Page 1
TASKPRED
BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM
Page 2
NS1_CON06310 TMS: Main Driving, CH: 3+876~3+849 (Mixed 27m) -->
NS1_CON06320 TMS: Main Driving, CH: 3+849~3+779 (Rock 70m) 75% (LTA-NSE INTERFACE @
-->
-->
NS1_CON06320 TMS: Main Driving, CH: 3+849~3+779 (Rock 70m) 75% (LTA-NSE INTE -->
NS1_KEY03070 KD17: Completion of 75% of tunnel drive (Mandai(T) to Sembawang) -->
NS1_CON06330 TMS: Main Driving, CH: 3+779~3+679 (Rock 100m)
-->
NS1_CON06420 TMS: Main Driving, CH: 3+179~3+113 (Rock 66m) 100% -->
NS1_KEY03090 KD18: TBM break through at Sembawang Shaft (Mandai(T) to Sembawang)
-->
-->
-->
NS1_KEY03090 KD18: TBM break through at Sembawang Shaft (Mandai(T) to Sembawa -->
NS1_CON06440 TMS: Tunnel Cleaning
-->
NS1-MOS1070 Material On Site - Fire detector, Smoke Control + Fire Extinguisher -->
NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->
NS1_CON06920 TMS: M&E - Fire detector, Smoke Control + Fire Extinguisher
-->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1470 Material On Site - High Silicon Steel Cable Support Frame, Cable Trays -->
NS1_CON98880 TMS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders
-->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1430 Material On Site - Earthing / Lightning Protection System -->
NS1_CON98890 TMS: M&E - Earthing System & Lightning Protection System
-->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1110 Material On Site - Control Panel, Remote Control & Monitoring Interfac -->
NS1_CON98910 TMS: M&E - Control Panel, Remote Control & Monitoring Interface Equipment
-->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1120 Material On Site - Tanks & Accessories -->
NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories
NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories -->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1100 Material On Site - Pipes & Fittings -->
NS1_CON98930 TMS: M&E - Pipes, Fittings, Valves & Spray Nozzles
-->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1220 Material On Site - 22KV Cable, LV Cable + Pilot Wire Cable -->
NS1_CON98940 TMS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
-->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1230 Material On Site - 415V Switchgears, 433V Transformer -->
NS1_CON98950 TMS: M&E - 415V Switchgears, 433V Transformer
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out -->
NS1_GEN10110 Submission of Draft Operation & Maintenance Manual and Training -->
NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories -->
NS1_CON98890 TMS: M&E - Earthing System & Lightning Protection System -->
NS1_CON98910 TMS: M&E - Control Panel, Remote Control & Monitoring Interface Equi -->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1_CON98880 TMS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladd -->
NS1_CON98950 TMS: M&E - 415V Switchgears, 433V Transformer -->
NS1_CON98930 TMS: M&E - Pipes, Fittings, Valves & Spray Nozzles -->
NS1_CON98940 TMS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable -->
NS1_CON06990 TMS: M&E - Testing & Commissioning
-->
-->
-->
NS1_STD_6790 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Submission by -->
NS1_STD_6800 ST206 Bored Tunnel (MAN-SEM) As Built - Review and Comment by MM
-->
NS1_STD_6800 ST206 Bored Tunnel (MAN-SEM) As Built - Review and Comment by MM -->
NS1_STD_6810 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Re-Submission by Sa
-->
NS1_STD_6810 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Re-Submission -->
NS1_STD_6820 ST206 Bored Tunnel (MAN-SEM) As Built - Review & Approval by MM
-->
-->
FS 0
TA-NSE INTERFACE @ CH; 3+780)
FS 0 NS1_CON06330 TMS: Main Driving, CH: 3+779~3+679 (Rock 100m)
FS 0 NS1_KEY03070 KD17: Completion of 75% of tunnel drive (Mandai(T) to Sembawang)
embawang)
FS 0 NS1_CON06330 TMS: Main Driving, CH: 3+779~3+679 (Rock 100m)
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FF 75
FS 0
FF 7
FS 0
T) to Sembawang)
FS -14 NS1_CON03370 MAN: Waterproofing, Adit - type A, NS2 Interface
FS 0 NS1_CON06430 TMS: TBM Dismantling in Sembawang Shaft
FS 0 NS1_CON06440 TMS: Tunnel Cleaning
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
SS 4
FS 3
FS 0
FS 0
FS 0
FS 0
FF 14
SS 14
SS 0
FF 14
FF 14
SS 14
FS 0
SS 4
FS 0
FF 48
FS 0
SS 0
ection's & Sembawang shaft's M&E fit-out
SS 0 NS1_CON06870 TMS: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units
SS 0
FS 0
SS 0
SS 0
FS 0
FS 0
arter & Control Panels
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units
SS 0
FS 0
ment + Accessories
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units
SS 0
FS 0
& Accessories
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units
SS 0
FS 0
SS 0
FS 0
FS 0
SS 0
SS 0
FS 0
SS 0
FS 0
SS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
SS 0
FS 0
FS 0
SS 0
SS 0
FS 0
SS 0
FS 0
FS 0 NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SS 0
FS 0
SS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
& Accessories
SS 0 NS1_CON98880 TMS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders
SS 0 NS1_CON98890 TMS: M&E - Earthing System & Lightning Protection System
SS 0 NS1_CON98910 TMS: M&E - Control Panel, Remote Control & Monitoring Interface Equipment
SS 0 NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories
SS 0 NS1_CON98930 TMS: M&E - Pipes, Fittings, Valves & Spray Nozzles
SS 0 NS1_CON98940 TMS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
SS 0 NS1_CON98950 TMS: M&E - 415V Switchgears, 433V Transformer
FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning
SS 0
FS 0
e Trays & Ladders
FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning
SS 0
FS 0
SS 0
FS 0
nterface Equipment
FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning
SS 0 NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories
FS 0 NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories
SS 0
FS 0
SS 0
FS 0
SS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
Tunnel Section's & Sembawang shaft's M&E fit-out
FS 0 NS1_TTR07010 Overall Testing & Commissioning of all Tunnels
FS 30
Submission by Samsung
FS 0 NS1_STD_6800 ST206 Bored Tunnel (MAN-SEM) As Built - Review and Comment by MM
FS 0
mment by MM
FS 0 NS1_STD_6810 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Re-Submission by Samsu
FS 0
Re-Submission by Samsung
FS 0 NS1_STD_6820 ST206 Bored Tunnel (MAN-SEM) As Built - Review & Approval by MM
FS 0
oval by MM
FS 453 NS1_GEN10130 Project Hand-Over
FS 0 NS1_STD_00340 PSR/CHSS - Preparation & Submission by Samsung
to Sembawang)
dai(T) to Sembawang)
n & Submission by Samsung
or Starter & Control Panels
quipment + Accessories
tion & Accessories
l and Training
ng Interface Equipment
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
s Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
s Built Preparation & Submission by Samsung
s Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
