-MDB-4401 0%
Power Distribution 0314 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-EC- HVAC Trip from F&G 23-10-MDB-4401 0%
Power Distribution 0315 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-EC- HVAC Trip from F&G 23-10-MDB-4401 0%
Power Distribution 0316 Main Distribution Board
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0101 MOV Distribution Board TO 23-10-M-0101
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0102 MOV Distribution Board TO 23-10-M-0102
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0103 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0104 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0105 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0106 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0107 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0108 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0109 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0110 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0111 MOV Distribution Board TO 23-10-MOV-
010-14-07 MDB Power Distribution and MOV DB E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-06 0%
Power Distribution 0112 MOV Distribution Board TO 23-10-MOV-
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0061 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0062 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0063 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-ESCP-4904 0%
0340 FMS Panel TO 23-10-ESCP-4903
Page 9 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-ESCP-4904 0%
0341 FMS Panel TO 23-10-ESCP-4905
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0064 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-ESCP-4904 0%
0344 FMS Panel TO 23-10-ESCP-4906
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0065 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0066 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0090 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0091 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0092 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0067 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0068 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0069 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0070 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0485 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0455 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0093 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0094 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0462 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0463 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0468 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0469 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0071 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0072 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0073 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0074 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0075 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0076 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0077 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0078 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0088 Backup)
Page 10 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0089 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0079 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0080 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0081 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0082 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0083 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0084 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0085 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0086 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0087 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0097 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0098 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0099 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (0.5hrs 0%
0100 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0095 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-10 (8hrs 0%
0096 Backup)
010-14-11 240V AC UPS System E-Electrical 23-10-EC- MCCB On/Off Indication 23-10-UPS-4401 0%
0266 240V AC UPS TO 23-10-ISL-4501-01
010-14-11 240V AC UPS System E-Electrical 23-10-EC- MCCB On/Off Indication 23-10-UPS-4401 0%
0267 240V AC UPS TO 23-10-ISL-4501-02
010-14-11 240V AC UPS System E-Electrical 23-10-EC- Battery-1 trip signal (Fire detection) 23-10- 0%
0268 ISL-4501-01
010-14-11 240V AC UPS System E-Electrical 23-10-EC- Battery-2 trip signal (Fire detection) 23-10- 0%
0269 ISL-4501-02
010-14-11 240V AC UPS System E-Electrical 23-10-EC- AC UPS Common Fail Alarm 23-10-UPS-4401 0%
0308 240V AC UPS TO IRP Cabinet 23-10-IRP-
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-UPS-4401 0%
0478 240V AC UPS TO 23-10-ECP-4402
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0101 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0102 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0103 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0466 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0105 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0335 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0106 AC UPS DB in Control Room
