CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD.

(A subsidiary of Coal India Ltd.)


Gondwana Place, Kanke Road, Ranchi-834 031 (Jharkhand), India
Email: hodcbm.cmpdi@coalindia.in,
Tel. (+91)-651-2230011 Fax: +91-651-2233314/2231447

NOTICE INVITING EXPRESSION OF INTEREST


CBMC/62(T)/I-794 Dated: 03/02/2017

Expression of Interest (EoI) invited for Pre-drainage of Methane within Moonidih


mine in Jharia coalfield under Bharat Coking Coal Limited (BCCL), Dhanbad
(Jharkhand) India

1. Background
Coal India Ltd. (CIL) is a Maharatna Company and is the single largest coal
producing company in the world with present level of production of about
538.75 million tonnes in 2015-16. Its gross revenue is about INR 837.38 Billion
(USD 12.5 Billion) in 2015-16. In line with international development and
realizing the needs for climate change mitigation for which reducing global
warming, management and development of coal based nonconventional
energy resources i.e; Coalbed Methane (CBM), Coal Mine Methane (CMM) etc.
are also in priority by CIL in its command area.

Central Mine Planning and Design Institute Ltd (CMPDI) is a subsidiary of Coal
India Limited (CIL) and located at Ranchi, Jharkhand which provides
consultancy in the area of mineral exploration, mining, engineering,
environment, coal preparation, geo-matics, CBM/CMM related services.
Regional Institutes of CMPDI are situated at Asansol, Dhanbad, Ranchi,
Nagpur, Bilaspur, Singrauli and Bhubaneswar which is providing services to
respective coal producing subsidiaries of CIL.

Bharat Coking Coal Limited (BCCL), is a coal producing subsidiary of Coal


India Limited (CIL) and located at Dhanbad, Jharkhand. Its meets almost 50%
of the total prime coking coal requirement of the integrated steel sector.
Moonidih UG Project: Coal mining operations in Moonidih UG Project, Jharia
coalfield is very old where XVIII, XVIIT, XVIIB, XVIT and XVIComb. seams have
extensively worked out and presently Seam XVIT is under mining. Project was
designed in early 1960s for horizon mining system through Longwall Mining
operation to produce coking coal from seams XVIII to XV upto a depth of 500m
for a production capacity of 2.1MTY. Most of the coal seams are gassy seams.
Seam XVI Top (D Panels) are being worked in Moonidih UG Project and for
the purpose Longwall equipment has been installed. Also below seams XVTop
&XV Bot. are also proposed to be worked. In the Moonidih mine, seam XVIT
balance reserves is about 15 million tonne in which and about 6 - 7 MT is likely
to be mined as planned.

Pre-drainage of Methane
Methane gas blowers have been encountered at various places while working
in XVIII, XVIIT, XVIIB, XVIT and XVIComb. Seams. Even when air is sufficient,
the problem in ventilation is due to (i) rise in temperature and humidity (in rainy
season particularly) and (ii) emission of methane in large quantity. The gas
content of seam XVIT is about 8-10 m3/tonne whereas in bottom seam XV
Seam is about 15m3/tonne. BCCL intend to go for pre-drainage of methane for
safe and successful operation of Longwall operations at Moonidih.

2. Invitation of Expression of Interest:


Bharat Coking Coal Limited (BCCL) intends for Pre-drainage of Methane within
Moonidih mine in Jharia coalfield at Dhanbad (Jharkhand) India. On behalf of
BCCL, CMPDI intends to go for global tendering process for which Expression
of Interest (EoI) is invited from financially sound reputed company from India
and abroad having good experiences to undertake such job on priority. The
work is critical in nature and is to be completed in a time bound manner.

3. Eligibility Criteria:
Firm/Organization having necessary domain knowledge (both technical and
functional) and experience of successfully executing pre-drainage of methane
and its utilization shall be considered for evaluation.
Firm/organization from India and abroad may be a sole firm/organization or an
associate (consortium) having state-of-art competency from concept to
commissioning with wide experience in pre-drainage of methane and/or
Coalbed Methane (CBM) or Coal Mine Methane (CMM) recovery in effective
manner and its commercial utilization.

Firm/organization from India and abroad having wide experience in pre-


drainage of gas from active coal mines with a proven credibility and reliability
will be preferred who are currently engaged for pre-drainage of large Longwall
operations using established drilling methodologies.