wang Tunnel Section's & Sembawang shaft's M&E fit-out
d Comment by MM
pproval by MM
NS1_KEY03080
NS1_KEY03080
NS1_CON05390
NS1_CON05390
NS1_CON05400
NS1_CON05400
NS1_CON05410
NS1_CON05410
NS1_CON05420
NS1_CON05420
NS1_CON05430
NS1_CON05430
NS1_CON05440
NS1_CON05450
NS1_CON05460
NS1_CON05460
NS1_KEY03100
NS1_CON02330
NS1_KEY02030
NS1_KEY03100
NS1_CON05470
NS1_CON05480
NS1_CON05490
NS1_CON05500
NS1_CON05610
NS1_CON05630
NS1_CON05710
NS1_CON05730
NS1_CON05740
NS1_CON05750
NS1-MOS1170
NS1-MOS1190
NS1_CON05750
NS1-MOS1180
NS1_CON05970
NS1_KEY04030
NS1_KEY04030
NS1_KEY04030
NS1_KEY04030
NS1-MOS1040
NS1_CON05970
NS1_CON05980
NS1_CON05970
NS1-MOS1050
NS1_CON06080
NS1_CON05970
NS1-MOS1060
NS1_CON06090
NS1_CON05970
NS1-MOS1460
NS1_CON06100
NS1_CON05970
NS1-MOS1080
NS1_CON06390
NS1-MOS1090
NS1_CON05970
NS1_CON06400
NS1_CON05970
NS1-MOS1070
NS1_CON06410
NS1_CON05970
NS1-MOS1010
NS1_CON06450
NS1-MOS1020
NS1_CON05970
NS1_CON06460
NS1_CON05970
NS1-MOS1030
NS1_CON06470
NS1-MOS1000
NS1_CON05970
NS1_CON06480
NS1_KEY04030
NS1_CON06410
NS1-MOS1200
NS1_CON06090
NS1_CON06100
NS1_CON06470
NS1_CON06480
NS1_CON06080
NS1_CON05980
NS1_CON06450
NS1-MOS1200
NS1_CON06390
NS1_CON06400
NS1_CON05970
NS1_CON06460
NS1-MOS1210
NS1_CON06490
NS1_CON06490
NS1-MOS1210
NS1_CON06500
NS1-MOS1270
NS1_CON06490
NS1_CON06570
NS1_CON06490
NS1-MOS1290
NS1_CON06580
NS1-MOS1280
NS1_CON06490
NS1_CON06590
NS1_CON06490
NS1-MOS1250
NS1_CON06600
NS1_CON06490
NS1-MOS1260
NS1_CON06610
NS1_CON06580
NS1_CON06590
NS1-MOS1240
NS1_CON06500
NS1_CON06600
NS1_CON06610
NS1_CON06570
NS1_CON06490
NS1_CON06620
NS1_CON06620
NS1-MOS1470
NS1_CON06630
NS1-MOS1430
NS1_CON06620
NS1_CON06640
NS1_CON06620
NS1-MOS1100
NS1_CON06650
NS1_CON06620
NS1-MOS1110
NS1_CON06660
NS1_CON06620
NS1-MOS1120
NS1_CON06670
NS1-MOS1260
NS1-MOS1220
NS1-MOS1250
NS1_CON06620
NS1-MOS1470
NS1-MOS1230
NS1-MOS1240
NS1_CON06680
NS1_CON06620
NS1-MOS1230
NS1_CON06690
NS1_CON08550
NS1_CON06630
NS1_CON06680
NS1_CON06620
NS1_CON06650
NS1_CON06660
NS1_CON06670
NS1_CON06690
NS1_CON06640
NS1_CON05990
NS1_CON05990
NS1_KEY04050
NS1_CON05470
NS1_STD_6440
NS1_STD_6440
NS1_STD_6440
NS1_STD_6450
NS1_STD_6450
NS1_STD_6450
NS1_STD_6460
NS1_STD_6460
NS1_STD_6460
NS1_STD_6470
NS1_STD_6470
NS1_STD_6470
KD16: Completion of 75% of tunnel drive (Gambas to Sembawang)
KD16: Completion of 75% of tunnel drive (Gambas to Sembawang) --> FS 0
TGS: Main Driving, CH: 2+800~2+850 (Rock 50m) (LTA-NSE INTERFACE @ CH-2+840)
--> FS 0
--> SS 0
KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft's M&E fit-out
KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft
--> SS 0
KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft
--> FS 0
Material On Site - Landing Valve, Standby Fire Hose & Accessories --> FS 0
TGS: M&E - Mechanical Ventilation + Accessories --> SS 0
TGS: M&E - Landing Valve, Standby Fire Hose & Accessories
--> FS 0
GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
TGS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
TGS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
TGS: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
TGS: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
TGS: M&E - Tanks, Pumps & Accessories --> FS 0
TGS: M&E - 415V Switchgears, 433V Transformer --> FS 0
TGS: M&E - Earthing System & Lightning Protection System --> FS 0
TGS: M&E - Testing & Commissioning
--> FS 0
--> FS 0
--> FS 0
ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Submission by Samsung --> FS 0
ST205 Bored Tunnel (GAM-SEM) As Built - Review and Comment by MM
ST205 Bored Tunnel (GAM-SEM) As Built - Review and Comment by MM --> FS 0
NS1_CON05440 TGS: Main Driving, CH: 2+800~2+850 (Rock 50m) (LTA-NSE INTERFACE @ CH-2+840)
NS1_STD_6460 ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Re-Submission by Samsung
NS1_STD_6460 ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Re-Submission by Samsung
Sembawang)
mission by Samsung
nt + Accessories
Accessories
ction's & Gambas shaft's M&E fit-out
ccessories
ccessories
ccessories
ccessories
ccessories
ccessories
ccessories
rface Equipment
reparation & Submission by Samsung
eparation & Submission by Samsung
reparation & Submission by Samsung
Preparation & Submission by Samsung
Preparation & Submission by Samsung
Preparation & Submission by Samsung
eparation & Submission by Samsung
paration & Submission by Samsung
reparation & Submission by Samsung
reparation & Submission by Samsung
reparation & Submission by Samsung
reparation & Submission by Samsung
Preparation & Submission by Samsung
eparation & Submission by Samsung
Preparation & Submission by Samsung
eparation & Submission by Samsung
Preparation & Submission by Samsung
Preparation & Submission by Samsung
eparation & Submission by Samsung
reparation & Submission by Samsung
ment by MM
ment by MM
Submission by Samsung
Submission by Samsung
SEMBAWANG EQUIPMENT BUILDING (SEB)
NS1_STD_5100 ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Submission by Samsun--> FS 0
NS1_STD_5110 ST303 Equipment Bldg. (Substructure) Intermediate Design - Review and Comment by .
--> FS 0 NS1_STD_5120
NS1_STD_5110 ST303 Equipment Bldg. (Substructure) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_5120 ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Re-Submis .
--> FS 0 NS1_STD_5130
NS1_STD_5120 ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by Sam --> FS 0
NS1_STD_5130 ST303 Equipment Bldg. (Substructure) Intermediate Design - Review & Approval by MM.
--> FS -8 NS1_STD_5180
NS1_STD_5180 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_5190 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_5200
NS1_STD_5190 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_5200 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by S .
--> FS 0 NS1_STD_5210
NS1_STD_5200 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5210 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM .
--> FS -1 NS1_STD_5250
NS1_STD_5140 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_5150 ST303 Equipment Bldg. (Substructure) - Review and Comment by AC .
--> FS 0 NS1_STD_5160
NS1_STD_5160 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5170 ST303 Equipment Bldg. (Substructure) - Review & Approval by AC .
--> FS 0 NS1_STD_5220
NS1_STD_5220 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_5230 ST303 Equipment Bldg. (Substructure) - Review and Comment by LTA/DBC .
--> FS 0 NS1_STD_5240
NS1_STD_5230 ST303 Equipment Bldg. (Substructure) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_5240 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5250
NS1_STD_5210 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_5240 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5250 ST303 Equipment Bldg. (Substructure) - Review & Approval by LTA/DBC .
--> FS 0 NS1_STD_5300
--> FS 0 NS1_STD_5310
NS1_STD_5260 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_5270 ST303 Equipment Bldg. (Substructure) - Review and Comment by BCA .