Page 11 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0107 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0108 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0110 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0336 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0467 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0111 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0112 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0113 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0114 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0115 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0116 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0117 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0349 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0118 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0119 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0120 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0121 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0122 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0123 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0124 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0350 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0479 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0480 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0486 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0487 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0488 AC UPS DB in Control Room
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-07 0%
0489 AC UPS DB in Control Room
010-14-12 110V DC UPS System E-Electrical 23-10-DC- Power Cable 23-10-DB-4401-11 0%
0002 110V DC UPS (Inbuilt DB) TO 23-10-HSWG-
010-14-12 110V DC UPS System E-Electrical 23-10-DC- Redundent Power Cable 23-10-DB-4401-11 0%
0003 110V DC UPS (Inbuilt DB) TO 23-10-HSWG-
Page 12 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-12 110V DC UPS System E-Electrical 23-10-DC- Power Cable 23-10-DB-4401-11 0%
0004 110V DC UPS (Inbuilt DB) TO 23-10-MSWG-
010-14-12 110V DC UPS System E-Electrical 23-10-DC- Redundent Power Cable 23-10-DB-4401-11 0%
0005 110V DC UPS (Inbuilt DB) TO 23-10-MSWG-
010-14-12 110V DC UPS System E-Electrical 23-10-DC- Power Cable 23-10-DB-4401-11 0%
0006 110V DC UPS (Inbuilt DB) TO 23-10-ECP-
010-14-12 110V DC UPS System E-Electrical 23-10-DC- Power Cable 23-10-DB-4401-11 0%
0010 110V DC UPS (Inbuilt DB) TO 23-10-HVPP-
010-14-12 110V DC UPS System E-Electrical 23-10-DC- Redundent Power Cable 23-10-DB-4401-11 0%
0011 110V DC UPS (Inbuilt DB) TO 23-10-HVPP-
010-14-12 110V DC UPS System E-Electrical 23-10-DC- Power Cable 23-10-DB-4401-11 0%
0012 110V DC UPS (Inbuilt DB) TO 23-10-GCP-
010-14-12 110V DC UPS System E-Electrical 23-10-EC- MCCB On/Off Indication 23-10-BC-4501 0%
0270 110V DC UPS TO 23-10-ISL-4501-03
010-14-12 110V DC UPS System E-Electrical 23-10-EC- MCCB On/Off Indication 23-10-BC-4501 0%
0271 110V DC UPS TO 23-10-ISL-4501-04
010-14-12 110V DC UPS System E-Electrical 23-10-EC- Battery-3 trip signal (Fire detection) 23-10- 0%
0272 ISL-4501-03
010-14-12 110V DC UPS System E-Electrical 23-10-EC- Battery-4 trip signal (Fire detection) 23-10- 0%
0273 ISL-4501-04
010-18-02 CCTV System E-Electrical 23-10-LV- Power Cable 23-10-CCTV-8301 0%
0327 CCTV Cabinet TO 23-10-CMRA-8301
010-18-02 CCTV System E-Electrical 23-10-LV- Power Cable 23-10-CCTV-8301 0%
0328 CCTV Cabinet TO 23-10-CMRA-8302
010-18-02 CCTV System E-Electrical 23-10-LV- Power Cable 23-10-CCTV-8301 0%
0329 CCTV Cabinet TO 23-10-CMRA-8303
010-18-02 CCTV System E-Electrical 23-10-LV- Power Cable 23-10-CCTV-8301 0%
0330 CCTV Cabinet TO 23-10-CMRA-8304
010-18-03 Telephone/PABX System E-Electrical 23-10-LV- Power Cable 23-10-PABX-8201 0%
0331 PABX Cabinet TO 23-10-TEL-8201
010-18-03 Telephone/PABX System E-Electrical 23-10-LV- Power Cable 23-10-PABX-8201 0%
0332 PABX Cabinet TO 23-10-TEL-8202
010-18-06 Meteorological System E-Electrical 23-10-LV- Power Cable 23-10-METE-8501 0%
0333 Meteorological Cabinet TO 23-10-METE-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0299 Small Power Distribution Board
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable JB-LV-065 0%
0001 240V AC Socket Outlet JB TO SKT-4401-71-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable JB-LV-065 0%
0391 240V AC Socket Outlet JB TO SKT-4401-20-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-20-R1 0%
0392 240V AC Convenience Outlet (Cellar) TO
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-21-R1 0%
0393 240V AC Convenience Outlet (Roof) TO SKT-
010-16-03 Plant Cathodic Protection System E-Electrical 23-10-LV- Power Cable JB-LV-065 0%
0264 240V AC Socket Outlet JB TO JB-LV-0113 for
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0002 Small Power Distribution Board
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-72-Y1 0%
0311 240V AC Convenience Outlet TO SKT-4401-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-73-Y1 0%
0451 24V AC Convenience Outlet TO SKT-4401-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-79-Y1 0%
0312 110V AC Convenience Outlet TO SKT-4401-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-74-Y1 0%
0313 240V AC Convenience Outlet TO SKT-4401-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-75-Y1 0%
0452 240V AC Convenience Outlet TO SKT-4401-
Page 13 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0003 Small Power Distribution Board
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-76-B1 0%
0453 240V AC Convenience Outlet TO SKT-4401-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-82-B1 0%
0315 110V AC Convenience Outlet TO SKT-4401-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-77-B1 0%
0316 24V AC Convenience Outlet TO SKT-4401-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable SKT-4401-78-B1 0%
0454 24V AC Convenience Outlet TO SKT-4401-
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
distribution 0009 Small Power Distribution Board TO 23-10-
