Anda di halaman 1dari 155

TASKPRED

Predecessor ID (*)Predecessor Activity Name RelationLag(d) Successor ID (*)Successor Activity Name


NS1_STD_2550 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation &GVBPSR --> FS 0 NS1_STD_2560 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM

Page 1
TASKPRED

BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM

Page 2
NS1_CON06310 TMS: Main Driving, CH: 3+876~3+849 (Mixed 27m) -->
NS1_CON06320 TMS: Main Driving, CH: 3+849~3+779 (Rock 70m) 75% (LTA-NSE INTERFACE @
-->
-->

NS1_KEY03070 KD17: Completion of 75% of tunnel drive (Mandai(T) to Sembawang)


NS1_KEY03070 KD17: Completion of 75% of tunnel drive (Mandai(T) to Sembawang) -->

NS1_CON06320 TMS: Main Driving, CH: 3+849~3+779 (Rock 70m) 75% (LTA-NSE INTE -->
NS1_KEY03070 KD17: Completion of 75% of tunnel drive (Mandai(T) to Sembawang) -->
NS1_CON06330 TMS: Main Driving, CH: 3+779~3+679 (Rock 100m)
-->

NS1_CON06330 TMS: Main Driving, CH: 3+779~3+679 (Rock 100m) -->


NS1_CON06340 TMS: Main Driving, CH: 3+679~3+579 (Rock 100m)
-->

NS1_CON06340 TMS: Main Driving, CH: 3+679~3+579 (Rock 100m) -->


NS1_CON06350 TMS: Main Driving, CH: 3+579~3+479 (Rock 100m)
-->

NS1_CON06350 TMS: Main Driving, CH: 3+579~3+479 (Rock 100m) -->


NS1_CON06360 TMS: Main Driving, CH: 3+479~3+379 (Rock 100m)
-->

NS1_CON06360 TMS: Main Driving, CH: 3+479~3+379 (Rock 100m) -->


NS1_CON06370 TMS: Main Driving, CH: 3+379~3+279 (Rock 100m)
-->

NS1_CON06370 TMS: Main Driving, CH: 3+379~3+279 (Rock 100m) -->


NS1_CON06380 TMS: Main Driving, CH: 3+279~3+179 (Rock 100m)
-->

NS1_CON02330 SEM: Permanent Lining, Sump & Shaft Bottom -->


NS1_CON06380 TMS: Main Driving, CH: 3+279~3+179 (Rock 100m) -->
NS1_PMF2300 PC Segment Manufacturing and Delivery (Ch: 5+678 - 3+113) + (3+04 -->
NS1_CON06420 TMS: Main Driving, CH: 3+179~3+113 (Rock 66m) 100%
-->

NS1_CON06420 TMS: Main Driving, CH: 3+179~3+113 (Rock 66m) 100% -->
NS1_KEY03090 KD18: TBM break through at Sembawang Shaft (Mandai(T) to Sembawang)
-->
-->
-->

NS1_CON100854 SEM: Down-Drill, Blasting+Mucking, 1st Shotcrete, Rockbolt + 2nd Shotcr


-->
NS1_KEY02030 KD9: Completion of Sembawang Temporary Shaft, Adits, & Enlargements -->
NS1_CON05470 TGS: TBM Dismantling in Sembawang Shaft -->
NS1_CON100914 SEM: Down-Drill, Blasting+Mucking, 1st Shotcrete, Rockbolt + 2nd Shotc-->
NS1_KEY03090 KD18: TBM break through at Sembawang Shaft (Mandai(T) to Sembawa -->
NS1_CON02180 SEM: 1st Shotcrete, Rockbolt + 2nd Shotcrete to Sump to GL-46 -->
NS1_CON06430 TMS: TBM Dismantling in Sembawang Shaft
-->
-->
-->

NS1_KEY03090 KD18: TBM break through at Sembawang Shaft (Mandai(T) to Sembawa -->
NS1_CON06440 TMS: Tunnel Cleaning
-->

NS1_CON06440 TMS: Tunnel Cleaning -->


NS1_CON06700 TMS: Tunnel Survey
-->

NS1_CON06700 TMS: Tunnel Survey -->


NS1_CON06710 TMS: Tunnel Repair
-->

NS1_KEY03100 KD19: TBM break through at Sembawang Shaft (Gambas to Sembawang-->


NS1_CON06710 TMS: Tunnel Repair -->
NS1_CON06510 TMS: Preparation for in-situ Invert Concrete
-->

NS1_CON06510 TMS: Preparation for in-situ Invert Concrete -->


NS1_CON06520 TMS: in-situ Invert Concrete Casting
-->

NS1_CON06520 TMS: in-situ Invert Concrete Casting -->


NS1_CON06530 TMS: Installation of Precast Trough
-->
-->

NS1_CON06530 TMS: Installation of Precast Trough -->


NS1_CON06530 TMS: Installation of Precast Trough -->
NS1_CON06540 TMS: Installation of Seperation Wall
-->
-->
-->

NS1_CON06540 TMS: Installation of Seperation Wall -->


NS1_CON06540 TMS: Installation of Seperation Wall -->
NS1_CON06550 TMS: Installation of Grating
-->
-->

NS1_CON06550 TMS: Installation of Grating -->


NS1_CON06550 TMS: Installation of Grating -->
NS1_CON06560 TMS: Installation of C-Channel
-->
-->

NS1-MOS1180 Material On Site - Pressurization System & Extinguisher -->


NS1_CON06560 TMS: Installation of C-Channel -->
NS1-MOS1190 Material On Site - Pipes & Fittings + Accessories -->
NS1_CON06560 TMS: Installation of C-Channel -->
NS1-MOS1170 Material On Site - Air Conditioning & Mechanical Ventilation -->
NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1_KEY04020 KD22: Commencement of Mandai to Sembawang Tunnel Section's & Sembawa
-->
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1-MOS1060 Material On Site - Remote Control & Monitoring Interface Equipment + -->
NS1_CON06860 TMS: M&E - Fan asssemblies + Accessories
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1_KEY04020 KD22: Commencement of Mandai to Sembawang Tunnel Section's & Semb
-->
NS1-MOS1050 Material On Site - Motor Starter & Control Panels -->
NS1-MOS1040 Material On Site - Ventilation & Smoke Exhaust Fans -->
NS1_CON06870 TMS: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Pan
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1-MOS1060 Material On Site - Remote Control & Monitoring Interface Equipment + -->
NS1_CON06880 TMS: M&E - Remote Control & Monitoring Interface Equipment + Accessories
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1-MOS1460 Material On Site - Fire Stopping & Sealing Opening/Penetration & Access-->
NS1_CON06890 TMS: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1-MOS1080 Material On Site - Air Release Pipes & Fittings -->
NS1_CON06900 TMS: M&E - Air Release Pipes & Fittings
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1-MOS1090 Material On Site - Landing Valve, Standby Fire Hose & Accessories -->
NS1_CON06910 TMS: M&E - Landing Valve, Standby Fire Hose & Accessories
-->

NS1-MOS1070 Material On Site - Fire detector, Smoke Control + Fire Extinguisher -->
NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->
NS1_CON06920 TMS: M&E - Fire detector, Smoke Control + Fire Extinguisher
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1-MOS1010 Material On Site - Motor Starter & Control Panels -->
NS1_CON06930 TMS: M&E - Motor Starter & Control Panels
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1-MOS1020 Material On Site - Remote Control & Monitoring Interface Equipment -->
NS1_CON06940 TMS: M&E - Remote Control & Monitoring Interface Equipment
-->

NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->


NS1-MOS1030 Material On Site - Pipes, Fiitings & Accessories -->
NS1_CON06950 TMS: M&E - Pipes, Fiitings & Accessories
-->
NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->
NS1-MOS1000 Material On Site - Duty & Standby Submersible Pumps -->
NS1_CON06960 TMS: M&E - Duty & Standby Submersible Pumps
-->

NS1-MOS1210 Material On Site - Potable ABC Monitoring Units -->


NS1_KEY04020 KD22: Commencement of Mandai to Sembawang Tunnel Section's & Semb -->
NS1_CON06890 TMS: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories -->
NS1_CON06940 TMS: M&E - Remote Control & Monitoring Interface Equipment -->
NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories -->
NS1_CON06860 TMS: M&E - Fan asssemblies + Accessories -->
NS1_CON06930 TMS: M&E - Motor Starter & Control Panels -->
NS1_CON06960 TMS: M&E - Duty & Standby Submersible Pumps -->
NS1_CON06950 TMS: M&E - Pipes, Fiitings & Accessories -->
NS1_CON06910 TMS: M&E - Landing Valve, Standby Fire Hose & Accessories -->
NS1_CON06900 TMS: M&E - Air Release Pipes & Fittings -->
NS1_CON06870 TMS: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control-->
NS1_CON06880 TMS: M&E - Remote Control & Monitoring Interface Equipment + Access-->
NS1_CON06920 TMS: M&E - Fire detector, Smoke Control + Fire Extinguisher -->
NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units
-->
-->
-->
-->
-->
-->
-->
-->

NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units -->


NS1-MOS1270 Material On Site - Leaky Feeder -->
NS1_CON98820 TMS: M&E - Leaky Feeder
-->

NS1-MOS1290 Material On Site - Fire Radio, UHF & Accessories -->


NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units -->
NS1_CON98830 TMS: M&E - Fire Radio, UHF & Accessories
-->

NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units -->


NS1-MOS1280 Material On Site - Telephone & Cables -->
NS1_CON98840 TMS: M&E - Telephone, Cables & Accessories
-->

NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units -->


NS1-MOS1250 Material On Site - Lighting, Small Power + Fittings -->
NS1_CON98850 TMS: M&E - Lighting, Small Power + Fittings
-->

NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units -->


NS1-MOS1260 Material On Site - Control Gear & Electrical Accessories -->
NS1_CON98860 TMS: M&E - Control Gear & Electrical Accessories
-->

NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units -->


NS1-MOS1200 Material On Site - Air Borne Contaminat Monitoring System -->
NS1_CON98900 TMS: M&E - Air Borne Contaminat Monitoring System
-->

NS1-MOS1240 Material On Site - Sub-Switchboard, Distribution Board Control & Access-->


NS1_CON98840 TMS: M&E - Telephone, Cables & Accessories -->
NS1_CON98820 TMS: M&E - Leaky Feeder -->
NS1_CON98850 TMS: M&E - Lighting, Small Power + Fittings -->
NS1_CON98860 TMS: M&E - Control Gear & Electrical Accessories -->
NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units -->
NS1_CON98900 TMS: M&E - Air Borne Contaminat Monitoring System -->
NS1_CON98830 TMS: M&E - Fire Radio, UHF & Accessories -->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories
-->
-->
-->
-->
-->
-->
-->
-->

NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1470 Material On Site - High Silicon Steel Cable Support Frame, Cable Trays -->
NS1_CON98880 TMS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders
-->

NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1430 Material On Site - Earthing / Lightning Protection System -->
NS1_CON98890 TMS: M&E - Earthing System & Lightning Protection System
-->

NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1110 Material On Site - Control Panel, Remote Control & Monitoring Interfac -->
NS1_CON98910 TMS: M&E - Control Panel, Remote Control & Monitoring Interface Equipment
-->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1120 Material On Site - Tanks & Accessories -->
NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories
NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories -->

NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1100 Material On Site - Pipes & Fittings -->
NS1_CON98930 TMS: M&E - Pipes, Fittings, Valves & Spray Nozzles
-->

NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1220 Material On Site - 22KV Cable, LV Cable + Pilot Wire Cable -->
NS1_CON98940 TMS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
-->

NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1-MOS1230 Material On Site - 415V Switchgears, 433V Transformer -->
NS1_CON98950 TMS: M&E - 415V Switchgears, 433V Transformer
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->
-->

NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out -->
NS1_GEN10110 Submission of Draft Operation & Maintenance Manual and Training -->
NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories -->
NS1_CON98890 TMS: M&E - Earthing System & Lightning Protection System -->
NS1_CON98910 TMS: M&E - Control Panel, Remote Control & Monitoring Interface Equi -->
NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories -->
NS1_CON98880 TMS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladd -->
NS1_CON98950 TMS: M&E - 415V Switchgears, 433V Transformer -->
NS1_CON98930 TMS: M&E - Pipes, Fittings, Valves & Spray Nozzles -->
NS1_CON98940 TMS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable -->
NS1_CON06990 TMS: M&E - Testing & Commissioning
-->
-->
-->

NS1_CON06990 TMS: M&E - Testing & Commissioning -->


NS1_KEY04040 KD24: Testing & Commissioning of Mandai to Sembawang Tunnel Section's &
-->

TMS - As Built Drawings


NS1_CON06430 TMS: TBM Dismantling in Sembawang Shaft -->
NS1_STD_6790 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Submission by Sams
-->

NS1_STD_6790 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Submission by -->
NS1_STD_6800 ST206 Bored Tunnel (MAN-SEM) As Built - Review and Comment by MM
-->

NS1_STD_6800 ST206 Bored Tunnel (MAN-SEM) As Built - Review and Comment by MM -->
NS1_STD_6810 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Re-Submission by Sa
-->

NS1_STD_6810 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Re-Submission -->
NS1_STD_6820 ST206 Bored Tunnel (MAN-SEM) As Built - Review & Approval by MM
-->
-->
FS 0
TA-NSE INTERFACE @ CH; 3+780)
FS 0 NS1_CON06330 TMS: Main Driving, CH: 3+779~3+679 (Rock 100m)
FS 0 NS1_KEY03070 KD17: Completion of 75% of tunnel drive (Mandai(T) to Sembawang)

embawang)
FS 0 NS1_CON06330 TMS: Main Driving, CH: 3+779~3+679 (Rock 100m)

FS 0
FS 0

FS 0 NS1_CON06340 TMS: Main Driving, CH: 3+679~3+579 (Rock 100m)

FS 0

FS 0 NS1_CON06350 TMS: Main Driving, CH: 3+579~3+479 (Rock 100m)

FS 0

FS 0 NS1_CON06360 TMS: Main Driving, CH: 3+479~3+379 (Rock 100m)

FS 0

FS 0 NS1_CON06370 TMS: Main Driving, CH: 3+379~3+279 (Rock 100m)

FS 0

FS 0 NS1_CON06380 TMS: Main Driving, CH: 3+279~3+179 (Rock 100m)

FS 0

FS 0 NS1_CON06420 TMS: Main Driving, CH: 3+179~3+113 (Rock 66m) 100%

FF 75
FS 0
FF 7

FS 0 NS1_KEY03090 KD18: TBM break through at Sembawang Shaft (Mandai(T) to Sembawang)

FS 0
T) to Sembawang)
FS -14 NS1_CON03370 MAN: Waterproofing, Adit - type A, NS2 Interface
FS 0 NS1_CON06430 TMS: TBM Dismantling in Sembawang Shaft
FS 0 NS1_CON06440 TMS: Tunnel Cleaning

FS 0
FS 0
FS 0
FS 0
FS 0
FS 0

FS 0 NS1_CON09010 SEB: Piling - Tubular Pile (D=1200), 92ea


FS 0 NS1_CON09110 SEB: Lift Pit / RC Wall for Lift
FS 30 NS1_STD_6790 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Submission by Samsung

FS 0

SS 4 NS1_CON06700 TMS: Tunnel Survey

SS 4

FS 3 NS1_CON06710 TMS: Tunnel Repair

FS 3

FS 0 NS1_CON06510 TMS: Preparation for in-situ Invert Concrete

FS 0
FS 0

FS 0 NS1_CON06520 TMS: in-situ Invert Concrete Casting

FS 0

FS 0 NS1_CON06530 TMS: Installation of Precast Trough

FS 0

FF 14 NS1_CON06540 TMS: Installation of Seperation Wall


SS 14 NS1_CON06540 TMS: Installation of Seperation Wall

FF 14
SS 14

FS 0 NS1_CON03360 MAN: Waterproofing, Adit - type A, Sembawang direction


SS 0 NS1_CON06550 TMS: Installation of Grating
FF 14 NS1_CON06550 TMS: Installation of Grating

SS 0
FF 14

FF 14 NS1_CON06560 TMS: Installation of C-Channel


SS 14 NS1_CON06560 TMS: Installation of C-Channel

FF 14
SS 14

SS 4 NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories


FF 48 NS1_CON07000 TMS: M&E - Mechanical Ventilation + Accessories

FS 0
SS 4
FS 0
FF 48
FS 0

SS 0 NS1_CON06860 TMS: M&E - Fan asssemblies + Accessories


SS 0 NS1_CON06870 TMS: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels
SS 0 NS1_CON06880 TMS: M&E - Remote Control & Monitoring Interface Equipment + Accessories
SS 0 NS1_CON06890 TMS: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories
SS 0 NS1_CON06900 TMS: M&E - Air Release Pipes & Fittings
SS 0 NS1_CON06910 TMS: M&E - Landing Valve, Standby Fire Hose & Accessories
SS 0 NS1_CON06920 TMS: M&E - Fire detector, Smoke Control + Fire Extinguisher
SS 0 NS1_CON06930 TMS: M&E - Motor Starter & Control Panels
SS 0 NS1_CON06940 TMS: M&E - Remote Control & Monitoring Interface Equipment
SS 0 NS1_CON06950 TMS: M&E - Pipes, Fiitings & Accessories
SS 0 NS1_CON06960 TMS: M&E - Duty & Standby Submersible Pumps
SS 0 NS1_KEY04020 KD22: Commencement of Mandai to Sembawang Tunnel Section's & Sembawang
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units
FS 0 NS1_GEN10110 Submission of Draft Operation & Maintenance Manual and Training

SS 0
ection's & Sembawang shaft's M&E fit-out
SS 0 NS1_CON06870 TMS: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
FS 0

FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
SS 0
FS 0
FS 0
arter & Control Panels
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
FS 0
ment + Accessories
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
FS 0
& Accessories
FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
FS 0

FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
FS 0

FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

FS 0
SS 0

FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
FS 0

FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
FS 0

FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

SS 0
FS 0

FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units


SS 0
FS 0

FS 0 NS1_CON98810 TMS: M&E - Potable ABC Monitoring Units

FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0

SS 0 NS1_CON98820 TMS: M&E - Leaky Feeder


SS 0 NS1_CON98830 TMS: M&E - Fire Radio, UHF & Accessories
SS 0 NS1_CON98840 TMS: M&E - Telephone, Cables & Accessories
SS 0 NS1_CON98850 TMS: M&E - Lighting, Small Power + Fittings
SS 0 NS1_CON98860 TMS: M&E - Control Gear & Electrical Accessories
SS 0 NS1_CON98900 TMS: M&E - Air Borne Contaminat Monitoring System
FS 0 NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories
FS 46 NS1_GEN10110 Submission of Draft Operation & Maintenance Manual and Training

SS 0
FS 0

FS 0 NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

FS 0
SS 0

FS 0 NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SS 0
FS 0

FS 0 NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SS 0
FS 0
FS 0 NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SS 0
FS 0

FS 0 NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SS 0
FS 0

FS 0 NS1_CON98870 TMS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
& Accessories
SS 0 NS1_CON98880 TMS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders
SS 0 NS1_CON98890 TMS: M&E - Earthing System & Lightning Protection System
SS 0 NS1_CON98910 TMS: M&E - Control Panel, Remote Control & Monitoring Interface Equipment
SS 0 NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories
SS 0 NS1_CON98930 TMS: M&E - Pipes, Fittings, Valves & Spray Nozzles
SS 0 NS1_CON98940 TMS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
SS 0 NS1_CON98950 TMS: M&E - 415V Switchgears, 433V Transformer
FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning

SS 0
FS 0
e Trays & Ladders
FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning

SS 0
FS 0

FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning

SS 0
FS 0
nterface Equipment
FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning
SS 0 NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories
FS 0 NS1_CON98920 TMS: M&E - Tanks, Pumps & Accessories

FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning

SS 0
FS 0

FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning

SS 0
FS 0

FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning

SS 0
FS 0

FS 0 NS1_CON06990 TMS: M&E - Testing & Commissioning


FS 0 NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submiss
FS 0 NS1_MNE-AS130 FFS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submissi
FS 0 NS1_MNE-AS170 SPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submiss
FS 0 NS1_MNE-AS210 DWSS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submi
FS 0 NS1_MNE-AS250 PCCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submis
FS 0 NS1_MNE-AS290 ABCM (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submi
FS 0 NS1_MNE-AS330 HS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submissio
FS 0 NS1_MNE-AS370 LS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submissio
FS 0 NS1_MNE-AS410 RCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submiss
FS 0 NS1_MNE-AS450 MTS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submiss
FS 0 NS1_MNE-AS490 UPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submiss
FS 0 NS1_MNE-AS50 MVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submiss
FS 0 NS1_MNE-AS530 SDGS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submis
FS 0 NS1_MNE-AS570 LSP (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submissi
FS 0 NS1_MNE-AS610 SMCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submis
FS 0 NS1_MNE-AS650 SS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submissio
FS 0 NS1_MNE-AS690 ELPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submis
FS 0 NS1_MNE-AS730 WMS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submis
FS 0 NS1_MNE-AS770 HVI (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submissi
FS 0 NS1_MNE-AS90 TVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submiss

FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0
FS 0

FS 0 NS1_GEN09300 TUNNEL RI (Architectural/Building) Inspection


FS 0 NS1_KEY04040 KD24: Testing & Commissioning of Mandai to Sembawang Tunnel Section's & Sem
FS 0 NS1_TTR07010 Overall Testing & Commissioning of all Tunnels

FS 0
Tunnel Section's & Sembawang shaft's M&E fit-out
FS 0 NS1_TTR07010 Overall Testing & Commissioning of all Tunnels

FS 30
Submission by Samsung
FS 0 NS1_STD_6800 ST206 Bored Tunnel (MAN-SEM) As Built - Review and Comment by MM

FS 0
mment by MM
FS 0 NS1_STD_6810 ST206 Bored Tunnel (MAN-SEM) As Built - Preparation & Re-Submission by Samsu

FS 0
Re-Submission by Samsung
FS 0 NS1_STD_6820 ST206 Bored Tunnel (MAN-SEM) As Built - Review & Approval by MM

FS 0
oval by MM
FS 453 NS1_GEN10130 Project Hand-Over
FS 0 NS1_STD_00340 PSR/CHSS - Preparation & Submission by Samsung
to Sembawang)

dai(T) to Sembawang)
n & Submission by Samsung
or Starter & Control Panels
quipment + Accessories
tion & Accessories

nnel Section's & Sembawang shaft's M&E fit-out

l and Training

or Starter & Control Panels


trol & Accessories
l and Training

trol & Accessories

trol & Accessories

trol & Accessories


trol & Accessories

trol & Accessories

trol & Accessories

Cable Trays & Ladders

ng Interface Equipment
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
s Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
As Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
s Built Preparation & Submission by Samsung
s Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
Built Preparation & Submission by Samsung
wang Tunnel Section's & Sembawang shaft's M&E fit-out

d Comment by MM

n & Re-Submission by Samsung

pproval by MM
NS1_KEY03080
NS1_KEY03080

NS1_CON05390
NS1_CON05390

NS1_CON05400
NS1_CON05400

NS1_CON05410
NS1_CON05410

NS1_CON05420
NS1_CON05420

NS1_CON05430
NS1_CON05430

NS1_CON05440

NS1_CON05450

NS1_CON05460

NS1_CON05460
NS1_KEY03100

NS1_CON02330
NS1_KEY02030
NS1_KEY03100
NS1_CON05470
NS1_CON05480

NS1_CON05490

NS1_CON05500

NS1_CON05610

NS1_CON05630

NS1_CON05710

NS1_CON05730

NS1_CON05740

NS1_CON05750

NS1-MOS1170
NS1-MOS1190
NS1_CON05750
NS1-MOS1180
NS1_CON05970
NS1_KEY04030
NS1_KEY04030
NS1_KEY04030

NS1_KEY04030
NS1-MOS1040
NS1_CON05970
NS1_CON05980

NS1_CON05970
NS1-MOS1050
NS1_CON06080

NS1_CON05970
NS1-MOS1060
NS1_CON06090

NS1_CON05970
NS1-MOS1460
NS1_CON06100

NS1_CON05970
NS1-MOS1080
NS1_CON06390

NS1-MOS1090
NS1_CON05970
NS1_CON06400

NS1_CON05970
NS1-MOS1070
NS1_CON06410

NS1_CON05970
NS1-MOS1010
NS1_CON06450
NS1-MOS1020
NS1_CON05970
NS1_CON06460

NS1_CON05970
NS1-MOS1030
NS1_CON06470

NS1-MOS1000
NS1_CON05970
NS1_CON06480

NS1_KEY04030
NS1_CON06410
NS1-MOS1200
NS1_CON06090
NS1_CON06100
NS1_CON06470
NS1_CON06480
NS1_CON06080
NS1_CON05980
NS1_CON06450
NS1-MOS1200
NS1_CON06390
NS1_CON06400
NS1_CON05970
NS1_CON06460
NS1-MOS1210
NS1_CON06490