--> FS 0 NS1_STD_5280
NS1_STD_5270 ST303 Equipment Bldg. (Substructure) - Review and Comment by BCA --> FS 0
NS1_STD_5280 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5290
NS1_STD_5280 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5290 ST303 Equipment Bldg. (Substructure) - Review & Approval by BCA (NOA) .
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_5300
--> FS 0 NS1_STD_5310
NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structura --> FS 0 <---???
NS1_STD_5310 ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_5320 ST303 Equipment Bldg. (Substructure) Final Design - Review and Comment by MM .
--> FS 0 NS1_STD_5330
NS1_STD_5320 ST303 Equipment Bldg. (Substructure) Final Design - Review and Comment by MM --> FS 0
NS1_STD_5330 ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Re-Submission by .
--> FS 0 NS1_STD_5340
NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structura --> FS 0 <---???
NS1_STD_5330 ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5340 ST303 Equipment Bldg. (Substructure) Final Design - Review & Approval by MM .
--> FS 0 NS1_STD_5350
NS1_STD_5350 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_5360 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_5370
NS1_STD_5360 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_5370 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission by Sa .
--> FS 0 NS1_STD_5380
NS1_STD_5370 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5380 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM .
Wrong link? ---> --> FS 0 NS1_CON08110
--> FS 1345 NS1_STD_00340
NS1_STD_5450 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Submission by Sams --> FS 0
NS1_STD_5460 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review and Comment .
--> FS 0 NS1_STD_5470
NS1_STD_5460 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_5470 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Re-Subm .
--> FS 0 NS1_STD_5480
NS1_STD_5470 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission by S --> FS 0
NS1_STD_5480 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review & Approval by .
--> FS -8 NS1_STD_5530
NS1_STD_5530 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_5540 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_5550
NS1_STD_5540 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_5550 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by .
--> FS 0 NS1_STD_5560
NS1_STD_5550 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5560 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM .
--> FS -1 NS1_STD_5600
NS1_STD_5490 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_5500 ST302 Equipment Bldg. (Superstructure) - Review and Comment by AC .
--> FS 0 NS1_STD_5510
NS1_STD_5510 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5520 ST302 Equipment Bldg. (Superstructure) - Review & Approval by AC .
--> FS 0 NS1_STD_5570
NS1_STD_5570 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_5580 ST302 Equipment Bldg. (Superstructure) - Review and Comment by LTA/DBC .
--> FS 0 NS1_STD_5590
NS1_STD_5580 ST302 Equipment Bldg. (Superstructure) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_5590 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5600
NS1_STD_5590 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5560 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_5600 ST302 Equipment Bldg. (Superstructure) - Review & Approval by LTA/DBC .
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_5650
--> FS 0 NS1_STD_5660
NS1_STD_5610 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_5620 ST302 Equipment Bldg. (Superstructure) - Review and Comment by BCA .
--> FS 0 NS1_STD_5630
NS1_STD_5620 ST302 Equipment Bldg. (Superstructure) - Review and Comment by BCA --> FS 0
NS1_STD_5630 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5640
NS1_STD_5630 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5640 ST302 Equipment Bldg. (Superstructure) - Review & Approval by BCA (NOA) .
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_5650
--> FS 0 NS1_STD_5660
NS1_STD_5660 ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_5670 ST302 Equipment Bldg. (Superstructure) Final Design - Review and Comment by MM .
--> FS 0 NS1_STD_5680
NS1_STD_5670 ST302 Equipment Bldg. (Superstructure) Final Design - Review and Comment by MM --> FS 0
NS1_STD_5680 ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Re-Submission .
--> FS 0 NS1_STD_5690
NS1_STD_5680 ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5690 ST302 Equipment Bldg. (Superstructure) Final Design - Review & Approval by MM .
--> FS 0 NS1_STD_5700
NS1_STD_5700 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_5710 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_5720
NS1_STD_5710 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_5720 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by .
--> FS 0 NS1_STD_5730
NS1_STD_5720 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5730 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM .
Link to CON09010 : SEB-Piling ?---> --> FS 1315 NS1_STD_00340
NS1_CON09120 SEB: Fdn, Basement 2 / Bottom Slab & Cooling Pump Room --> FS 0
NS1_CON09040 SEB: Removal of Tubular Pile --> FS 0 <--- ???
NS1_CON99900 SEB: Wall / Column Basement 2 Cooling Pump Room .
--> FS 60 NS1_CON09200
--> FS 0 NS1_CON99800
NS1_KEY06010 KD31: Completion of Sembawang Equipment Building's basic civil and structural works for SPPA su --> FS 0
NS1_CON09170 SEB: Roof Slab + Parapet --> FS 0 <---???
NS1_CON09210 SEB: Underground Utilities --> SS 0
NS1_CON09180 SEB: Installation of Steel Stair / Grating --> SF 0 <---???
NS1_CON09200 SEB: Architectural (Rough-in Finishes) --> FS 0
NS1_KEY06020 KD32: Completion of Sembawang Equipment Building's basic civil & structural works for M&E fit-out--> FS 0
NS1_CON99700 SEB: Landscaping Work --> FF 0
NS1_CON10020 SEB: Architectural (Final Finishes)
--> FS 0 NS1_GEN00120
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1390 Material On Site - Lift System --> FF 0 <-FS or FF ?
NS1-MOS1390 Material On Site - Lift System --> FS 30 <-FS or FF ?
NS1-MOS1400 Material On Site - Electrical Emergency System & Safety Devices + Cabling --> FS 30
NS1-MOS1440 Material On Site - Lifting Devices, Electric Hoist, Control Panels --> FS 30
NS1-MOS1450 Material On Site - Lifting Beam, Chain Block, Support & Accessories --> FS 30
NS1_CON09480 SEB: M&E - Lift System
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09590
??? ---> --> FS 0 NS1_CON09600
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1320 Material On Site - Standby Generator Sets --> FF 0 <-FS or FF ?
NS1-MOS1320 Material On Site - Standby Generator Sets --> FS 30 <-FS or FF ?
NS1-MOS1330 Material On Site - Silencer, Filters, Sound Attenuator, Control Panel & Accessories --> FS 30
NS1-MOS1340 Material On Site - Service Fuel Tank, Bulk Fuel Storage --> FS 30
NS1-MOS1350 Material On Site - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 30
NS1_CON09490 SEB: M&E - Standby Generator Sets
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09590
??? ---> --> FS 0 NS1_CON09600
??? ---> --> FS 0 NS1_DSG00150
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1270 Material On Site - Leaky Feeder --> FF 0 <-FS or FF ?
NS1-MOS1270 Material On Site - Leaky Feeder --> FS 30 <-FS or FF ?
NS1-MOS1290 Material On Site - Fire Radio, UHF & Accessories --> FS 30
NS1_CON09540 SEB: M&E - Leaky Feeder
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09600
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09710 SEB: M&E - Potable ABC Monitoring Units --> SS 0
NS1-MOS1250 Material On Site - Lighting, Small Power + Fittings --> FF 0 <-FS or FF ?
NS1-MOS1250 Material On Site - Lighting, Small Power + Fittings --> FS 30 <-FS or FF ?
NS1_CON09550 SEB: M&E - Lighting, Small Power + Fittings
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09590
??? ---> --> FS 0 NS1_CON09600
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1440 Material On Site - Lifting Devices, Electric Hoist, Control Panels --> FF 0 <-FS or FF ?
NS1-MOS1440 Material On Site - Lifting Devices, Electric Hoist, Control Panels --> FS 30 <-FS or FF ?