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-LV- Redundent Power Cable 23-10-DB-4401-03 0%
distribution 0010 Small Power Distribution Board TO 23-10-
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
distribution 0011 Small Power Distribution Board TO 23-10-
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-LV- Redundent Power Cable 23-10-DB-4401-03 0%
distribution 0012 Small Power Distribution Board TO 23-10-
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
distribution 0007 Small Power Distribution Board TO 23-10-
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-LV- Power Cable 23-10-TP-4303 0%
distribution 0322 Aux. Power Supply for NET TO 23-10-NER-
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
distribution 0008 Small Power Distribution Board TO 23-10-
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-LV- Power Cable 23-10-TP-4304 0%
distribution 0045 Aux. Power Supply for NET TO 23-10-NER-
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
distribution 0013 Small Power Distribution Board TO 23-10-
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-LV- Power Cable 23-10-TP-4301 0%
distribution 0046 Aux. Power Supply for 33/0.433kV Trafo. TO
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
distribution 0014 Small Power Distribution Board TO 23-10-
010-14-03 415V Switchgear MSWG-4401 Power E-Electrical 23-10-LV- Power Cable 23-10-TP-4302 0%
distribution 0323 Aux. Power Supply for 33/0.433kV Trafo. TO
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0015 Small Power Distribution Board TO 23-10-
010-14-12 110V DC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0016 Small Power Distribution Board TO 23-10-
010-14-04 Emergency power Generator G-4201 E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0018 Small Power Distribution Board TO 23-10-
010-14-05 HVAC System (substation) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0019 Small Power Distribution Board TO 23-10-
010-14-08 SCMS E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0020 Small Power Distribution Board TO 23-10-
010-14-08 SCMS E-Electrical 23-10-LV- Power Cable 23-10-ESCP-4901 0%
0324 Aux. Power Supply for SCMS System Cabinet
010-14-09 FMS E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0041 Small Power Distribution Board TO 23-10-
010-14-09 FMS E-Electrical 23-10-LV- Power Cable 23-10-ESCP-4904 0%
0346 FMS RTU Panel-1 TO 23-10-ESCP-4903
010-14-09 FMS E-Electrical 23-10-LV- Power Cable 23-10-ESCP-4904 0%
0347 FMS RTU Panel-2 TO 23-10-ESCP-4905
010-14-09 FMS E-Electrical 23-10-LV- Power Cable 23-10-ESCP-4904 0%
0348 FMS RTU Panel-3 TO 23-10-ESCP-4906
010-10-01 Nitrogen Distribution System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0042 Small Power Distribution Board TO 23-10-
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0043 Small Power Distribution Board TO 23-10-
Page 14 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
distribution 0044 Small Power Distribution Board TO 23-10-
010-10-01 Nitrogen Distribution System E-Electrical 23-10-LV- Auxiliary Supply Small Power Distribution 0%
0244 Panel for
010-10-01 Nitrogen Distribution System E-Electrical 23-10-LV- Auxiliary Supply Small Power Distribution 0%
0371 Panel for
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Auxiliary Supply 23-10-DB-4401-03 0%
0461 Small Power Distribution Board
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Auxiliary Supply 23-10-JB-LV-005 (Near 0%
0475 Guard House) TO 23-10-FCP-5805
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable 23-10-JB-LV-005 (Near Guard 0%
0476 House) TO Split AC-1 in Guard House
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Auxiliary Supply 23-10-DB-4401-03 0%
0470 Small Power Distribution Board
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Auxiliary Supply SKT-4401-11-R14 0%
0471 110V AC Convenience Outlet TO SKT-4401-
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0474 Small Power Distribution Board
010-14-06 Small Power and Lighting (substation) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-03 0%
0481 Small Power Distribution Board
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0201 Small Power Distribution Board TO SDH-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0202 Small Power Distribution Board TO FCMS-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0203 Small Power Distribution Board TO PABX-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Redundent Power Cable 23-10-DB-4401-05 0%
building) 0204 Small Power Distribution Board TO SDH-85-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0205 Small Power Distribution Board TO PAS-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0207 Small Power Distribution Board TO CCTV-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0208 Small Power Distribution Board TO METE-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0209 Small Power Distribution Board TO XMR-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable XMR-5401 0%
building) 0482 F & G Marshalling Cabinet TO XMR-5402
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0210 Small Power Distribution Board TO LAN-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0212 Small Power Distribution Board TO DCS-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0213 Small Power Distribution Board TO PLC-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0214 Small Power Distribution Board TO PLC-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0215 Small Power Distribution Board TO DCC-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable DCC-7202 0%
building) 0483 Network Cabinet-1 TO DCC-7203
