LUAS TIMBUNAN LUAS GALIAN GALIAN TANAH TIMBUNAN

VOLUME JARAK
NO NOMOR PATOK JARAK VOLUME GALIAN VOLUME VOLUME TANAH VOLUME GALIAN TIMBUNAN VOLUME SISA DEPOSIT PANJANG TUJUAN JARAK SISA HASIL TIMBUNAN AKHIR KETERAN TUJUAN PERPINDA
JARAK LOKASI BUANGAN JARAK HAULING VOLUME TIMBUNAN DEVIASI ASAL HAULING VOLUME HAULING GAN HAULING HAN TIPE - B1 DARI TIPE - B1 DARI TIPE - B1 DARI TIPE - B1 DARI
TANAH DEPOSIT BERBATU BATU TANPA JARAK HAULING PER SEGMEN SEGMEN HAULING HAULING DEPOSIT
RATA- RATA- ANGKUT timbunan galian DENGAN JARAK DENGAN JARAK TANAH TIPE - A1 DARI BORROW PIT BORROW PIT BORROW PIT BORROW PIT
LUAS LUAS 0-800 800-1500
RATA RATA ANGKUT 1-3 KM ANGKUT 3-5 KM HASIL GALIAN DENGAN JARAK DENGAN JARAK DENGAN JARAK DENGAN JARAK
0.1 -1 KM 1 -3KM 3-5KM > 5 KM

1 2 3 4 5 6 7 8=3*5 9=0,8*8 8=3*5 8=3*5 9=3*7 11=9-10 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

1 P35 - 22.58
50.00 0.48 20.92 50.00 1,045.88 836.70 1,045.88 875,083.61 DISPOSAL XX XXX M 23.75 812.95 23.75 (812.95) DISPOSAL (3,095.95) 400.00 - - P35 - P36 23.75 1,022.13 - 23.75
2 P36 0.95 19.26
50.00 0.84 18.06 50.00 902.80 722.24 902.80 652,038.27 41.90 680.34 41.90 (680.34) - - - - P36 - P37 41.90 860.90 - 41.90
3 P37 0.73 16.85 3,095.95 200.00
50.00 0.36 19.16 50.00 957.95 766.36 957.95 734,134.56 18.15 748.21 18.15 (748.21) - - - - P37 - P38 18.15 939.80 - 18.15
4 P38 - 21.46
50.00 8.68 14.14 50.00 707.05 565.64 707.05 399,935.76 433.93 131.72 433.93 (131.72) - - - - P38 - P39 433.93 273.13 - 433.93
5 P39 17.36 6.82
15.35 28.37 3.41 15.35 52.33 41.86 52.33 2,190.59 435.51 (393.65) 52.33 393.65 BCPKa9-S5 2,099.18 200.00 - - P39 - 39A 52.33 435.51 -
6 39A 39.39 -
34.65 38.61 - 34.65 - - - - 1,337.91 (1,337.91) - 1,337.91 (2,099.18) 95.10 - - - - 39A - P40 - 1,337.91
7 P40 37.84 -
45.10 18.92 10.54 45.10 475.13 380.10 475.13 180,597.67 853.22 (473.12) 475.13 473.12 - - - - P40 - (BCPKA 9) 475.13 853.22
8 (BCPKA 9) - 21.07
4.90 - 21.07 4.90 103.24 82.59 103.24 8,527.29 - 82.59 - (82.59) P39-BCPKA9 (2,099.18) 200.00 10,697.83 - (BCPKA 9) - P41 - 103.24 -
9 P41 - 21.07
50.00 - 20.50 50.00 1,024.88 819.90 1,024.88 840,295.01 - 819.90 - (819.90) - P41 - P42 - 1,024.88 -
10 P42 - 19.93
50.00 - 21.84 50.00 1,092.08 873.66 1,092.08 954,102.24 - 873.66 - (873.66) DISPOSAL (10,697.83) 400.00 - (10,697.83) P42 - P43 - 1,092.08 -
11 P43 - 23.76
50.00 - 37.38 50.00 1,869.20 1,495.36 1,869.20 2,795,126.91 - 1,495.36 - (1,495.36) - - - - P43 - 43A - 1,869.20 -
12 43A - 51.01 12,797.01 304.90
50.00 - 49.66 50.00 2,483.18 1,986.54 2,483.18 4,932,926.46 - 1,986.54 - (1,986.54) - - - - 43A - P45 - 2,483.18 -
13 P45 - 48.32
50.00 - 46.72 50.00 2,335.90 1,868.72 2,335.90 4,365,143.05 - 1,868.72 - (1,868.72) - - - - P45 - P47 - 2,335.90 -
14 P47 - 45.12
33.88 - 68.94 33.88 2,335.69 1,868.55 2,335.69 4,364,347.76 - 1,868.55 - (1,868.55) - - - - P47 - 47A - 2,335.69 -
15 47A - 92.76
16.12 - 96.33 16.12 1,552.86 1,242.28 1,552.86 1,929,088.71 - 1,242.28 - (1,242.28) - - - - 47A - P48 - 1,552.86 -
16 P48 - 99.90