NS1_CON06490
NS1-MOS1210
NS1_CON06500

NS1-MOS1270
NS1_CON06490
NS1_CON06570

NS1_CON06490
NS1-MOS1290
NS1_CON06580
NS1-MOS1280
NS1_CON06490
NS1_CON06590

NS1_CON06490
NS1-MOS1250
NS1_CON06600

NS1_CON06490
NS1-MOS1260
NS1_CON06610

NS1_CON06580
NS1_CON06590
NS1-MOS1240
NS1_CON06500
NS1_CON06600
NS1_CON06610
NS1_CON06570
NS1_CON06490
NS1_CON06620

NS1_CON06620
NS1-MOS1470
NS1_CON06630

NS1-MOS1430
NS1_CON06620
NS1_CON06640

NS1_CON06620
NS1-MOS1100
NS1_CON06650

NS1_CON06620
NS1-MOS1110
NS1_CON06660

NS1_CON06620
NS1-MOS1120
NS1_CON06670
NS1-MOS1260
NS1-MOS1220
NS1-MOS1250
NS1_CON06620
NS1-MOS1470
NS1-MOS1230
NS1-MOS1240
NS1_CON06680

NS1_CON06620
NS1-MOS1230
NS1_CON06690

NS1_CON08550
NS1_CON06630
NS1_CON06680
NS1_CON06620
NS1_CON06650
NS1_CON06660
NS1_CON06670
NS1_CON06690
NS1_CON06640
NS1_CON05990

NS1_CON05990
NS1_KEY04050
NS1_CON05470
NS1_STD_6440
NS1_STD_6440

NS1_STD_6440
NS1_STD_6450
NS1_STD_6450

NS1_STD_6450
NS1_STD_6460
NS1_STD_6460

NS1_STD_6460
NS1_STD_6470
NS1_STD_6470
NS1_STD_6470
KD16: Completion of 75% of tunnel drive (Gambas to Sembawang)
KD16: Completion of 75% of tunnel drive (Gambas to Sembawang) --> FS 0

TGS: Main Driving, CH: 2+286~2+445 (Rock 159m)


TGS: Main Driving, CH: 2+286~2+445 (Rock 159m) --> FS 0

TGS: Main Driving, CH: 2+445~2+500 (Soil 55m)


TGS: Main Driving, CH: 2+445~2+500 (Soil 55m) --> FS 0

TGS: Main Driving, CH: 2+500~2+600 (Rock 100m)


TGS: Main Driving, CH: 2+500~2+600 (Rock 100m) --> FS 0

TGS: Main Driving, CH: 2+600~2+700 (Rock 100m)


TGS: Main Driving, CH: 2+600~2+700 (Rock 100m) --> FS 0

TGS: Main Driving, CH: 2+700~2+800 (Rock 100m)


TGS: Main Driving, CH: 2+700~2+800 (Rock 100m) --> FS 0

TGS: Main Driving, CH: 2+800~2+850 (Rock 50m) (LTA-NSE INTERFACE @ CH-2+840)
--> FS 0
--> SS 0

TGS: Cutter Head Intervention Start @ (CH: 2+850)


--> FS 0

TGS: Main Driving, CH: 2+850~3040 (Rock 140m) 100%


--> FF 0

TGS: Main Driving, CH: 2+850~3040 (Rock 140m) 100% --> FF 0


KD19: TBM break through at Sembawang Shaft (Gambas to Sembawang)
--> FS 0
--> FS 0
--> FS 0
--> FS 0

SEM: Permanent Lining, Sump & Shaft Bottom --> FS 0


KD9: Completion of Sembawang Temporary Shaft, Adits, & Enlargements, ready f --> FS 0
KD19: TBM break through at Sembawang Shaft (Gambas to Sembawang) --> FS 0
TGS: TBM Dismantling in Sembawang Shaft
--> FS 0
--> FS 0
--> FS 0
--> FS 30
TGS: Tunnel Cleaning
--> SS 4

TGS: Tunnel Survey


--> SS 4

TGS: Tunnel Repair


--> FS 0

TGS: Preparation for in-situ Invert Concrete


--> FS 0

TGS: In-situ Invert Concrete Casting


--> FS 0

TGS: Installation of Precast Trough


--> SS 5
--> SS 5

TGS: Installation of Seperation Wall


--> SS 0
--> FS 0

TGS: Installation of Grating


--> SS 14
--> FF 14

TGS: Installation of C-Channel


--> SS 12

Material On Site - Air Conditioning & Mechanical Ventilation --> FS 0


Material On Site - Pipes & Fittings + Accessories --> FS 0
TGS: Installation of C-Channel --> SS 12
Material On Site - Pressurization System & Extinguisher --> FS 0
TGS: M&E - Mechanical Ventilation + Accessories
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> FS 0
--> SS 0

KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft's M&E fit-out
KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft
--> SS 0
KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft
--> FS 0

KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft


--> SS 0
Material On Site - Ventilation & Smoke Exhaust Fans --> FS 0
TGS: M&E - Mechanical Ventilation + Accessories --> SS 0
TGS: M&E - Ventilation & Smoke Exhaust Fans
--> FS 0

TGS: M&E - Mechanical Ventilation + Accessories --> SS 0


Material On Site - Motor Starter & Control Panels --> FS 0
TGS: M&E - Motor Starter & Control Panels
--> FS 0

TGS: M&E - Mechanical Ventilation + Accessories --> SS 0


Material On Site - Remote Control & Monitoring Interface Equipment + Accessorie--> FS 0
TGS: M&E - Remote Control & Monitoring Interface Equipment + Accessories
--> FS 0

TGS: M&E - Mechanical Ventilation + Accessories --> SS 0


Material On Site - Fire Stopping & Sealing Opening/Penetration & Accessories --> FS 0
TGS: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories
--> FS 0

TGS: M&E - Mechanical Ventilation + Accessories --> SS 0


Material On Site - Air Release Pipes & Fittings --> FS 0
TGS: M&E - Air Release Pipes & Fittings
--> FS 0

Material On Site - Landing Valve, Standby Fire Hose & Accessories --> FS 0
TGS: M&E - Mechanical Ventilation + Accessories --> SS 0
TGS: M&E - Landing Valve, Standby Fire Hose & Accessories
--> FS 0

TGS: M&E - Mechanical Ventilation + Accessories --> SS 0


Material On Site - Fire detector, Smoke Control + Fire Extinguisher --> FS 0
TGS: M&E - Fire detector, Smoke Control + Fire Extinguisher
--> FS 0

TGS: M&E - Mechanical Ventilation + Accessories --> SS 0


Material On Site - Motor Starter & Control Panels --> FS 0
TGS: M&E - Motor Starter & Control Panels
--> FS 0
Material On Site - Remote Control & Monitoring Interface Equipment --> FS 0
TGS: M&E - Mechanical Ventilation + Accessories --> SS 0
TGS: M&E - Remote Control & Monitoring Interface Equipment
--> FS 0

TGS: M&E - Mechanical Ventilation + Accessories --> SS 0


Material On Site - Pipes, Fiitings & Accessories --> FS 0
TGS: M&E - Pipes, Fiitings & Accessories
--> FS 0

Material On Site - Duty & Standby Submersible Pumps --> FS 0


TGS: M&E - Mechanical Ventilation + Accessories --> SS 0
TGS: M&E - Duty & Standby Submersible Pumps
--> FS 0

KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft--> FS 0


TGS: M&E - Fire detector, Smoke Control + Fire Extinguisher --> FS 0
Material On Site - Air Borne Contaminat Monitoring System --> FF 0
TGS: M&E - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
TGS: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories --> FS 0
TGS: M&E - Pipes, Fiitings & Accessories --> FS 0
TGS: M&E - Duty & Standby Submersible Pumps --> FS 0
TGS: M&E - Motor Starter & Control Panels --> FS 0
TGS: M&E - Ventilation & Smoke Exhaust Fans --> FS 0
TGS: M&E - Motor Starter & Control Panels --> FS 0
Material On Site - Air Borne Contaminat Monitoring System --> FS 30
TGS: M&E - Air Release Pipes & Fittings --> FS 0
TGS: M&E - Landing Valve, Standby Fire Hose & Accessories --> FS 0
TGS: M&E - Mechanical Ventilation + Accessories --> FS 0
TGS: M&E - Remote Control & Monitoring Interface Equipment --> FS 0
Material On Site - Potable ABC Monitoring Units --> FS 30
TGS: M&E - Air Borne Contaminat Monitoring System
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> FS 0

TGS: M&E - Air Borne Contaminat Monitoring System --> SS 0


Material On Site - Potable ABC Monitoring Units --> FS 0
TGS: M&E - Potable ABC Monitoring Units
--> FS 0

Material On Site - Leaky Feeder --> FS 0


TGS: M&E - Air Borne Contaminat Monitoring System --> SS 0
TGS: M&E - Leaky Feeder
--> FS 0

TGS: M&E - Air Borne Contaminat Monitoring System --> SS 0


Material On Site - Fire Radio, UHF & Accessories --> FS 0
TGS: M&E - Fire Radio, UHF System & Accessories
--> FS 0
Material On Site - Telephone & Cables --> FS 0
TGS: M&E - Air Borne Contaminat Monitoring System --> SS 0
TGS: M&E - Telephone, Cables & Accessories
--> FS 0

TGS: M&E - Air Borne Contaminat Monitoring System --> SS 0


Material On Site - Lighting, Small Power + Fittings --> FS 0
TGS: M&E - Lighting, Small Power + Fittings
--> FS 0

TGS: M&E - Air Borne Contaminat Monitoring System --> SS 0


Material On Site - Control Gear & Electrical Accessories --> FS 0
TGS: M&E - Control Gear & Electrical Accessories
--> FS 0

TGS: M&E - Fire Radio, UHF System & Accessories --> FS 0


TGS: M&E - Telephone, Cables & Accessories --> FS 0
Material On Site - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
TGS: M&E - Potable ABC Monitoring Units --> FS 0
TGS: M&E - Lighting, Small Power + Fittings --> FS 0
TGS: M&E - Control Gear & Electrical Accessories --> FS 0
TGS: M&E - Leaky Feeder --> FS 0
TGS: M&E - Air Borne Contaminat Monitoring System --> FS 0
TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories
--> FS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0
--> SS 0

TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> SS 0


Material On Site - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
TGS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders
--> FS 0

Material On Site - Earthing / Lightning Protection System --> FS 0


TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> SS 0
TGS: M&E - Earthing System & Lightning Protection System
--> FS 0

TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> SS 0


Material On Site - Pipes & Fittings --> FS 0
TGS: M&E - Pipes, Fittings, Valves & Spray Nozzles
--> FS 0

TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> SS 0


Material On Site - Control Panel, Remote Control & Monitoring Interface Equipmen--> FS 0
TGS: M&E - Control Panel, Remote Control & Monitoring Interface Equipment
--> FS 0

TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> SS 0


Material On Site - Tanks & Accessories --> FS 0
TGS: M&E - Tanks, Pumps & Accessories
--> FS 0

Material On Site - Control Gear & Electrical Accessories --> FS 0


Material On Site - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
Material On Site - Lighting, Small Power + Fittings --> FS 0
TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> SS 0
Material On Site - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
Material On Site - 415V Switchgears, 433V Transformer --> FS 0
Material On Site - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
TGS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
--> FS 0

TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> SS 0


Material On Site - 415V Switchgears, 433V Transformer --> FS 0
TGS: M&E - 415V Switchgears, 433V Transformer
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0

GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
TGS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
TGS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
TGS: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
TGS: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
TGS: M&E - Tanks, Pumps & Accessories --> FS 0
TGS: M&E - 415V Switchgears, 433V Transformer --> FS 0
TGS: M&E - Earthing System & Lightning Protection System --> FS 0
TGS: M&E - Testing & Commissioning
--> FS 0
--> FS 0
--> FS 0

TGS: M&E - Testing & Commissioning --> FS 0


KD25: Testing & Commissioning of Gambas to Sembawang Tunnel Section's & Gambas shaft's M&
--> FS 0
TGS: TBM Dismantling in Sembawang Shaft --> FS 30
ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Submission by Samsung
ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Submission by Samsung --> FS 0

ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Submission by Samsung --> FS 0
ST205 Bored Tunnel (GAM-SEM) As Built - Review and Comment by MM
ST205 Bored Tunnel (GAM-SEM) As Built - Review and Comment by MM --> FS 0

ST205 Bored Tunnel (GAM-SEM) As Built - Review and Comment by MM --> FS 0


ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Re-Submission by Samsung
ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Re-Submission by Samsu--> FS 0

ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Re-Submission by Samsu--> FS 0


ST205 Bored Tunnel (GAM-SEM) As Built - Review & Approval by MM
ST205 Bored Tunnel (GAM-SEM) As Built - Review & Approval by MM --> FS 483
ST205 Bored Tunnel (GAM-SEM) As Built - Review & Approval by MM --> FS 0
NS1_CON05390 TGS: Main Driving, CH: 2+286~2+445 (Rock 159m)

NS1_CON05400 TGS: Main Driving, CH: 2+445~2+500 (Soil 55m)

NS1_CON05410 TGS: Main Driving, CH: 2+500~2+600 (Rock 100m)

NS1_CON05420 TGS: Main Driving, CH: 2+600~2+700 (Rock 100m)

NS1_CON05430 TGS: Main Driving, CH: 2+700~2+800 (Rock 100m)

NS1_CON05440 TGS: Main Driving, CH: 2+800~2+850 (Rock 50m) (LTA-NSE INTERFACE @ CH-2+840)

NS1_CON05450 TGS: Cutter Head Intervention Start @ (CH: 2+850)


NS1_iKEY00010 i_KD1: Handover of existing Gambas shaft by SPPA to NS1

NS1_CON05460 TGS: Main Driving, CH: 2+850~3040 (Rock 140m) 100%

NS1_KEY03100 KD19: TBM break through at Sembawang Shaft (Gambas to Sembawang)

NS1_CON01340 GAM: Waterproofing, Adit: type A


NS1_CON05470 TGS: TBM Dismantling in Sembawang Shaft
NS1_CON05480 TGS: Tunnel Cleaning
NS1_CON06510 TMS: Preparation for in-situ Invert Concrete

NS1_CON05610 TGS: Preparation for in-situ Invert Concrete


NS1_CON05630 TGS: In-situ Invert Concrete Casting
NS1_CON06430 TMS: TBM Dismantling in Sembawang Shaft
NS1_STD_6440 ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Submission by Samsung
NS1_CON05490 TGS: Tunnel Survey

NS1_CON05500 TGS: Tunnel Repair

NS1_CON05610 TGS: Preparation for in-situ Invert Concrete

NS1_CON05630 TGS: In-situ Invert Concrete Casting

NS1_CON05710 TGS: Installation of Precast Trough

NS1_CON05730 TGS: Installation of Seperation Wall


NS1_CON05740 TGS: Installation of Grating

NS1_CON05740 TGS: Installation of Grating


NS1_CON08560 GVB: M&E - Air Conditioning

NS1_CON05750 TGS: Installation of C-Channel


NS1_CON05750 TGS: Installation of C-Channel

NS1_CON05970 TGS: M&E - Mechanical Ventilation + Accessories

NS1_CON05980 TGS: M&E - Ventilation & Smoke Exhaust Fans


NS1_CON06080 TGS: M&E - Motor Starter & Control Panels
NS1_CON06090 TGS: M&E - Remote Control & Monitoring Interface Equipment + Accessories
NS1_CON06100 TGS: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories
NS1_CON06390 TGS: M&E - Air Release Pipes & Fittings
NS1_CON06400 TGS: M&E - Landing Valve, Standby Fire Hose & Accessories
NS1_CON06410 TGS: M&E - Fire detector, Smoke Control + Fire Extinguisher
NS1_CON06450 TGS: M&E - Motor Starter & Control Panels
NS1_CON06460 TGS: M&E - Remote Control & Monitoring Interface Equipment
NS1_CON06470 TGS: M&E - Pipes, Fiitings & Accessories
NS1_CON06480 TGS: M&E - Duty & Standby Submersible Pumps
NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System
NS1_KEY04030 KD23: Commencement of Gambas to Sembawang Tunnel Section's & Gambas shaft's M

shaft's M&E fit-out


NS1_CON05980 TGS: M&E - Ventilation & Smoke Exhaust Fans
NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System


NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06490 TGS: M&E - Air Borne Contaminat Monitoring System

NS1_CON06500 TGS: M&E - Potable ABC Monitoring Units


NS1_CON06570 TGS: M&E - Leaky Feeder
NS1_CON06580 TGS: M&E - Fire Radio, UHF System & Accessories
NS1_CON06590 TGS: M&E - Telephone, Cables & Accessories
NS1_CON06600 TGS: M&E - Lighting, Small Power + Fittings
NS1_CON06610 TGS: M&E - Control Gear & Electrical Accessories
NS1_CON06620 TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

NS1_CON06620 TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

NS1_CON06620 TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

NS1_CON06620 TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories


NS1_CON06620 TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

NS1_CON06620 TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

NS1_CON06620 TGS: M&E - Sub-Switchboard, Distribution Board Control & Accessories

NS1_CON05990 TGS: M&E - Testing & Commissioning


NS1_CON06630 TGS: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders
NS1_CON06640 TGS: M&E - Earthing System & Lightning Protection System
NS1_CON06650 TGS: M&E - Pipes, Fittings, Valves & Spray Nozzles
NS1_CON06660 TGS: M&E - Control Panel, Remote Control & Monitoring Interface Equipment
NS1_CON06670 TGS: M&E - Tanks, Pumps & Accessories
NS1_CON06680 TGS: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
NS1_CON06690 TGS: M&E - 415V Switchgears, 433V Transformer

NS1_CON05990 TGS: M&E - Testing & Commissioning

NS1_CON05990 TGS: M&E - Testing & Commissioning

NS1_CON05990 TGS: M&E - Testing & Commissioning

NS1_CON05990 TGS: M&E - Testing & Commissioning


NS1_CON05990 TGS: M&E - Testing & Commissioning

NS1_CON05990 TGS: M&E - Testing & Commissioning

NS1_CON05990 TGS: M&E - Testing & Commissioning


NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS130 FFS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS170 SPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS210 DWSS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission b
NS1_MNE-AS250 PCCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission b
NS1_MNE-AS290 ABCM (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission b
NS1_MNE-AS330 HS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by S
NS1_MNE-AS370 LS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by S
NS1_MNE-AS410 RCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS450 MTS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS490 UPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS50 MVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS530 SDGS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission b
NS1_MNE-AS570 LSP (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS610 SMCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission b
NS1_MNE-AS650 SS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by S
NS1_MNE-AS690 ELPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS730 WMS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission b
NS1_MNE-AS770 HVI (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS90 TVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by

NS1_GEN09290 TUNNEL RI (M&E) Inspection


NS1_KEY04050 KD25: Testing & Commissioning of Gambas to Sembawang Tunnel Section's & Gambas s
NS1_TTR07010 Overall Testing & Commissioning of all Tunnels

& Gambas shaft's M&E fit-out


NS1_TTR07010 Overall Testing & Commissioning of all Tunnels
NS1_STD_6440 ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Submission by Samsung

NS1_STD_6450 ST205 Bored Tunnel (GAM-SEM) As Built - Review and Comment by MM

NS1_STD_6450 ST205 Bored Tunnel (GAM-SEM) As Built - Review and Comment by MM

NS1_STD_6460 ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Re-Submission by Samsung

NS1_STD_6460 ST205 Bored Tunnel (GAM-SEM) As Built - Preparation & Re-Submission by Samsung

NS1_STD_6470 ST205 Bored Tunnel (GAM-SEM) As Built - Review & Approval by MM

NS1_STD_6470 ST205 Bored Tunnel (GAM-SEM) As Built - Review & Approval by MM

NS1_GEN10130 Project Hand-Over


NS1_STD_00340 PSR/CHSS - Preparation & Submission by Samsung
INTERFACE @ CH-2+840)

Sembawang)

mission by Samsung
nt + Accessories
Accessories
ction's & Gambas shaft's M&E fit-out
ccessories

ccessories

ccessories

ccessories
ccessories

ccessories

ccessories

ays & Ladders

rface Equipment
reparation & Submission by Samsung
eparation & Submission by Samsung
reparation & Submission by Samsung
Preparation & Submission by Samsung
Preparation & Submission by Samsung
Preparation & Submission by Samsung
eparation & Submission by Samsung
paration & Submission by Samsung
reparation & Submission by Samsung
reparation & Submission by Samsung
reparation & Submission by Samsung
reparation & Submission by Samsung
Preparation & Submission by Samsung
eparation & Submission by Samsung
Preparation & Submission by Samsung
eparation & Submission by Samsung
Preparation & Submission by Samsung
Preparation & Submission by Samsung
eparation & Submission by Samsung
reparation & Submission by Samsung

Tunnel Section's & Gambas shaft's M&E fit-out


mission by Samsung

ment by MM

ment by MM

Submission by Samsung

Submission by Samsung
SEMBAWANG EQUIPMENT BUILDING (SEB)

SEB / SUB - Intermediate Design Submission


NS1_PDB_01100 AIP-C Permanent Works Design - Preparation & Submission by Samsung --> FS 0
NS1_GEN00000 Contract Award / Commencement Date --> FS 293
NS1_STD_5100 ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Submissio .
--> FS 0 NS1_STD_5110
--> SS 0 NS1_STD_5140

NS1_STD_5100 ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Submission by Samsun--> FS 0
NS1_STD_5110 ST303 Equipment Bldg. (Substructure) Intermediate Design - Review and Comment by .
--> FS 0 NS1_STD_5120

NS1_STD_5110 ST303 Equipment Bldg. (Substructure) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_5120 ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Re-Submis .
--> FS 0 NS1_STD_5130

NS1_STD_5120 ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by Sam --> FS 0
NS1_STD_5130 ST303 Equipment Bldg. (Substructure) Intermediate Design - Review & Approval by MM.
--> FS -8 NS1_STD_5180

SEB / SUB - PSR/CDS Submission


NS1_STD_5130 ST303 Equipment Bldg. (Substructure) Intermediate Design - Review & Approval by MM --> FS -8
NS1_STD_5180 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Submission by Sams .
--> FS 0 NS1_STD_5190

NS1_STD_5180 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_5190 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_5200

NS1_STD_5190 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_5200 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by S .
--> FS 0 NS1_STD_5210

NS1_STD_5200 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5210 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM .
--> FS -1 NS1_STD_5250

SEB / SUB - AC Approval


NS1_STD_5100 ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Submission by Samsun--> SS 0
NS1_STD_5140 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to AC .
--> FS 0 NS1_STD_5150

NS1_STD_5140 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_5150 ST303 Equipment Bldg. (Substructure) - Review and Comment by AC .
--> FS 0 NS1_STD_5160

NS1_STD_5150 ST303 Equipment Bldg. (Substructure) - Review and Comment by AC --> FS 0


NS1_STD_5160 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5170

NS1_STD_5160 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5170 ST303 Equipment Bldg. (Substructure) - Review & Approval by AC .
--> FS 0 NS1_STD_5220

SEB / SUB - LTA/DBC Approval


NS1_STD_5170 ST303 Equipment Bldg. (Substructure) - Review & Approval by AC --> FS 0
NS1_STD_5220 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to LTA .
--> FS 0 NS1_STD_5230
--> SS 0 NS1_STD_5260

NS1_STD_5220 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_5230 ST303 Equipment Bldg. (Substructure) - Review and Comment by LTA/DBC .
--> FS 0 NS1_STD_5240

NS1_STD_5230 ST303 Equipment Bldg. (Substructure) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_5240 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5250

NS1_STD_5210 ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_5240 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5250 ST303 Equipment Bldg. (Substructure) - Review & Approval by LTA/DBC .
--> FS 0 NS1_STD_5300
--> FS 0 NS1_STD_5310

SEB / SUB - BCA Approval


NS1_STD_5220 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC --> SS 0
NS1_STD_5260 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to BCA .
--> FS 0 NS1_STD_5270

NS1_STD_5260 ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_5270 ST303 Equipment Bldg. (Substructure) - Review and Comment by BCA .
--> FS 0 NS1_STD_5280

NS1_STD_5270 ST303 Equipment Bldg. (Substructure) - Review and Comment by BCA --> FS 0
NS1_STD_5280 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5290

NS1_STD_5280 ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5290 ST303 Equipment Bldg. (Substructure) - Review & Approval by BCA (NOA) .
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_5300
--> FS 0 NS1_STD_5310

SEB / SUB - Permit to Start


NS1_STD_5290 ST303 Equipment Bldg. (Substructure) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_5250 ST303 Equipment Bldg. (Substructure) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commenc .
Wrong link ?---> --> FS 0 NS1_CON08110
--> FS 0 NS1_CON09110
--> FS 0 NS1_STD_5320
--> FS 0 NS1_STD_5340

SEB / SUB - Final Design Submission


NS1_STD_5290 ST303 Equipment Bldg. (Substructure) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_5250 ST303 Equipment Bldg. (Substructure) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_5310 ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Submission by Sa .
--> FS 0 NS1_STD_5320

NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structura --> FS 0 <---???
NS1_STD_5310 ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_5320 ST303 Equipment Bldg. (Substructure) Final Design - Review and Comment by MM .
--> FS 0 NS1_STD_5330

NS1_STD_5320 ST303 Equipment Bldg. (Substructure) Final Design - Review and Comment by MM --> FS 0
NS1_STD_5330 ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Re-Submission by .
--> FS 0 NS1_STD_5340

NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structura --> FS 0 <---???
NS1_STD_5330 ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5340 ST303 Equipment Bldg. (Substructure) Final Design - Review & Approval by MM .
--> FS 0 NS1_STD_5350

SEB / SUB - PSR/CNSS Submission


NS1_STD_5340 ST303 Equipment Bldg. (Substructure) Final Design - Review & Approval by MM --> FS 0
NS1_STD_5350 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Submission by Samsu.
--> FS 0 NS1_STD_5360

NS1_STD_5350 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_5360 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_5370

NS1_STD_5360 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_5370 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission by Sa .
--> FS 0 NS1_STD_5380

NS1_STD_5370 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5380 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM .
Wrong link? ---> --> FS 0 NS1_CON08110
--> FS 1345 NS1_STD_00340

SEB / SUPER - Intermediate Design Submission


NS1_GEN00000 Contract Award / Commencement Date --> FS 323
NS1_PDB_01100 AIP-C Permanent Works Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_5450 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Submiss .
--> FS 0 NS1_STD_5460
--> SS 0 NS1_STD_5490

NS1_STD_5450 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Submission by Sams --> FS 0
NS1_STD_5460 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review and Comment .
--> FS 0 NS1_STD_5470

NS1_STD_5460 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_5470 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Re-Subm .
--> FS 0 NS1_STD_5480

NS1_STD_5470 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission by S --> FS 0
NS1_STD_5480 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review & Approval by .
--> FS -8 NS1_STD_5530

SEB / SUPER - PSR/CDSS Submission


NS1_STD_5480 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review & Approval by MM --> FS -8
NS1_STD_5530 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Submission by Sa .
--> FS 0 NS1_STD_5540

NS1_STD_5530 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_5540 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_5550

NS1_STD_5540 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_5550 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by .
--> FS 0 NS1_STD_5560
NS1_STD_5550 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5560 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM .
--> FS -1 NS1_STD_5600

SEB / SUPER - AC Approval


NS1_STD_5450 ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Submission by Sams --> SS 0
NS1_STD_5490 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to AC.
--> FS 0 NS1_STD_5500

NS1_STD_5490 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_5500 ST302 Equipment Bldg. (Superstructure) - Review and Comment by AC .
--> FS 0 NS1_STD_5510

NS1_STD_5500 ST302 Equipment Bldg. (Superstructure) - Review and Comment by AC --> FS 0


NS1_STD_5510 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5520

NS1_STD_5510 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5520 ST302 Equipment Bldg. (Superstructure) - Review & Approval by AC .
--> FS 0 NS1_STD_5570

SEB / SUPER - LTA/DBC Approval


NS1_STD_5520 ST302 Equipment Bldg. (Superstructure) - Review & Approval by AC --> FS 0
NS1_STD_5570 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to L .
--> FS 0 NS1_STD_5580
--> SS 0 NS1_STD_5610

NS1_STD_5570 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_5580 ST302 Equipment Bldg. (Superstructure) - Review and Comment by LTA/DBC .
--> FS 0 NS1_STD_5590

NS1_STD_5580 ST302 Equipment Bldg. (Superstructure) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_5590 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5600

NS1_STD_5590 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5560 ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_5600 ST302 Equipment Bldg. (Superstructure) - Review & Approval by LTA/DBC .
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_5650
--> FS 0 NS1_STD_5660

SEB / SUPER - BCA Approval


NS1_STD_5570 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC --> SS 0
NS1_STD_5610 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to B .
--> FS 0 NS1_STD_5620

NS1_STD_5610 ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_5620 ST302 Equipment Bldg. (Superstructure) - Review and Comment by BCA .
--> FS 0 NS1_STD_5630

NS1_STD_5620 ST302 Equipment Bldg. (Superstructure) - Review and Comment by BCA --> FS 0
NS1_STD_5630 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung .
--> FS 0 NS1_STD_5640

NS1_STD_5630 ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5640 ST302 Equipment Bldg. (Superstructure) - Review & Approval by BCA (NOA) .
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_5650
--> FS 0 NS1_STD_5660

SEB / SUPER - Permit To Commence Structural Works


NS1_STD_5600 ST302 Equipment Bldg. (Superstructure) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_5640 ST302 Equipment Bldg. (Superstructure) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_5650 ST302 Equipment Bldg. (Superstructure) - Submission & Approval for Permit to Comm .
Wrong link ? Link to CON09110 : SEB lift pit/walls ?---> --> FS 1107 NS1_CON08130

SEB / SUPER - Final Design Submission


NS1_STD_5600 ST302 Equipment Bldg. (Superstructure) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_5640 ST302 Equipment Bldg. (Superstructure) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_5660 ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Submission by .
--> FS 0 NS1_STD_5670

NS1_STD_5660 ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_5670 ST302 Equipment Bldg. (Superstructure) Final Design - Review and Comment by MM .
--> FS 0 NS1_STD_5680

NS1_STD_5670 ST302 Equipment Bldg. (Superstructure) Final Design - Review and Comment by MM --> FS 0
NS1_STD_5680 ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Re-Submission .
--> FS 0 NS1_STD_5690

NS1_STD_5680 ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5690 ST302 Equipment Bldg. (Superstructure) Final Design - Review & Approval by MM .
--> FS 0 NS1_STD_5700

SEB / SUPER - PSR/CNSS


NS1_STD_5690 ST302 Equipment Bldg. (Superstructure) Final Design - Review & Approval by MM --> FS 0
NS1_STD_5700 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by Sam .
--> FS 0 NS1_STD_5710

NS1_STD_5700 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_5710 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_5720

NS1_STD_5710 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_5720 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by .
--> FS 0 NS1_STD_5730

NS1_STD_5720 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_5730 ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM .
Link to CON09010 : SEB-Piling ?---> --> FS 1315 NS1_STD_00340

SEB / SUPER - Piling & Excavation


NS1_KEY01040 KD5: Completion of all Design & Authorities Approval for Shafts, Adits and Enlargements --> FS 0 <--- ???
NS1_CON06430 TMS: TBM Dismantling in Sembawang Shaft --> FS 0
NS1_CON02330 SEM: Permanent Lining, Sump & Shaft Bottom --> FS 0
NS1_CON02340 SEM: Permanent Lining, Sembawang Shaft --> FS 0
NS1_CON09010 SEB: Piling - Tubular Pile (D=1200), 92ea
--> FF 5 NS1_CON09015
--> SS 6 NS1_CON09015

NS1_CON09010 SEB: Piling - Tubular Pile (D=1200), 92ea --> FF 5


NS1_CON09010 SEB: Piling - Tubular Pile (D=1200), 92ea --> SS 6
NS1_CON09015 SEB: Piling - Sheet Pile (ISP II), 92ea
--> FF 6 NS1_CON09020
--> SS 6 NS1_CON09020

NS1_CON09015 SEB: Piling - Sheet Pile (ISP II), 92ea --> FF 6


NS1_CON09015 SEB: Piling - Sheet Pile (ISP II), 92ea --> SS 6
NS1_CON09020 SEB: JGP for Water tightness
--> FF 7 NS1_CON09030
--> SS 8 NS1_CON09030

NS1_CON09020 SEB: JGP for Water tightness --> FF 7


NS1_CON09020 SEB: JGP for Water tightness --> SS 8
NS1_CON09030 SEB: Strutted Excavation for Ventilation Building
--> FS 18 NS1_CON09040
--> FS 0 NS1_CON09120

NS1_CON09030 SEB: Strutted Excavation for Ventilation Building --> FS 18


NS1_CON09040 SEB: Removal of Tubular Pile
Link to CON09120 : SEB-Foundation ?---> --> FS 0 NS1_CON99900

SEM SHAFT - CIVIL FIT OUT


NS1_CON02340 SEM: Permanent Lining, Sembawang Shaft --> FS 0
NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structura --> FS 0 <--- ???
NS1_CON02330 SEM: Permanent Lining, Sump & Shaft Bottom --> FS 0
NS1_CON06430 TMS: TBM Dismantling in Sembawang Shaft --> FS 0 <--- Add lag ???
NS1_CON09110 SEB: Lift Pit / RC Wall for Lift
--> FS 0 NS1_CON09120
--> FS 0 NS1_CON09180

NS1_CON09110 SEB: Lift Pit / RC Wall for Lift --> FS 0


NS1_CON09180 SEB: Installation of Steel Stair / Grating
??? ---> --> FS 0 NS1_CON09170
??? ---> --> SF 0 NS1_CON10020
??? ---> --> FS 0 NS1_NCS01030

SEB - SUBSTRUCTURE & SUPERSTRUCTURE


NS1_CON09110 SEB: Lift Pit / RC Wall for Lift --> FS 0
NS1_CON09030 SEB: Strutted Excavation for Ventilation Building --> FS 0 <--- ???
NS1_CON09120 SEB: Fdn, Basement 2 / Bottom Slab & Cooling Pump Room .
--> FS 0 NS1_CON99900

NS1_CON09120 SEB: Fdn, Basement 2 / Bottom Slab & Cooling Pump Room --> FS 0
NS1_CON09040 SEB: Removal of Tubular Pile --> FS 0 <--- ???
NS1_CON99900 SEB: Wall / Column Basement 2 Cooling Pump Room .
--> FS 60 NS1_CON09200
--> FS 0 NS1_CON99800

NS1_CON99900 SEB: Wall / Column Basement 2 Cooling Pump Room --> FS 0


NS1_CON99800 SEB: Basement 1 Bottom Slab & Cable Chamber .
--> FS 0 NS1_CON09130

NS1_CON99800 SEB: Basement 1 Bottom Slab & Cable Chamber --> FS 0


NS1_CON09130 SEB: Wall / Column Basement 1 Cable Chamber
--> FS 0 NS1_CON09140

NS1_CON09130 SEB: Wall / Column Basement 1 Cable Chamber --> FS 0


NS1_STD_6000 BP-BB Sembawang (Bldg. Architectural Design) - Submission & Approval for Permit to Commence --> FS 0
NS1_CON09140 SEB: 1st Storey Slab
--> FS 0 NS1_CON09150
--> FS 30 NS1_STD_5390

NS1_CON09140 SEB: 1st Storey Slab --> FS 0


NS1_CON09150 SEB: Backfilling up to GL
--> FS 0 NS1_CON09160
???---> --> FS 0 NS1_NCS01030

NS1_CON09150 SEB: Backfilling up to GL --> FS 0


NS1_CON09160 SEB: 1st Storey Wall / Column
--> FS 0 NS1_CON10000

NS1_CON09160 SEB: 1st Storey Wall / Column --> FS 0


NS1_CON10000 SEB: 2nd Storey Slab
???---> --> FS 0 NS1_CON09910
--> FS 0 NS1_CON10010

NS1_CON10000 SEB: 2nd Storey Slab --> FS 0


NS1_CON10010 SEB: 2nd Storey Wall / Column
--> FS 0 NS1_CON09170
???---> --> FS 0 NS1_CON09910

NS1_CON10010 SEB: 2nd Storey Wall / Column --> FS 0


NS1_CON09180 SEB: Installation of Steel Stair / Grating --> FS 0 <---???
NS1_CON09170 SEB: Roof Slab + Parapet
??? ---> --> FF 2 NS1_CON09200
--> FS 0 NS1_CON09210
--> FS 0 NS1_CON10020
--> FS 0 NS1_CON99700
--> FS 0 NS1_KEY06010
--> FS 0 NS1_KEY06020
--> FS 30 NS1_STD_5740
??? ---> --> FS 0 NS1_STD_6090

SEB - Architectural Work


NS1_CON99900 SEB: Wall / Column Basement 2 Cooling Pump Room --> FS 60 <--- ???
NS1_CON09170 SEB: Roof Slab + Parapet --> FF 2
NS1_CON09200 SEB: Architectural (Rough-in Finishes)
--> FS 0 NS1_CON10020

NS1_KEY06010 KD31: Completion of Sembawang Equipment Building's basic civil and structural works for SPPA su --> FS 0
NS1_CON09170 SEB: Roof Slab + Parapet --> FS 0 <---???
NS1_CON09210 SEB: Underground Utilities --> SS 0
NS1_CON09180 SEB: Installation of Steel Stair / Grating --> SF 0 <---???
NS1_CON09200 SEB: Architectural (Rough-in Finishes) --> FS 0
NS1_KEY06020 KD32: Completion of Sembawang Equipment Building's basic civil & structural works for M&E fit-out--> FS 0
NS1_CON99700 SEB: Landscaping Work --> FF 0
NS1_CON10020 SEB: Architectural (Final Finishes)
--> FS 0 NS1_GEN00120

SEB - M&E Works


NS1_CON10000 SEB: 2nd Storey Slab --> FS 0 <---???
NS1_CON10010 SEB: 2nd Storey Wall / Column --> FS 0 <---???
NS1-MOS1170 Material On Site - Air Conditioning & Mechanical Ventilation --> FS 0
NS1_CON09910 SEB: M&E - Air Conditioning
--> FS 0 NS1_CON09410
--> SS 0 NS1_CON09430
--> SS 0 NS1_CON09500
--> SS 0 NS1_CON09510
--> SS 0 NS1_CON09520
--> SS 0 NS1_CON09530
--> SS 0 NS1_CON09580
--> SS 0 NS1_CON09610
--> SS 0 NS1_CON09620
--> SS 0 NS1_CON09630
--> SS 0 NS1_CON09640
--> SS 0 NS1_CON09650
--> SS 0 NS1_CON09660
--> SS 0 NS1_CON09670
--> SS 0 NS1_CON09680
--> SS 0 NS1_CON09690
--> SS 0 NS1_CON09700
--> SS 0 NS1_CON09900
--> SS 0 NS1_KEY07010

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1_KEY07010 KD34: Commencement of Sembawang Equipment Building's M&E fit-out .
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1130 Material On Site - Cooling Tower --> FS 30
NS1-MOS1140 Material On Site - Pipes & Fittings --> FS 0
NS1-MOS1150 Material On Site - Tank, Pumps --> FS 0
NS1_CON09430 SEB: M&E - Cooling Tower, Tank, Pumps, Pipes & fittings .
--> FS 0 NS1_CON09410
???---> --> FS 0 NS1_CON09600

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1040 Material On Site - Ventilation & Smoke Exhaust Fans --> FS 0
NS1_CON09500 SEB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels .
--> FS 0 NS1_CON09410
???---> --> FS 0 NS1_CON09590
???---> --> FS 0 NS1_CON09600

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1060 Material On Site - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON09510 SEB: M&E - Remote Control & Monitoring Interface Equipment + Accessories .
--> FS 0 NS1_CON09410
???---> --> FS 0 NS1_CON09590
???---> --> FS 0 NS1_CON09600

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1040 Material On Site - Ventilation & Smoke Exhaust Fans --> FS 30
NS1-MOS1050 Material On Site - Motor Starter & Control Panels --> FS 30
NS1-MOS1060 Material On Site - Remote Control & Monitoring Interface Equipment + Accessories --> FS 30
NS1_CON09520 SEB: M&E - Fan asssemblies + Accessories
--> FS 0 NS1_CON09410
???---> --> FS 0 NS1_CON09600

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1190 Material On Site - Pipes & Fittings + Accessories --> FS 0
NS1_CON09530 SEB: M&E - Domestic Water Supply System
--> FS 0 NS1_CON09410
???---> --> FS 0 NS1_CON09600

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1180 Material On Site - Pressurization System & Extinguisher --> FS 0
NS1_CON09580 SEB: M&E - Pressurization System & Extinguisher .
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1190 Material On Site - Pipes & Fittings + Accessories --> FS 0
NS1_CON09610 SEB: M&E - Pipes & Fittings + Accessories
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1460 Material On Site - Fire Stopping & Sealing Opening/Penetration & Accessories --> FS 0
NS1_CON09620 SEB: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories .
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1080 Material On Site - Air Release Pipes & Fittings --> FS 0
NS1_CON09630 SEB: M&E - Air Release Pipes & Fittings
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1090 Material On Site - Landing Valve, Standby Fire Hose & Accessories --> FS 0
NS1_CON09640 SEB: M&E - Landing Valve, Standby Fire Hose & Accessories .
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1070 Material On Site - Fire detector, Smoke Control + Fire Extinguisher --> FS 0
NS1_CON09650 SEB: M&E - Fire detector, Smoke Control + Fire Extinguisher .
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1010 Material On Site - Motor Starter & Control Panels --> FS 0
NS1_CON09660 SEB: M&E - Motor Starter & Control Panels
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1020 Material On Site - Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09670 SEB: M&E - Remote Control & Monitoring Interface Equipment .
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1030 Material On Site - Pipes, Fiitings & Accessories --> FS 0
NS1_CON09680 SEB: M&E - Pipes, Fiitings & Accessories
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS


NS1-MOS1000 Material On Site - Duty & Standby Submersible Pumps --> FS
NS1_CON09690 SEB: M&E - Duty & Standby Submersible Pumps
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1170 Material On Site - Air Conditioning & Mechanical Ventilation --> FS 0
NS1_CON09900 SEB: M&E - Mechanical Ventilation + Accessories .
--> FS 0 NS1_CON09410

NS1_CON09910 SEB: M&E - Air Conditioning --> SS 0


NS1-MOS1160 Material On Site - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment .
--> FS 0 NS1_CON09410
--> FS 0 NS1_CON09480
--> FS 0 NS1_CON09490
--> FS 0 NS1_CON09540
--> FS 0 NS1_CON09550
--> FS 0 NS1_CON09560
--> FS 0 NS1_CON09710
--> FS 0 NS1_CON09720
--> FS 0 NS1_CON09730
--> FS 0 NS1_CON09740
--> FS 0 NS1_CON09750
--> FS 0 NS1_CON09760
--> FS 0 NS1_CON09770
--> FS 0 NS1_CON09780
--> FS 0 NS1_CON09790
--> FS 0 NS1_CON09800
--> FS 0 NS1_CON09810

NS1_KEY07010 KD34: Commencement of Sembawang Equipment Building's M&E fit-out --> FS 0


NS1_CON09430 SEB: M&E - Cooling Tower, Tank, Pumps, Pipes & fittings --> FS 0
NS1_CON09500 SEB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels --> FS 0
NS1_CON09510 SEB: M&E - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON09520 SEB: M&E - Fan asssemblies + Accessories --> FS 0
NS1_CON09530 SEB: M&E - Domestic Water Supply System --> FS 0
NS1_CON09580 SEB: M&E - Pressurization System & Extinguisher --> FS 0
NS1_CON09610 SEB: M&E - Pipes & Fittings + Accessories --> FS 0
NS1_CON09620 SEB: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories --> FS 0
NS1_CON09630 SEB: M&E - Air Release Pipes & Fittings --> FS 0
NS1_CON09640 SEB: M&E - Landing Valve, Standby Fire Hose & Accessories --> FS 0
NS1_CON09650 SEB: M&E - Fire detector, Smoke Control + Fire Extinguisher --> FS 0
NS1_CON09660 SEB: M&E - Motor Starter & Control Panels --> FS 0
NS1_CON09670 SEB: M&E - Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09680 SEB: M&E - Pipes, Fiitings & Accessories --> FS 0
NS1_CON09690 SEB: M&E - Duty & Standby Submersible Pumps --> FS 0
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09900 SEB: M&E - Mechanical Ventilation + Accessories --> FS 0
NS1_CON09910 SEB: M&E - Air Conditioning --> FS 0
NS1-MOS1200 Material On Site - Air Borne Contaminat Monitoring System --> FS 0
NS1_CON09410 SEB: M&E - Air Borne Contaminat Monitoring System .
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1390 Material On Site - Lift System --> FF 0 <-FS or FF ?
NS1-MOS1390 Material On Site - Lift System --> FS 30 <-FS or FF ?
NS1-MOS1400 Material On Site - Electrical Emergency System & Safety Devices + Cabling --> FS 30
NS1-MOS1440 Material On Site - Lifting Devices, Electric Hoist, Control Panels --> FS 30
NS1-MOS1450 Material On Site - Lifting Beam, Chain Block, Support & Accessories --> FS 30
NS1_CON09480 SEB: M&E - Lift System
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09590
??? ---> --> FS 0 NS1_CON09600

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1320 Material On Site - Standby Generator Sets --> FF 0 <-FS or FF ?
NS1-MOS1320 Material On Site - Standby Generator Sets --> FS 30 <-FS or FF ?
NS1-MOS1330 Material On Site - Silencer, Filters, Sound Attenuator, Control Panel & Accessories --> FS 30
NS1-MOS1340 Material On Site - Service Fuel Tank, Bulk Fuel Storage --> FS 30
NS1-MOS1350 Material On Site - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 30
NS1_CON09490 SEB: M&E - Standby Generator Sets
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09590
??? ---> --> FS 0 NS1_CON09600
??? ---> --> FS 0 NS1_DSG00150
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1270 Material On Site - Leaky Feeder --> FF 0 <-FS or FF ?
NS1-MOS1270 Material On Site - Leaky Feeder --> FS 30 <-FS or FF ?
NS1-MOS1290 Material On Site - Fire Radio, UHF & Accessories --> FS 30
NS1_CON09540 SEB: M&E - Leaky Feeder
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09600

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09710 SEB: M&E - Potable ABC Monitoring Units --> SS 0
NS1-MOS1250 Material On Site - Lighting, Small Power + Fittings --> FF 0 <-FS or FF ?
NS1-MOS1250 Material On Site - Lighting, Small Power + Fittings --> FS 30 <-FS or FF ?
NS1_CON09550 SEB: M&E - Lighting, Small Power + Fittings
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09590
??? ---> --> FS 0 NS1_CON09600

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1440 Material On Site - Lifting Devices, Electric Hoist, Control Panels --> FF 0 <-FS or FF ?
NS1-MOS1440 Material On Site - Lifting Devices, Electric Hoist, Control Panels --> FS 30 <-FS or FF ?
NS1-MOS1450 Material On Site - Lifting Beam, Chain Block, Support & Accessories --> FS 30
NS1_CON09560 SEB: M&E - Lifting Devices, Electric Hoist, Control Panels
--> FS 0 NS1_CON09470
??? ---> --> FS 0 NS1_CON09600

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1210 Material On Site - Potable ABC Monitoring Units --> FS 0
NS1_CON09710 SEB: M&E - Potable ABC Monitoring Units
--> FS 0 NS1_CON09470
--> SS 0 NS1_CON09550

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1450 Material On Site - Lifting Beam, Chain Block, Support & Accessories --> FS 0
NS1_CON09720 GVB: M&E - Lifting Beam, Chain Block, Support & Accessories .
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1400 Material On Site - Electrical Emergency System & Safety Devices + Cabling --> FS 0
NS1_CON09730 SEB: M&E - Electrical Emergency System & Safety Devices + Cabling .
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1290 Material On Site - Fire Radio, UHF & Accessories --> FS 0
NS1_CON09740 SEB: M&E - Fire Radio, UHF & Accessories
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1280 Material On Site - Telephone & Cables --> FS 0
NS1_CON09750 SEB: M&E - Telephone, Cables & Accessories
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1310 Material On Site - Standby Batteries & Accessories --> FS 0
NS1_CON09760 SEB: M&E - Standby Batteries & Accessories
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1300 Material On Site - Rectifier/Charger & Inverter Panels --> FS 0
NS1_CON09770 SEB: M&E - Rectifier/Charger & Inverter Panels
--> FS 0 NS1_CON09470
NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1330 Material On Site - Silencer, Filters, Sound Attenuator, Control Panel & Accessories --> FS 0
NS1_CON09780 SEB: M&E - Silencer, Filters, Sound Attenuator, Control Panel & Accessories .
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1340 Material On Site - Service Fuel Tank, Bulk Fuel Storage --> FS 0
NS1_CON09790 SEB: M&E - Service Fuel Tank, Bulk Fuel Storage .
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1350 Material On Site - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 0
NS1_CON09800 SEB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries .
--> FS 0 NS1_CON09470

NS1_CON09700 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1-MOS1260 Material On Site - Control Gear & Electrical Accessories --> FS 0
NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories .
--> FS 0 NS1_CON09440
--> FS 0 NS1_CON09450
--> FS 0 NS1_CON09460
--> FS 0 NS1_CON09470
--> FS 0 NS1_CON09820
--> FS 0 NS1_CON09830
--> FS 0 NS1_CON09840
--> FS 0 NS1_CON09850
--> FS 0 NS1_CON09860
--> FS 0 NS1_CON09870
--> FS 0 NS1_CON09880
--> FS 0 NS1_CON09890