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0216 Small Power Distribution Board TO XCP-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable XCP-7202 0%
building) 0484 Server Cabinet-1 TO XCP-7203
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0217 Small Power Distribution Board TO SDP-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0218 Small Power Distribution Board TO XMR-
Page 15 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0219 Small Power Distribution Board TO XMR-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0220 Small Power Distribution Board TO UCP-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0221 Small Power Distribution Board TO UCP-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0222 Small Power Distribution Board TO UCP-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0223 Small Power Distribution Board TO UCP-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0224 Small Power Distribution Board TO Printer
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0326 Small Power Distribution Board TO 23-10-
010-14-11 240V AC UPS System E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
0339 Small Power Distribution Board TO 23-10-
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0389 Small Power Distribution Board
010-15-02 Small Power and Lighting (control E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-05 0%
building) 0464 Small Power Distribution Board TO FCP-
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0135 Power Distribution Board TO 23-10-DB-
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0136 Power Distribution Board TO 32A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0137 Power Distribution Board TO 32A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0138 Power Distribution Board TO 32A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0139 Power Distribution Board TO 32A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0140 Power Distribution Board TO 32A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0141 Power Distribution Board TO 32A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0142 Power Distribution Board TO 63A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0143 Power Distribution Board TO 63A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0144 Power Distribution Board TO 63A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0145 Power Distribution Board TO 63A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0146 Power Distribution Board TO 63A, 415V,
010-17-03 HVAC System (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0147 Power Distribution Board TO 63A, 415V,
010-17-01 Power Distribution (workshop) E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-08 0%
0148 Power Distribution Board TO For EOT Crane
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-09 0%
0231 Lighting & Small Power Distribution Board
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Power Cable SKT-4405-31-R 0%
0021 240V AC Convenience Socket TO SKT-4405-
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Power Cable SKT-4405-32-R 0%
0394 240V AC Convenience Socket TO SKT-4405-
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-09 0%
0233 Lighting & Small Power Distribution Board
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-09 0%
0234 Lighting & Small Power Distribution Board
Page 16 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable JB-LV-012 0%
0472 Workshop Store Lighting TO Lighting Switch
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable Lighting Switch -S1 in 0%
0442 Workshop TO Lighting Fixture (Workshop)
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Workshop) 0%
0443 23-10-LF-4705-04-R TO Lighting Fixture
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-09 0%
0235 Lighting & Small Power Distribution Board
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable Lighting Switch -S2 in 0%
0473 Workshop TO Lighting Fixture (Workshop)
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Workshop) 0%
0444 23-10-LF-4705-01-Y TO Lighting Fixture
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-09 0%
0236 Lighting & Small Power Distribution Board
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable JB-LV-016 0%
0477 Workshop Lighting TO Lighting Switch -S5
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable Lighting Switch -S5 in 0%
0445 Workshop TO Lighting Fixture (Workshop)
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Workshop) 0%
0446 23-10-LF-4705-05-B TO Lighting Fixture
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable JB-LV-016 0%
0447 Workshop Lighting TO Exit Light (Workshop)
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable Exit Light (Workshop) 0%
0448 23-10-LF-4705-22-B TO Exit Light
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Lighting Cable Exit Light (Workshop) 0%
0449 23-10-LF-4705-23-B TO Exit Light
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-09 0%
0242 Lighting & Small Power Distribution Board
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-09 0%
0243 Lighting & Small Power Distribution Board
010-17-02 Small Power and Lighting (workshop) E-Electrical 23-10-LV- Power Cable 23-10-DB-4401-09 0%
0465 Lighting & Small Power Distribution Board
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0051 SCMS at CGS Substation TO 23-10-MDB-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0062 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0063 SCMS at CGS Substation TO 23-10-MCC-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0052 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0054 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0064 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0060 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0034 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0053 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0066 SCMS at CGS Substation TO 23-10-MCC-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0067 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control Cable 23-10-ESCP-4902 0%