NS1-MOS1450 Material On Site - Lifting Beam, Chain Block, Support & Accessories --> FS 30
NS1_CON09560 SEB: M&E - Lifting Devices, Electric Hoist, Control Panels
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09600
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1210 Material On Site - Potable ABC Monitoring Units --> FS 0
NS1_CON09710 SEB: M&E - Potable ABC Monitoring Units
--> FS 0 NS1_CON09470
--> SS 0 NS1_CON09550
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1450 Material On Site - Lifting Beam, Chain Block, Support & Accessories --> FS 0
NS1_CON09720 GVB: M&E - Lifting Beam, Chain Block, Support & Accessories .
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1400 Material On Site - Electrical Emergency System & Safety Devices + Cabling --> FS 0
NS1_CON09730 SEB: M&E - Electrical Emergency System & Safety Devices + Cabling .
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1290 Material On Site - Fire Radio, UHF & Accessories --> FS 0
NS1_CON09740 SEB: M&E - Fire Radio, UHF & Accessories
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1280 Material On Site - Telephone & Cables --> FS 0
NS1_CON09750 SEB: M&E - Telephone, Cables & Accessories
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1310 Material On Site - Standby Batteries & Accessories --> FS 0
NS1_CON09760 SEB: M&E - Standby Batteries & Accessories
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1300 Material On Site - Rectifier/Charger & Inverter Panels --> FS 0
NS1_CON09770 SEB: M&E - Rectifier/Charger & Inverter Panels
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1330 Material On Site - Silencer, Filters, Sound Attenuator, Control Panel & Accessories --> FS 0
NS1_CON09780 SEB: M&E - Silencer, Filters, Sound Attenuator, Control Panel & Accessories .
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1340 Material On Site - Service Fuel Tank, Bulk Fuel Storage --> FS 0
NS1_CON09790 SEB: M&E - Service Fuel Tank, Bulk Fuel Storage .
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1350 Material On Site - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 0
NS1_CON09800 SEB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries .
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1260 Material On Site - Control Gear & Electrical Accessories --> FS 0
NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories .
--> FS 0 NS1_CON09440
--> FS 0 NS1_CON09450
--> FS 0 NS1_CON09460
--> FS 0 NS1_CON09470
--> FS 0 NS1_CON09820
--> FS 0 NS1_CON09830
--> FS 0 NS1_CON09840
--> FS 0 NS1_CON09850
--> FS 0 NS1_CON09860
--> FS 0 NS1_CON09870
--> FS 0 NS1_CON09880
--> FS 0 NS1_CON09890
NS1_KEY07030 KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipment B--> FS 0
NS1_CON09440 SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
NS1_CON09450 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON09480 SEB: M&E - Lift System --> FS 0
NS1_CON09490 SEB: M&E - Standby Generator Sets --> FS 0
NS1_CON09500 SEB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels --> FS 0
NS1_CON09510 SEB: M&E - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON09550 SEB: M&E - Lighting, Small Power + Fittings --> FS 0
NS1_CON09570 SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_CON09590 SEB: Initial Testing & Commissioning
--> FS 0 NS1_CON09600
--> SS 0 NS1_GEN09100
--> FS 0 NS1_GEN09220
--> FS 0 NS1_KEY07050
--> FS 0 NS1_TTR07010
NS1_CON09440 SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
NS1_CON09450 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09460 ???
NS1_CON09470 SEB: M&E - Tanks, Pumps & Accessories --> FS 0
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON09820 SEB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
NS1_CON09830 SEB: M&E - Intruder Alarm System & Accessories --> FS 0
NS1_CON09840 SEB: M&E - Control & Data Cable + Accessories --> FS 0
NS1_CON09850 SEB: M&E - Mimic, Alarm & Marshall Cabinets --> FS 0
NS1_CON09860 SEB: M&E - Equipment For Monitoring & Control System & Accessories --> FS 0
NS1_CON09870 SEB: M&E - Earthing System & Lightning Protection System --> FS 0
NS1_CON09880 SEB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
NS1_CON09890 SEB: M&E - 415V Switchgears, 433V Transformer --> FS 0
NS1_CON101154 SEM Handing of the SPPA Substation to SPPA
--> FS 0 NS1_CON09570
--> FS 0 NS1_CON09600
--> FS 0 NS1_DSG00150
--> FS 0 NS1_KEY07050
--> FS 0 NS1_TTR07010
NS1_CON09510 SEB: M&E - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON09430 SEB: M&E - Cooling Tower, Tank, Pumps, Pipes & fittings --> FS 0
NS1_CON09440 SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
NS1_CON09450 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON09480 SEB: M&E - Lift System --> FS 0
NS1_CON09490 SEB: M&E - Standby Generator Sets --> FS 0
NS1_CON09500 SEB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels --> FS 0
NS1_CON09520 SEB: M&E - Fan asssemblies + Accessories --> FS 0
NS1_CON09530 SEB: M&E - Domestic Water Supply System --> FS 0
NS1_CON09540 SEB: M&E - Leaky Feeder --> FS 0
NS1_CON09550 SEB: M&E - Lighting, Small Power + Fittings --> FS 0
NS1_CON09560 SEB: M&E - Lifting Devices, Electric Hoist, Control Panels --> FS 0
NS1_CON09570 SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_CON09590 SEB: Initial Testing & Commissioning --> FS 0
NS1_KEY07030 KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipment B--> FS 0
NS1_CON101154 SEM Handing of the SPPA Substation to SPPA --> FS 0
NS1_CON09600 SEB: Testing & Commissioning
--> FS 0 NS1_GEN09280
--> FS 0 NS1_KEY07050
--> FS 0 NS1_TTR07010
ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by Samsung
ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Submission by Samsung
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Submission by Samsung
ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Re-Submission by Samsung
ST303 Equipment Bldg. (Substructure) Final Design - Review & Approval by MM
ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission by Samsung
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST302 Equipment Bldg. (Superstructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung
ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Re-Submission by Samsung
NS1_STD_1950 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Submission by Sa --> FS 0
NS1_STD_1960 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_1970
NS1_STD_1960 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_1970 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1980
NS1_STD_1970 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by --> FS 0
NS1_STD_1980 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_2030
--> FS 0 NS1_STD_2070
NS1_STD_2030 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_2040 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_2050
NS1_STD_2040 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_2050 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2060
NS1_STD_2050 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2060 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_2100
NS1_STD_1990 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_2000 ST105 Ventilation Bldg. (Substructure) - Review and Comment by AC
--> FS 0 NS1_STD_2010
NS1_STD_2010 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2020 ST105 Ventilation Bldg. (Substructure) - Review & Approval by AC
--> FS 0 NS1_STD_2070
NS1_STD_2070 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC
--> FS 0 NS1_STD_2080
--> SS 0 NS1_STD_2110
NS1_STD_2070 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_2080 ST105 Ventilation Bldg. (Substructure) - Review and Comment by LTA/DBC
--> FS 0 NS1_STD_2090
NS1_STD_2080 ST105 Ventilation Bldg. (Substructure) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_2090 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2100
NS1_STD_2060 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_2090 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2100 ST105 Ventilation Bldg. (Substructure) - Review & Approval by LTA/DBC
--> FS 0 NS1_STD_2150
--> FS 0 NS1_STD_2160
NS1_STD_2110 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_2120 ST105 Ventilation Bldg. (Substructure) - Review and Comment by BCA
--> FS 0 NS1_STD_2130
NS1_STD_2120 ST105 Ventilation Bldg. (Substructure) - Review and Comment by BCA --> FS 0
NS1_STD_2130 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2140
NS1_STD_2130 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2140 ST105 Ventilation Bldg. (Substructure) - Review & Approval by BCA (NOA)
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_2150
--> FS 0 NS1_STD_2160
NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0
NS1_STD_2160 ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_2170 ST105 Ventilation Bldg. (Substructure) Final Design - Review and Comment by MM .