It is desirable that firm/organization should have at least 10 years experience


in gas drainage from active coal mining areas and having in-house capabilities
of drilling for (i) Underground In Seam Drilling (UIS); (ii) Surface to In Seam
Drilling (SIS) with horizontal wells; (iii) Goaf Drilling; and or combinations of
these methods; and competency for resource estimation in distressed
condition, reservoir modelling and related activities for recovery and end use
utilization.

4. Scope of Work
4.1 Pre-drainage of Methane within Moonidih mine in Jharia coalfield by the
most appropriate/suitable technology which have to be carried out by the
financial sound Firm/organization from India or Abroad having sufficient
experience and equipment for execution of job.

4.2 Extraction of Methane gas through pre-drainage from working or to be


worked out coal seams i.e; Seam XVIT.

Annexures with respect to Moonidih project given as (I) Schematic Map of


Jharia coalfield, (II) Block Location Map for Moonidih block, (III) Schematic
geological Log Section, Moonidih block, Jharia Cf, (IV) Coal Seams Sequence
and Parting Range, (V) Working Plan of Seam XVI, and (VI) Nature of
immediate roof and floor rocks of different Seams.

The job will be executed on concept to commissioning basis to recover or


produce gas from coal seams on turn key basis i.e. Built Own Operate model
or other applicable model which may include following:
Technical Assessment and Resource evaluation and
feasibility through study Reservoir modelling and envisaged
production forecasts,
Economic assessment and Economic assessment and
feasibility Market survey
Field operations Drilling & completion of wells as per
global best practices for pre-mine
methane drainage,
Production operations
Use(s) As per defined end use

5. Deliverables
Effective pre-drainage of methane resulting in smooth mining operations and
utilization of drained/captured CMM in an economic manner subject to
applicable legislation and guidelines in this regard including but not limited to
gas utilization policy.

6. CMPDI/BCCLs responsibility
All the necessary inputs such as Geologic information, mining status, data on
gassiness on seams, ventilation data or any other data of relevance will be
provided. The company shall make best efforts to provide existing
infrastructure facilities to the extent possible.

7. Formulation of Tender Specific Document (TSD)


Based on the above consideration and information /documents submitted by
the respondents to this EoI, a bidders meet will be convened to discuss and
define the terms and conditions suitable for formulation of Notice Inviting
Tender (NIT)/ Tender Specification Document (TSD). Subsequently, Notice
Inviting Tender (NIT)/ Tender Specification Document (TSD) will be finalized
and floated for global e-tendering to select suitable financially sound
experienced Firm/organization for Pre-drainage of Methane within
Moonidih mine in Jharia coalfield under Bharat Coking Coal Limited
(BCCL), Dhanbad (Jharkhand) India.

CMPDI reserves the right to (a) accept or reject any/all EoI submitted by
potential bidders, (b) cancel the process at any time without any liability and
assigning any reason thereof.
8. Submission of Expression of Interest (EoI):
CMPDI looks forward to receive response in this regard. Interested parties
please submit their Expression of Interest (EoI) along with supporting
information/document by hard copy in duplicate in a sealed envelope super-
scribing Expression of Interest for Pre-drainage of Methane within
Moonidih mine in Jharia coalfield under Bharat Coking Coal Limited
(BCCL), Dhanbad (Jharkhand) India. EoI should be submitted with covering
along with organization brief duly signed and submitted in compatible electronic
version also preferably in Pen drive/ CD/ DVD. EoI may be submitted by e-
mail also by due date, but it must be followed by duly signed hard copy along
with compatible electronic version preferably in Pen drive/ CD/ DVD.