0160 SCMS at CGS Substation TO 23-10-DB-4401-
010-14-08 SCMS E-Electrical 23-10-EC- Control cable for DO form SCMS to LV 0%
0264 Switchgear 23-10-ESCP-4902
Page 17 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-08 SCMS E-Electrical 23-10-EC- Control cable for DI form LV Switchgear to 0%
0265 SCMS 23-10-ESCP-4902
010-14-08 SCMS E-Electrical 23-10-EC- Cantrol cable for Local Remote Selection 23- 0%
0276 10-ESCP-4902
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Bus VT Input 23-10-ESCP- 0%
0128 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Bus VT Input 23-10-ESCP- 0%
0129 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0130 4905
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4905 0%
0131 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for PT Input 23-10-ESCP-4905 0%
0278 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0132 4905
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4905 0%
0133 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for PT Input 23-10-ESCP-4905 0%
0279 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0134 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0135 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0136 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0137 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0138 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0139 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0140 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0141 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0142 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0143 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0144 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0145 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0146 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0147 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0148 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0149 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0150 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0151 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0152 4905
Page 18 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4905 0%
0153 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0154 4905
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4905 0%
0155 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0156 4905
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4905 0%
0157 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0158 4905
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4905 0%
0159 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0304 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0305 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0306 4904
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for CT Input 23-10-ESCP-4904 0%
0307 FMS at CGS Substation TO 23-10-HWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Bus VT Input 23-10-ESCP- 0%
0161 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Bus VT Input 23-10-ESCP- 0%
0162 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0163 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Line VT Input 23-10-ESCP- 0%
0164 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Line CT Input 23-10-ESCP- 0%
0280 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0165 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Line VT Input 23-10-ESCP- 0%
0166 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Line CT Input 23-10-ESCP- 0%
0281 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Line VT Input 23-10-ESCP- 0%
0168 4906
010-14-09 FMS E-Electrical 23-10-EC- 23-10-ESCP-4906 0%
0282 FMS at CGS Substation TO 23-10-MWSG-
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for DI Signals 23-10-ESCP- 0%
0169 4906
010-14-09 FMS E-Electrical 23-10-EC- Control Cable for Bus Coupler CT Input 23- 0%
0170 10-ESCP-4906
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS Incomer-1 (F1) 0%
0247 23-10-ESCP-4905
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS Bus Coupler 0%
0248 (F2A) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS Bus Coupler 0%
0283 (F2B) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS Incomer-2 (F3) 0%
0249 23-10-ESCP-4905
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0250 A (F4) 23-10-ESCP-4905
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0251 A (F5) 23-10-ESCP-4905
Page 19 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0252 A (F6) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0253 A (F7) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0254 A (F8) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0255 A (F9) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0256 A (F10) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0257 B (F11) 23-10-ESCP-4905
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0258 B (F12) 23-10-ESCP-4905
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0259 B (F13) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0260 B (F14) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0261 B (F15) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0262 B (F16) 23-10-ESCP-4904
010-14-09 FMS E-Electrical 23-10-EC- Busbar Diff operated for GIS O/G fdr on Bus- 0%
0263 B (F17) 23-10-ESCP-4904
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- CT input Cable 23-10-ECP-4402 0%