--> FS 0 NS1_STD_2180
GAMBAS VENTILATION BUILDING - GVB
NS1_STD_2170 ST105 Ventilation Bldg. (Substructure) Final Design - Review and Comment by MM --> FS 0
NS1_STD_2180 ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Re-Submissio .
--> FS 0 NS1_STD_2190
NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0
NS1_STD_2180 ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Re-Submission by Samsung--> FS 0
NS1_STD_2190 ST105 Ventilation Bldg. (Substructure) Final Design - Review & Approval by MM .
--> FS 0 NS1_STD_2200
NS1_STD_2200 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_2210 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_2220
NS1_STD_2210 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_2220 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission b .
--> FS 0 NS1_STD_2230
NS1_STD_2220 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2230 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM .
--> FS 0 NS1_CON08110
Add-> --> FS 0 NS1_CON08010
--> FS 1345 NS1_STD_00340
NS1_STD_2240 ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Submission by Samsung --> FS 0
NS1_STD_2250 ST105 Ventilation Bldg. (Substructure) As Built - Review and Comment by MM
--> FS 0 NS1_STD_2260
NS1_STD_2250 ST105 Ventilation Bldg. (Substructure) As Built - Review and Comment by MM --> FS 0
NS1_STD_2260 ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2270
NS1_STD_2260 ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2270 ST105 Ventilation Bldg. (Substructure) As Built - Review & Approval by MM .
--> FS 0 NS1_GEN10130
Lag=0-> --> FS 153 NS1_STD_00340
GAMBAS VENTILATION BUILDING - GVB
NS1_STD_1550 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Submission by --> FS 0
NS1_STD_1560 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_1570
NS1_STD_1560 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_1570 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1580
NS1_STD_1570 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission --> FS 0
NS1_STD_1580 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_1630
NS1_STD_1630 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_1640 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_1650
NS1_STD_1640 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_1650 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1660
NS1_STD_1650 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by Samsung--> FS 0
NS1_STD_1660 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_1700
NS1_STD_1590 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_1600 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by AC
--> FS 0 NS1_STD_1610
NS1_STD_1610 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_1620 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by AC
--> FS 0 NS1_STD_1670
--> FS 0 NS1_STD_1680
--> SS 0 NS1_STD_1710
NS1_STD_1670 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_1680 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by LTA/DBC
--> FS 0 NS1_STD_1690
NS1_STD_1680 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_1690 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1700
NS1_STD_1690 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_1660 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_1700 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by LTA/DBC
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_1750
--> FS 0 NS1_STD_1760
NS1_STD_1710 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_1720 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by BCA
--> FS 0 NS1_STD_1730
NS1_STD_1720 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by BCA --> FS 0
NS1_STD_1730 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1740
NS1_STD_1730 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_1740 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by BCA (NOA)
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_1750
--> FS 0 NS1_STD_1760
NS1_STD_1760 ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_1770 ST104 Ventilation Bldg. (Superstructure) Final Design - Review and Comment by M .
--> FS 0 NS1_STD_1780
NS1_STD_1770 ST104 Ventilation Bldg. (Superstructure) Final Design - Review and Comment by MM --> FS 0
NS1_STD_1780 ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Re-Submiss .
--> FS 0 NS1_STD_1790
GAMBAS VENTILATION BUILDING - GVB
NS1_STD_1780 ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Re-Submission by Samsu--> FS 0
NS1_STD_1790 ST104 Ventilation Bldg. (Superstructure) Final Design - Review & Approval by MM .
--> FS 0 NS1_STD_1800
NS1_STD_1800 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by Samsung --> FS 0 NS1_STD_1810
NS1_STD_1810 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/M .
--> FS 0 NS1_STD_1820
NS1_STD_1810 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM --> FS 0 NS1_STD_1820
NS1_STD_1820 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission .
--> FS 0 NS1_STD_1830
NS1_STD_1820 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0 NS1_STD_1830
NS1_STD_1830 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM .
--> FS 1315 NS1_STD_00340
Add-> --> FS 0 NS1_CON08110
NS1_STD_1840 ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Submission by Samsung --> FS 0
NS1_STD_1850 ST104 Ventilation Bldg. (Superstructure) As Built - Review and Comment by MM
--> FS 0 NS1_STD_1860
NS1_STD_1850 ST104 Ventilation Bldg. (Superstructure) As Built - Review and Comment by MM --> FS 0
NS1_STD_1860 ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1870
NS1_STD_1860 ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_1870 ST104 Ventilation Bldg. (Superstructure) As Built - Review & Approval by MM .
--> FS 0 NS1_GEN10130
Lag=0-> --> FS 9 NS1_STD_00340
NS1_STD_2300 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Submission b --> FS 0
NS1_STD_2310 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_2320
NS1_STD_2310 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review and Comment by MM--> FS 0
GAMBAS VENTILATION BUILDING - GVB
NS1_STD_2320 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2330
NS1_STD_2320 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Re-Submissio --> FS 0
NS1_STD_2330 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_2380
--> FS 0 NS1_STD_2420
NS1_STD_2380 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_2390 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_2400
NS1_STD_2390 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_2400 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2410
NS1_STD_2400 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Re-Submission by Sams --> FS 0
NS1_STD_2410 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_2450
NS1_STD_2420 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to LTA/U --> FS 0
NS1_STD_2430 BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by LTA/URA/FSSD/CBPU/NPaks
--> FS 0 NS1_STD_2440
NS1_STD_2430 BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by LTA/URA/FSSD/CBPU/NPa--> FS 0 NS1_STD_2440
NS1_STD_2440 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung
NS1_STD_2440 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung --> FS 0 NS1_STD_2450
NS1_STD_2410 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_2440 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2450 BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by LTA/URA/FSSD/CBPU/NPaks
--> FS 0 NS1_STD_2500
--> FS 0 NS1_STD_2510
NS1_STD_2460 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_2470 BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by BCA
--> FS 0 NS1_STD_2480
NS1_STD_2470 BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by BCA --> FS 0
NS1_STD_2480 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2490
GAMBAS VENTILATION BUILDING - GVB
NS1_STD_2480 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2490 BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by BCA (NOA)
--> FS 0 NS1_STD_2500
--> FS 0 NS1_STD_2510
NS1_STD_2510 BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Submission by Samsu --> FS 0
NS1_STD_2520 BP-AA Gambas (Bldg. Architectural Design) Final Design - Review and Comment by MM
--> FS 0 NS1_STD_2530
NS1_STD_2520 BP-AA Gambas (Bldg. Architectural Design) Final Design - Review and Comment by MM --> FS 0
NS1_STD_2530 BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2540
NS1_STD_2530 BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Re-Submission by Sa --> FS 0
NS1_STD_2540 BP-AA Gambas (Bldg. Architectural Design) Final Design - Review & Approval by MM
--> FS 0 NS1_STD_2550
NS1_STD_2550 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_2560 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_2570
NS1_STD_2560 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_2570 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2580
NS1_STD_2570 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Re-Submission by Samsu --> FS 0
NS1_STD_2580 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review & Approval by SP/MM
--> FS 0 NS1_CON08040
--> FS 1151 NS1_STD_00340
--> FS 0 NS1_CON08170
NS1_STD_2590 BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Submission by Samsung --> FS 0
GAMBAS VENTILATION BUILDING - GVB
NS1_STD_2600 BP-AA Gambas (Bldg. Architectural Design) As Built - Review and Comment by MM
--> FS 0 NS1_STD_2610
NS1_STD_2600 BP-AA Gambas (Bldg. Architectural Design) As Built - Review and Comment by MM --> FS 0
NS1_STD_2610 BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2620
NS1_STD_2610 BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Re-Submission by Samsun --> FS 0
NS1_STD_2620 BP-AA Gambas (Bldg. Architectural Design) As Built - Review & Approval by MM
--> FS 0 NS1_GEN10130
Lag=0-> --> FS 9 NS1_STD_00340
GVB - Substructure
NS1_CON07180 TEG: Backfilling up to Ground Level --> FS 15
NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Com --> FS 0 <-Add
NS1_STD_2230 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0 <-Add
NS1_CON08010 GVB: Piling - Tubular Pile (D=1200)
--> SS 8 NS1_CON08020
--> FF 8 NS1_CON08020
NS1_STD_2580 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review & Approval by SP/MM --> FS 0
NS1_CON08030 GVB: JGP for Water tightness --> FS 0
NS1_CON08040 GVB: Strutted Excavation for Ventilation Building
--> FS 0 NS1_CON08050
--> FS 0 NS1_CON08120
GAMBAS VENTILATION BUILDING - GVB
NS1_CON08120 GVB: Fdn, Basement 2 / Bottom Slab & Cable Gallery --> FS 0
NS1_CON10030 GVB: Wall / Column Basement 2 Cable Gallery .
