REKAPITULASI REKAYASA LAPANGAN (AKHIR)

REHABILITASI SALURAN AIR RW 11


KELURAHAN BANDUNGREJOSARI KECAMATAN SUKUN KOTA MALANG

MC 0 REKAYASA LAPANGAN PEKERJAAN TAMBAH PEKERJAAN KURANG MC AKHIR

NO. JENIS PEKERJAAN SAT HARGA SATUAN V O L U M E JUMLAH HARGA V O L U M E JUMLAH HARGA V O L U M E JUMLAH HARGA V O L U M E JUMLAH HARGA V O L U M E JUMLAH HARGA
(Rp.) ( Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

I PEKERJAAN PENDAHULUAN

1- - - - - - - - - 0 - - -

II PEKERJAAN TANAH

1 Galian tanah biasa sedalam 1m m 49,350.00 9.69 478,078.13 10.74 530,019.00 1.1 51,940.88 0 - 10.74 530,019.00

III PEKERJAAN PASANGAN

1 Pasangan bata merah tebal 1/2 bata, 1Pc : 6Ps m 106,090.00 11.63 1,233,296.25 - - 0 - (11.6) (1,233,296.25) - -

2 Plesteran 1Pc : 5Ps, tebal 15 mm m 37,891.00 11.63 440,482.88 - - 0 - (11.6) (440,482.88) - -

3 Beton mutu fc'=9,8 Mpa (K125) slump (12 2) cm, w/c = 0,78 m 903,959.82 2.13 1,926,564.36 2.36 2,135,876.26 0.2 209,311.90 0 - 2.36 2,135,876.26

4 Pasang pipa beton U, diameter 30 m 223,208.50 38.75 8,649,329.38 - - 0 - (38.8) (8,649,329.38) - -

5 Pasang pipa beton U, diameter 40 kg 234,208.50 - 0.00 42.96 10,061,597.16 43.0 10,061,597.16 0 - 42.96 10,061,597.16

JUMLAH 12,727,750.99 12,727,492.42 11,133,434.31 (10,323,108.50) 12,727,492.42


PPN 10 % 1,272,775.10 1,272,749.24 1,113,343.43 (1,032,310.85) 1,272,749.24
JUMLAH TOTAL 14,000,526.08 14,000,241.66 12,246,777.74 (11,355,419.35) 14,000,241.66
PEMBULATAN 14,000,000.00 14,000,000.00 12,246,778.00 (11,355,420.00) 14,000,000.00

Mengetahui Mengetahui Diperiksa Oleh Dibuat Oleh : Dibuat Oleh :

PEJABAT PEMBUAT KOMITMEN LPMK Bandungrejosari PELAKSANA PELAKSANA


SKPD KELURAHAN BANDUNGREJOSARI POKMAS BANDUNG I POKMAS BANDUNG I
KOTA MALANG

ZAINUL AMALI, SSos Msi PURYANTO MAKIN MAKIN


PEMBINA KETUA KETUA KETUA
19641109 198810 1 001