0174 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- PT input Cable 23-10-ECP-4402 0%
0175 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- CT input Cable 23-10-ECP-4402 0%
0176 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- PT input Cable 23-10-ECP-4402 0%
0177 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Status Signal Cable 23-10-ECP-4402 0%
0178 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Intertrip Cable 23-10-ECP-4402 0%
0179 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Status Signal Cable 23-10-ECP-4402 0%
0180 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Intertrip Cable 23-10-ECP-4402 0%
0181 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Status Signal Cable 23-10-ECP-4402 0%
0182 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Intertrip Cable 23-10-ECP-4402 0%
0238 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Status Signal Cable 23-10-ECP-4402 0%
0239 APFC Panel TO 23-10-HWSG-4301
010-14-02 33KV Power factor correction Capacitors E-Electrical 23-10-EC- Intertrip Cable 23-10-ECP-4402 0%
0185 APFC Panel TO 23-10-HWSG-4301
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0186 R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0187 H00 + R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0188 R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0189 H00 + R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0190 R03
Page 20 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0198 R03
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0199 H00 + R03
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0192 R04
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0193 H00 + R04
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0194 R04
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0195 H00 + R04
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0196 R04
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0197 H00 + R04
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0200 R01
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0201 H00 + R01
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0202 R01
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0203 H00 + R01
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0204 R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0205 H00 + R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0206 R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0207 H00 + R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0208 R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0209 H00 + R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0210 R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0211 H00 + R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0212 R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0213 H00 + R02
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0214 R04
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0215 H00 + R04
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0216 R03
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0217 H00 + R03
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0218 R03
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0219 H00 + R03
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- CT Input Cable 23-10-HVPP-4401 - H00 + 0%
distribution 0220 R03
Page 21 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-14-01 33KV switchgear HSWG-4301 Power E-Electrical 23-10-EC- Interlock/Intertrip cable 23-10-HVPP-4401 - 0%
distribution 0221 H00 + R03
010-16-02 Field Lighting and Small Power E-Electrical 23-10-EC- Control Cable Photocell At CGS Substation 0%
0055 TO 23-10-DB-4401-02
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0148 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-101 0%
0425 Substation Periphery Lighting TO
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0426 (Cellar)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0427 (Cellar)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0428 (SS Periphery)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0429 (Cellar)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0430 (Cellar)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0431 (Cellar)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-101 0%
0432 Substation Periphery Lighting TO
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0433 (SS Periphery)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0149 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0434 (Workshop)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0435 (Workshop)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0150 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0395 23-10-LF-4703-10-R5 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0396 23-10-LF-4703-06-R5 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0397 23-10-LF-4703-02-R5 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Substation 0%
0398 Periphery)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Substation 0%
0399 Periphery)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0151 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0400 23-10-LF-4703-03-Y5 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0401 23-10-LF-4703-07-Y5 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0402 23-10-LF-4703-09-Y5 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0403 23-10-LF-4703-15-Y5 TO JB-LV-011
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-011 0%
0404 Light Fixture JB TO Lighting Fixture (SS
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (SS Stairs) 0%
0405 23-10-LF-4703-69-Y5 TO Lighting Fixture (SS
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-011 0%