Offers must be submitted latest by 15.00 Hrs. (IST) on or before 10th


March,2017 at the following address:

General Manager (CBM), CBM Cell, Central Mine Planning & Design
Institute Ltd (CMPDI), Gondwana Place, Kanke Road, Ranchi-834031,
Jharkhand, India. E-mail: hodcbm.cmpdi@coalindia.in Tel: +91-651-
2230011 Fax: +91-651-223-3314/223-1447.
ANNEXURES
LB-3
RL- 181.81

LB-2
RL- 187.00
N
NCCJ-28
KP-13 F14 RL- 180.48
RL- 179.72

NCCJ-6 90 m.
F4 LB-1
1 RL-174.98
F6
NCCJ-5 RL- 196.66
P
O

NALA
5 m. RL- 195.33
ANNEXURE-II

IA
F14 O

AN
T

R
NCCJ-19

JARI
F9 F6 F
MNN-6 LB-4
RL-183.16
RL- 198.18
K

U
RL- 197.87
F4
E
P NCCJ-8 E
A RL- 196.12
NCCJ-13 5 m.
RL- 175.94
B
K

KEND
WADIH U
MNN-3
RL- 190.39
MN-2
RL- 195.97 TO F1 L
JK-1
NCCJ-21
NCCJ-18 L
RL-173.70
RL- 189.19
NCCJ-1
RL- 197.58
NCCJ-3
RL- 196.23
F2 IA L E G E N D :-
TO MAHUDA
RL- 186.61
R
F6
NCCJ-23
NCCJ-29
RL- 194.83
40m.
Y
.
RL- 190.26 10 m NCCJ - 1 BOREHOLE
NCCJ-22 P
RL- 173.55 F1 F
5 R
NCJA-21 MNN-4 MNN-1 PGB-10 O RL - 186.61 REDUCED SURFACE LEVEL IN M.
RL-170.27 RL-174.13 RL-177.37
NCCJ-9 NCCJ-11
RL- 196.70
RL- 189.69
J
RL- 189.87
E SHAFT
1 0m
.
C
NCCJ-7 MN-5
RL- 186.90
T MOONIDIH COLLIERY BOUNDARY
RL- 188.70 BG-1
MNN-8 .
RL- 185.55
RL-185.23 20 m CMM BLOCK BOUNDARY
NCCJ-4
RL- 195.85 NCCJ-20
MN-6 RL- 201.33 NCCJ-12

BH
NCCJ-17 RL- 196.67 RL- 193.83 DYKE
RL- 194.30 F7

AG
RIVER WITH DIRECTION OF FLOW
MN-4
RL- 192.95 NCCJ-25

AB
RL- 189.67 POND / TANK
NCCJ-26 F8

AN
MNN-13
RL- 186.16 RAILWAY LINE

2 m.
RL- 193.72

D
.
MN-7 5
m ROAD
MNN-5 NCCJ-2 M
RL- 183.10 OO

CO
RL- 188.94 RL- 191.12 NCCJ-16
AR
NI
DI F2
AG RL- 195.55 H
F2 FAULT WITH THROW IN M.

A
RL 20m.

LL
Y.
N

ST NCCJ-10

I
NY RI

R
NCCJ-15 N.

AR T
RL- 189.04
LOST

G AS

IER
MNN-16 MN-3
NASH RL- 190.09 SETTLEMENTS
CO A

F8 SHAFT-I
SH

RL- 182.78 RL- 184.23


SHAFT-II PBG-7
RL- 184.75 UNDP/GEF - GOI:CBM PROJECT

Y
MNN-2 F7 JK-2
RL- 177.31 RL- 188.42
A A' GEOLOGICAL CROSS-SECTION LINE
MNN-11 F9 NCCJ-2
NCCJ-24
4
RL- 170.14 RL- 186.92
MNN-9 MN-1
RL- 185.39 RL- 196.26
PBG-3
RL- 170.49
NCCJ-27 50 m.
RL- 193.23

F3
NCCJ-14
MNN-10 RL- 185.02
RL- 182.24
MNN-14
RL- 197.99

MNN-7 JBK-5
SI RL- 188.53 NCJJ-3 RL- 171.67
A'

RL- 183.93
NG MGE-1
MNN-12 RL- 186.39 0 m.
RA RL- 183.09
19 EK-19
MND-4 40 m
. RL- 172.29
MNN-15 RL- 176.10
RL- 186.05

MND-16 MND-11
RL- 177.61 RL- 171.00
JK-7 F3 EK-17
MND-1 RL- 165.00
RL- 183.00 RL- 170.67
MNN-17
RL- 177.06 F 3a
JBK-4
MND-6 NCCJ-30 RL- 165.15 EK-18
CBM-4 RL- 186.82
K