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1_CON09410 SEB: M&E - Air Borne Contaminat Monitoring System --> FS 0
NS1_CON09480 SEB: M&E - Lift System --> FS 0
NS1_CON09490 SEB: M&E - Standby Generator Sets --> FS 0
NS1_CON09540 SEB: M&E - Leaky Feeder --> FS 0
NS1_CON09550 SEB: M&E - Lighting, Small Power + Fittings --> FS 0
NS1_CON09560 SEB: M&E - Lifting Devices, Electric Hoist, Control Panels --> FS 0
NS1_CON09710 SEB: M&E - Potable ABC Monitoring Units --> FS 0
NS1_CON09720 GVB: M&E - Lifting Beam, Chain Block, Support & Accessories --> FS 0
NS1_CON09730 SEB: M&E - Electrical Emergency System & Safety Devices + Cabling --> FS 0
NS1_CON09740 SEB: M&E - Fire Radio, UHF & Accessories --> FS 0
NS1_CON09750 SEB: M&E - Telephone, Cables & Accessories --> FS 0
NS1_CON09760 SEB: M&E - Standby Batteries & Accessories --> FS 0
NS1_CON09770 SEB: M&E - Rectifier/Charger & Inverter Panels --> FS 0
NS1_CON09780 SEB: M&E - Silencer, Filters, Sound Attenuator, Control Panel & Accessories --> FS 0
NS1_CON09790 SEB: M&E - Service Fuel Tank, Bulk Fuel Storage --> FS 0
NS1_CON09800 SEB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 0
NS1-MOS1240 Material On Site - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories .
--> FS 0 NS1_CON09590
--> FS 0 NS1_CON09600
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1100 Material On Site - Pipes & Fittings --> FS 0
NS1_CON09440 SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles .
--> FS 0 NS1_CON09590
--> FS 0 NS1_CON09600
--> FS 0 NS1_CON101154
NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0
NS1-MOS1110 Material On Site - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09450 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment .
--> FS 0 NS1_CON09590
--> FS 0 NS1_CON09600
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1120 Material On Site - Tanks & Accessories --> FS 0
NS1_CON09460 SEB: M&E - Tanks, Pumps & Accessories
--> FS 0 NS1_CON101154

NS1_CON09710 SEB: M&E - Potable ABC Monitoring Units --> FS 0 NS1_CON09470


NS1_CON09770 SEB: M&E - Rectifier/Charger & Inverter Panels --> FS 0 NS1_CON09470
NS1_CON09490 SEB: M&E - Standby Generator Sets --> FS 0 NS1_CON09470
NS1_CON09780 SEB: M&E - Silencer, Filters, Sound Attenuator, Control Panel & Accessories --> FS 0 NS1_CON09470
NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0 NS1_CON09470
NS1_CON09480 SEB: M&E - Lift System --> FS 0 NS1_CON09470
NS1_CON09540 SEB: M&E - Leaky Feeder --> FS 0 NS1_CON09470
NS1_CON09800 SEB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 0 NS1_CON09470
NS1_CON09750 SEB: M&E - Telephone, Cables & Accessories --> FS 0 NS1_CON09470
NS1_CON09730 SEB: M&E - Electrical Emergency System & Safety Devices + Cabling --> FS 0 NS1_CON09470
NS1_CON09410 SEB: M&E - Air Borne Contaminat Monitoring System --> FS 0 NS1_CON09470
NS1_CON09740 SEB: M&E - Fire Radio, UHF & Accessories --> FS 0 NS1_CON09470
NS1_CON09560 SEB: M&E - Lifting Devices, Electric Hoist, Control Panels --> FS 0 NS1_CON09470
NS1_CON09760 SEB: M&E - Standby Batteries & Accessories --> FS 0 NS1_CON09470
NS1_CON09720 GVB: M&E - Lifting Beam, Chain Block, Support & Accessories --> FS 0 NS1_CON09470
NS1_CON09790 SEB: M&E - Service Fuel Tank, Bulk Fuel Storage --> FS 0 NS1_CON09470
NS1_CON09550 SEB: M&E - Lighting, Small Power + Fittings --> FS 0 NS1_CON09470
NS1-MOS1240 Material On Site - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0 NS1_CON09470
NS1_CON09470
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0 NS1_CON09590
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0 NS1_CON09600
NS1_CON09470 SEB: M&E - Tanks, Pumps & Accessories --> FS 0 NS1_CON101154
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1470 Material On Site - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
NS1_CON09820 SEB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders .
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1410 Material On Site - Intruder Alarm System & Accessories --> FS 0
NS1_CON09830 SEB: M&E - Intruder Alarm System & Accessories .
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1360 Material On Site - Control & Data Cable + Accessories --> FS 0
NS1_CON09840 SEB: M&E - Control & Data Cable + Accessories .
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1370 Material On Site - Mimic, Alarm & Marshall Cabinets --> FS 0
NS1_CON09850 SEB: M&E - Mimic, Alarm & Marshall Cabinets
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1380 Material On Site - Equipment For Monitoring & Control System & Accessories --> FS 0
NS1_CON09860 SEB: M&E - Equipment For Monitoring & Control System & Accessories .
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1430 Material On Site - Earthing / Lightning Protection System --> FS 0
NS1_CON09870 SEB: M&E - Earthing System & Lightning Protection System .
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1220 Material On Site - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
NS1_CON09880 SEB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable .
--> FS 0 NS1_CON101154

NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0


NS1-MOS1230 Material On Site - 415V Switchgears, 433V Transformer --> FS 0
NS1-MOS1240 Material On Site - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1-MOS1250 Material On Site - Lighting, Small Power + Fittings --> FS 0
NS1-MOS1260 Material On Site - Control Gear & Electrical Accessories --> FS 0
NS1_CON09890 SEB: M&E - 415V Switchgears, 433V Transformer
--> FS 0 NS1_CON101154
--> FS 0 NS1_MNE-AS10
--> FS 0 NS1_MNE-AS130
--> FS 0 NS1_MNE-AS170
--> FS 0 NS1_MNE-AS210
--> FS 0 NS1_MNE-AS250
--> FS 0 NS1_MNE-AS290
--> FS 0 NS1_MNE-AS330
--> FS 0 NS1_MNE-AS370
--> FS 0 NS1_MNE-AS410
--> FS 0 NS1_MNE-AS450
--> FS 0 NS1_MNE-AS490
--> FS 0 NS1_MNE-AS50
--> FS 0 NS1_MNE-AS530
--> FS 0 NS1_MNE-AS570
--> FS 0 NS1_MNE-AS610
--> FS 0 NS1_MNE-AS650
--> FS 0 NS1_MNE-AS690
--> FS 0 NS1_MNE-AS730
--> FS 0 NS1_MNE-AS770
--> FS 0 NS1_MNE-AS90

NS1_KEY07030 KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipment B--> FS 0
NS1_CON09440 SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
NS1_CON09450 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON09480 SEB: M&E - Lift System --> FS 0
NS1_CON09490 SEB: M&E - Standby Generator Sets --> FS 0
NS1_CON09500 SEB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels --> FS 0
NS1_CON09510 SEB: M&E - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON09550 SEB: M&E - Lighting, Small Power + Fittings --> FS 0
NS1_CON09570 SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_CON09590 SEB: Initial Testing & Commissioning
--> FS 0 NS1_CON09600
--> SS 0 NS1_GEN09100
--> FS 0 NS1_GEN09220
--> FS 0 NS1_KEY07050
--> FS 0 NS1_TTR07010

NS1_CON09440 SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
NS1_CON09450 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09460 ???
NS1_CON09470 SEB: M&E - Tanks, Pumps & Accessories --> FS 0
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON09820 SEB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
NS1_CON09830 SEB: M&E - Intruder Alarm System & Accessories --> FS 0
NS1_CON09840 SEB: M&E - Control & Data Cable + Accessories --> FS 0
NS1_CON09850 SEB: M&E - Mimic, Alarm & Marshall Cabinets --> FS 0
NS1_CON09860 SEB: M&E - Equipment For Monitoring & Control System & Accessories --> FS 0
NS1_CON09870 SEB: M&E - Earthing System & Lightning Protection System --> FS 0
NS1_CON09880 SEB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
NS1_CON09890 SEB: M&E - 415V Switchgears, 433V Transformer --> FS 0
NS1_CON101154 SEM Handing of the SPPA Substation to SPPA
--> FS 0 NS1_CON09570
--> FS 0 NS1_CON09600
--> FS 0 NS1_DSG00150
--> FS 0 NS1_KEY07050
--> FS 0 NS1_TTR07010

NS1_CON09510 SEB: M&E - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON09430 SEB: M&E - Cooling Tower, Tank, Pumps, Pipes & fittings --> FS 0
NS1_CON09440 SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
NS1_CON09450 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON09480 SEB: M&E - Lift System --> FS 0
NS1_CON09490 SEB: M&E - Standby Generator Sets --> FS 0
NS1_CON09500 SEB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels --> FS 0
NS1_CON09520 SEB: M&E - Fan asssemblies + Accessories --> FS 0
NS1_CON09530 SEB: M&E - Domestic Water Supply System --> FS 0
NS1_CON09540 SEB: M&E - Leaky Feeder --> FS 0
NS1_CON09550 SEB: M&E - Lighting, Small Power + Fittings --> FS 0
NS1_CON09560 SEB: M&E - Lifting Devices, Electric Hoist, Control Panels --> FS 0
NS1_CON09570 SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_CON09590 SEB: Initial Testing & Commissioning --> FS 0
NS1_KEY07030 KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipment B--> FS 0
NS1_CON101154 SEM Handing of the SPPA Substation to SPPA --> FS 0
NS1_CON09600 SEB: Testing & Commissioning
--> FS 0 NS1_GEN09280
--> FS 0 NS1_KEY07050
--> FS 0 NS1_TTR07010

NS1-MOS1430 Material On Site - Earthing / Lightning Protection System --> FS 0


NS1_CON09810 SEB: M&E - Control Gear & Electrical Accessories --> FS 0
NS1_CON09870 SEB: M&E - Earthing System & Lightning Protection System
--> FS 0 NS1_CON101154

NS1_CON09890 SEB: M&E - 415V Switchgears, 433V Transformer --> FS 0


NS1_CON09820 SEB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
NS1_CON09830 SEB: M&E - Intruder Alarm System & Accessories --> FS 0
NS1_CON09450 SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON09470 SEB: M&E - Tanks, Pumps & Accessories --> FS 0
NS1_CON09850 SEB: M&E - Mimic, Alarm & Marshall Cabinets --> FS 0
NS1_CON09870 SEB: M&E - Earthing System & Lightning Protection System --> FS 0
NS1_CON09470 SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON09840 SEB: M&E - Control & Data Cable + Accessories --> FS 0
NS1_CON09440 SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles --> FS 0
NS1_CON09880 SEB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
NS1_CON09860 SEB: M&E - Equipment For Monitoring & Control System & Accessories --> FS 0
NS1_CON101154 SEM Handing of the SPPA Substation to SPPA
--> FS 0 NS1_CON09570
--> FS 0 NS1_CON09600
--> FS 0 NS1_DSG00150
--> FS 0 NS1_KEY07050
--> FS 0 NS1_TTR07010

NS1_CON101154 SEM Handing of the SPPA Substation to SPPA --> FS 0


NS1_CON09570 SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out
--> FS 0 NS1_CON09590
--> FS 0 NS1_CON09600
--> FS 0 NS1_KEY07030
ST303 Equipment Bldg. (Substructure) Intermediate Design - Review and Comment by MM
ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to AC

ST303 Equipment Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by Samsung

ST303 Equipment Bldg. (Substructure) Intermediate Design - Review & Approval by MM

ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Submission by Samsung

ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM

ST303 Equipment Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by Samsung

ST303 Equipment Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM

ST303 Equipment Bldg. (Substructure) - Review & Approval by LTA/DBC

ST303 Equipment Bldg. (Substructure) - Review and Comment by AC

ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung

ST303 Equipment Bldg. (Substructure) - Review & Approval by AC

ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC


ST303 Equipment Bldg. (Substructure) - Review and Comment by LTA/DBC
ST303 Equipment Bldg. (Substructure) - Preparation & Submission by Samsung to BCA

ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung

ST303 Equipment Bldg. (Substructure) - Review & Approval by LTA/DBC

ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Submission by Samsung

ST303 Equipment Bldg. (Substructure) - Review and Comment by BCA

ST303 Equipment Bldg. (Substructure) - Preparation & Re-Submission by Samsung

ST303 Equipment Bldg. (Substructure) - Review & Approval by BCA (NOA)

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Submission by Samsung

GVB: Lift Pit / RC Wall for Lift


SEB: Lift Pit / RC Wall for Lift
ST303 Equipment Bldg. (Substructure) Final Design - Review and Comment by MM
ST303 Equipment Bldg. (Substructure) Final Design - Review & Approval by MM

ST303 Equipment Bldg. (Substructure) Final Design - Review and Comment by MM

ST303 Equipment Bldg. (Substructure) Final Design - Preparation & Re-Submission by Samsung
ST303 Equipment Bldg. (Substructure) Final Design - Review & Approval by MM

ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Submission by Samsung

ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM

ST303 Equipment Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission by Samsung

ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM

GVB: Lift Pit / RC Wall for Lift


PSR/CHSS - Preparation & Submission by Samsung

ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review and Comment by MM


ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to AC

ST302 Equipment Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission by Samsung

ST302 Equipment Bldg. (Superstructure) Intermediate Design - Review & Approval by MM

ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Submission by Samsung

ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM

ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by Samsung

ST302 Equipment Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM


ST302 Equipment Bldg. (Superstructure) - Review & Approval by LTA/DBC

ST302 Equipment Bldg. (Superstructure) - Review and Comment by AC

ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung

ST302 Equipment Bldg. (Superstructure) - Review & Approval by AC

ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC

ST302 Equipment Bldg. (Superstructure) - Review and Comment by LTA/DBC


ST302 Equipment Bldg. (Superstructure) - Preparation & Submission by Samsung to BCA

ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung

ST302 Equipment Bldg. (Superstructure) - Review & Approval by LTA/DBC

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST302 Equipment Bldg. (Superstructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung

ST302 Equipment Bldg. (Superstructure) - Review and Comment by BCA

ST302 Equipment Bldg. (Superstructure) - Preparation & Re-Submission by Samsung

ST302 Equipment Bldg. (Superstructure) - Review & Approval by BCA (NOA)


KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST302 Equipment Bldg. (Superstructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung

GVB: 1st Storey Wall & Slab

ST302 Equipment Bldg. (Superstructure) Final Design - Review and Comment by MM

ST302 Equipment Bldg. (Superstructure) Final Design - Preparation & Re-Submission by Samsung

ST302 Equipment Bldg. (Superstructure) Final Design - Review & Approval by MM

ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by Samsung

ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM

ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by Samsung

ST302 Equipment Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM

PSR/CHSS - Preparation & Submission by Samsung

SEB: Piling - Sheet Pile (ISP II), 92ea


SEB: Piling - Sheet Pile (ISP II), 92ea
SEB: JGP for Water tightness
SEB: JGP for Water tightness

SEB: Strutted Excavation for Ventilation Building


SEB: Strutted Excavation for Ventilation Building

SEB: Removal of Tubular Pile


SEB: Fdn, Basement 2 / Bottom Slab & Cooling Pump Room

SEB: Wall / Column Basement 2 Cooling Pump Room

SEB: Fdn, Basement 2 / Bottom Slab & Cooling Pump Room


SEB: Installation of Steel Stair / Grating

SEB: Roof Slab + Parapet


SEB: Architectural (Final Finishes)
SEB: SCADA works by NSC, Shaft & Equipment building

SEB: Wall / Column Basement 2 Cooling Pump Room

SEB: Architectural (Rough-in Finishes)


SEB: Basement 1 Bottom Slab & Cable Chamber

SEB: Wall / Column Basement 1 Cable Chamber

SEB: 1st Storey Slab


SEB: Backfilling up to GL
ST303 Equipment Bldg. (Substructure) As Built - Preparation & Submission by Samsung

SEB: 1st Storey Wall / Column


SEB: SCADA works by NSC, Shaft & Equipment building

SEB: 2nd Storey Slab

SEB: M&E - Air Conditioning


SEB: 2nd Storey Wall / Column

SEB: Roof Slab + Parapet


SEB: M&E - Air Conditioning

SEB: Architectural (Rough-in Finishes)


SEB: Underground Utilities
SEB: Architectural (Final Finishes)
SEB: Landscaping Work
KD31: Completion of Sembawang Equipment Building's basic civil and structural works for SPPA substation
KD32: Completion of Sembawang Equipment Building's basic civil & structural works for M&E fit-out of transformer, etc.
ST302 Equipment Bldg. (Superstructure) As Built - Preparation & Submission by Samsung
BP-BB Sembawang (Bldg. Architectural Design) As Built - Preparation & Submission by Samsung

SEB: Architectural (Final Finishes)

SEM: Site Clearance & Reinstatement


SEB: M&E - Air Borne Contaminat Monitoring System
SEB: M&E - Cooling Tower, Tank, Pumps, Pipes & fittings
SEB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels
SEB: M&E - Remote Control & Monitoring Interface Equipment + Accessories
SEB: M&E - Fan asssemblies + Accessories
SEB: M&E - Domestic Water Supply System
SEB: M&E - Pressurization System & Extinguisher
SEB: M&E - Pipes & Fittings + Accessories
SEB: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories
SEB: M&E - Air Release Pipes & Fittings
SEB: M&E - Landing Valve, Standby Fire Hose & Accessories
SEB: M&E - Fire detector, Smoke Control + Fire Extinguisher
SEB: M&E - Motor Starter & Control Panels
SEB: M&E - Remote Control & Monitoring Interface Equipment
SEB: M&E - Pipes, Fiitings & Accessories
SEB: M&E - Duty & Standby Submersible Pumps
SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment
SEB: M&E - Mechanical Ventilation + Accessories
KD34: Commencement of Sembawang Equipment Building's M&E fit-out

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System


SEB: Testing & Commissioning

SEB: M&E - Air Borne Contaminat Monitoring System


SEB: Initial Testing & Commissioning
SEB: Testing & Commissioning

SEB: M&E - Air Borne Contaminat Monitoring System


SEB: Initial Testing & Commissioning
SEB: Testing & Commissioning

SEB: M&E - Air Borne Contaminat Monitoring System


SEB: Testing & Commissioning

SEB: M&E - Air Borne Contaminat Monitoring System


SEB: Testing & Commissioning
SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System

SEB: M&E - Air Borne Contaminat Monitoring System


SEB: M&E - Lift System
SEB: M&E - Standby Generator Sets
SEB: M&E - Leaky Feeder
SEB: M&E - Lighting, Small Power + Fittings
SEB: M&E - Lifting Devices, Electric Hoist, Control Panels
SEB: M&E - Potable ABC Monitoring Units
GVB: M&E - Lifting Beam, Chain Block, Support & Accessories
SEB: M&E - Electrical Emergency System & Safety Devices + Cabling
SEB: M&E - Fire Radio, UHF & Accessories
SEB: M&E - Telephone, Cables & Accessories
SEB: M&E - Standby Batteries & Accessories
SEB: M&E - Rectifier/Charger & Inverter Panels
SEB: M&E - Silencer, Filters, Sound Attenuator, Control Panel & Accessories
SEB: M&E - Service Fuel Tank, Bulk Fuel Storage
SEB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries
SEB: M&E - Control Gear & Electrical Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories


SEB: Initial Testing & Commissioning
SEB: Testing & Commissioning

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories


SEB: Initial Testing & Commissioning
SEB: Testing & Commissioning
As-Built Information/Drawings Submission
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: Testing & Commissioning

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories


SEB: Initial Testing & Commissioning
SEB: Testing & Commissioning

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories


SEB: Testing & Commissioning

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories


SEB: M&E - Lighting, Small Power + Fittings

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories


SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: M&E - Pipes, Fittings, Valves & Spray Nozzles


SEB: M&E - Control Panel, Remote Control & Monitoring Interface Equipment
SEB: M&E - Tanks, Pumps & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders
SEB: M&E - Intruder Alarm System & Accessories
SEB: M&E - Control & Data Cable + Accessories
SEB: M&E - Mimic, Alarm & Marshall Cabinets
SEB: M&E - Equipment For Monitoring & Control System & Accessories
SEB: M&E - Earthing System & Lightning Protection System
SEB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
SEB: M&E - 415V Switchgears, 433V Transformer

SEB: Initial Testing & Commissioning


SEB: Testing & Commissioning
SEM Handing of the SPPA Substation to SPPA

SEB: Initial Testing & Commissioning


SEB: Testing & Commissioning
SEM Handing of the SPPA Substation to SPPA
SEB: Initial Testing & Commissioning
SEB: Testing & Commissioning
SEM Handing of the SPPA Substation to SPPA

SEM Handing of the SPPA Substation to SPPA

SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories


SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
SEB: M&E - Sub-Switchboard, Distribution Board Control & Accessories

SEB: Initial Testing & Commissioning


SEB: Testing & Commissioning
SEM Handing of the SPPA Substation to SPPA
SEM Handing of the SPPA Substation to SPPA

SEM Handing of the SPPA Substation to SPPA

SEM Handing of the SPPA Substation to SPPA

SEM Handing of the SPPA Substation to SPPA

SEM Handing of the SPPA Substation to SPPA


SEM Handing of the SPPA Substation to SPPA

SEM Handing of the SPPA Substation to SPPA

SEM Handing of the SPPA Substation to SPPA

SEM Handing of the SPPA Substation to SPPA


ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
FFS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
SPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
DWSS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
PCCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
ABCM (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
HS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
LS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
RCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
MTS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
UPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
MVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
SDGS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
LSP (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
SMCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
SS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
ELPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
WMS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
HVI (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
TVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung

SEB: Testing & Commissioning


TFP & TOP Submission/Application (General)
SEM RI (Archictectural/Building) Inspection
KD38: Testing & Commissioning of Sembawang Equipment Building's M&E fit-out
Overall Testing & Commissioning of all Tunnels
SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out
SEB: Testing & Commissioning
As-Built Information/Drawings Submission
KD38: Testing & Commissioning of Sembawang Equipment Building's M&E fit-out
Overall Testing & Commissioning of all Tunnels

SEM RI (M&E) Inspection


KD38: Testing & Commissioning of Sembawang Equipment Building's M&E fit-out
Overall Testing & Commissioning of all Tunnels

SEM Handing of the SPPA Substation to SPPA


SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out
SEB: Testing & Commissioning
As-Built Information/Drawings Submission
KD38: Testing & Commissioning of Sembawang Equipment Building's M&E fit-out
Overall Testing & Commissioning of all Tunnels

SEB: Initial Testing & Commissioning


SEB: Testing & Commissioning
KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipment Building
GAMBAS VENTILATION BUILDING - GVB

GVB / SUB - Intermediate Design Submission


NS1_GEN00000 Contract Award / Commencement Date --> FS 293
NS1_PDB_01100 AIP-C Permanent Works Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_1950 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Submission by Samsung
--> FS 0 NS1_STD_1960
--> SS 0 NS1_STD_1990

NS1_STD_1950 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Submission by Sa --> FS 0
NS1_STD_1960 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_1970

NS1_STD_1960 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_1970 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1980

NS1_STD_1970 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by --> FS 0
NS1_STD_1980 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_2030
--> FS 0 NS1_STD_2070

GVB / SUB - PSR/CDSS Submission


NS1_STD_1980 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review & Approval by MM --> FS -8
NS1_STD_2030 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Submission by Samsung
--> FS 0 NS1_STD_2040

NS1_STD_2030 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_2040 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_2050

NS1_STD_2040 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_2050 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2060

NS1_STD_2050 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2060 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_2100

GVB / SUB - AC Approval


NS1_STD_1950 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Submission by Sa --> SS 0
NS1_STD_1990 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to AC
--> FS 0 NS1_STD_2000

NS1_STD_1990 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_2000 ST105 Ventilation Bldg. (Substructure) - Review and Comment by AC
--> FS 0 NS1_STD_2010

NS1_STD_2000 ST105 Ventilation Bldg. (Substructure) - Review and Comment by AC --> FS 0


NS1_STD_2010 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2020

NS1_STD_2010 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2020 ST105 Ventilation Bldg. (Substructure) - Review & Approval by AC
--> FS 0 NS1_STD_2070

GVB / SUB - LTA/DBC Approval


NS1_STD_1980 ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review & Approval by MM --> FS 0
NS1_STD_2020 ST105 Ventilation Bldg. (Substructure) - Review & Approval by AC --> FS 0
GAMBAS VENTILATION BUILDING - GVB

NS1_STD_2070 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC
--> FS 0 NS1_STD_2080
--> SS 0 NS1_STD_2110

NS1_STD_2070 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_2080 ST105 Ventilation Bldg. (Substructure) - Review and Comment by LTA/DBC
--> FS 0 NS1_STD_2090

NS1_STD_2080 ST105 Ventilation Bldg. (Substructure) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_2090 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2100

NS1_STD_2060 ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_2090 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2100 ST105 Ventilation Bldg. (Substructure) - Review & Approval by LTA/DBC
--> FS 0 NS1_STD_2150
--> FS 0 NS1_STD_2160

GVB / SUB - BCA Approval


NS1_STD_2070 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC --> SS 0
NS1_STD_2110 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to BCA
--> FS 0 NS1_STD_2120

NS1_STD_2110 ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_2120 ST105 Ventilation Bldg. (Substructure) - Review and Comment by BCA
--> FS 0 NS1_STD_2130

NS1_STD_2120 ST105 Ventilation Bldg. (Substructure) - Review and Comment by BCA --> FS 0
NS1_STD_2130 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2140

NS1_STD_2130 ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2140 ST105 Ventilation Bldg. (Substructure) - Review & Approval by BCA (NOA)
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_2150
--> FS 0 NS1_STD_2160

GVB / SUB - Permit To Start


NS1_STD_2100 ST105 Ventilation Bldg. (Substructure) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_2140 ST105 Ventilation Bldg. (Substructure) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Com .
--> FS 0 NS1_CON08110
--> FS 0 NS1_STD_2170
--> FS 0 NS1_STD_2190
Add-> --> FS 0 NS1_CON08010

GVB / SUB - Final Design Submission


NS1_STD_2140 ST105 Ventilation Bldg. (Substructure) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_2100 ST105 Ventilation Bldg. (Substructure) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_2160 ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Submission b .
--> FS 0 NS1_STD_2170

NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0
NS1_STD_2160 ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_2170 ST105 Ventilation Bldg. (Substructure) Final Design - Review and Comment by MM .
--> FS 0 NS1_STD_2180
GAMBAS VENTILATION BUILDING - GVB

NS1_STD_2170 ST105 Ventilation Bldg. (Substructure) Final Design - Review and Comment by MM --> FS 0
NS1_STD_2180 ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Re-Submissio .
--> FS 0 NS1_STD_2190

NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0
NS1_STD_2180 ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Re-Submission by Samsung--> FS 0
NS1_STD_2190 ST105 Ventilation Bldg. (Substructure) Final Design - Review & Approval by MM .
--> FS 0 NS1_STD_2200

GVB / SUB - PSR/CNSS Submission


NS1_STD_2190 ST105 Ventilation Bldg. (Substructure) Final Design - Review & Approval by MM --> FS 0
NS1_STD_2200 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Submission by Sa .
--> FS 0 NS1_STD_2210

NS1_STD_2200 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_2210 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM .
--> FS 0 NS1_STD_2220

NS1_STD_2210 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_2220 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission b .
--> FS 0 NS1_STD_2230

NS1_STD_2220 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2230 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM .
--> FS 0 NS1_CON08110
Add-> --> FS 0 NS1_CON08010
--> FS 1345 NS1_STD_00340

Key Date ???