0406 Light Fixture JB TO Lighting Fixture (Control
Page 22 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0152 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0407 23-10-LF-4703-13-B5 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Cellar) 0%
0408 23-10-LF-4703-11-B5 TO Lighting Fixture (SS
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (SS Periphery) 0%
0409 23-10-LF-4703-78-B5 TO Lighting Fixture (SS
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (SS Periphery) 0%
0410 23-10-LF-4703-77-B5 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0153 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0411 23-10-LF-4703-36-R6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0412 23-10-LF-4703-34-R6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0413 23-10-LF-4703-32-R6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0414 23-10-LF-4703-30-R6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0415 23-10-LF-4703-29-R6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0416 23-10-LF-4703-27-R6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0417 23-10-LF-4703-25-R6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0154 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0418 23-10-LF-4703-37-Y6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0419 23-10-LF-4703-35-Y6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0420 23-10-LF-4703-33-Y6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0421 23-10-LF-4703-31-Y6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0422 23-10-LF-4703-28-Y6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0423 23-10-LF-4703-26-Y6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Trafo. Bay) 0%
0424 23-10-LF-4703-24-Y6 TO Lighting Fixture
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0390 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0439 (CR Periphery)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0440 (CR Periphery)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Emergency Lighting Fixture 0%
0441 (CR Periphery)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0155 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-106 0%
0458 Workshop Periphery Lighting TO JB-LV-107
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-106 0%
0459 Workshop Periphery Lighting TO JB-LV-108
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-106 0%
0436 Workshop Periphery Lighting TO Lighting
Page 23 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Workshop 0%
0437 Periphery Lighting)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Lighting Fixture (Laydown 0%
0438 Area)
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0141 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-078 0%
0142 Light Fixture JB TO JB-LV-079
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0143 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-081 0%
0144 Light Fixture JB TO JB-LV-080
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-02 0%
0117 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-011 0%
0301 Sub Lighting JB near Instr. Air compressor &
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-027 0%
0302 Light Fixture JB TO JB-LV-029
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-029 0%
0303 Light Fixture JB TO JB-LV-031
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-031 0%
0245 Light Fixture JB TO JB-LV-034
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-027 0%
0247 Light Fixture JB TO JB-LV-094
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-029 0%
0255 Light Fixture JB TO JB-LV-073
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-073 0%
0257 Light Fixture JB TO JB-LV-075
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-011 0%
0251 Sub Lighting JB near Instr. Air compressor &
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-097 0%
0252 Light Fixture JB TO JB-LV-026
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-097 0%
0254 Light Fixture JB TO JB-LV-095
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-011 0%
0258 Sub Lighting JB near Instr. Air compressor &
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-030 0%
0259 Light Fixture JB TO JB-LV-098
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-098 0%
0337 Light Fixture JB TO Enclosure Lighting for
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable Enclosure Lighting for 0%
0338 Compressor A TO Enclosure Lighting for
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-030 0%
0260 Light Fixture JB TO JB-LV-032
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-032 0%
0261 Light Fixture JB TO JB-LV-033
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-033 0%
0248 Light Fixture JB TO JB-LV-070
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-070 0%
0250 Light Fixture JB TO JB-LV-072
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-02 0%
0118 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-012 0%
0147 Sub Ligthing JB near Chemical Storage Area
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-045 0%
0262 Light Fixture JB TO JB-LV-049
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-049 0%
0263 Light Fixture JB TO JB-LV-051
Page 24 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-012 0%
0265 Sub Ligthing JB near Chemical Storage Area
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-046 0%
0266 Light Fixture JB TO JB-LV-048
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-048 0%
0267 Light Fixture JB TO JB-LV-052
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-052 0%
0268 Light Fixture JB TO JB-LV-039
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-012 0%
0272 Sub Ligthing JB near Chemical Storage Area