RL- RL- 178.88 F 3b RL- 161.82


MND-9
A

NCJJ-5
T

RL- 166.80
C RL- 176.65
R

CO .P.P MND-2
I

CA LO . CBM-3 RL- 171.37


PO PTIV
NY RL- NCJJ-4
RL- 164.17
PL WER E
NA

AN
T
UNDP/ GEF - GoI:CBM PROJE
CT TISC
DI

NCJJ-1
RL-171.75
MND-14
RL- 168.45 O
CBM-10
RL- MND-5 MND-3 NCJJ-2
RL- 168.05 RL- 177.90 RL-167.76
PROJECT
D LON
CO

.M Y

MND-12
CPP RL- RL- 161.08 MOONIDIH PROJECT
ASH
POND
MND-13
RL- 171.52 SUBJECT
MND-10 PLATE N0. :- I
MND-8 RL- 173.74 GEOLOGICAL 80 0 80 160 240 320 m.
MND-19 RL- 163.32
RL-162.65 NCJJ-6 PLAN SCALE
RL-156.14 SHAKIL AHMAD
DRAWN BY :- CHEIF D/MAN
PREPARED BY :- T P S INGH
NCJJ-7 F2 DY. C.G.
RL- 165.34 CHECKED BY :- J K SINGH
MND-7 MND-17 DY. C.G

RL- 163.59 RL- 166.02 APPROVED BY :- B N PRASAD


(HOD) CBM CELL
ANNEXURE III

SCHEMATIC GEOLOGICAL LOG SECTION


MOONIDIH CMM BLOCK, JHARIA COALFIELD
COAL SEAM
FORMATION/ LOG THICKNESS PARTING
SEAM NAME RANGE (m) RANGE (m)
ALLUVIUM/SOIL 4.50-12.00
INTRUSIVES

BARREN MEASURES Up to 270 (+)


BARAKAR
XVIII 1.25-6.10
32-60
XVII TOP Up to 2.65 14-40
XVII BOTTOM 0.25-2.05

96-125
XVI COMBINED 4.15-6.31
(Splits in XVI Top & Bottom)
87-128
XV COMBINED 5.99-9.25
(Splits in XV Top & Bottom)
37-73
XIV J + MP J + MP
4.25-12.04
3-18
XIII 1.90-8.69
10-25
XII 3.43-5.59
6-24
XI 1.59-6.19
18-60
X 2.44-4.41
2-68
IX 2.51-4.12
62-69
VIIIC 2.56-2.71
4-5
VIIIB 1.85-2.64
8-10
VIIIA 0.71-1.52 18-55
4.75 - 7.96 58-105 From IX
VIII 8*-26*
V/VI/VII 32.91*- 37.56*
2*-8*
IV 5.66*-10.62*
9*-51*
III 5.76*-11.82*
II 9*-31*
1.65*-7.38* 15*-20*
I J + MP J + MP
7.63*-10.67*
(Splits in ITop,Mid.&Bot)
TALCHIR T T T T -
METAMORPHICS + + + + + -
(Scale :- Schematic)
* - Data considered from adjacent block
ANNEXURE - IV

Sequence of Coal Seams & Parting in Moonidih Block


Coal Seams & Thickness Range (m)
Parting
Minimum Maximum
XVIII 1.25 6.10
P 32 60
XVII TOP UP TO 2.65
P 14 40
XVII BOT 0.25 2.05
P (XVII BOT TO XVI
COMB) 96 101
P (XVII BOT TO XVI
TOP) 74 125
XVI COMB 4.15 6.31
XVI TOP 1.52 8.53
P UP TO 28
XVI BOT 0.58 4.40
P (XVI COMB TO
XV COMB) 89 104
P (XVI COMB TO
XV TOP) 106 126
P (XVI BOT TO XV
TOP) 89 125
P (XVI BOT TO XV
TOP) 87 128
XV COMB 5.15 10.77
XV TOP 1.53 4.16
P UP TO 12.12
XV BOT 1.65 6.15
P 37 73
XIV 4.25 11.35
P 3 18
XIII 1.90 8.69
P 10 25
XII 3.43 5.59
P 6 24
XI 1.59 6.19
P 18 60
X 2.44 4.41
P 2 68
IX 2.51 4.12
P 62 69
VIII C 2.56 2.71
P UP TO 4.5
VIII B 1.85 2.64
ANNEXURE - IV

Coal Seams & Thickness Range (m)


