NO. JENIS PEKERJAAN SAT HARGA SATUAN V O L U M E JUMLAH HARGA V O L U M E JUMLAH HARGA V O L U M E JUMLAH HARGA V O L U M E JUMLAH HARGA V O L U M E JUMLAH HARGA
(Rp.) ( Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
I PEKERJAAN PENDAHULUAN
1- - - - - - - - - 0 - - -
II PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1m m 49,350.00 9.69 478,078.13 10.74 530,019.00 1.1 51,940.88 0 - 10.74 530,019.00
1 Pasangan bata merah tebal 1/2 bata, 1Pc : 6Ps m 106,090.00 11.63 1,233,296.25 - - 0 - (11.6) (1,233,296.25) - -
3 Beton mutu fc'=9,8 Mpa (K125) slump (12 2) cm, w/c = 0,78 m 903,959.82 2.13 1,926,564.36 2.36 2,135,876.26 0.2 209,311.90 0 - 2.36 2,135,876.26
5 Pasang pipa beton U, diameter 40 kg 234,208.50 - 0.00 42.96 10,061,597.16 43.0 10,061,597.16 0 - 42.96 10,061,597.16