NS1_KEY01050 KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
???--> --> FS 0 NS1_CON05040
???--> --> FS 0 NS1_CON05050
Link only to STD_01060 / CCT ERSS-PSR/CNSS? --> --> FS 30 NS1_CON07010
???--> --> FS 0 NS1_STD_6390

GVB / SUB - AS Built Drawings Submission


NS1_CON08120 GVB: Fdn, Basement 2 / Bottom Slab & Cable Gallery --> FS 30
NS1_CON10040 GVB: Basement 1 Bottom Slab & Cable Chamber --> FS 30 <-Add
NS1_STD_2240 ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Submission by Sam .
--> FS 0 NS1_STD_2250

NS1_STD_2240 ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Submission by Samsung --> FS 0
NS1_STD_2250 ST105 Ventilation Bldg. (Substructure) As Built - Review and Comment by MM
--> FS 0 NS1_STD_2260

NS1_STD_2250 ST105 Ventilation Bldg. (Substructure) As Built - Review and Comment by MM --> FS 0
NS1_STD_2260 ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2270

NS1_STD_2260 ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2270 ST105 Ventilation Bldg. (Substructure) As Built - Review & Approval by MM .
--> FS 0 NS1_GEN10130
Lag=0-> --> FS 153 NS1_STD_00340
GAMBAS VENTILATION BUILDING - GVB

GVB / SUPER - Intermediate Design Submission


NS1_PDB_01100 AIP-C Permanent Works Design - Preparation & Submission by Samsung --> FS 0
NS1_GEN00000 Contract Award / Commencement Date --> FS 323 ???
NS1_STD_1550 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Submission by Samsung
--> FS 0 NS1_STD_1560
--> SS 0 NS1_STD_1590

NS1_STD_1550 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Submission by --> FS 0
NS1_STD_1560 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_1570

NS1_STD_1560 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_1570 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1580

NS1_STD_1570 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission --> FS 0
NS1_STD_1580 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_1630

GVB / SUPER - PSR/CDSS Submission


NS1_STD_1580 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review & Approval by MM --> FS -8
NS1_STD_1630 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Submission by Samsung
--> FS 0 NS1_STD_1640

NS1_STD_1630 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_1640 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_1650

NS1_STD_1640 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_1650 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1660

NS1_STD_1650 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by Samsung--> FS 0
NS1_STD_1660 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_1700

GVB / SUPER - AC Approval


NS1_STD_1550 ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Submission by --> SS 0
NS1_STD_1590 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to AC
--> FS 0 NS1_STD_1600

NS1_STD_1590 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_1600 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by AC
--> FS 0 NS1_STD_1610

NS1_STD_1600 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by AC --> FS 0


NS1_STD_1610 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1620

NS1_STD_1610 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_1620 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by AC
--> FS 0 NS1_STD_1670

GVB / SUPER - LTA/DBC Approval


NS1_STD_1620 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by AC --> FS 0
NS1_STD_1670 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC
GAMBAS VENTILATION BUILDING - GVB

--> FS 0 NS1_STD_1680
--> SS 0 NS1_STD_1710

NS1_STD_1670 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_1680 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by LTA/DBC
--> FS 0 NS1_STD_1690

NS1_STD_1680 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_1690 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1700

NS1_STD_1690 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_1660 ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_1700 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by LTA/DBC
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_1750
--> FS 0 NS1_STD_1760

GVB / SUPER - BCA Approval


NS1_STD_1670 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC --> SS 0
NS1_STD_1710 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to BCA
--> FS 0 NS1_STD_1720

NS1_STD_1710 ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_1720 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by BCA
--> FS 0 NS1_STD_1730

NS1_STD_1720 ST104 Ventilation Bldg. (Superstructure) - Review and Comment by BCA --> FS 0
NS1_STD_1730 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1740

NS1_STD_1730 ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_1740 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by BCA (NOA)
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_1750
--> FS 0 NS1_STD_1760

GVB / SUPER - Permit To Start


NS1_STD_1700 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_1740 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_1750 ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to .
--> FS 1107 NS1_CON08130
Add-> --> FS 0 NS1_CON08110

GVB / SUPER - Final Design Submission


NS1_STD_1700 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_1740 ST104 Ventilation Bldg. (Superstructure) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_1760 ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Submission .
--> FS 0 NS1_STD_1770

NS1_STD_1760 ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_1770 ST104 Ventilation Bldg. (Superstructure) Final Design - Review and Comment by M .
--> FS 0 NS1_STD_1780

NS1_STD_1770 ST104 Ventilation Bldg. (Superstructure) Final Design - Review and Comment by MM --> FS 0
NS1_STD_1780 ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Re-Submiss .
--> FS 0 NS1_STD_1790
GAMBAS VENTILATION BUILDING - GVB

NS1_STD_1780 ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Re-Submission by Samsu--> FS 0
NS1_STD_1790 ST104 Ventilation Bldg. (Superstructure) Final Design - Review & Approval by MM .
--> FS 0 NS1_STD_1800

GVB / SUPER - PSR/CNSS Submission


NS1_STD_1790 ST104 Ventilation Bldg. (Superstructure) Final Design - Review & Approval by MM --> FS 0 NS1_STD_1800
NS1_STD_1800 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by .
--> FS 0 NS1_STD_1810

NS1_STD_1800 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by Samsung --> FS 0 NS1_STD_1810
NS1_STD_1810 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/M .
--> FS 0 NS1_STD_1820

NS1_STD_1810 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM --> FS 0 NS1_STD_1820
NS1_STD_1820 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission .
--> FS 0 NS1_STD_1830

NS1_STD_1820 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0 NS1_STD_1830
NS1_STD_1830 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM .
--> FS 1315 NS1_STD_00340
Add-> --> FS 0 NS1_CON08110

GVB / SUPER - As Built Drawing Submission


NS1_CON10070 GVB: 2nd Storey Wall / Column --> FS 30
NS1_CON08160 GVB: Roof Slab + Parapet --> FS 30 <-Add
NS1_STD_1840 ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Submission by S .
--> FS 0 NS1_STD_1850

NS1_STD_1840 ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Submission by Samsung --> FS 0
NS1_STD_1850 ST104 Ventilation Bldg. (Superstructure) As Built - Review and Comment by MM
--> FS 0 NS1_STD_1860

NS1_STD_1850 ST104 Ventilation Bldg. (Superstructure) As Built - Review and Comment by MM --> FS 0
NS1_STD_1860 ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1870

NS1_STD_1860 ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_1870 ST104 Ventilation Bldg. (Superstructure) As Built - Review & Approval by MM .
--> FS 0 NS1_GEN10130
Lag=0-> --> FS 9 NS1_STD_00340

GVB / ARCH - Intermediate Design Submission


NS1_GEN00000 Contract Award / Commencement Date --> FS 323 ???
NS1_MNE-WM0010 WMS (Building, Shaft, Adit/Enlargement & Tunnel) - Design --> FS 8
NS1_PDB_01100 AIP-C Permanent Works Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_2300 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Submission by Samsung
--> FS 0 NS1_STD_2310

NS1_STD_2300 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Submission b --> FS 0
NS1_STD_2310 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_2320

NS1_STD_2310 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review and Comment by MM--> FS 0
GAMBAS VENTILATION BUILDING - GVB

NS1_STD_2320 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2330

NS1_STD_2320 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Re-Submissio --> FS 0
NS1_STD_2330 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_2380
--> FS 0 NS1_STD_2420

GVB / ARCH - PSR/CDSS Submission


NS1_STD_2330 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review & Approval by MM --> FS -8
NS1_STD_2380 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Submission by Samsung
--> FS 0 NS1_STD_2390

NS1_STD_2380 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_2390 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_2400

NS1_STD_2390 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_2400 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2410

NS1_STD_2400 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Re-Submission by Sams --> FS 0
NS1_STD_2410 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_2450

GVB / ARCH - LTA/URA/FSSD/CPU/Noarks Approval


NS1_STD_2330 BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review & Approval by MM --> FS 0
NS1_STD_2420 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to LTA/URA/FSSD/CBPU/NPaks
--> FS 0 NS1_STD_2430
--> SS 0 NS1_STD_2460

NS1_STD_2420 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to LTA/U --> FS 0
NS1_STD_2430 BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by LTA/URA/FSSD/CBPU/NPaks
--> FS 0 NS1_STD_2440

NS1_STD_2430 BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by LTA/URA/FSSD/CBPU/NPa--> FS 0 NS1_STD_2440
NS1_STD_2440 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung
NS1_STD_2440 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung --> FS 0 NS1_STD_2450

NS1_STD_2410 BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_2440 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2450 BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by LTA/URA/FSSD/CBPU/NPaks
--> FS 0 NS1_STD_2500
--> FS 0 NS1_STD_2510

GVB / ARCH - BCA Approval


NS1_STD_2420 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to LTA/U --> SS 0
NS1_STD_2460 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to BCA
--> FS 0 NS1_STD_2470

NS1_STD_2460 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_2470 BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by BCA
--> FS 0 NS1_STD_2480

NS1_STD_2470 BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by BCA --> FS 0
NS1_STD_2480 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2490
GAMBAS VENTILATION BUILDING - GVB

NS1_STD_2480 BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_2490 BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by BCA (NOA)
--> FS 0 NS1_STD_2500
--> FS 0 NS1_STD_2510

GVB / ARCH - Permit To Start Works


NS1_STD_2450 BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by LTA/URA/FSSD/CBPU/NPaks --> FS 0
NS1_STD_2490 BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_2500 BP-AA Gambas (Bldg. Architectural Design) - Submission & Approval for Permit to Commence Structural Works by MM
--> FS 943 NS1_CON08130

GVB / ARCH - Final Design Submission


NS1_STD_2490 BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_2450 BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by LTA/URA/FSSD/CBPU/NPaks --> FS 0
NS1_STD_2510 BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Submission by Samsung
--> FS 0 NS1_STD_2520

NS1_STD_2510 BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Submission by Samsu --> FS 0
NS1_STD_2520 BP-AA Gambas (Bldg. Architectural Design) Final Design - Review and Comment by MM
--> FS 0 NS1_STD_2530

NS1_STD_2520 BP-AA Gambas (Bldg. Architectural Design) Final Design - Review and Comment by MM --> FS 0
NS1_STD_2530 BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2540

NS1_STD_2530 BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Re-Submission by Sa --> FS 0
NS1_STD_2540 BP-AA Gambas (Bldg. Architectural Design) Final Design - Review & Approval by MM
--> FS 0 NS1_STD_2550

GVB / ARCH - PSR/CNSS Submission


NS1_STD_2540 BP-AA Gambas (Bldg. Architectural Design) Final Design - Review & Approval by MM --> FS 0
NS1_STD_2550 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Submission by Samsung
--> FS 0 NS1_STD_2560

NS1_STD_2550 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_2560 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_2570

NS1_STD_2560 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_2570 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2580

NS1_STD_2570 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Re-Submission by Samsu --> FS 0
NS1_STD_2580 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review & Approval by SP/MM
--> FS 0 NS1_CON08040
--> FS 1151 NS1_STD_00340
--> FS 0 NS1_CON08170

GVB / ARCH - As Built Drawing Submission


NS1_CON10070 GVB: 2nd Storey Wall / Column --> FS 30
NS1_CON10080 GVB: Architectural (Final Finishes) --> FS 30 <-Add
NS1_STD_2590 BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Submission by Samsung
--> FS 0 NS1_STD_2600

NS1_STD_2590 BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Submission by Samsung --> FS 0
GAMBAS VENTILATION BUILDING - GVB

NS1_STD_2600 BP-AA Gambas (Bldg. Architectural Design) As Built - Review and Comment by MM
--> FS 0 NS1_STD_2610

NS1_STD_2600 BP-AA Gambas (Bldg. Architectural Design) As Built - Review and Comment by MM --> FS 0
NS1_STD_2610 BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_2620

NS1_STD_2610 BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Re-Submission by Samsun --> FS 0
NS1_STD_2620 BP-AA Gambas (Bldg. Architectural Design) As Built - Review & Approval by MM
--> FS 0 NS1_GEN10130
Lag=0-> --> FS 9 NS1_STD_00340

GAM Shaft - Civil Fit-Out


NS1_CON01330 GAM: Permanent Lining, Gambas Shaft --> FS 0
NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0 <-SEB???
NS1_CON01360 GAM: Waterproofing, Gambas Shaft --> FS 0
NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0
NS1_STD_1750 ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to --> FS 0 <-Add
NS1_STD_5380 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0 <-SEB???
NS1_STD_2230 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0
NS1_STD_1830 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0 <-Add
NS1_CON08110 GVB: Lift Pit / RC Wall for Lift
--> FS 0 NS1_CON08120
--> FS 0 NS1_CON08300

NS1_CON08110 GVB: Lift Pit / RC Wall for Lift --> FS 0


NS1_CON08300 GVB: Installation of Steel Stair / Grating
--> FS 0 NS1_CON08560
--> FS 0 NS1_NCS01010

GVB - Substructure
NS1_CON07180 TEG: Backfilling up to Ground Level --> FS 15
NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Com --> FS 0 <-Add
NS1_STD_2230 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0 <-Add
NS1_CON08010 GVB: Piling - Tubular Pile (D=1200)
--> SS 8 NS1_CON08020
--> FF 8 NS1_CON08020

NS1_CON08010 GVB: Piling - Tubular Pile (D=1200) --> SS 8


NS1_CON08010 GVB: Piling - Tubular Pile (D=1200) --> FF 8
NS1_CON08020 GVB: Piling - Sheet Pile (ISP II)
--> SS 5 NS1_CON08030

NS1_CON08020 GVB: Piling - Sheet Pile (ISP II) --> SS 5


NS1_CON08030 GVB: JGP for Water tightness
--> FS 0 NS1_CON08040

NS1_STD_2580 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review & Approval by SP/MM --> FS 0
NS1_CON08030 GVB: JGP for Water tightness --> FS 0
NS1_CON08040 GVB: Strutted Excavation for Ventilation Building
--> FS 0 NS1_CON08050
--> FS 0 NS1_CON08120
GAMBAS VENTILATION BUILDING - GVB

NS1_CON08040 GVB: Strutted Excavation for Ventilation Building --> FS 0


NS1_CON08050 GVB: Removal of D/W (from GL to -4m)
Link=FF+14-> --> SS 0 NS1_CON08120
--> FS 0 NS1_CON10040
--> FS 0 NS1_CON10050

NS1_CON08040 GVB: Strutted Excavation for Ventilation Building --> FS 0


NS1_CON08110 GVB: Lift Pit / RC Wall for Lift --> FS 0
NS1_CON08050 GVB: Removal of D/W (from GL to -4m) --> SS 0 <-Link=FF+14
NS1_CON08120 GVB: Fdn, Basement 2 / Bottom Slab & Cable Gallery .
--> FS 0 NS1_CON10030
--> FS 30 NS1_STD_2240
???SEB-> --> FS 0 NS1_STD_5390

NS1_CON08120 GVB: Fdn, Basement 2 / Bottom Slab & Cable Gallery --> FS 0
NS1_CON10030 GVB: Wall / Column Basement 2 Cable Gallery .
--> FS 0 NS1_CON08170
--> FS 0 NS1_CON10040

NS1_CON08050 GVB: Removal of D/W (from GL to -4m) --> FS 0


NS1_CON10030 GVB: Wall / Column Basement 2 Cable Gallery --> FS 0
NS1_CON10040 GVB: Basement 1 Bottom Slab & Cable Chamber .
Add-> --> FS 30 NS1_STD_2240
--> FS 0 NS1_CON10050

NS1_CON08050 GVB: Removal of D/W (from GL to -4m) --> FS 0


NS1_CON10040 GVB: Basement 1 Bottom Slab & Cable Chamber --> FS 0
NS1_CON10050 GVB: Wall / Column Basement 1 Cable Chamber .
--> FS 0 NS1_CON08130
Add-> --> FS 0 NS1_CON08140
--> FS 0 NS1_NCS01010

NS1_CON10050 GVB: Wall / Column Basement 1 Cable Chamber --> FS 0


NS1-MOS1420 Material On Site - SCADA System --> FS 30
NS1-MOS1410 Material On Site - Intruder Alarm System & Accessories --> FS 30
NS1_CON08300 GVB: Installation of Steel Stair / Grating --> FS 0
NS1_NCS01010 GVB: SCADA works by NSC, Shaft & Ventilation building
--> SS 0 NS1_KEY05030
--> FS 0 NS1_NCS01020
--> SS 0 NS1_NCS01030
--> SS 0 NS1_NCS01050

GVB - Superstructure
NS1_CON01330 GAM: Permanent Lining, Gambas Shaft --> FS 0
NS1_STD_5300 ST303 Equipment Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0 <-SEB???
NS1_CON01360 GAM: Waterproofing, Gambas Shaft --> FS 0
NS1_STD_2150 ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Struc --> FS 0
NS1_STD_1750 ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to --> FS 0 <-Add
NS1_STD_5380 ST303 Equipment Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0 <-SEB???
NS1_STD_2230 ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0
NS1_STD_1830 ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM --> FS 0 <-Add
NS1_CON08110 GVB: Lift Pit / RC Wall for Lift
--> FS 0 NS1_CON08120
--> FS 0 NS1_CON08300
GAMBAS VENTILATION BUILDING - GVB

NS1_CON08130 GVB: 1st Storey Wall & Slab --> FS 0


NS1_CON10050 GVB: Wall / Column Basement 1 Cable Chamber --> FS 0 <-Add
NS1_CON08140 GVB: Backfilling up to GL
--> FS 0 NS1_CON08150
Add-> --> FS 0 NS1_CON08130

NS1_STD_1750 ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to Commence St --> FS 1107
NS1_STD_2500 BP-AA Gambas (Bldg. Architectural Design) - Submission & Approval for Permit to Commence --> FS 943
NS1_STD_5650 ST302 Equipment Bldg. (Superstructure) - Submission & Approval for Permit to Commence Str --> FS 1107
NS1_STD_6000 BP-BB Sembawang (Bldg. Architectural Design) - Submission & Approval for Permit to Commen--> FS 943
NS1_CON10050 GVB: Wall / Column Basement 1 Cable Chamber --> FS 0
NS1_CON08140 GVB: Backfilling up to GL --> FS 0 <-Add
NS1_CON08130 GVB: 1st Storey Wall & Slab
--> FS 0 NS1_CON08140
--> FS 0 NS1_CON08560
Add-> --> FS 0 NS1_CON08150

NS1_CON08140 GVB: Backfilling up to GL --> FS 0


NS1_CON08130 GVB: 1st Storey Wall & Slab --> FS 0 <-Add
NS1_CON08150 GVB: 1st Storey Wall / Column
--> SS 8 NS1_CON08560
--> FS 0 NS1_CON10060

NS1_CON08150 GVB: 1st Storey Wall / Column --> FS 0


NS1_CON10060 GVB: 2nd Storey Slab
--> FS 0 NS1_CON10070

NS1_CON10060 GVB: 2nd Storey Slab --> FS 0


NS1_CON10070 GVB: 2nd Storey Wall / Column
--> FS 0 NS1_CON08160
--> FS 30 NS1_STD_1840
--> FS 30 NS1_STD_2590

NS1_CON10070 GVB: 2nd Storey Wall / Column --> FS 0


NS1_CON08160 GVB: Roof Slab + Parapet
Lag=14-> --> FF 0 NS1_CON08170
Link=FS+0-> --> FF 0 NS1_CON08200
--> FF 0 NS1_CON99600
--> FS 0 NS1_KEY06030
Add-> --> FS 30 NS1_STD_1840

GVB - Architectural
NS1_CON08160 GVB: Roof Slab + Parapet --> FF 0 <-Lag=14
NS1_CON10030 GVB: Wall / Column Basement 2 Cable Gallery --> FS 0
NS1_STD_2580 BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review & Approval by SP/M --> FS 0 <-Add
NS1_CON08170 GVB: Architectural (Rough-in Finishes)
--> FS 0 NS1_CON10080
--> FS 0 NS1_GEN00100
Add-> --> FS 0 NS1_CON08560

NS1_CON08170 GVB: Architectural (Rough-in Finishes) --> FS 0


NS1_CON99600 GVB: Landscaping Works --> SS 0
NS1_KEY06030 KD33: Completion of Gambas Ventilation Building's basic civil and structural works for M&E fit-o--> FS 0
NS1_CON10080 GVB: Architectural (Final Finishes)
--> FS 0 NS1_CON08600
--> FS 0 NS1_GEN00100
GAMBAS VENTILATION BUILDING - GVB

Add-> --> FS 30 NS1_STD_2590

GVB - External Works


NS1-MOS1180 Material On Site - Pressurization System & Extinguisher --> FS 30
NS1-MOS1160 Material On Site - Control Panel, Remote Control & Monitoring Interface Equipment --> FS 14
NS1-MOS1080 Material On Site - Air Release Pipes & Fittings --> FS 14
NS1-MOS1020 Material On Site - Remote Control & Monitoring Interface Equipment --> FS 30
NS1-MOS1140 Material On Site - Pipes & Fittings --> FS 30
NS1-MOS1100 Material On Site - Pipes & Fittings --> FS 14
NS1-MOS1010 Material On Site - Motor Starter & Control Panels --> FS 30
NS1-MOS1000 Material On Site - Duty & Standby Submersible Pumps --> FS 30
NS1-MOS1030 Material On Site - Pipes, Fiitings & Accessories --> FS 14
NS1-MOS1190 Material On Site - Pipes & Fittings + Accessories --> FS 30
NS1_CON08160 GVB: Roof Slab + Parapet --> FF 0 <-Link=FS+0
NS1_CON08200 GVB: Drainage & Sewerage
--> FS 0 NS1_CON99600

NS1_CON08160 GVB: Roof Slab + Parapet --> FF 0


NS1_KEY06030 KD33: Completion of Gambas Ventilation Building's basic civil and structural works for M&E fit-o--> FS 0
NS1_CON08200 GVB: Drainage & Sewerage --> FS 0
NS1_CON99600 GVB: Landscaping Works
--> SS 0 NS1_CON10080
open ended??? -->

NS1_CON08160 GVB: Roof Slab + Parapet --> FS 0


NS1_KEY06030 KD33: Completion of Gambas Ventilation Building's basic civil and structural works for M&E fit-out of transformer, etc.
--> FS 0 NS1_CON10080
--> FS 0 NS1_CON99600

NS1_CON10080 GVB: Architectural (Final Finishes) --> FS 0


NS1_CON08170 GVB: Architectural (Rough-in Finishes) --> FS 0
NS1_GEN00100 GAM: Site Clearance & Reinstatement
--> FS 0 NS1_GEN10130
--> FS 0 NS1_GEN18000

GVB - M&E Works (1st Part)


NS1_CON08300 GVB: Installation of Steel Stair / Grating --> FS 0
NS1_CON08150 GVB: 1st Storey Wall / Column --> SS 8
NS1_CON08130 GVB: 1st Storey Wall & Slab --> FS 0
NS1-MOS1170 Material On Site - Air Conditioning & Mechanical Ventilation --> FF 0 <-FF?-to check
NS1-MOS1170 Material On Site - Air Conditioning & Mechanical Ventilation --> FS 0
NS1_CON05730 TGS: Installation of Seperation Wall --> FS 0
NS1_CON08170 GVB: Architectural (Rough-in Finishes) --> FS 0 <-Add
NS1_CON08560 GVB: M&E - Air Conditioning
--> SS 0 NS1_KEY07020
--> SS 0 NS1_CON08570
--> SS 0 NS1_CON08580
--> SS 0 NS1_CON08610
--> SS 0 NS1_CON08620
--> SS 0 NS1_CON08630
--> SS 0 NS1_CON08640
--> SS 0 NS1_CON08650
--> SS 0 NS1_CON08660
GAMBAS VENTILATION BUILDING - GVB