Parting
Minimum Maximum
P 8 10
VIII A 0.71 1.52
P (FROM VIII A) 18 55
P (FROM IX) 58 105
VIII 4.75 8.21
P 9 11
V/VI/VII UP TO 32.91
P 8
IV 10.62
P 53
III 11.82
P 7 31
II 2.67 6.40
82800

82800

83200

83600

84000

84400

84800

85200

85600

86000

86400

86800

87200

87600

88800
104000 104000

ANNEXURE-V

F19

F19
103600 103600

NN
AL
A LB-2 LO N
JA
RIA
MIN
EB
OU
RL 187.0
YA
BA
N DA
F4 RY

ST
NCCJ-28
RL 180.48
D

R
40m

KE
NCCJ-6
RL 174.98
CO
LL

IP
F4 LB-1

LI
D
RL 196.66

N
IE

LL

E
NCCJ-5
8
RY
103200 F6 RL 195.53 103200

FU
P.B IN
F1 PR 1
OJ
EC
T
LB-4
NCCJ-19
30m
MOONIDIH SECTOR RL 197.17
MNN-6 RL 189.18
RL 183.16 -118.80

-112
.08
NBAD
TO DHA
NCCJ-8
A RL 196.42 -104.5
0

AL NH-32
NN
RIA -117.38
72
JA -117.128
-100. 50m
102800 102800
89 -129.10
-153.

4
NCCJ-13 -114.70

1 in
-132.40
.35
RL 175.94 .824
NCCJ-18 -92

-154 -129.85
27
RL 197.58
-109.