--> FS 0 NS1_CON08170
--> FS 0 NS1_CON10040
GVB - Superstructure
NS1_CON01330 GAM: Permanent Lining, Gambas Shaft --> FS 0
NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0 <-SEB???
NS1_CON01360 GAM: Waterproofing, Gambas Shaft --> FS 0
NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0
NS1_STD_1750 ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to --> FS 0 <-Add
NS1_STD_5380 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0 <-SEB???
NS1_STD_2230 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0
NS1_STD_1830 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0 <-Add
NS1_CON08110 GVB: Lift Pit / RC Wall for Lift
--> FS 0 NS1_CON08120
--> FS 0 NS1_CON08300
GAMBAS VENTILATION BUILDING - GVB
NS1_STD_1750 ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to Commence St --> FS 1107
NS1_STD_2500 BP-AA Gambas (Bldg. Architectural Design) - Submission & Approval for Permit to Commence --> FS 943
NS1_STD_5650 ST302 Equipment Bldg. (Superstructure) - Submission & Approval for Permit to Commence Str --> FS 1107
NS1_STD_6000 BP-BB Sembawang (Bldg. Architectural Design) - Submission & Approval for Permit to Commen--> FS 943
NS1_CON10050 GVB: Wall / Column Basement 1 Cable Chamber --> FS 0
NS1_CON08140 GVB: Backfilling up to GL --> FS 0 <-Add
NS1_CON08130 GVB: 1st Storey Wall & Slab
--> FS 0 NS1_CON08140
--> FS 0 NS1_CON08560
Add-> --> FS 0 NS1_CON08150
GVB - Architectural
NS1_CON08160 GVB: Roof Slab + Parapet --> FF 0 <-Lag=14
NS1_CON10030 GVB: Wall / Column Basement 2 Cable Gallery --> FS 0
NS1_STD_2580 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review & Approval by SP/M --> FS 0 <-Add
NS1_CON08170 GVB: Architectural (Rough-in Finishes)
--> FS 0 NS1_CON10080
--> FS 0 NS1_GEN00100
Add-> --> FS 0 NS1_CON08560
--> SS 0 NS1_CON08670
--> SS 0 NS1_CON08680
--> SS 0 NS1_CON08690
--> SS 0 NS1_CON08700
--> SS 0 NS1_CON08710
--> SS 0 NS1_CON08720
--> SS 0 NS1_CON08730
--> FS 0 NS1_CON08740
NS1_CON08870 GVB: M&E - Service Fuel Tank, Bulk Fuel Storage --> FS 0
NS1_CON08880 GVB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 0
NS1_CON08890 GVB: M&E - Lighting, Small Power + Fittings --> FS 0
NS1_CON08900 GVB: M&E - Control Gear & Electrical Accessories --> FS 0
NS1_CON08910 GVB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON08920 GVB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
NS1_CON08930 GVB: M&E - Intruder Alarm System & Accessories --> FS 0
NS1_CON08940 GVB: M&E - Control & Data Cable + Accessories --> FS 0
NS1_CON08950 GVB: M&E - Mimic, Alarm & Marshall Cabinets --> FS 0
NS1_CON08960 GVB: M&E - Equipment For Monitoring & Control System & Accessories --> FS 0
NS1_CON08970 GVB: M&E - Earthing System & Lightning Protection System --> FS 0 <- to start during substructutre?
NS1_CON08980 GVB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
NS1_CON08990 GVB: M&E - 415V Switchgears, 433V Transformer --> FS 0
NS1_CON101164 GAM Handing of the SPPA Substation to SPPA .
--> FS 0 NS1_CON08550
--> FS 0 NS1_CON08600
--> FS 0 NS1_KEY07060
--> FS 0 NS1_TTR07010
SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out ???
NS1_CON101164 GAM Handing of the SPPA Substation to SPPA --> FS 0
NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out .
--> FS 0 NS1_CON08590
--> FS 0 NS1_CON08600
--> FS 0 NS1_CON05990
Power supply from SEB not GVB -> --> FS 0 NS1_CON06990
--> FS 0 NS1_KEY07040
TMV by others Omit link -> --> FS 0 NS1_NCS03030
TMV by others Omit link -> --> FS 0 NS1_NCS03050
NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_KEY07040 KD37: Completion of Permanent power supply fit-out and energisation of Gambas Ven<- set as Milestone
--> FS 0 NS1_CON08590
--> FS 0 NS1_CON08600
NS1_KEY04010 KD21: Commencement of Gambas Cut & Cover Tunnel Section's M&E fit-out --> FS 0
NS1_KEY07030 KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipmen --> FS 0
NS1_KEY05010 KD26: Commencement of Gambas Cut & Cover Tunnel Section's SCADA fit-out --> FS 0
NS1_iKEY00020 i_KD2: Handback of existing Gambas shaft by NS1 Contractor to SPPA --> FS 0
NS1_KEY07040 KD37: Completion of Permanent power supply fit-out and energisation of Gambas Ventilation Bu--> FS 0
NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_CON08590 GVB: M&E - Initial Testing & Commissioning .
--> FS 0 NS1_CON08600
--> SS 0 NS1_GEN09100
--> FS 0 NS1_GEN09210
--> FS 0 NS1_KEY07060
--> FS 0 NS1_TTR07010
NS1_KEY05010 KD26: Commencement of Gambas Cut & Cover Tunnel Section's SCADA fit-out --> FS 0
NS1_iKEY00020 i_KD2: Handback of existing Gambas shaft by NS1 Contractor to SPPA --> FS 0
NS1_KEY04010 KD21: Commencement of Gambas Cut & Cover Tunnel Section's M&E fit-out --> FS 0
NS1_KEY07040 KD37: Completion of Permanent power supply fit-out and energisation of Gambas Ventilation Bu--> FS 0
NS1_KEY07030 KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipmen --> FS 0
NS1_CON07220 TEG: SCADA works by NSC, Cut & Cover Tunnel Section --> FS 0
NS1_CON07210 TEG: M&E works in Culvert, Existing Gambas ~ GVB Cable Gallery --> FS 0
NS1_CON101164 GAM Handing of the SPPA Substation to SPPA --> FS 0
NS1_CON10080 GVB: Architectural (Final Finishes) --> FS 0
NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_CON08590 GVB: M&E - Initial Testing & Commissioning --> FS 0
NS1_CON08600 GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel) .
