PROJECT SPECIFICATION: IQWQ-FT-NSPDS-00-

Contractor Project CONSTRUCTION


IR No. : CE-C0960 Description: PROCEDURE: IQWQ-CE1092-CPZZZ-00-0003_0
Produced Water
Treatment M109 -
AWQ0109
ITP: IQWQ-CE1092-CPQAC-00-0001 REV. 1 CIV

DRWG NO: IQWQ-CE1091-CDFND-D7-009/28/


Rev No: 1
Sht No: /
NDE Instrumentation Material Inspection
Civil

Structural Painting Pre Hydrotest Walk down Any Others (mention Bel

HDPE Mechanical Equipment Hydrotest

Welding Piping Reinstatement

PWHT Electrical Mechanical Completions

MONTHS DAYS
JAN FEB MAR APR MAY JUN 1 2 3 4 5 6 7 8 9 10 11
JUL AUG SEP OCT NOV DEC 17 18 19 20 21 22 23 24 25 26

No ITEM/TAG Number AREA LOCATION Time of


In
Description Inspection
SAMPLING BACKFILL SOIL (ZONE 1,2,3,) BETWEEN TWO SLEEPER DS7 11:30 a.m
A
A
(f
R
R
Fo

TICK THIS BOX IF NO EMIL / SOC and if it is a WITNESS as per ITP,


(by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
Comments for this QA activity: (include any Handmade drawing)