MN-2 -127.67

3
.50

.00
MNN-3 -154
RL 195.97 -10

-86
882
-104. 4.13
-114.30
RL 190.8910m -172.82

F1
43
-10
9 15 -13 8.43

-90.
-173.70 -169.88 -154.9 5.8

PIT
0 -11
2.41 NCCJ-3

LE
9 D- STA -13 3
5 PA -102.24 -115.3

AP
-172.119 .985

1.39
-169.63 2.7
NE -154 PLE 5 RL 196.23

ST
-15 18 ML

-10
PIT -11

0
28 1.5

.19
L 38 27 7.92 -III

-86
25
-173.069 7 XV /2

8.3
-175 I (T) PA

-11

3
NCCJ-21 SE NEL

3.0
F2

F5
77
.978 -173.053

37
-13

5
1 in 4

9
-10
9.8
-170.734 -15

3.2
AM

9.4
1 in
-17 6.3
NCCJ-1 2.2

-10

-10
RL 189.19 9.0

-11
34
NCCJ-29

0
9

10
6
8 1

2.8

4.5
-174.106

2
-18

0.6

-12
NH-32

.53

m
RL 186.6

-10
TO MAHUDA 4.8

4
-13

-90
-172.194

78

5.4
98
78
RL-194.89

5
0.7

2.9

-10
-175.058

7
-18

0.7
-15

8
-14
9.3 -10

6.5
-11
57 4.9 6
-176.59 E-4

-10
-176.549 -14 85

5
.83

3
3
XV

9.9
8.9

7.1
28
I (B PANE
2 -90

-12
39 -15
D-1

3.1

-10
-189.815 23
9.12

-12
) SE L

2.0
D- -175.49
F3

F5
F9 7 7P AM

95
.524 40 ML

-14

24
-13

3.9
-189 AN

3.7
-III
PA 1.55

2
XV /1

-12
EL -14

.04

-11
.234 -177.793 24 6 7.6 -10
-16 I (T) PA

-169
NE -190 -13 7 9.2

7
102400 .53 -182.20
NCCJ-23 9.7 NE 102400

4.4
8
1.30 34
SE

3.5
-191 7
AM L

-12
L 6

.43

-13
.852 -176.047 83

39
RL 190.26

.0
-167
-97.7

6.0
-192

-145

24

-12
0

5.7
5
6.2
-13

2.23

-11
-192.131 -17

-17
.901 2.1
8.8 -14

-15
-194 89

86
D-1 F6 0 9.3

45

8.5
0

7.6
NCCJ-11

-12
.942

63
-191.62

-17

3.1
6 -197

6
ML

03
5.7
41
25

-15
-198

6.7

9.3
PA XV -IV/I RL 196.70

.716

-13
-195.07 -17

4
.22

-17

-12
9.80
1.6

-158
I (T) PA

85
-210
NE

18
0

1.9
ML

-15
.10
SE NEL E-1

5.9
-15

-13
-IV

-14
L XV /2 AM 2.9
XV (ML-I

30
45
.32
NCCJ-22 37

-128
9

7.4
I (T) PA
PBG-10

1
6.8
I (B) II/3

-145
9.82
-217

-12
NE

1
-17

.36
4.3
.60 SE -13 SE ) PA
AM L

-16
RL 173.55 RL 189.69

-15
0.6

1
6.5 1
D-1

4
AM NE

in
26 -12
NCCJ-9 6.1 -108.715

0m
9

10
6

8
-23

91

3
-19 L 0.9

6.8
4.5 -13

0.50

5.8
8.6 -15 01

-17
1A 0 7.2

-19
85

5
.52
RL 189.87

-21
-112.54

.64 27
MNN-1 1 0

in

58

12
in -18

166 8.4
29 -111

9
1

7.0
-112.095
PA

1.0
-23 5 5.73

-14
MNN-4

-19
-12

-13
4.8

-23

49
6
-114.03

1
-30
RL 177.37 -24 6.0

0.31

73

7.81
NE 1

2.8
8.1 16

6.8
2.2 -23 50
RL 174.13 2.2

22
68

-21

-17
88 00 6.2

-19
-16

.985
-17
L 0 -17 0.2 -115.70
.45

-30 -23 -19 2.0 3.2

3
27
78

-209

7.42
-24 7.6 8.2 85 -18
-315

9.1 7

7.4
1

0
-25 12

4.5
0.7 80 8 7.8

3.5
19 2.8 8.3

-17
-19
7 1

in

-11
37

BH
-120.22

49
05 -16

-23
-30

1
7.8
-14

4.5
-29

8.3
6.9
9.6

7
8.5

-19
9.2 -120.215

92
-20

1 in
-32 9
6

52

63
56

17
6.0

8.0
2.5 -16 -121.70 4.63
-124.28

9.4
2.9 33
-31

32

7.85
-19

13
68
2 -31 -12
ML -17

-17
92

04
-29

8.6

3.2
-26 -23 -17 -136.033

54
0.7 -199 6.5 -122.27 -124.01

07

0.9
-III

-19
4.0 -23 8.2 2.2

-21

-21
8.5

7.5
02

0.3
8

15
-32 -257.239 XV /4( .026 -124.90

-17
-34 2 8 8.2 88 1 64

75 -19
3.0

-18
7.5 3.0 -26 -23 88 I (B) E-3 -128.19 7.3

8.59
1 -29 -16

85
-21
4 -27 4.5 4.6 1 in -122.79 -12
4.7 -23 -21
SE PA ML 28

1.4
-31 9.4 -25 4.4

-21
-34 92 31 4 4.7 5
8.1
AM NE -II/ 8.5 4

-18
1.4
NCCJ-25

2.2
-35 8.1 -32 2 8.6 38 -129.83
03 -17 XV 7(E -15

.24
2.9 83 L)

.516
-21
3 3.3 62 -131.074

32
6.8

A
7 I (B) -2 -126.23

-293

2.6
-34 43 4
-31 -27
RL 189.67

-197
20 -19 -128.32
8.8
SE PANE

-18
102000 102000

0.8
9 -131.72

3.24
-32 1.3 4.6 -23 2.3
BG-1

-28
1 -17
88 5 35 AM

-21
4.3 5.1 9.9

1.5
-26 -26

-29
-36 69 L)