--> SS 0 NS1_CON08670
--> SS 0 NS1_CON08680
--> SS 0 NS1_CON08690
--> SS 0 NS1_CON08700
--> SS 0 NS1_CON08710
--> SS 0 NS1_CON08720
--> SS 0 NS1_CON08730
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1_KEY07020 KD35: Commencement of Gambas Ventilation Building's M&E fit-out
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1180 Material On Site - Pressurization System & Extinguisher --> FS 0
NS1_CON08570 GVB: M&E - Pressurization System & Extinguisher
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1190 Material On Site - Pipes & Fittings + Accessories --> FS 0
NS1_CON08580 GVB: M&E - Pipes & Fittings + Accessories
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1170 Material On Site - Air Conditioning & Mechanical Ventilation --> FS 0
NS1_CON08610 GVB: M&E - Mechanical Ventilation + Accessories
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1040 Material On Site - Ventilation & Smoke Exhaust Fans --> FS 0
NS1-MOS1050 Material On Site - Motor Starter & Control Panels --> FS 0
NS1_CON08620 GVB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels .
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1060 Material On Site - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON08630 GVB: M&E - Remote Control & Monitoring Interface Equipment + Accessories .
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1060 Material On Site - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON08640 GVB: M&E - Fan asssemblies + Accessories
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1460 Material On Site - Fire Stopping & Sealing Opening/Penetration & Accessories --> FS 0
NS1_CON08650 GVB: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories .
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1080 Material On Site - Air Release Pipes & Fittings --> FS 0
NS1_CON08660 GVB: M&E - Air Release Pipes & Fittings
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1090 Material On Site - Landing Valve, Standby Fire Hose & Accessories --> FS 0
NS1_CON08670 GVB: M&E - Landing Valve, Standby Fire Hose & Accessories
--> FS 0 NS1_CON08740
GAMBAS VENTILATION BUILDING - GVB

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1070 Material On Site - Fire detector, Smoke Control + Fire Extinguisher --> FS 0
NS1_CON08680 GVB: M&E - Fire detector, Smoke Control + Fire Extinguisher
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1010 Material On Site - Motor Starter & Control Panels --> FS 0
NS1_CON08690 GVB: M&E - Motor Starter & Control Panels
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1020 Material On Site - Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON08700 GVB: M&E - Remote Control & Monitoring Interface Equipment
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1030 Material On Site - Pipes, Fiitings & Accessories --> FS 0
NS1_CON08710 GVB: M&E - Pipes, Fiitings & Accessories .
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1000 Material On Site - Duty & Standby Submersible Pumps --> FS 0
NS1_CON08720 GVB: M&E - Duty & Standby Submersible Pumps
--> FS 0 NS1_CON08740

NS1_CON08560 GVB: M&E - Air Conditioning --> SS 0


NS1-MOS1190 Material On Site - Pipes & Fittings + Accessories --> FS 0
NS1_CON08730 GVB: M&E - Domestic Water Supply System
--> FS 0 NS1_CON08740

GVB - M&E Works (2nd Part)


NS1_CON08560 GVB: M&E - Air Conditioning --> FS 0
NS1_CON08620 GVB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels --> FS 0
NS1_CON08710 GVB: M&E - Pipes, Fiitings & Accessories --> FS 0
NS1_CON08610 GVB: M&E - Mechanical Ventilation + Accessories --> FS 0
NS1_CON08630 GVB: M&E - Remote Control & Monitoring Interface Equipment + Accessories --> FS 0
NS1_CON08660 GVB: M&E - Air Release Pipes & Fittings --> FS 0
NS1_CON08680 GVB: M&E - Fire detector, Smoke Control + Fire Extinguisher --> FS 0
NS1_KEY07020 KD35: Commencement of Gambas Ventilation Building's M&E fit-out --> FS 0
NS1_CON08670 GVB: M&E - Landing Valve, Standby Fire Hose & Accessories --> FS 0
NS1_CON08640 GVB: M&E - Fan asssemblies + Accessories --> FS 0
NS1_CON08700 GVB: M&E - Remote Control & Monitoring Interface Equipment --> FS 0
NS1_CON08570 GVB: M&E - Pressurization System & Extinguisher --> FS 0
NS1_CON08690 GVB: M&E - Motor Starter & Control Panels --> FS 0
NS1_CON08720 GVB: M&E - Duty & Standby Submersible Pumps --> FS 0
NS1_CON08580 GVB: M&E - Pipes & Fittings + Accessories --> FS 0
NS1_CON08730 GVB: M&E - Domestic Water Supply System --> FS 0
NS1_CON08650 GVB: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories --> FS 0
NS1-MOS1200 Material On Site - Air Borne Contaminat Monitoring System --> FS 0
NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System .
--> SS 0 NS1_CON08750
--> SS 0 NS1_CON08760
--> SS 0 NS1_CON08770
--> SS 0 NS1_CON08780
--> SS 0 NS1_CON08790
--> SS 0 NS1_CON08800
--> SS 0 NS1_CON08810
--> SS 0 NS1_CON08820
--> SS 0 NS1_CON08830
--> SS 0 NS1_CON08840
GAMBAS VENTILATION BUILDING - GVB

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1210 Material On Site - Potable ABC Monitoring Units --> FS 0
NS1_CON08750 GVB: M&E - Potable ABC Monitoring Units
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1440 Material On Site - Lifting Devices, Electric Hoist, Control Panels --> FS 0
NS1_CON08760 GVB: M&E - Lifting Devices, Electric Hoist, Control Panels
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1450 Material On Site - Lifting Beam, Chain Block, Support & Accessories --> FS 0
NS1_CON08770 GVB: M&E - Lifting Beam, Chain Block, Support & Accessories
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1390 Material On Site - Lift System --> FS 0
NS1_CON08780 GVB: M&E - Lift System
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1400 Material On Site - Electrical Emergency System & Safety Devices + Cabling --> FS 0
NS1_CON08790 GVB: M&E - Electrical Emergency System & Safety Devices + Cabling
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1270 Material On Site - Leaky Feeder --> FS 0
NS1_CON08800 GVB: M&E - Leaky Feeder
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1280 Material On Site - Telephone & Cables --> FS 0
NS1_CON08810 GVB: M&E - Telephone, Cables & Accessories .
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1290 Material On Site - Fire Radio, UHF & Accessories --> FS 0
NS1_CON08820 GVB: M&E - Fire Radio, UHF & Accessories
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1-MOS1300 Material On Site - Rectifier/Charger & Inverter Panels --> FS 30
NS1-MOS1300 Material On Site - Rectifier/Charger & Inverter Panels --> FF 0 <--???
NS1_CON08840 GVB: M&E - Rectifier/Charger & Inverter Panels
--> SS 0 NS1_CON08830

NS1_CON08740 GVB: M&E - Air Borne Contaminat Monitoring System --> SS 0


NS1_CON08750 GVB: M&E - Potable ABC Monitoring Units --> SS 0
NS1_CON08760 GVB: M&E - Lifting Devices, Electric Hoist, Control Panels --> SS 0
NS1_CON08770 GVB: M&E - Lifting Beam, Chain Block, Support & Accessories --> SS 0
NS1_CON08780 GVB: M&E - Lift System --> SS 0
NS1_CON08790 GVB: M&E - Electrical Emergency System & Safety Devices + Cabling --> SS 0
NS1_CON08800 GVB: M&E - Leaky Feeder --> SS 0
NS1_CON08810 GVB: M&E - Telephone, Cables & Accessories --> SS 0
NS1_CON08820 GVB: M&E - Fire Radio, UHF & Accessories --> SS 0
NS1_CON08840 GVB: M&E - Rectifier/Charger & Inverter Panels --> SS 0
NS1-MOS1310 Material On Site - Standby Batteries & Accessories --> FF 0 <-FF?-to check
NS1-MOS1310 Material On Site - Standby Batteries & Accessories --> FS 30
GAMBAS VENTILATION BUILDING - GVB

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories


--> FS 0 NS1_CON08850
--> FS 0 NS1_CON08860
--> FS 0 NS1_CON08870
--> FS 0 NS1_CON08880
--> FS 0 NS1_CON08890
--> FS 0 NS1_CON08900
--> FS 0 NS1_CON08910
--> FS 0 NS1_CON08920
--> FS 0 NS1_CON08930
--> FS 0 NS1_CON08940
--> FS 0 NS1_CON08950
--> FS 0 NS1_CON08960
--> FS 0 NS1_CON08970
--> FS 0 NS1_CON08980
--> FS 0 NS1_CON08990

GVB - M&E Works (3rd Part)


NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0
NS1-MOS1320 Material On Site - Standby Generator Sets --> FS 0
NS1_CON08850 GVB: M&E - Standby Generator Sets
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1330 Material On Site - Silencer, Filters, Sound Attenuator, Control Panel & Accessories --> FS 0
NS1_CON08860 GVB: M&E - Silencer, Filters, Sound Attenuator, Control Panel & Accessories
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1340 Material On Site - Service Fuel Tank, Bulk Fuel Storage --> FS 0
NS1_CON08870 GVB: M&E - Service Fuel Tank, Bulk Fuel Storage
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1350 Material On Site - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 0
NS1_CON08880 GVB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1250 Material On Site - Lighting, Small Power + Fittings --> FS 0
NS1_CON08890 GVB: M&E - Lighting, Small Power + Fittings
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1260 Material On Site - Control Gear & Electrical Accessories --> FS 0
NS1_CON08900 GVB: M&E - Control Gear & Electrical Accessories
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1240 Material On Site - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON08910 GVB: M&E - Sub-Switchboard, Distribution Board Control & Accessories .
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1470 Material On Site - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
NS1_CON08920 GVB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders .
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1410 Material On Site - Intruder Alarm System & Accessories --> FS 0
GAMBAS VENTILATION BUILDING - GVB

NS1-MOS1370 Material On Site - Mimic, Alarm & Marshall Cabinets --> FS 0


NS1_CON08930 GVB: M&E - Intruder Alarm System & Accessories
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1360 Material On Site - Control & Data Cable + Accessories --> FS 0
NS1_CON08940 GVB: M&E - Control & Data Cable + Accessories
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1370 Material On Site - Mimic, Alarm & Marshall Cabinets --> FS 0
NS1_CON08950 GVB: M&E - Mimic, Alarm & Marshall Cabinets
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1380 Material On Site - Equipment For Monitoring & Control System & Accessories --> FS 0
NS1_CON08960 GVB: M&E - Equipment For Monitoring & Control System & Accessories .
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1430 Material On Site - Earthing / Lightning Protection System --> FS 0
NS1_CON08970 GVB: M&E - Earthing System & Lightning Protection System
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1220 Material On Site - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
NS1_CON08980 GVB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
--> FS 0 NS1_CON101164

NS1_CON08830 GVB: M&E - Standby Batteries & Accessories --> FS 0


NS1-MOS1260 Material On Site - Control Gear & Electrical Accessories --> FS 0
NS1-MOS1240 Material On Site - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1-MOS1250 Material On Site - Lighting, Small Power + Fittings --> FS 0
NS1-MOS1230 Material On Site - 415V Switchgears, 433V Transformer --> FS 0
NS1_CON08990 GVB: M&E - 415V Switchgears, 433V Transformer
--> FS 0 NS1_CON101164
--> FS 0 NS1_MNE-AS10
--> FS 0 NS1_MNE-AS130
--> FS 0 NS1_MNE-AS170
--> FS 0 NS1_MNE-AS210
--> FS 0 NS1_MNE-AS250
--> FS 0 NS1_MNE-AS290
--> FS 0 NS1_MNE-AS330
--> FS 0 NS1_MNE-AS370
--> FS 0 NS1_MNE-AS410
--> FS 0 NS1_MNE-AS450
--> FS 0 NS1_MNE-AS490
--> FS 0 NS1_MNE-AS50
--> FS 0 NS1_MNE-AS530
--> FS 0 NS1_MNE-AS570
--> FS 0 NS1_MNE-AS610
--> FS 0 NS1_MNE-AS650
--> FS 0 NS1_MNE-AS690
--> FS 0 NS1_MNE-AS730
--> FS 0 NS1_MNE-AS770
--> FS 0 NS1_MNE-AS90

NS1_CON08850 GVB: M&E - Standby Generator Sets --> FS 0


NS1_CON08860 GVB: M&E - Silencer, Filters, Sound Attenuator, Control Panel & Accessories --> FS 0
GAMBAS VENTILATION BUILDING - GVB

NS1_CON08870 GVB: M&E - Service Fuel Tank, Bulk Fuel Storage --> FS 0
NS1_CON08880 GVB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries --> FS 0
NS1_CON08890 GVB: M&E - Lighting, Small Power + Fittings --> FS 0
NS1_CON08900 GVB: M&E - Control Gear & Electrical Accessories --> FS 0
NS1_CON08910 GVB: M&E - Sub-Switchboard, Distribution Board Control & Accessories --> FS 0
NS1_CON08920 GVB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders --> FS 0
NS1_CON08930 GVB: M&E - Intruder Alarm System & Accessories --> FS 0
NS1_CON08940 GVB: M&E - Control & Data Cable + Accessories --> FS 0
NS1_CON08950 GVB: M&E - Mimic, Alarm & Marshall Cabinets --> FS 0
NS1_CON08960 GVB: M&E - Equipment For Monitoring & Control System & Accessories --> FS 0
NS1_CON08970 GVB: M&E - Earthing System & Lightning Protection System --> FS 0 <- to start during substructutre?
NS1_CON08980 GVB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable --> FS 0
NS1_CON08990 GVB: M&E - 415V Switchgears, 433V Transformer --> FS 0
NS1_CON101164 GAM Handing of the SPPA Substation to SPPA .
--> FS 0 NS1_CON08550
--> FS 0 NS1_CON08600
--> FS 0 NS1_KEY07060
--> FS 0 NS1_TTR07010

SEB: SPPA Substation Energisation & Permanent Power Supply Fit-out ???
NS1_CON101164 GAM Handing of the SPPA Substation to SPPA --> FS 0
NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out .
--> FS 0 NS1_CON08590
--> FS 0 NS1_CON08600
--> FS 0 NS1_CON05990
Power supply from SEB not GVB -> --> FS 0 NS1_CON06990
--> FS 0 NS1_KEY07040
TMV by others Omit link -> --> FS 0 NS1_NCS03030
TMV by others Omit link -> --> FS 0 NS1_NCS03050

NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_KEY07040 KD37: Completion of Permanent power supply fit-out and energisation of Gambas Ven<- set as Milestone
--> FS 0 NS1_CON08590
--> FS 0 NS1_CON08600

NS1_KEY04010 KD21: Commencement of Gambas Cut & Cover Tunnel Section's M&E fit-out --> FS 0
NS1_KEY07030 KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipmen --> FS 0
NS1_KEY05010 KD26: Commencement of Gambas Cut & Cover Tunnel Section's SCADA fit-out --> FS 0
NS1_iKEY00020 i_KD2: Handback of existing Gambas shaft by NS1 Contractor to SPPA --> FS 0
NS1_KEY07040 KD37: Completion of Permanent power supply fit-out and energisation of Gambas Ventilation Bu--> FS 0
NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_CON08590 GVB: M&E - Initial Testing & Commissioning .
--> FS 0 NS1_CON08600
--> SS 0 NS1_GEN09100
--> FS 0 NS1_GEN09210
--> FS 0 NS1_KEY07060
--> FS 0 NS1_TTR07010

NS1_CON09590 SEB: Initial Testing & Commissioning --> SS 0


NS1_CON08590 GVB: M&E - Initial Testing & Commissioning --> SS 0
NS1_GEN09100 TFP & TOP Submission/Application (General)
--> FS 0 NS1_GEN09200
--> SS 10 NS1_GEN09210
--> SS 5 NS1_GEN09220
???-> --> SS 5 NS1_GEN09290
--> SS 5 NS1_GEN09300
--> FS 0 NS1_GEN09330
--> FS 0 NS1_GEN09340
--> FS 0 NS1_GEN09350
GAMBAS VENTILATION BUILDING - GVB

NS1_KEY05010 KD26: Commencement of Gambas Cut & Cover Tunnel Section's SCADA fit-out --> FS 0
NS1_iKEY00020 i_KD2: Handback of existing Gambas shaft by NS1 Contractor to SPPA --> FS 0
NS1_KEY04010 KD21: Commencement of Gambas Cut & Cover Tunnel Section's M&E fit-out --> FS 0
NS1_KEY07040 KD37: Completion of Permanent power supply fit-out and energisation of Gambas Ventilation Bu--> FS 0
NS1_KEY07030 KD36: Completion of Permanent power supply fit-out and energisation of Sembawang Equipmen --> FS 0
NS1_CON07220 TEG: SCADA works by NSC, Cut & Cover Tunnel Section --> FS 0
NS1_CON07210 TEG: M&E works in Culvert, Existing Gambas ~ GVB Cable Gallery --> FS 0
NS1_CON101164 GAM Handing of the SPPA Substation to SPPA --> FS 0
NS1_CON10080 GVB: Architectural (Final Finishes) --> FS 0
NS1_CON08550 GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out --> FS 0
NS1_CON08590 GVB: M&E - Initial Testing & Commissioning --> FS 0
NS1_CON08600 GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel) .
--> FS 0 NS1_GEN09290
--> FS 0 NS1_KEY07060
--> FS 0 NS1_TTR07010
Add-> --> FS 0 NS1_GEN09210

NS1_CON08600 GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel) --> FS 0
NS1_CON08590 GVB: M&E - Initial Testing & Commissioning --> FS 0
NS1_CON101164 GAM Handing of the SPPA Substation to SPPA --> FS 0
NS1_KEY07060 KD39: Testing & Commissioning of Gambas Ventilation Building's M&E fit-out <- set as Milestone
--> FS 0 NS1_TTR07010

NS1_GEN09100 TFP & TOP Submission/Application (General) --> SS 10


NS1_CON08590 GVB: M&E - Initial Testing & Commissioning --> FS 0
NS1_CON08600 GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel) --> FS 0 <-Add
NS1_GEN09220 SEM RI (Archictectural/Building) Inspection --> FS 0
NS1_GEN09210 GAM RI (Archictectural/Building) Inspection
--> FS 0 NS1_GEN09270

NS1_GEN09210 GAM RI (Archictectural/Building) Inspection --> FS 0


NS1_GEN09270 GAM RI (M&E) Inspection
--> FS 0 NS1_GEN09200

NS1_GEN09300 TUNNEL RI (Architectural/Building) Inspection --> FS 0 <- FS link to GEN09290


NS1_GEN09290 TUNNEL RI (M&E) Inspection --> FS 0
NS1_GEN09280 SEM RI (M&E) Inspection --> FS 0
NS1_GEN09270 GAM RI (M&E) Inspection --> FS 0
NS1_GEN09100 TFP & TOP Submission/Application (General) --> FS 0
NS1_GEN09200 TFP Approval by Authority (General)
--> FS 0 NS1_GEN09330
--> FS 0 NS1_GEN09340
--> FS 0 NS1_GEN09350
--> FS 0 NS1_GEN10130

NS1_STD_710 ST101 Lower Shaft As Built - Review & Approval by MM --> FS 0


NS1_GEN09200 TFP Approval by Authority (General) --> FS 0
NS1_GEN09100 TFP & TOP Submission/Application (General) --> FS 0
NS1_STD_00370 PSR/CHSS - Review & Approval by MM --> FS 0
NS1_GEN09330 GAM TOP Approval by Authority
--> FS 0 NS1_GEN10130

NS1_GEN09200 TFP Approval by Authority (General) --> FS 0


NS1_GEN00120 SEM: Site Clearance & Reinstatement --> FS 0
NS1_STD_5770 ST302 Equipment Bldg. (Superstructure) As Built - Review & Approval by MM --> FS 0
NS1_GEN00180 TOL Fee for Site Facilities --> FS 0
NS1_GEN00100 GAM: Site Clearance & Reinstatement --> FS 0
GAMBAS VENTILATION BUILDING - GVB

NS1_STD_6960 M&E Systems PSR/SHSS - Review & Approval by MM --> FS 0


NS1_GEN10080 Completion of All Punch Lists --> FS 0
NS1_GEN18000 Overall Reinstatement --> FS 0
NS1_GEN00070 Engineering Office: Removal & Reinstatement --> FS 0
NS1_STD_2270 ST105 Ventilation Bldg. (Substructure) As Built - Review & Approval by MM --> FS 0
NS1_STD_5070 ST204 Adit & Enlargement As Built - Review & Approval by MM --> FS 887
NS1_DSG00150 As-Built Information/Drawings Submission --> FS 0
NS1_GEN10160 Project Clean-Up & Initial Demobilzation --> FS 0
NS1_GEN09330 GAM TOP Approval by Authority --> FS 0
NS1_GEN00080 Env., Safety & Security Consideration --> FS 0
NS1_STD_4020 ST202 Adit & Enlargement As Built - Review & Approval by MM --> FS 0
NS1_STD_1480 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review & Approval by MM --> FS 0
NS1_STD_2970 ST200 Upper Shaft(Dwall) As Built - Review & Approval by MM --> FS 0
NS1_STD_3320 ST201 Lower Shaft As Built - Review & Approval by MM --> FS 1418
NS1_STD_6470 ST205 Bored Tunnel (GAM-SEM) As Built - Review & Approval by MM --> FS 483
NS1_GEN10100 Client To Issue Certificate of Actual Total Completion --> FS 0
NS1_GEN09350 TUNNEL TOP/CSC Approval by Authority --> FS 0
NS1_STD_710 ST101 Lower Shaft As Built - Review & Approval by MM --> FS 0
NS1_STD_5420 ST303 Equipment Bldg. (Substructure) As Built - Review & Approval by MM --> FS 0
NS1_GEN00170 Supervisory Staff's Salary : After Time 1 --> FS 0
NS1_STD_6820 ST206 Bored Tunnel (MAN-SEM) As Built - Review & Approval by MM --> FS 453
NS1_STD_00330 ST100 Upper Shaft(Dwall) As Built - Review & Approval by MM --> FS 0
NS1_NCS05010 NSC: Overall Testing & Commissioning --> FS 0
NS1_GEN10310 Project Clean-Up & Final Demobilzation --> FS 0
NS1_GEN00150 Bond, Insurances & Duties etc --> FS 0
NS1_GEN00240 Post-construction Survey & Review --> FS 0
NS1_STD_2620 BP-AA Gambas (Bldg. Architectural Design) As Built - Review & Approval by MM --> FS 0
NS1_STD_01100 ST102 Cut & Cover Tunnel (ERSS) As Built - Review & Approval by MM --> FS 0
NS1_STD_4720 ST301 Lower Shaft As Built - Review & Approval by MM --> FS 838
NS1_STD_4370 ST300 Upper Shaft(Dwall) As Built - Review & Approval by MM --> FS 1237
NS1_STD_6120 BP-BB Sembawang (Bldg. Architectural Design) As Built - Review & Approval by MM --> FS 0
NS1_TTR07010 Overall Testing & Commissioning of all Tunnels --> FS 0
NS1_GEN09340 SEM TOP Approval by Authority --> FS 0
NS1_GEN00040 Contractor's Office: Removal & Reinstatement --> FS 0
NS1_STD_1870 ST104 Ventilation Bldg. (Superstructure) As Built - Review & Approval by MM --> FS 0
NS1_STD_3670 ST203 Adit & Enlargement As Built - Review & Approval by MM --> FS 1346
NS1_GEN10130 Project Hand-Over
--> FS 0 NS1_GEN10000
--> FS 0 NS1_KEY10400

NS1_GEN10130 Project Hand-Over --> FS 0


NS1_GEN10000 Completion of Construction
--> FF 0 NS1_KEY10400

NS1_GEN10130 Project Hand-Over --> FS 0


NS1_GEN10000 Completion of Construction --> FF 0
NS1_KEY10400 KD46: Total Completion Date
ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review and Comment by MM
ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to AC

ST105 Ventilation Bldg. (Substructure) Intermediate Design - Preparation & Re-Submission by Samsung

ST105 Ventilation Bldg. (Substructure) Intermediate Design - Review & Approval by MM

ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Submission by Samsung


ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC

ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review and Comment by SP/MM

ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Preparation & Re-Submission by Samsung

ST105 Ventilation Bldg. (Substructure) PSR/CDSS - Review & Approval by SP/MM

ST105 Ventilation Bldg. (Substructure) - Review & Approval by LTA/DBC

ST105 Ventilation Bldg. (Substructure) - Review and Comment by AC

ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung

ST105 Ventilation Bldg. (Substructure) - Review & Approval by AC

ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to LTA/DBC


ST105 Ventilation Bldg. (Substructure) - Review and Comment by LTA/DBC
ST105 Ventilation Bldg. (Substructure) - Preparation & Submission by Samsung to BCA

ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung

ST105 Ventilation Bldg. (Substructure) - Review & Approval by LTA/DBC

ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Submission by Samsung

ST105 Ventilation Bldg. (Substructure) - Review and Comment by BCA

ST105 Ventilation Bldg. (Substructure) - Preparation & Re-Submission by Samsung

ST105 Ventilation Bldg. (Substructure) - Review & Approval by BCA (NOA)

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST105 Ventilation Bldg. (Substructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Submission by Samsung