Volume (1) 16,938.14 16,938.14 23,033,537.91 1,045.18 15,892.96 3,144.37

1 S19 - 60.07
9.17 - 55.45 9.17 508.51 406.81 508.51 206,868.52 - 406.81 - (406.81) DISPOSAL 2 & 7 (4,361.41) 250.00 - - S19 - S20=D - 508.51 - -
2 S20=D - 50.84
14.75 0.48 43.08 14.75 635.48 508.39 635.48 323,069.52 7.07 501.32 7.07 (501.32) - - - - S20=D - S22 7.07 628.42 - 7.07
3 S22 0.96 35.33
19.72 0.48 32.71 19.72 644.97 515.98 644.97 332,791.29 9.45 506.53 9.45 (506.53) - - - - S22 - S23=B 9.45 635.53 - 9.45
4 S23=B - 30.08
12.09 10.25 39.77 12.09 480.81 384.65 480.81 184,945.11 123.90 260.75 123.90 (260.75) - - - - S23=B - S24 123.90 356.91 - 123.90
5 S24 20.50 49.46
24.17 24.23 57.61 24.17 1,392.41 1,113.93 1,392.41 1,551,043.44 585.53 528.40 585.53 (528.40) - - - - S24 - A(BCPka12) 585.53 806.88 - 585.53
6 A(BCPka12) 27.95 65.76
17.50 29.62 60.90 17.50 1,065.66 852.53 1,065.66 908,509.25 518.30 334.23 518.30 (334.23) 4,361.41 222.70 - - - - A(BCPka12) - S27 518.30 547.37 - 518.30
7 S27 31.28 56.03
23.50 36.25 57.78 23.50 1,357.89 1,086.31 1,357.89 1,475,089.49 851.83 234.48 851.83 (234.48) - - - - S27 - S28 851.83 506.06 - 851.83
8 S28 41.22 59.54
25.20 41.15 46.73 25.20 1,177.53 942.03 1,177.53 1,109,267.17 1,037.03 (95.00) 1,037.03 95.00 - - - - S28 - S29=88 1,037.03 140.50 - 1,037.03
9 S29=88 41.09 33.92
23.30 41.22 34.12 23.30 795.00 636.00 795.00 505,614.91 960.50 (324.50) 795.00 324.50 - - - - S29=88 - 88A 795.00 - - 960.50
10 88A 41.36 34.32
22.70 35.24 37.47 22.70 850.49 680.39 850.49 578,665.98 799.96 (119.57) 799.96 119.57 - - - - 88A - P89 799.96 50.53 - 799.96
11 P89 29.12 40.61
30.60 22.81 28.72 30.60 878.72 702.98 878.72 617,725.96 698.02 4.96 698.02 (4.96) - - - - P89 - 89A 698.02 180.71 - 698.02
12 89A 16.50 16.82
18.00 8.25 27.04 18.00 486.77 389.42 486.77 189,559.14 148.49 240.93 148.49 (240.93) DISPOSAL 4 (4,485.30) 150.00 - - 89A - P90 148.49 338.28 - 148.49
13 P90 - 37.27
16.00 - 36.05 16.00 576.86 461.48 576.86 266,210.28 - 461.48 - (461.48) - - - - P90 - 90A - 576.86 - -
14 90A - 34.84
25.90 - 31.53 25.90 816.55 653.24 816.55 533,402.21 - 653.24 - (653.24) - - - - 90A - P91 - 816.55 - -
15 P91 - 28.21
21.76 - 34.07 21.76 741.32 593.06 741.32 439,643.89 - 593.06 - (593.06) 4,485.30 190.01 - - - - P91 - 91A - 741.32 - -
16 91A - 39.92
38.57 - 35.01 38.57 1,350.28 1,080.22 1,350.28 1,458,600.21 - 1,080.22 - (1,080.22) - - - - 91A - P92 - 1,350.28 - -
17 P92 - 30.09
29.78 - 22.23 29.78 662.01 529.61 662.01 350,605.16 - 529.61 - (529.61) - - - - P92 - 92A - 662.01 - -
18 92A - 14.37
40.00 30.77 7.18 40.00 287.34 229.87 287.34 66,051.42 1,230.74 (1,000.87) 287.34 1,000.87 - - - - 92A - P93 287.34 - - 1,230.74
19 P93 61.54 -
34.00 30.77 14.43 34.00 490.64 392.51 490.64 192,579.73 1,046.13 (653.62) 490.64 653.62 DISPOSAL 3 (5,869.10) 500.00 - - P93 - P94 490.64 - - 1,046.13
20 P94 - 28.86
2.50 1.56 27.10 2.50 67.76 54.21 67.76 3,673.00 3.91 50.30 3.91 (50.30) - - - - P94 - 94A/BCPKa 13 3.91 63.85 - 3.91
21 94A/BCPKa 13 3.13 25.35
50.00 1.56 36.27 50.00 1,813.40 1,450.72 1,813.40 2,630,735.65 78.18 1,372.55 78.18 (1,372.55) - - - - 94A/BCPKa 13 - P95 78.18 1,735.23 - 78.18
22 P95 - 47.19
50.00 - 43.80 50.00 2,189.83 1,751.86 2,189.83 3,836,266.82 - 1,751.86 - (1,751.86) 5,869.10 - - - - P95 - P96 - 2,189.83 - -
23 P96 - 40.40
27.00 - 41.52 27.00 1,121.12 896.90 1,121.12 1,005,529.84 - 896.90 - (896.90) - - - - P96 - 96A - 1,121.12 - -
24 96A - 42.64
20.60 0.57 34.23 20.60 705.15 564.12 705.15 397,787.30 11.64 552.48 11.64 (552.48) - - - - 96A - P97 11.64 693.51 - 11.64
25 P97 1.13 25.82
9.00 5.62 12.91 9.00 116.18 92.94 116.18 10,798.42 50.62 42.33 50.62 (42.33) - - - - P97 - 97A 50.62 65.57 - 50.62
26 97A 10.12 -