34

7
-34 -27 5.3 78 -21 -17 1

8
-27 0.9
FRL -281.09

2.2
3.4 8.7 -166.61 -129.99
-31 9.6 1 4.7
RL 165.55

.647
5 8.6 5.2 -132.53

11
36

-13
MN-5

GA
0 -32 2.1 77 0 85 -18 24 7

3.5
-23

-198
5.3 87 -28 -20 4.8 -18 6.2
-34

-30
-27 -26 7.4 4.55 -18 15
87 2.0 32 0.2 -19 -17 -131.53
RL 186.94

.948
8.3 5.7 2.1 4 1.1 -155.62
9 -31 34 -28 0 -25 05 4.5
-32 1

0.0
-304.461 9 -23 0

-199
-37 -34 5.1 2.1 0.4 6.9

-21
45 4.5

-27

-23
6.2 8.6 63 1 12 -26 -133.99
54 -30 56

6.6

4.7
5 -28 5.5 -134.44
4.4 -28 -17

03
3

9
5.6 2

9
-37 -32
NCCJ-7 01 2.8

5.12
9.4

1.0
11 1

0.00
-24

.95
5.3 6.1 -313.18 53 91 -26 in 5.13 -136.45
33

-27

-20
-30 3.0 6.1 35 4 -16

-209
-23

-21
48 23

-22
-19

7.9
8
RL 188.74 5.0 24

19
6.7
-37 -20 6.0 -138.03
-28

4
-34 -32 51

3
7.0 -27 -21 7.3 2

2.19
2.1
NCCJ-12

BA
8.3 6.1 82

DR EL
32
25 -313.65 -27

-23
2.6 -23 7.6 -18

67
91 45 -30 2 -26

6.4

LEV
IFT
-167.60

-20
-37 9.0 -25 78 4.2 03 8.90 -140.7

8.8
7.5
6.1 -28 5.8
NCCJ-4 -18

-21
7.3 01 8.0 -28 8 9.7 86 6

42
-24

-21
29 16 27 0.87
RL 193.89

38
98 -325.999 8.6 33 3.4

3.2
31 -17

-26
86

8.1
-28 07

5.5
64 -23
NCCJ-20

-20

36
0
3.5
RL 195.96

-27
4.9 -24

-21
1
-31in 70 8.7 -18 -19

90
8 D- 7.7

9.7

9
4.92 2 7.62

4.19
5.53
-34 E- 3.3
m -37 -30 -28 XV 8 8 -207
RL 201.33

2
-325.058 -28
MNN-8 8.1 7.1 XV 6 49

-26
7.6 I (T PA .77

-20
9.1

-21
8.8
10 32 61 I (B PA 17

18
95

3.5
2 -26
) SE NE
58

28

-28

-23

64
NE
RL 185.23

-24
14
-37 6.1
9.4

) SE L -23

6.6
L

1.5

8.2
-30 -30 -28 -27 29 099

8.5
7.5
-33

AM 4.1

N
9

-21

5
-330.025 7.1 7.3 4.1 4.3 -23 -179.