--> FS 0 NS1_GEN09290
--> FS 0 NS1_KEY07060
--> FS 0 NS1_TTR07010
Add-> --> FS 0 NS1_GEN09210
NS1_CON08600 GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel) --> FS 0
NS1_CON08590 GVB: M&E - Initial Testing & Commissioning --> FS 0
NS1_CON101164 GAM Handing of the SPPA Substation to SPPA --> FS 0
NS1_KEY07060 KD39: Testing & Commissioning of Gambas Ventilation Building's M&E fit-out <- set as Milestone
--> FS 0 NS1_TTR07010
ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by Samsung
ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Submission by Samsung
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Submission by Samsung
ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Re-Submission by Samsung
ST105 Ventilation Bldg. (Substructure) Final Design - Review & Approval by MM
Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung
ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review and Comment by MM
ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to AC
ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission by Samsung
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung
ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Re-Submission by Samsung
Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review and Comment by MM
BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Re-Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review & Approval by MM
BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to LTA/URA/FSSD/CBPU/NPaks
BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review and Comment by SP/MM
BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Re-Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review & Approval by SP/MM
BP-AA Gambas (Bldg. Architectural Design) - Submission & Approval for Permit to Commence Structural Works by MM
BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by BCA (NOA)
BP-AA Gambas (Bldg. Architectural Design) - Submission & Approval for Permit to Commence Structural Works by MM
BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Submission by Samsung
s by MM
GVB: 1st Storey Wall & Slab
BP-AA Gambas (Bldg. Architectural Design) Final Design - Review and Comment by MM
BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Re-Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) Final Design - Review & Approval by MM
BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM
BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Re-Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review & Approval by SP/MM
Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung
KD28: Commencement of Gambas to Sembawang Tunnel Section's, Gambas Shaft's & Gambas Ventilation Bldg's SCADA fit-out
GVB: Testing of SCADA works, Shaft & Ventilation building
SEB: SCADA works by NSC, Shaft & Equipment building
TGS: SCADA works by NSC, Tunnel section
GVB: Backfilling up to GL
GVB: M&E - Air Conditioning
GVB: 1st Storey Wall / Column
mer, etc.
GVB: Architectural (Final Finishes)
GVB: Landscaping Works
Project Hand-Over
Overall Reinstatement
GEN09290
Project Hand-Over
Completion of Construction
KD46: Total Completion Date
NS1_STD_00780 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Submission by S --> FS 0
NS1_STD_00790 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_00800
NS1_STD_00790 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_00800 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00810
NS1_STD_00800 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Re-Submission b --> FS 0
NS1_STD_00810 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_00860
NS1_STD_00860 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_00870 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_00880
NS1_STD_00870 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_00880 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00890
NS1_STD_00880 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_00890 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_00930
NS1_STD_00820 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_00830 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by AC
--> FS 0 NS1_STD_00840
NS1_STD_00830 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by AC --> FS 0
NS1_STD_00840 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00850
NS1_STD_00840 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_00850 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by AC
--> FS 0 NS1_STD_00900
NS1_STD_00910 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_00920 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00930
NS1_STD_00920 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_00890 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_00930 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by LTA/DBC
--> FS 0 NS1_STD_00980
--> FS 0 NS1_STD_00990
NS1_STD_00940 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_00950 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by BCA
--> FS 0 NS1_STD_00960
NS1_STD_00950 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by BCA --> FS 0 NS1_STD_00960
NS1_STD_00960 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00970
NS1_STD_00960 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_00970 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by BCA (NOA)
--> FS 0 NS1_STD_00980
--> FS 0 NS1_STD_00990
NS1_STD_00990 ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_01000 ST102 Cut & Cover Tunnel (ERSS) Final Design - Review and Comment by MM
--> FS 0 NS1_STD_01010
NS1_STD_01000 ST102 Cut & Cover Tunnel (ERSS) Final Design - Review and Comment by MM --> FS 0
NS1_STD_01010 ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_01020
NS1_STD_01010 ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Re-Submission by Samsu --> FS 0
NS1_STD_01020 ST102 Cut & Cover Tunnel (ERSS) Final Design - Review & Approval by MM
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_01030
NS1_STD_01030 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_01040 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_01050
NS1_STD_01040 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_01050 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_01060
NS1_STD_01050 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_01060 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review & Approval by SP/MM
Also link to CON07010 / TEG Piling? --> --> FS 98 NS1_KEY01050
Key Date
NS1_KEY01050 KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
???--> --> FS 0 NS1_CON05040
???--> --> FS 0 NS1_CON05050
Link only to STD_01060 / CCT ERSS-PSR/CNSS? --> --> FS 30 NS1_CON07010
???--> --> FS 0 NS1_STD_6390
NS1_STD_01070 ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Submission by Samsung --> FS 0
NS1_STD_01080 ST102 Cut & Cover Tunnel (ERSS) As Built - Review and Comment by MM
--> FS 0 NS1_STD_01090
NS1_STD_01080 ST102 Cut & Cover Tunnel (ERSS) As Built - Review and Comment by MM --> FS 0
NS1_STD_01090 ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_01100
NS1_STD_01090 ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_01100 ST102 Cut & Cover Tunnel (ERSS) As Built - Review & Approval by MM
???--> --> FS 0 NS1_GEN10130
Remove lag? --> --> FS 396 NS1_STD_00340
NS1_STD_1160 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Subm--> FS 0
NS1_STD_1170 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_1180
NS1_STD_1170 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review and Comme--> FS 0
NS1_STD_1180 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1190
NS1_STD_1180 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Re-S --> FS 0
NS1_STD_1190 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_1240
NS1_STD_1240 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Submission by --> FS 0
NS1_STD_1250 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_1260
NS1_STD_1250 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review and Comment by SP/ --> FS 0
NS1_STD_1260 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1270
NS1_STD_1260 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Re-Submission --> FS 0
NS1_STD_1270 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_1310
NS1_STD_1200 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to--> FS 0
NS1_STD_1210 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by AC .