GVB: Lift Pit / RC Wall for Lift


ST105 Ventilation Bldg. (Substructure) Final Design - Review and Comment by MM
ST105 Ventilation Bldg. (Substructure) Final Design - Review & Approval by MM
GVB: Piling - Tubular Pile (D=1200)

ST105 Ventilation Bldg. (Substructure) Final Design - Review and Comment by MM

ST105 Ventilation Bldg. (Substructure) Final Design - Preparation & Re-Submission by Samsung
ST105 Ventilation Bldg. (Substructure) Final Design - Review & Approval by MM

ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Submission by Samsung

ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review and Comment by SP/MM

ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Preparation & Re-Submission by Samsung

ST105 Ventilation Bldg. (Substructure) PSR/CNSS - Review & Approval by SP/MM

GVB: Lift Pit / RC Wall for Lift


GVB: Piling - Tubular Pile (D=1200)
PSR/CHSS - Preparation & Submission by Samsung

TGS: TBM Assembly & Test Running


TGS: Installation of Temp. Segment & Reaction Frame
TEG: Piling - Tubular Pile (D=1200), 123ea
ST205 Bored Tunnel (GAM-SEM) Final Design - Review & Approval by MM

ST105 Ventilation Bldg. (Substructure) As Built - Review and Comment by MM

ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Re-Submission by Samsung

ST105 Ventilation Bldg. (Substructure) As Built - Review & Approval by MM

Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung
ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review and Comment by MM
ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to AC

ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) Intermediate Design - Review & Approval by MM

ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review and Comment by SP/MM

ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) PSR/CDSS - Review & Approval by SP/MM

ST104 Ventilation Bldg. (Superstructure) - Review & Approval by LTA/DBC

ST104 Ventilation Bldg. (Superstructure) - Review and Comment by AC

ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) - Review & Approval by AC

ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to LTA/DBC


ST104 Ventilation Bldg. (Superstructure) - Review and Comment by LTA/DBC
ST104 Ventilation Bldg. (Superstructure) - Preparation & Submission by Samsung to BCA

ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) - Review & Approval by LTA/DBC

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) - Review and Comment by BCA

ST104 Ventilation Bldg. (Superstructure) - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) - Review & Approval by BCA (NOA)

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST104 Ventilation Bldg. (Superstructure) - Submission & Approval for Permit to Commence Structural Works by MM
ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Submission by Samsung

GVB: 1st Storey Wall & Slab


GVB: Lift Pit / RC Wall for Lift

ST104 Ventilation Bldg. (Superstructure) Final Design - Review and Comment by MM

ST104 Ventilation Bldg. (Superstructure) Final Design - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) Final Design - Review & Approval by MM


ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM

ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review and Comment by SP/MM

ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM

ST104 Ventilation Bldg. (Superstructure) PSR/CNSS - Review & Approval by SP/MM

PSR/CHSS - Preparation & Submission by Samsung


GVB: Lift Pit / RC Wall for Lift

ST104 Ventilation Bldg. (Superstructure) As Built - Review and Comment by MM

ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Re-Submission by Samsung

ST104 Ventilation Bldg. (Superstructure) As Built - Review & Approval by MM

Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review and Comment by MM

BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Preparation & Re-Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) Intermediate Design - Review & Approval by MM

BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to LTA/URA/FSSD/CBPU/NPaks

BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review and Comment by SP/MM

BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Preparation & Re-Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) PSR/CDSS - Review & Approval by SP/MM

BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by LTA/URA/FSSD/CBPU/Npaks

BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by LTA/URA/FSSD/CBPU/NPaks


BP-AA Gambas (Bldg. Architectural Design) - Preparation & Submission by Samsung to BCA

BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by LTA/URA/FSSD/CBPU/NPaks

BP-AA Gambas (Bldg. Architectural Design) - Submission & Approval for Permit to Commence Structural Works by MM
BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) - Review and Comment by BCA

BP-AA Gambas (Bldg. Architectural Design) - Preparation & Re-Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) - Review & Approval by BCA (NOA)
BP-AA Gambas (Bldg. Architectural Design) - Submission & Approval for Permit to Commence Structural Works by MM
BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Submission by Samsung

s by MM
GVB: 1st Storey Wall & Slab

BP-AA Gambas (Bldg. Architectural Design) Final Design - Review and Comment by MM

BP-AA Gambas (Bldg. Architectural Design) Final Design - Preparation & Re-Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) Final Design - Review & Approval by MM

BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review and Comment by SP/MM

BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Preparation & Re-Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) PSR/CNSS - Review & Approval by SP/MM

GVB: Strutted Excavation for Ventilation Building


PSR/CHSS - Preparation & Submission by Samsung
GVB: Architectural (Rough-in Finishes)

BP-AA Gambas (Bldg. Architectural Design) As Built - Review and Comment by MM


BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Re-Submission by Samsung

BP-AA Gambas (Bldg. Architectural Design) As Built - Review & Approval by MM

Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung

GVB: Fdn, Basement 2 / Bottom Slab & Cable Gallery


GVB: Installation of Steel Stair / Grating

GVB: M&E - Air Conditioning


GVB: SCADA works by NSC, Shaft & Ventilation building

GVB: Piling - Sheet Pile (ISP II)


GVB: Piling - Sheet Pile (ISP II)

GVB: JGP for Water tightness

GVB: Strutted Excavation for Ventilation Building

GVB: Removal of D/W (from GL to -4m)


GVB: Fdn, Basement 2 / Bottom Slab & Cable Gallery
GVB: Fdn, Basement 2 / Bottom Slab & Cable Gallery
GVB: Basement 1 Bottom Slab & Cable Chamber
GVB: Wall / Column Basement 1 Cable Chamber

GVB: Wall / Column Basement 2 Cable Gallery


ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Submission by Samsung
ST303 Equipment Bldg. (Substructure) As Built - Preparation & Submission by Samsung

GVB: Architectural (Rough-in Finishes)


GVB: Basement 1 Bottom Slab & Cable Chamber

ST105 Ventilation Bldg. (Substructure) As Built - Preparation & Submission by Samsung


GVB: Wall / Column Basement 1 Cable Chamber

GVB: 1st Storey Wall & Slab


GVB: Backfilling up to GL
GVB: SCADA works by NSC, Shaft & Ventilation building

KD28: Commencement of Gambas to Sembawang Tunnel Section's, Gambas Shaft's & Gambas Ventilation Bldg's SCADA fit-out
GVB: Testing of SCADA works, Shaft & Ventilation building
SEB: SCADA works by NSC, Shaft & Equipment building
TGS: SCADA works by NSC, Tunnel section

GVB: Fdn, Basement 2 / Bottom Slab & Cable Gallery


GVB: Installation of Steel Stair / Grating
GVB: 1st Storey Wall / Column
GVB: 1st Storey Wall & Slab

GVB: Backfilling up to GL
GVB: M&E - Air Conditioning
GVB: 1st Storey Wall / Column

GVB: M&E - Air Conditioning


GVB: 2nd Storey Slab

GVB: 2nd Storey Wall / Column

GVB: Roof Slab + Parapet


ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Submission by Samsung
BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Submission by Samsung

GVB: Architectural (Rough-in Finishes)


GVB: Drainage & Sewerage
GVB: Landscaping Works
KD33: Completion of Gambas Ventilation Building's basic civil and structural works for M&E fit-out of transformer, etc.
ST104 Ventilation Bldg. (Superstructure) As Built - Preparation & Submission by Samsung

GVB: Architectural (Final Finishes)


GAM: Site Clearance & Reinstatement
GVB: M&E - Air Conditioning

GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel)


GAM: Site Clearance & Reinstatement
BP-AA Gambas (Bldg. Architectural Design) As Built - Preparation & Submission by Samsung

GVB: Landscaping Works

GVB: Architectural (Final Finishes)

mer, etc.
GVB: Architectural (Final Finishes)
GVB: Landscaping Works

Project Hand-Over
Overall Reinstatement

KD35: Commencement of Gambas Ventilation Building's M&E fit-out


GVB: M&E - Pressurization System & Extinguisher
GVB: M&E - Pipes & Fittings + Accessories
GVB: M&E - Mechanical Ventilation + Accessories
GVB: M&E - Ventilation & Smoke Exhaust Fans + Motor Starter & Control Panels
GVB: M&E - Remote Control & Monitoring Interface Equipment + Accessories
GVB: M&E - Fan asssemblies + Accessories
GVB: M&E - Fire Stopping & Sealing Opening/Penetration & Accessories
GVB: M&E - Air Release Pipes & Fittings
GVB: M&E - Landing Valve, Standby Fire Hose & Accessories
GVB: M&E - Fire detector, Smoke Control + Fire Extinguisher
GVB: M&E - Motor Starter & Control Panels
GVB: M&E - Remote Control & Monitoring Interface Equipment
GVB: M&E - Pipes, Fiitings & Accessories
GVB: M&E - Duty & Standby Submersible Pumps
GVB: M&E - Domestic Water Supply System
GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System


GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Air Borne Contaminat Monitoring System

GVB: M&E - Potable ABC Monitoring Units


GVB: M&E - Lifting Devices, Electric Hoist, Control Panels
GVB: M&E - Lifting Beam, Chain Block, Support & Accessories
GVB: M&E - Lift System
GVB: M&E - Electrical Emergency System & Safety Devices + Cabling
GVB: M&E - Leaky Feeder
GVB: M&E - Telephone, Cables & Accessories
GVB: M&E - Fire Radio, UHF & Accessories
GVB: M&E - Standby Batteries & Accessories
GVB: M&E - Rectifier/Charger & Inverter Panels
GVB: M&E - Standby Batteries & Accessories

GVB: M&E - Standby Batteries & Accessories

GVB: M&E - Standby Batteries & Accessories

GVB: M&E - Standby Batteries & Accessories

GVB: M&E - Standby Batteries & Accessories

GVB: M&E - Standby Batteries & Accessories

GVB: M&E - Standby Batteries & Accessories

GVB: M&E - Standby Batteries & Accessories

GVB: M&E - Standby Batteries & Accessories


GVB: M&E - Standby Generator Sets
GVB: M&E - Silencer, Filters, Sound Attenuator, Control Panel & Accessories
GVB: M&E - Service Fuel Tank, Bulk Fuel Storage
GVB: M&E - Pipes & Fittings & Fuel Transfer Pump + Batteries
GVB: M&E - Lighting, Small Power + Fittings
GVB: M&E - Control Gear & Electrical Accessories
GVB: M&E - Sub-Switchboard, Distribution Board Control & Accessories
GVB: M&E - High Silicon Steel Cable Support Frame, Cable Trays & Ladders
GVB: M&E - Intruder Alarm System & Accessories
GVB: M&E - Control & Data Cable + Accessories
GVB: M&E - Mimic, Alarm & Marshall Cabinets
GVB: M&E - Equipment For Monitoring & Control System & Accessories
GVB: M&E - Earthing System & Lightning Protection System
GVB: M&E - 22KV Cable, LV Cable + Pilot Wire Cable
GVB: M&E - 415V Switchgears, 433V Transformer

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA


GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA

GAM Handing of the SPPA Substation to SPPA


ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
FFS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
SPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
DWSS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
PCCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
ABCM (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
HS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
LS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
RCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
MTS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
UPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
MVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
SDGS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
LSP (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
SMCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
SS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
ELPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
WMS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
HVI (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
TVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsung
uring substructutre?

GVB: SPPA Substation Energisation & Permanent Power Supply Fit-out


GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel)
KD39: Testing & Commissioning of Gambas Ventilation Building's M&E fit-out
Overall Testing & Commissioning of all Tunnels

GVB: M&E - Initial Testing & Commissioning


GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel)
TGS: M&E - Testing & Commissioning
TMS: M&E - Testing & Commissioning
KD37: Completion of Permanent power supply fit-out and energisation of Gambas Ventilation Building
Gambas & TGS: Testing & Commissioning of TMV Fit-out (including test-run in the tunnels)
Sembawang & TMS: Testing & Commissioning of TMV Fit-out (including test-run in the tunnels)

GVB: M&E - Initial Testing & Commissioning


GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel)

GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel)


TFP & TOP Submission/Application (General)
GAM RI (Archictectural/Building) Inspection
KD39: Testing & Commissioning of Gambas Ventilation Building's M&E fit-out
Overall Testing & Commissioning of all Tunnels

TFP Approval by Authority (General)


GAM RI (Archictectural/Building) Inspection
SEM RI (Archictectural/Building) Inspection
TUNNEL RI (M&E) Inspection
TUNNEL RI (Architectural/Building) Inspection
GAM TOP Approval by Authority
SEM TOP Approval by Authority
TUNNEL TOP/CSC Approval by Authority
TUNNEL RI (M&E) Inspection
KD39: Testing & Commissioning of Gambas Ventilation Building's M&E fit-out
Overall Testing & Commissioning of all Tunnels
GAM RI (Archictectural/Building) Inspection

Overall Testing & Commissioning of all Tunnels

GAM RI (M&E) Inspection

TFP Approval by Authority (General)

GEN09290

GAM TOP Approval by Authority


SEM TOP Approval by Authority
TUNNEL TOP/CSC Approval by Authority
Project Hand-Over

Project Hand-Over
Completion of Construction
KD46: Total Completion Date

KD46: Total Completion Date


CCT / ERSS - Intermediate Design Submission
NS1_GEN00000 Contract Award / Commencement Date --> FS 156
NS1_STD_00780 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Submission by Samsung
--> FS 0 NS1_STD_00790
--> SS 0 NS1_STD_00820

NS1_STD_00780 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Submission by S --> FS 0
NS1_STD_00790 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_00800

NS1_STD_00790 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review and Comment by MM --> FS 0
NS1_STD_00800 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00810

NS1_STD_00800 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Re-Submission b --> FS 0
NS1_STD_00810 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_00860

CCT / ERSS - PSR/CDSS Submission


NS1_STD_00810 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review & Approval by MM --> FS -8
NS1_STD_00860 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Submission by Samsung
--> FS 0 NS1_STD_00870

NS1_STD_00860 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_00870 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_00880

NS1_STD_00870 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review and Comment by SP/MM --> FS 0
NS1_STD_00880 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00890

NS1_STD_00880 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_00890 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_00930

CCT / ERSS - AC Approval


NS1_STD_00780 ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Submission by S --> SS 0
NS1_STD_00820 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to AC
--> FS 0 NS1_STD_00830

NS1_STD_00820 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to AC --> FS 0
NS1_STD_00830 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by AC
--> FS 0 NS1_STD_00840

NS1_STD_00830 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by AC --> FS 0
NS1_STD_00840 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00850

NS1_STD_00840 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_00850 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by AC
--> FS 0 NS1_STD_00900

CCT / ERSS - LTA/DBC Approval


NS1_STD_00850 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by AC --> FS 0
NS1_STD_00900 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to LTA/DBC
--> FS 0 NS1_STD_00910
--> SS 0 NS1_STD_00940
NS1_STD_00900 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to LTA/DBC --> FS 0
NS1_STD_00910 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by LTA/DBC
--> FS 0 NS1_STD_00920

NS1_STD_00910 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_00920 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00930

NS1_STD_00920 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_00890 ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_00930 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by LTA/DBC
--> FS 0 NS1_STD_00980
--> FS 0 NS1_STD_00990

CCT / ERSS - BCA Approval


NS1_STD_00900 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to LTA/DBC --> SS 0
NS1_STD_00940 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to BCA
--> FS 0 NS1_STD_00950

NS1_STD_00940 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to BCA --> FS 0
NS1_STD_00950 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by BCA
--> FS 0 NS1_STD_00960

NS1_STD_00950 ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by BCA --> FS 0 NS1_STD_00960
NS1_STD_00960 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_00970

NS1_STD_00960 ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_00970 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by BCA (NOA)
--> FS 0 NS1_STD_00980
--> FS 0 NS1_STD_00990

CCT / ERSS - Permit To Start Works


NS1_STD_00930 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_00970 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_00980 ST102 Cut & Cover Tunnel (ERSS) - Submission & Approval for Permit to Commence Structural Works by MM
???--> --> FS 0 NS1_CON01200
--> FS 0 NS1_CON07010
???--> --> FS 0 NS1_CON07110
???--> --> FS 200 NS1_CON99950
--> FS 0 NS1_KEY01050

CCT / ERSS - Final Design


NS1_STD_00970 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_00930 ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_00990 ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Submission by Samsung
--> FS 0 NS1_STD_01000

NS1_STD_00990 ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Submission by Samsung --> FS 0
NS1_STD_01000 ST102 Cut & Cover Tunnel (ERSS) Final Design - Review and Comment by MM
--> FS 0 NS1_STD_01010

NS1_STD_01000 ST102 Cut & Cover Tunnel (ERSS) Final Design - Review and Comment by MM --> FS 0
NS1_STD_01010 ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_01020

NS1_STD_01010 ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Re-Submission by Samsu --> FS 0
NS1_STD_01020 ST102 Cut & Cover Tunnel (ERSS) Final Design - Review & Approval by MM
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_01030

CCT / ERSS - PRS/CNSS


NS1_STD_01020 ST102 Cut & Cover Tunnel (ERSS) Final Design - Review & Approval by MM --> FS 0
NS1_STD_01030 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Submission by Samsung
--> FS 0 NS1_STD_01040

NS1_STD_01030 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Submission by Samsung --> FS 0
NS1_STD_01040 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_01050

NS1_STD_01040 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review and Comment by SP/MM --> FS 0
NS1_STD_01050 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_01060

NS1_STD_01050 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_01060 ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review & Approval by SP/MM
Also link to CON07010 / TEG Piling? --> --> FS 98 NS1_KEY01050

Key Date
NS1_KEY01050 KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
???--> --> FS 0 NS1_CON05040
???--> --> FS 0 NS1_CON05050
Link only to STD_01060 / CCT ERSS-PSR/CNSS? --> --> FS 30 NS1_CON07010
???--> --> FS 0 NS1_STD_6390

CCT / ERSS - As Built Drawings


NS1_CON99924 GAM: Down-Drill, Blasting+Mucking, 1st Shotcrete, Rockbolt + 2nd Shotcrete, Adit: type --> FS 0 <--???
NS1_CON99906 GAM: 1st Shotcrete, Rockbolt + 2nd Shotcrete, down to GL -45.5m --> FS 0 <--???
NS1_CON01058 GAM: Diaphragm Wall: Secondary Panel-7 --> FS 60 <--???
NS1_CON07050 TEG: Strutted Excavation, CH: 0-020~0+000 --> FS 30
NS1_STD_01070 ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Submission by Samsung
--> FS 0 NS1_STD_01080

NS1_STD_01070 ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Submission by Samsung --> FS 0
NS1_STD_01080 ST102 Cut & Cover Tunnel (ERSS) As Built - Review and Comment by MM
--> FS 0 NS1_STD_01090

NS1_STD_01080 ST102 Cut & Cover Tunnel (ERSS) As Built - Review and Comment by MM --> FS 0
NS1_STD_01090 ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_01100

NS1_STD_01090 ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Re-Submission by Samsung --> FS 0
NS1_STD_01100 ST102 Cut & Cover Tunnel (ERSS) As Built - Review & Approval by MM
???--> --> FS 0 NS1_GEN10130
Remove lag? --> --> FS 396 NS1_STD_00340

CCT / Permanent Works - Intermediate Design Submission


NS1_STW_01120 AIP-A2 Tunneling Works Design - Preparation & Re-Submission by Samsung --> FS 0
NS1_STW_01200 AIP-A2 Tunneling Works Design - Review & Approval by MM
--> FS 140 NS1_KEY01050
--> FS 0 NS1_STD_1160
--> FS 0 NS1_STD_4750
--> FS 74 NS1_STD_6150
--> FS 74 NS1_STD_6500
NS1_GEN00000 Contract Award / Commencement Date --> FS 323 <--???
NS1_STW_01200 AIP-A2 Tunneling Works Design - Review & Approval by MM --> FS 0
NS1_STD_1160 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Submission by Samsung
--> FS 0 NS1_STD_1170
--> SS 0 NS1_STD_1200

NS1_STD_1160 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Subm--> FS 0
NS1_STD_1170 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review and Comment by MM
--> FS 0 NS1_STD_1180

NS1_STD_1170 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review and Comme--> FS 0
NS1_STD_1180 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1190

NS1_STD_1180 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Re-S --> FS 0
NS1_STD_1190 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review & Approval by MM
--> FS -8 NS1_STD_1240

CCT / Permanent Works - PSR/CDSS Submission


NS1_STD_1190 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review & Approval --> FS -8
NS1_STD_1240 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Submission by Samsung
--> FS 0 NS1_STD_1250

NS1_STD_1240 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Submission by --> FS 0
NS1_STD_1250 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_1260

NS1_STD_1250 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review and Comment by SP/ --> FS 0
NS1_STD_1260 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1270

NS1_STD_1260 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Re-Submission --> FS 0
NS1_STD_1270 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review & Approval by SP/MM
--> FS -1 NS1_STD_1310

CCT / Permanent Works - AC Approval


NS1_STD_1160 ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Subm--> SS 0
NS1_STD_1200 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to AC
--> FS 0 NS1_STD_1210

NS1_STD_1200 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to--> FS 0
NS1_STD_1210 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by AC .
--> FS 0 NS1_STD_1220

NS1_STD_1210 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by AC --> FS 0
NS1_STD_1220 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1230

NS1_STD_1220 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsun --> FS 0
NS1_STD_1230 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by AC
--> FS 0 NS1_STD_1280

CCT / Permanent Works - LTA/DBC Approval


NS1_STD_1230 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by AC --> FS 0
NS1_STD_1280 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to LTA/DBC
--> FS 0 NS1_STD_1290
--> SS 0 NS1_STD_1320

NS1_STD_1280 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung t --> FS 0
NS1_STD_1290 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by LTA/DBC
--> FS 0 NS1_STD_1300

NS1_STD_1290 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by LTA/DBC --> FS 0
NS1_STD_1300 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1310

NS1_STD_1300 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsu --> FS 0
NS1_STD_1270 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review & Approval by SP/MM --> FS -1
NS1_STD_1310 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by LTA/DBC
Link to BCA Approval?--> ???--> --> FS 0 NS1_KEY01050
Link to BCA Approval?--> ???--> --> FS 0 NS1_STD_1360
Link to BCA Approval?--> ???--> --> FS 0 NS1_STD_1370

CCT / Permanent Works - BCA Approval


NS1_STD_1280 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung t --> SS 0
NS1_STD_1320 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to BCA
--> FS 0 NS1_STD_1330

NS1_STD_1320 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung t --> FS 0
NS1_STD_1330 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by BCA
--> FS 0 NS1_STD_1340

NS1_STD_1330 ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by BCA --> FS 0
NS1_STD_1340 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1350

NS1_STD_1340 ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsu --> FS 0
NS1_STD_1350 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by BCA (NOA)
--> FS 0 NS1_KEY01050
--> FS 0 NS1_STD_1360
--> FS 0 NS1_STD_1370

CCT / Permanent Works - Permit To Start Works


NS1_STD_1350 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_1310 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_1360 ST103 Cut & Cover Tunnel (Permanent Works) - Submission & Approval for Permit to Commence Structural Works by MM
???--> --> FS 727 NS1_CON07010

CCT / Permanent Works - Final Design Submission


NS1_STD_1350 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by BCA (NOA) --> FS 0
NS1_STD_1310 ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by LTA/DBC --> FS 0
NS1_STD_1370 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Submission by Samsung
--> FS 0 NS1_STD_1380

NS1_STD_1370 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Submission --> FS 0 NS1_STD_1380
NS1_STD_1380 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by MM
NS1_STD_1380 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by M --> FS 0 NS1_STD_1390

NS1_STD_1380 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by M --> FS 0
NS1_STD_1390 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1400

NS1_STD_1390 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Re-Submiss --> FS 0
NS1_STD_1400 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review & Approv
--> FS 0 NS1_STD_1410

CCT / Permanent Works - PRS/CNSS Submission


NS1_STD_1400 ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review & Approval by MM --> FS 0
NS1_STD_1410 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Submission by Samsung
--> FS 0 NS1_STD_1420

NS1_STD_1410 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Submission by --> FS 0
NS1_STD_1420 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review and Comment by SP/MM
--> FS 0 NS1_STD_1430

NS1_STD_1420 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review and Comment by SP/ --> FS 0
NS1_STD_1430 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1440

NS1_STD_1430 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Re-Submission --> FS 0
NS1_STD_1440 ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review & Approval -->
--> FS 1315 NS1_STD_00340

CCT / Permanent Works - As Built Drawings Submission


NS1_CON01058 GAM: Diaphragm Wall: Secondary Panel-7 --> FS 60 <--???
NS1_CON07050 TEG: Strutted Excavation, CH: 0-020~0+000 --> FS 0 <--???
NS1_CON99924 GAM: Down-Drill, Blasting+Mucking, 1st Shotcrete, Rockbolt + 2nd Shotcrete, Adit: type --> FS 0 <--???
NS1_CON07160 TEG: Wall & Slab Concrete T3, 16m --> FS 30 <--???
NS1_CON99906 GAM: 1st Shotcrete, Rockbolt + 2nd Shotcrete, down to GL -45.5m --> FS 0 <--???
NS1_STD_1450 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Submission by Samsung
--> FS 0 NS1_STD_1460

NS1_STD_1450 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Submission by S --> FS 0
NS1_STD_1460 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review and Comment by MM
--> FS 0 NS1_STD_1470

NS1_STD_1460 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review and Comment by MM --> FS 0
NS1_STD_1470 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Re-Submission by Samsung
--> FS 0 NS1_STD_1480

NS1_STD_1470 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Re-Submission b --> FS 0
NS1_STD_1480 ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review & Approval by MM
???--> --> FS 0 NS1_GEN10130
Remove lag? --> --> FS 331 NS1_STD_00340

CCT / TEG - Piling


NS1_KEY01050 KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings --> FS 30
NS1_STD_00980 ST102 Cut & Cover Tunnel (ERSS) - Submission & Approval for Permit to Commence Str --> FS 0
NS1_KEY04000 KD20: Commencement of Gambas Cut & Cover Tunnel Construction --> SS -25 <--???
NS1_STD_1360 ST103 Cut & Cover Tunnel (Permanent Works) - Submission & Approval for Permit to C --> FS 727 <--???
NS1_CON07010 TEG: Piling - Tubular Pile (D=1200), 123ea
--> SS 7 NS1_CON07020

NS1_CON07010 TEG: Piling - Tubular Pile (D=1200), 123ea --> SS 7


NS1_CON07020 TEG: Piling - Sheet Pile (ISP II), 123ea
--> SS 10 NS1_CON07030

NS1_CON07020 TEG: Piling - Sheet Pile (ISP II), 123ea --> SS 10


NS1_CON07030 TEG: JGP for Water tightness
--> FS 0 NS1_CON07040

NS1_CON07030 TEG: JGP for Water tightness --> FS 0


NS1_CON07040 TEG: Strutted Excavation, CH: 0-046~0-020
--> FS 0 NS1_CON07050
NS1_CON07040 TEG: Strutted Excavation, CH: 0-046~0-020 --> FS 0
NS1_CON07050 TEG: Strutted Excavation, CH: 0-020~0+000
--> FS 0 NS1_CON07110
???--> --> FS 0 NS1_CON07130
--> FS 30 NS1_STD_01070
???--> --> FS 0 NS1_STD_1450

CCT - TEG Construction


NS1_STD_00980 ST102 Cut & Cover Tunnel (ERSS) - Submission & Approval for Permit to Commence Str --> FS 0 <--???
NS1_CON07050 TEG: Strutted Excavation, CH: 0-020~0+000 --> FS 0
NS1_CON07110 TEG: Bottom Concrete T1, 15m
--> FS 0 NS1_CON07120
--> FS 0 NS1_CON07140

NS1_CON07050 TEG: Strutted Excavation, CH: 0-020~0+000 --> FS 0 <--???


