Anda di halaman 1dari 4

ESTIDAMA PBRS - 2 PEARL

Consulting Engineering Office CEO

ESSEN S TEEL IDUSTRIE S LLC

DE TAILED PLANNING AP PLICATION


PBRS credit confirmation check list
DECEMB ER 2015
2014 Consulting Engineering Office CEO All Rights Reserved. Copyright in the whole and every part of this document belongs to
Consulting Engineering Office CEO and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner
or form or in or on any media to any person without the prior writtenconsent of Consulting Engineering Office CEO.

IDP-R1: Integrated Development Strategy 1


ESTIDAMA PBRS - 2 PEARL

Table of Contents

1 Statement of compliance with Estidama ................................................................................................... 3


2 PQP of the project....................................................................................................................................................... 4

IDP-R1: Integrated Development Strategy 2


ESTIDAMA PBRS - 2 PEARL

1 Statement of compliance with Estidama


Pearl Building Rating System -1 Pearl

Credit Credit Points


Credit Title Design
Reference Available
IDP Integrated Development Process

IDP-R1 Integrated Development Strategy Required


Tenant Fit-Out Design & Construction
IDP-R2 Required
Guide
IDP-R3 Basic Commissioning Required

NS Natural Systems

NS-R1 Natural Systems Assessment Required

NS-R2 Natural Systems Protection Required


Natural Systems Design & Management
NS-R3 Required
Strategy

LBo Livable Buildings : Outdoors

LBo-R1 Plan 2030 Required

LBo-R2 Urban Systems Assessment Required

LBo-R3 Outdoor Thermal Comfort Strategy Required

LBi Livable Buildings : Indoors

LBi-R1 Healthy Ventilation Delivery Required

LBi-R2 Smoking Control Required

LBi-R3 Legionella Prevention Required

PW Precious Water

PW-R1 Minimum Interior Water Use Reduction Required

PW-R2 Exterior Water Monitoring Required

IDP-R1: Integrated Development Strategy 3


ESTIDAMA PBRS - 2 PEARL

RE Resourceful Energy

RE-R1 Minimum Energy Performance Required

RE-R2 Energy Monitoring & Reporting Required


Ozone Impacts of Refrigerants & Fire
RE-R3 Required
Suppression Systems

SM Stewarding Materials

SM-R1 Hazardous Materials Elimination Required

SM-R2 Basic Construction Waste Management Required

SM-R3 Basic Operational Waste Management Required

2 PQP of the project


Mrs. Hanaa ALshier
Certification Number: 000

IDP-R1: Integrated Development Strategy 4