Volume (2) 21,212.68 21,212.68 19,175,033.70 6,496.88 14,715.80 8,161.27

LANJUTKAN SACNA UNTUK VOL (3) DST


Mengetahui, Konsultan Supervisi Kontraktor
Direksi Lapangan NIPPON KOEI PP-Sacna KSO

Danny Mardiansyah, ST Ir. Agus Sangaji Alex Heri Kurniawan, ST


NIP. 198103172009121001 Construction Engineer Site Engineering Manager
DIAGRAM PEMINDAHAN TANAH GA
JARINGAN IRIGASI LEUWIGOO

P.35 - P.39 P.39 - BCP Ka 9 BCP Ka 9 - P.48


GALIAN 3,613.68 GALIAN 527.46 GALIAN 12,797.01
TIMBUNAN 517.73 TIMBUNAN 2,626.64 TIMBUNAN -
v v v
DEVIASI DEVIASI DEVIASI
3,095.95 (2,099.18) 12,797.01
v
<<< v
v v
2,099.18 v
v
400 m 400 m
DISPOSAL 6 (P.45) DISPOSAL 5 (P.49)
3,095.95 10,697.83

LANJUTKAN SACNA
IAGRAM PEMINDAHAN TANAH GALIAN - TIMBUNAN
JARINGAN IRIGASI LEUWIGOONG AMS-19B

S.19 - P.89 A P.89 A - P.93 P.93 - P. 97A


GALIAN 9,787.48 GALIAN 4,921.13 GALIAN
P48 - S19 (PERMASALAHAN

TIMBUNAN 5,591.57 TIMBUNAN 1,379.23 TIMBUNAN


PEMBEBASAN LAHAN)

v v
DEVIASI DEVIASI DEVIASI
4,195.91 3,541.90 5,313.60

v v
v v
v v
250 m 150 m 500 m
DISPOSAL 2 & 7 DISPOSAL 4 DISPOSAL 1
4,195.91 3,541.90 5,313.60
P.93 - P. 97A
6,504.07

JALAN CIBATU - WANARAJA


1,190.47
v
DEVIASI
5,313.60

v
v
v

DISPOSAL 1
5,313.60