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-041 0%
0380 Light Fixture JB TO JB-LV-096
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-096 0%
0305 Light Fixture JB TO JB-LV-038
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-02 0%
0119 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-013 0%
0273 Sub Lighting JB near MPFM & MSM Skid R-
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-082 0%
0276 Light Fixture JB TO JB-LV-057
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-057 0%
0291 Light Fixture JB TO JB-LV-058
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-082 0%
0376 Light Fixture JB TO JB-LV-092
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-092 0%
0377 Light Fixture JB TO JB-LV-093
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-093 0%
0278 Light Fixture JB TO JB-LV-084
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-013 0%
0277 Sub Lighting JB near MPFM & MSM Skid Y-
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-059 0%
0279 Light Fixture JB TO JB-LV-060
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-060 0%
0285 Light Fixture JB TO JB-LV-061
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-060 0%
0280 Light Fixture JB TO JB-LV-062
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-059 0%
0290 Light Fixture JB TO JB-LV-042
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-042 0%
0456 Light Fixture JB TO JB-LV-086
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-MV-013 0%
0282 Sub Lighting JB near MPFM & MSM Skid B-
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-085 0%
0374 Light Fixture JB TO JB-LV-091
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-091 0%
0275 Light Fixture JB TO JB-LV-043
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-085 0%
0378 Light Fixture JB TO JB-LV-083
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-043 0%
0373 Light Fixture JB TO JB-LV-088
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-043 0%
0375 Light Fixture JB TO JB-LV-090
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-02 0%
0121 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-02 0%
0122 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable JB-MV-002 0%
0123 High Mast Lighting Pole TO JB-MV-003
Page 25 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable 23-10-DB-4401-02 0%
0131 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-MV- Power Cable JB-MV-005 0%
0132 High Mast Lighting Pole TO JB-MV-004
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0286 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-047 0%
0287 Emergency Light Fixture JB TO JB-LV-050
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-050 0%
0379 Emergency Light Fixture JB TO JB-LV-055
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-055 0%
0271 Emergency Light Fixture JB TO JB-LV-054
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-054 0%
0304 Emergency Light Fixture JB TO JB-LV-040
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0269 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-099 0%
0457 Emergency Light Fixture JB TO JB-LV-044
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-099 0%
0292 Emergency Light Fixture JB TO JB-LV-063
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-063 0%
0281 Light Fixture JB TO JB-LV-064
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-044 0%
0274 Emergency Light Fixture JB TO JB-LV-089
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-089 0%
0372 Emergency Light Fixture JB TO JB-LV-087
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0295 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-022 0%
0296 Emergency Light Fixture JB TO JB-LV-025
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-025 0%
0297 Emergency Light Fixture JB TO JB-LV-028
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-028 0%
0256 Emergency Light Fixture JB TO JB-LV-074
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-074 0%
0249 Emergency Light Fixture JB TO JB-LV-071
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-028 0%
0288 Emergency Light Fixture JB TO JB-LV-035
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-035 0%
0321 Emergency Light Fixture JB TO JB-LV-100
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-100 0%
0300 Emergency Light Fixture JB TO JB-LV-076
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-003 0%
0325 Inside Substation TO JB-LV-010
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable 23-10-DB-4401-02 0%
0317 Outdoor Lighting Distribution Board
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-015 0%
0318 Emerrgency Light Fixture JB TO JB-LV-056
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-056 0%
0319 Emergency Light Fixture JB TO JB-LV-069
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-069 0%
0320 Emergency Light Fixture JB TO JB-LV-068
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-015 0%
0283 Emerrgency Light Fixture JB TO JB-LV-013
010-16-02 Field Lighting and Small Power E-Electrical 23-10-LV- Lighting Cable JB-LV-013 0%
0294 Emergency Light Fixture JB TO JB-LV-077
010-16-02 Field Lighting and Small Power E-Electrical 23-10-EC- On/Off Push button control cable 23-10-DB- 0%
0056 4401-02
Page 26 of 27 Report generated at 8/29/2017 11:32:28 AM
Project Code: P23001
Project Name: MENDER FIELD DEVELOPMENT PROJECT PHASE I
EPC Contractor: China Petrolleum Engineering and Construction Corporation

Component Report
Subsystem Checklists Testsheets Progress
Code Name Discipline Component Description Report Date Report Date Progress
No No No
001-01-01 Production Manifold System E-Electrical test test AC-E-01- 8/29/201 0%
9 7

Page 27 of 27 Report generated at 8/29/2017 11:32:28 AM