NS1_CON07130 TEG: Bottom Concrete T3, 16m
--> FS 0 NS1_CON07120
--> FS 0 NS1_CON07160

NS1_CON07110 TEG: Bottom Concrete T1, 15m --> FS 0


NS1_CON07130 TEG: Bottom Concrete T3, 16m --> FS 0
NS1_CON07120 TEG: Bottom Concrete T2, 15m
--> FS 0 NS1_CON07140
--> FS 0 NS1_CON07150
--> FS 0 NS1_CON07160

NS1_CON07110 TEG: Bottom Concrete T1, 15m --> FS 0


NS1_CON07120 TEG: Bottom Concrete T2, 15m --> FS 0
NS1_CON07140 TEG: Wall & Slab Concrete T1, 15m
--> FS 0 NS1_CON07150

NS1_CON07120 TEG: Bottom Concrete T2, 15m --> FS 0


NS1_CON07130 TEG: Bottom Concrete T3, 16m --> FS 0
NS1_CON07160 TEG: Wall & Slab Concrete T3, 16m
--> FS 0 NS1_CON07150
--> FS 30 NS1_STD_1450

NS1_CON07140 TEG: Wall & Slab Concrete T1, 15m --> FS 0


NS1_CON07120 TEG: Bottom Concrete T2, 15m --> FS 0
NS1_CON07160 TEG: Wall & Slab Concrete T3, 16m --> FS 0
NS1_CON07150 TEG: Wall & Slab Concrete T2, 15m
--> FS 0 NS1_CON07170

NS1_CON07150 TEG: Wall & Slab Concrete T2, 15m --> FS 0


NS1_CON07170 TEG: Waterproofing treatment
--> SS 5 NS1_CON07180

NS1_CON07170 TEG: Waterproofing treatment --> SS 5


NS1_CON07180 TEG: Backfilling up to Ground Level
--> FS 0 NS1_CON07210
--> FS 0 NS1_CON07220
--> FS 15 NS1_CON08010
ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review and Comment by MM
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to AC

ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) Intermediate Design - Review & Approval by MM

ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review and Comment by SP/MM

ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) PSR/CDSS - Review & Approval by SP/MM

ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by LTA/DBC

ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by AC

ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by AC

ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to LTA/DBC

ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by LTA/DBC
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Submission by Samsung to BCA
ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by LTA/DBC

ST102 Cut & Cover Tunnel (ERSS) - Submission & Approval for Permit to Commence Structural Works by MM+K101
ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) - Review and Comment by BCA

ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) - Review & Approval by BCA (NOA)

ST102 Cut & Cover Tunnel (ERSS) - Submission & Approval for Permit to Commence Structural Works by MM
ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Submission by Samsung

GAM: Drill, Install Pipe Roof and Grouted Spiles, Adit: type A
TEG: Piling - Tubular Pile (D=1200), 123ea
TEG: Bottom Concrete T1, 15m
SEM: Instrumentation Installation by IMC
KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings

ST102 Cut & Cover Tunnel (ERSS) Final Design - Review and Comment by MM

ST102 Cut & Cover Tunnel (ERSS) Final Design - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) Final Design - Review & Approval by MM

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review and Comment by SP/MM

ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) PSR/CNSS - Review & Approval by SP/MM

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings

TGS: TBM Assembly & Test Running


TGS: Installation of Temp. Segment & Reaction Frame
TEG: Piling - Tubular Pile (D=1200), 123ea
ST205 Bored Tunnel (GAM-SEM) Final Design - Review & Approval by MM

ST102 Cut & Cover Tunnel (ERSS) As Built - Review and Comment by MM

ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Re-Submission by Samsung

ST102 Cut & Cover Tunnel (ERSS) As Built - Review & Approval by MM

Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Submission by Samsung
ST204 Adit & Enlargement Intermediate Design - Preparation & Submission by Samsung
ST205 Bored Tunnel (GAM-SEM) Intermediate Design - Preparation & Submission by Samsung
ST206 Bored Tunnel (MAN-SEM) Intermediate Design - Preparation & Submission by Samsung
<---Also STD_1160 to link to CCT/ERSS?

ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review and Comment by MM
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to AC

ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Preparation & Re-Submission by Samsung

esign - Preparation & Re-Submission by Samsung


ST103 Cut & Cover Tunnel (Permanent Works) Intermediate Design - Review & Approval by MM

ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review and Comment by SP/MM

ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Preparation & Re-Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) PSR/CDSS - Review & Approval by SP/MM

ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by LTA/DBC

ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by AC

ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by AC

ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to LTA/DBC

ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by LTA/DBC
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Submission by Samsung to BCA
ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by LTA/DBC

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST103 Cut & Cover Tunnel (Permanent Works) - Submission & Approval for Permit to Commence Structural Works by MM
ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) - Review and Comment by BCA

ST103 Cut & Cover Tunnel (Permanent Works) - Preparation & Re-Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) - Review & Approval by BCA (NOA)

KD6: Completion of all Design & Authorities Approval for Tunnels & Buildings
ST103 Cut & Cover Tunnel (Permanent Works) - Submission & Approval for Permit to Commence Structural Works by MM
ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Submission by Samsung

& Approval for Permit to Commence Structural Works by MM


TEG: Piling - Tubular Pile (D=1200), 123ea

ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by MM

ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review and Comment by MM

ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Preparation & Re-Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) Final Design - Review & Approval by MM

ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review and Comment by SP/MM

ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Preparation & Re-Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) PSR/CNSS - Review & Approval by SP/MM

PSR/CHSS - Preparation & Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review and Comment by MM

ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Re-Submission by Samsung

ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review & Approval by MM

Project Hand-Over
PSR/CHSS - Preparation & Submission by Samsung

TEG: Piling - Sheet Pile (ISP II), 123ea

TEG: JGP for Water tightness

TEG: Strutted Excavation, CH: 0-046~0-020

TEG: Strutted Excavation, CH: 0-020~0+000


TEG: Bottom Concrete T1, 15m
TEG: Bottom Concrete T3, 16m
ST102 Cut & Cover Tunnel (ERSS) As Built - Preparation & Submission by Samsung
ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Submission by Samsung

TEG: Bottom Concrete T2, 15m


TEG: Wall & Slab Concrete T1, 15m

TEG: Bottom Concrete T2, 15m


TEG: Wall & Slab Concrete T3, 16m

TEG: Wall & Slab Concrete T1, 15m


TEG: Wall & Slab Concrete T2, 15m
TEG: Wall & Slab Concrete T3, 16m

TEG: Wall & Slab Concrete T2, 15m

TEG: Wall & Slab Concrete T2, 15m


ST103 Cut & Cover Tunnel (Permanent Works) As Built - Preparation & Submission by Samsung

TEG: Waterproofing treatment

TEG: Backfilling up to Ground Level

TEG: M&E works in Culvert, Existing Gambas ~ GVB Cable Gallery


TEG: SCADA works by NSC, Cut & Cover Tunnel Section
GVB: Piling - Tubular Pile (D=1200)
NS1_GEN10300
NS1_CON06990
NS1_CON101154
NS1_KEY04050
NS1_CON05990
NS1_GEN10280
NS1_CON09590
NS1_CON09600
NS1_CON08600
NS1_CON08590
NS1_GEN10240
NS1_GEN10260
NS1_KEY04040
NS1_CON101164
NS1_GEN10200
NS1_KEY07050
NS1_KEY07060
NS1_GEN10180
NS1_GEN10220
NS1_TTR07010

NS1_GEN09100
NS1_CON08600
NS1_CON05990
NS1_GEN09290

NS1_GEN09100
NS1_CON06990
NS1_GEN09300

NS1_GEN09300
NS1_GEN09290
NS1_GEN09280
NS1_GEN09270
NS1_GEN09100
NS1_GEN09200

NS1_STD_710
NS1_GEN09200
NS1_GEN09100
NS1_STD_00370
NS1_GEN09330

NS1_GEN09100
NS1_GEN09200
NS1_GEN09340

NS1_GEN09100
NS1_GEN09200
NS1_GEN09350

NS1_CON06690
NS1_CON98950
NS1_CON08990
NS1_CON09890
NS1_MNE-AS10

NS1_CON101154
NS1_CON09490
NS1_TTR07010
NS1_MNE-AS40
NS1_MNE-AS80
NS1_MNE-AS520
NS1_MNE-AS200
NS1_MNE-AS320
NS1_MNE-AS360
NS1_MNE-AS400
NS1_MNE-AS600
NS1_MNE-AS680
NS1_MNE-AS120
NS1_MNE-AS440
NS1_MNE-AS280
NS1_MNE-AS560
NS1_MNE-AS760
NS1_MNE-AS800
NS1_MNE-AS640
NS1_MNE-AS480
NS1_MNE-AS720
NS1_MNE-AS160
NS1_MNE-AS240
NS1_DSG00150

NS1_NCS01020
NS1_KEY08060
NS1_KEY05050
NS1_NCS01080
NS1_NCS03050
NS1_NCS03030
NS1_KEY05040
NS1_NCS01060
NS1_DSG00150
NS1_iKEY00060
NS1_NCS01040
NS1_KEY08050
NS1_NCS05010

NS1_TTR07010
NS1_GEN10080

NS1_GEN00120
NS1_GEN00100
NS1_GEN00140
NS1_TTR07010
NS1_GEN18000

NS1_TTR07010
NS1_GEN18000
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160
NS1_GEN10160

NS1_GEN10160
NS1_GEN00030
NS1_GEN00140
NS1_GEN00040

NS1_GEN10160
NS1_GEN00060
NS1_GEN00140
NS1_GEN00070

NS1_TTR07010
NS1_GEN10160
NS1_GEN10310

NS1_GEN10080
NS1_NCS05010
NS1_GEN10100

NS1_GEN09200
NS1_GEN00120
NS1_STD_5770
NS1_GEN00180
NS1_GEN00100
NS1_STD_6960
NS1_GEN10080
NS1_GEN18000
NS1_GEN00070
NS1_STD_2270
NS1_STD_5070
NS1_DSG00150
NS1_GEN10160
NS1_GEN09330
NS1_GEN00080
NS1_STD_4020
NS1_STD_1480
NS1_STD_2970
NS1_STD_3320
NS1_STD_6470
NS1_GEN10100
NS1_GEN09350
NS1_STD_710
NS1_STD_5420
NS1_GEN00170
NS1_STD_6820
NS1_STD_00330
NS1_NCS05010
NS1_GEN10310
NS1_GEN00150
NS1_GEN00240
NS1_STD_2620
NS1_STD_01100
NS1_STD_4720
NS1_STD_4370
NS1_STD_6120
NS1_TTR07010
NS1_GEN09340
NS1_GEN00040
NS1_STD_1870
NS1_STD_3670
NS1_GEN10130

NS1_GEN10130
NS1_GEN10000

NS1_GEN10130
NS1_GEN10000
NS1_KEY10400
Removal of Temporary Communication Facilities --> FS 0
TMS: M&E - Testing & Commissioning --> FS 0
SEM Handing of the SPPA Substation to SPPA --> FS 0
KD25: Testing & Commissioning of Gambas to Sembawang Tunnel Section's & Gam --> FS 0
TGS: M&E - Testing & Commissioning --> FS 0
Removal of Temporary Drainage System --> FS 0
SEB: Initial Testing & Commissioning --> FS 0
SEB: Testing & Commissioning --> FS 0
GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel) --> FS 0
GVB: M&E - Initial Testing & Commissioning --> FS 0
Removal of Temporary Sanitary Waste Disposal System --> FS 0
Removal of Temporary Fire Fighting Facilities --> FS 0
KD24: Testing & Commissioning of Mandai to Sembawang Tunnel Section's & Semb--> FS 0
GAM Handing of the SPPA Substation to SPPA --> FS 0
Removal of Temporary Electricity Power Supply System & Lighting --> FS 0
KD38: Testing & Commissioning of Sembawang Equipment Building's M&E fit-out --> FS 0
KD39: Testing & Commissioning of Gambas Ventilation Building's M&E fit-out --> FS 0
Removal of Temporary Water Supply System --> FS 0
Removal of Temporary Ventilation System --> FS 0
Overall Testing & Commissioning of all Tunnels
--> SS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0
--> FS 0

TFP & TOP Submission/Application (General) --> SS 5


GVB: M&E - Testing & Commissioning (including TEG:cut&cover tunnel) --> FS 0
TGS: M&E - Testing & Commissioning --> FS 0
TUNNEL RI (M&E) Inspection
--> FS 0

TFP & TOP Submission/Application (General) --> SS 5


TMS: M&E - Testing & Commissioning --> FS 0
TUNNEL RI (Architectural/Building) Inspection
--> FS 0

TUNNEL RI (Architectural/Building) Inspection --> FS 0


TUNNEL RI (M&E) Inspection --> FS 0
SEM RI (M&E) Inspection --> FS 0
GAM RI (M&E) Inspection --> FS 0
TFP & TOP Submission/Application (General) --> FS 0
TFP Approval by Authority (General)
--> FS 0
--> FS 0
--> FS 0
--> FS 0

ST101 Lower Shaft As Built - Review & Approval by MM --> FS 0


TFP Approval by Authority (General) --> FS 0
TFP & TOP Submission/Application (General) --> FS 0
PSR/CHSS - Review & Approval by MM --> FS 0
GAM TOP Approval by Authority
--> FS 0

TFP & TOP Submission/Application (General) --> FS 0


TFP Approval by Authority (General) --> FS 0
SEM TOP Approval by Authority
--> FS 0

TFP & TOP Submission/Application (General) --> FS 0


TFP Approval by Authority (General) --> FS 0
TUNNEL TOP/CSC Approval by Authority
--> FS 0

TGS: M&E - 415V Switchgears, 433V Transformer --> FS 0


TMS: M&E - 415V Switchgears, 433V Transformer --> FS 0
GVB: M&E - 415V Switchgears, 433V Transformer --> FS 0
SEB: M&E - 415V Switchgears, 433V Transformer --> FS 0
ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by Samsun

SEM Handing of the SPPA Substation to SPPA --> FS 0


SEB: M&E - Standby Generator Sets --> FS 0
Overall Testing & Commissioning of all Tunnels --> SS 0
ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
MVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval b --> FF 0
UPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
SPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
ABCM (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval --> FF 0
HS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
LS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
LSP (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
SS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
TVS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
RCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
PCCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval --> FF 0
SDGS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval --> FF 0
WMS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval b --> FF 0
HVI (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
SMCS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval --> FF 0
MTS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval b --> FF 0
ELPS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval b --> FF 0
FFS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval by --> FF 0
DWSS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Review & Approval --> FF 0
As-Built Information/Drawings Submission
--> FS 0
--> FS 0

GVB: Testing of SCADA works, Shaft & Ventilation building --> FS 0


KD45: Testing & Commissioning of Gambas to Sembawang Tunnel & Gambas shaft --> FS 0
KD30: Test & Commission of Gambas to Sembawang Tunnel Section's, Gambas Shaf --> FS 0
TMS: Testing of SCADA works, Tunnel section --> FS 0
Sembawang & TMS: Testing & Commissioning of TMV Fit-out (including test-run in--> FS 0
Gambas & TGS: Testing & Commissioning of TMV Fit-out (including test-run in the--> FS 0
KD29: Test & Commission of Mandai to Sembawang Tunnel Section's, Sembawang--> Sh FS 0
TGS: Testing of SCADA works, Tunnel section --> FS 0
As-Built Information/Drawings Submission --> FS 0
i_KD6: Overall Testing & Commissioning of all Tunnels, Shafts and Building's M&E --> FS 0
SEB: Testing of SCADA works, Shaft & Equipment building --> FS 0
KD44: Testing & Commissioning of Mandai to Sembawang Tunnel & Sembawang sha --> FS 0
NSC: Overall Testing & Commissioning
--> FS 0
--> FS 0

Overall Testing & Commissioning of all Tunnels --> FS 0


Completion of All Punch Lists
--> FS 0
--> FS 0

SEM: Site Clearance & Reinstatement --> FS 0


GAM: Site Clearance & Reinstatement --> FS 0
MAN: Site Clearance & Reinstatement --> FS 0
Overall Testing & Commissioning of all Tunnels --> FS 0
Overall Reinstatement
--> FS 0
--> SS 0

Overall Testing & Commissioning of all Tunnels --> FS 0


Overall Reinstatement --> SS 0
Project Clean-Up & Initial Demobilzation
Project Clean-Up & Initial Demobilzation --> FS 0
Project Clean-Up & Initial Demobilzation --> FS 0
Project Clean-Up & Initial Demobilzation --> FS 0
Project Clean-Up & Initial Demobilzation --> FS 0
Temporary Communication Facilities --> FS 0

Project Clean-Up & Initial Demobilzation --> FS 0


Contractor's Office: Operation & Maintenance --> FS 0
MAN: Site Clearance & Reinstatement --> FS 0
Contractor's Office: Removal & Reinstatement
--> FS 0

Project Clean-Up & Initial Demobilzation --> FS 0


Engineering Office: Operation & Maintenance --> FS 0
MAN: Site Clearance & Reinstatement --> FS 0
Engineering Office: Removal & Reinstatement
--> FS 0

Overall Testing & Commissioning of all Tunnels --> FS 0


Project Clean-Up & Initial Demobilzation --> FS 0
Project Clean-Up & Final Demobilzation
--> FS 0

Completion of All Punch Lists --> FS 0


NSC: Overall Testing & Commissioning --> FS 0
Client To Issue Certificate of Actual Total Completion
--> FS 0

TFP Approval by Authority (General) --> FS 0


SEM: Site Clearance & Reinstatement --> FS 0
ST302 Equipment Bldg. (Superstructure) As Built - Review & Approval by MM --> FS 0
TOL Fee for Site Facilities --> FS 0
GAM: Site Clearance & Reinstatement --> FS 0
M&E Systems PSR/SHSS - Review & Approval by MM --> FS 0
Completion of All Punch Lists --> FS 0
Overall Reinstatement --> FS 0
Engineering Office: Removal & Reinstatement --> FS 0
ST105 Ventilation Bldg. (Substructure) As Built - Review & Approval by MM --> FS 0
ST204 Adit & Enlargement As Built - Review & Approval by MM --> FS 887
As-Built Information/Drawings Submission --> FS 0
Project Clean-Up & Initial Demobilzation --> FS 0
GAM TOP Approval by Authority --> FS 0
Env., Safety & Security Consideration --> FS 0
ST202 Adit & Enlargement As Built - Review & Approval by MM --> FS 0
ST103 Cut & Cover Tunnel (Permanent Works) As Built - Review & Approval by M --> FS 0
ST200 Upper Shaft(Dwall) As Built - Review & Approval by MM --> FS 0
ST201 Lower Shaft As Built - Review & Approval by MM --> FS 1418
ST205 Bored Tunnel (GAM-SEM) As Built - Review & Approval by MM --> FS 483
Client To Issue Certificate of Actual Total Completion --> FS 0
TUNNEL TOP/CSC Approval by Authority --> FS 0
ST101 Lower Shaft As Built - Review & Approval by MM --> FS 0
ST303 Equipment Bldg. (Substructure) As Built - Review & Approval by MM --> FS 0
Supervisory Staff's Salary : After Time 1 --> FS 0
ST206 Bored Tunnel (MAN-SEM) As Built - Review & Approval by MM --> FS 453
ST100 Upper Shaft(Dwall) As Built - Review & Approval by MM --> FS 0
NSC: Overall Testing & Commissioning --> FS 0
Project Clean-Up & Final Demobilzation --> FS 0
Bond, Insurances & Duties etc --> FS 0
Post-construction Survey & Review --> FS 0
BP-AA Gambas (Bldg. Architectural Design) As Built - Review & Approval by MM --> FS 0
ST102 Cut & Cover Tunnel (ERSS) As Built - Review & Approval by MM --> FS 0
ST301 Lower Shaft As Built - Review & Approval by MM --> FS 838
ST300 Upper Shaft(Dwall) As Built - Review & Approval by MM --> FS 1237
BP-BB Sembawang (Bldg. Architectural Design) As Built - Review & Approval by --> FS 0
Overall Testing & Commissioning of all Tunnels --> FS 0
SEM TOP Approval by Authority --> FS 0
Contractor's Office: Removal & Reinstatement --> FS 0
ST104 Ventilation Bldg. (Superstructure) As Built - Review & Approval by MM --> FS 0
ST203 Adit & Enlargement As Built - Review & Approval by MM --> FS 1346
Project Hand-Over
--> FS 0
--> FS 0

Project Hand-Over --> FS 0


Completion of Construction
--> FF 0

Project Hand-Over --> FS 0


Completion of Construction --> FF 0
KD46: Total Completion Date
NS1_DSG00150 As-Built Information/Drawings Submission
NS1_GEN10080 Completion of All Punch Lists
NS1_GEN10130 Project Hand-Over
NS1_GEN10160 Project Clean-Up & Initial Demobilzation
NS1_GEN10310 Project Clean-Up & Final Demobilzation
NS1_GEN18000 Overall Reinstatement

NS1_GEN09200 TFP Approval by Authority (General)

NS1_GEN09200 TFP Approval by Authority (General)

NS1_GEN09330 GAM TOP Approval by Authority


NS1_GEN09340 SEM TOP Approval by Authority
NS1_GEN09350 TUNNEL TOP/CSC Approval by Authority
NS1_GEN10130 Project Hand-Over
NS1_GEN10130 Project Hand-Over

NS1_GEN10130 Project Hand-Over

NS1_GEN10130 Project Hand-Over

NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
NS1_MNE-AS10 ACS (Building, Shaft, Adit/Enlargement & Tunnel) - As Built Preparation & Submission by
bmission by Samsung

NS1_GEN10130 Project Hand-Over


NS1_NCS05010 NSC: Overall Testing & Commissioning
NS1_GEN10100 Client To Issue Certificate of Actual Total Completion
NS1_GEN10130 Project Hand-Over

NS1_GEN10100 Client To Issue Certificate of Actual Total Completion


NS1_GEN10130 Project Hand-Over

NS1_GEN10130 Project Hand-Over


NS1_GEN10160 Project Clean-Up & Initial Demobilzation

NS1_GEN10160 Project Clean-Up & Initial Demobilzation


NS1_GEN10160 Project Clean-Up & Initial Demobilzation

NS1_GEN00040 Contractor's Office: Removal & Reinstatement


NS1_GEN00070 Engineering Office: Removal & Reinstatement
NS1_GEN10130 Project Hand-Over
NS1_GEN10310 Project Clean-Up & Final Demobilzation
NS1_GEN10290 Maintenance of Temporary Communication Facilities

NS1_GEN10130 Project Hand-Over

NS1_GEN10130 Project Hand-Over

NS1_GEN10130 Project Hand-Over


NS1_GEN10130 Project Hand-Over

NS1_GEN10000 Completion of Construction


NS1_KEY10400 KD46: Total Completion Date

NS1_KEY10400 KD46: Total Completion Date


reparation & Submission by Samsung
reparation & Submission by Samsung
reparation & Submission by Samsung
reparation & Submission by Samsung

Anda mungkin juga menyukai