--> FS 0 NS1_STD_1220
NS1_STD_1210 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by AC --> FS 0
NS1_STD_1220 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1230
NS1_STD_1220 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsun --> FS 0
NS1_STD_1230 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by AC
--> FS 0 NS1_STD_1280
NS1_STD_1280 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung t --> FS 0
NS1_STD_1290 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by LTA/DBC
--> FS 0 NS1_STD_1300
NS1_STD_1290 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_1300 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1310
NS1_STD_1300 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsu --> FS 0
NS1_STD_1270 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_1310 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by LTA/DBC
Link to BCA Approval?--> ???--> --> FS 0 NS1_KEY01050
Link to BCA Approval?--> ???--> --> FS 0 NS1_STD_1360
Link to BCA Approval?--> ???--> --> FS 0 NS1_STD_1370
NS1_STD_1320 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung t --> FS 0
NS1_STD_1330 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by BCA
--> FS 0 NS1_STD_1340
NS1_STD_1330 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by BCA --> FS 0
NS1_STD_1340 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1350
NS1_STD_1340 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsu --> FS 0
NS1_STD_1350 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by BCA (NOA)
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_1360
--> FS 0 NS1_STD_1370
NS1_STD_1370 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Submission --> FS 0 NS1_STD_1380
NS1_STD_1380 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by MM
NS1_STD_1380 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by M --> FS 0 NS1_STD_1390
NS1_STD_1380 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by M --> FS 0
NS1_STD_1390 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1400
NS1_STD_1390 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Re-Submiss --> FS 0
NS1_STD_1400 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review & Approv
--> FS 0 NS1_STD_1410
NS1_STD_1410 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Submission by --> FS 0
NS1_STD_1420 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_1430
NS1_STD_1420 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review and Comment by SP/ --> FS 0
NS1_STD_1430 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1440
NS1_STD_1430 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Re-Submission --> FS 0
NS1_STD_1440 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review & Approval -->
--> FS 1315 NS1_STD_00340
NS1_STD_1450 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Submission by S --> FS 0
NS1_STD_1460 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review and Comment by MM
--> FS 0 NS1_STD_1470
NS1_STD_1460 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review and Comment by MM --> FS 0
NS1_STD_1470 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1480
NS1_STD_1470 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Re-Submission b --> FS 0
NS1_STD_1480 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review & Approval by MM
???--> --> FS 0 NS1_GEN10130
Remove lag? --> --> FS 331 NS1_STD_00340
ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review & Approval by MM
ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review and Comment by SP/MM
ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review & Approval by SP/MM
ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by LTA/DBC
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to LTA/DBC
ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by LTA/DBC
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to BCA
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by LTA/DBC
ST102 Cut & Cover Tunnel (ERSS) - Submission & Approval for Permit to Commence Structural Works by MM+K101
ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by BCA
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by BCA (NOA)
ST102 Cut & Cover Tunnel (ERSS) - Submission & Approval for Permit to Commence Structural Works by MM
ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Submission by Samsung
GAM: Drill, Install Pipe Roof and Grouted Spiles, Adit: type A
TEG: Piling - Tubular Pile (D=1200), 123ea
TEG: Bottom Concrete T1, 15m
SEM: Instrumentation Installation by IMC
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST102 Cut & Cover Tunnel (ERSS) Final Design - Review and Comment by MM
ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) Final Design - Review & Approval by MM
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review and Comment by SP/MM
ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review & Approval by SP/MM
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST102 Cut & Cover Tunnel (ERSS) As Built - Review and Comment by MM
ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Re-Submission by Samsung
ST102 Cut & Cover Tunnel (ERSS) As Built - Review & Approval by MM
Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Submission by Samsung
ST204 Adit & Enlargement Intermediate Design - Preparation & Submission by Samsung
ST205 Bored Tunnel (GAM-SEM) Intermediate Design - Preparation & Submission by Samsung
ST206 Bored Tunnel (MAN-SEM) Intermediate Design - Preparation & Submission by Samsung
<---Also STD_1160 to link to CCT/ERSS?
ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review and Comment by MM
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to AC
ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Re-Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review and Comment by SP/MM
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Re-Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review & Approval by SP/MM
ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by LTA/DBC
ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by AC
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by AC
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to LTA/DBC
ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by LTA/DBC
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to BCA
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by LTA/DBC
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST103 Cut & Cover Tunnel (Permanent Works) - Submission & Approval for Permit to Commence Structural Works by MM
ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by BCA
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by BCA (NOA)
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST103 Cut & Cover Tunnel (Permanent Works) - Submission & Approval for Permit to Commence Structural Works by MM
ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by MM
ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by MM
ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Re-Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review & Approval by MM
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review and Comment by SP/MM
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Re-Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review & Approval by SP/MM
ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review and Comment by MM
ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Re-Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review & Approval by MM
Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung
NS1_GEN09100
NS1_CON08600
NS1_CON05990
NS1_GEN09290
NS1_GEN09100
NS1_CON06990
NS1_GEN09300
NS1_GEN09300
NS1_GEN09290
NS1_GEN09280
NS1_GEN09270
NS1_GEN09100
NS1_GEN09200
NS1_STD_710
NS1_GEN09200
NS1_GEN09100
NS1_STD_00370
NS1_GEN09330
NS1_GEN09100
NS1_GEN09200
NS1_GEN09340
NS1_GEN09100
NS1_GEN09200
NS1_GEN09350
NS1_CON06690
NS1_CON98950
NS1_CON08990
NS1_CON09890
NS1_MNE-AS10
NS1_CON101154
NS1_CON09490
NS1_TTR07010
NS1_MNE-AS40
NS1_MNE-AS80
NS1_MNE-AS520
NS1_MNE-AS200
NS1_MNE-AS320
NS1_MNE-AS360
NS1_MNE-AS400
NS1_MNE-AS600
NS1_MNE-AS680
NS1_MNE-AS120
NS1_MNE-AS440
NS1_MNE-AS280
NS1_MNE-AS560
NS1_MNE-AS760
NS1_MNE-AS800
NS1_MNE-AS640
NS1_MNE-AS480
NS1_MNE-AS720
NS1_MNE-AS160
NS1_MNE-AS240
NS1_DSG00150
NS1_NCS01020
NS1_KEY08060
NS1_KEY05050
NS1_NCS01080
NS1_NCS03050
NS1_NCS03030
NS1_KEY05040
NS1_NCS01060
NS1_DSG00150
NS1_iKEY00060
NS1_NCS01040
NS1_KEY08050
NS1_NCS05010
NS1_TTR07010
NS1_GEN10080
NS1_GEN00120
NS1_GEN00100
NS1_GEN00140
NS1_TTR07010
NS1_GEN18000
NS1_TTR07010
NS1_GEN18000
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160
NS1_GEN00030
NS1_GEN00140
NS1_GEN00040
NS1_GEN10160
NS1_GEN00060
NS1_GEN00140
NS1_GEN00070
NS1_TTR07010
NS1_GEN10160
NS1_GEN10310
NS1_GEN10080
NS1_NCS05010
NS1_GEN10100
NS1_GEN09200
NS1_GEN00120
NS1_STD_5770
NS1_GEN00180
NS1_GEN00100
NS1_STD_6960
NS1_GEN10080
NS1_GEN18000
NS1_GEN00070
NS1_STD_2270
NS1_STD_5070
NS1_DSG00150
NS1_GEN10160
NS1_GEN09330
NS1_GEN00080
NS1_STD_4020
NS1_STD_1480
NS1_STD_2970
NS1_STD_3320
NS1_STD_6470
NS1_GEN10100
NS1_GEN09350
NS1_STD_710
NS1_STD_5420
NS1_GEN00170
NS1_STD_6820
NS1_STD_00330
NS1_NCS05010
NS1_GEN10310
NS1_GEN00150
NS1_GEN00240
NS1_STD_2620
NS1_STD_01100
NS1_STD_4720
NS1_STD_4370
NS1_STD_6120
NS1_TTR07010
NS1_GEN09340
NS1_GEN00040
NS1_STD_1870
NS1_STD_3670
NS1_GEN10130
NS1_GEN10130
NS1_GEN10000
NS1_GEN10130
NS1_GEN10000
NS1_KEY10400
Removal of Temporary Communication Facilities --> FS 0
TMS: M&E - Testing & Commissioning --> FS 0
SEM Handing of the SPPA Substation to SPPA --> FS 0
KD25: Testing & Commissioning of Gambas to Sembawang Tunnel Section's & Gam --> FS 0
TGS: M&E - Testing & Commissioning --> FS 0
Removal of Temporary Drainage System --> FS 0
SEB: Initial Testing & Commissioning --> FS 0
SEB: Testing & Commissioning --> FS 0
GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel) --> FS 0
GVB: M&E - Initial Testing & Commissioning --> FS 0
Removal of Temporary Sanitary Waste Disposal System --> FS 0
Removal of Temporary Fire Fighting Facilities --> FS 0
KD24: Testing & Commissioning of Mandai to Sembawang Tunnel Section's & Semb--> FS 0
GAM Handing of the SPPA Substation to SPPA --> FS 0
Removal of Temporary Electricity Power Supply System & Lighting --> FS 0
KD38: Testing & Commissioning of Sembawang Equipment Building's M&E fit-out --> FS 0
KD39: Testing & Commissioning of Gambas Ventilation Building's M&E fit-out --> FS 0
Removal of Temporary Water Supply System --> FS 0
Removal of Temporary Ventilation System --> FS 0
Overall Testing & Commissioning of all Tunnels
--> SS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
bmission by Samsung