IFT
25 -30 -29 AM 1

1 in
-38
-38 -324.87 6 91 7.9 83 0.3 39
MN-6 8.3 1 in -194.233

DR
3.2

-28
8 4

-24
8.6 87 81 -29 64 -26

EL
2.5
7

8.6
-37 4.3 14
0.0
RL XV196.97

LEV
3
-34 -31

0
7.7 -341.22 -329.838 1 11 -27 E- -23 -197.396
NCCJ-16

9
-29
-38 -31 -28

8.6
85 8.9 7.8 -26 8.7 0
8.9 4.45 -201.43

1.1
5.4

D
6 6.6

-19
26 5.8
I (B PA

-24
29 0 0 8.6

-28
7

76
94 29 -210.859
-34 -30
RL 195.55

8.3
-22
) SENEL -23

4.1
-37 9.3 -340.47 8.2 -31 -29

F8
-30 8.8 -24 -15

8
6.8 83 0 6.1 3.3 -28 0.1 -210.94

4.5
9.6 17 8.5

-26
60 04 -27 AM
40 4.0 -186.994
FRL -392.40

-24
-34 -32 71 1 24

in
4.8
3.3

4.5
-38

7.8
-37 -28 6
NCCJ-17 -202.039

7.8

1
9.5
-34 7.9 8.0

01
8.9 -29 79 .052

-22

-20
6.8

in
6.2 -29

-17
51 -211.719

3
19 9.5 38 -31 -22

1
60 -339.72 -31 1.6 49 -29 -26 -182

2.0
5.4 -28

7.8

34
51 8.8

-24
6.5 56 15
5.4 3.6 4.4 -203.88

39

CO
RL 194.02

2.0
-37 0

74
63

45
-30

1.2
-38 94 -31 15 9 0 -24 0.5

-18
6.5m
6.7

-29
8.9 -31

7
9.2 50 -34 -33 0.4 8.5 -23

6.0
59 9.8 1 8.0 11 3
8.0

5
-38 -37 04 54 -28 -27
78

-26
5.0 -38 6.3 3.5 2.1
-34 -31

3.3
-28 6

7
62 7.9 85 43

4.0
101600 -34 2.1 -31 1.6 -28 -29 D- 101600

93
6.8

-24
09 9.4 -33

-23
XV 9

54
34 8.2 81 9.5 18 5.1
2.3

8.5
-38 -37 97
81 50 -31 9 95 I (T PA -28

2
6.5 -31 8.0 3.6
) SE NEL
7.5 -38 -34 -26
8 0.2 49 1 0

-27
99 -34 2.2 -31 -187.226

3
7.4 2 3.6 1.5

6.6
21 -31 -29

1.1
09 9.6 2.7 -28 AM -28 2 -21

-23
9.6 5.1 -26

7
-37 22 19 4.6

-185
-31 6.4 -26
NCCJ-25

55
73 62 3.3

LL
6.8 9.3 7 0

-29
-34 92 43 4.3

46
95 -33 -31 0.6

.167
-34 54 -28

1.9

0.02
9.7 5.5 2.4 22 -21 0.45
-38 9.6 4.4
RL 189.67

52
-37

83
47 8 86 -29 -19

-24
6.4 6.8 57 -31 -31 -31 -28 6.4
6.4 20 -26 -26
20 60 1.7 55
55 2.7 5.0

1
-34 1.0 9.1 7.5

3.18
-34 8 19 05 6 1
2.3 -29 69

F8
-24
9.6 D- -29
-32
-37 84 -31 3.1 -26
6.3 75 -31 XV 10 -28 7.1 -27
0.4

9 MN-4 9.2 I (T PA
3.9 39
7.5 79 3.0 2.4 .687 -26
76

-196
-34 5 34 2 0..8
-30 39 68 -254

IE
9.2 -33 9.7 ) SE NE 59 0
RL 192.95 -31

.767
-38 77 1.1
4.9
AM L
6.3 -37 0 9.1
2 -20

51

53
49 5.5 -34 89 -31 -26
15 -34 0.6 3.2 5.4
7.4 24 -31 -31 85 3.82 2 -212.00

-27
-38 -37 95 9.8 -31 -31
4.9 9.8 -27 -212.00

8.0
4.5

56
08 0.9 -195.92
5.8
1 7 94 08 -26 JK-2

5
-32
86
D-
MNN-13 -291.4 6.6

57
0.5

RY
-34 -212.30
KAPURIA BLOCK

-202
XV 11 44
-38
RL 188.42

84
6.8
6

2
201

4.3 -37 77 I (T PA

.797
7
46 3.4 -34 -32
RL 193.72
-29 -25
08.

) SE NE -32

ST
-32 1.1 2.1
1.0 0.7 F-1
FRL -380.00

-204
65 -34 -31 1.5
17.

1.6 64 0 -27
AM L

AP
22 XV

97
-38 7.1 2.4 04 7
I (C PANE
42 5.2

7.5
ON

.15
-37

LE
2.3 37 9
NCCJ-2 7

-26
4 3.3
AS

) SE L

-29

PI

-204.05
15 -23
D -31

T
2.4
-314.483

-205.09
-37 0.6
-38
XV -12
3.0 58 -32
RL in191.12 AM

3
8.9 -34 62
2.1 -34 5 200

-24
1 7.3 0.5 1

200
7 1.2 9 in -25

16T
1

2.2
82

-206.39
5

3
I (T PA

in
-38 22 -32 8.3

87
-18

to

1
-37 1.9 15 -18 4.7

59
3.8 -32

16B
2.6 4.7

-31
) S NE
1

-208.99
7 -34 0.2 -313.85 -17 97
97
8

2.9
7.6

11
NCCJ-26 -38 8 -29 9.2

1 in

2.0
17

73
07
-38
3.0
EA L 2.7
NCCJ-16

1 in 5
-28

-27
3.0
47 95

100
6.4
RL 184.16 47- -34 -34 -32 0

38
6 -170.60
M

-31
-38
383 -37 -37 8.9 3.3 1.8 -313.843
RL 195.55 8.6

2.1
3.7 6 9.9

1.8
.70 4.2 4.3 62 51 2 -20

-28

36
077 -20

0
2 8
MN-7 -29 4

7.5

m
-41 -34 -314.533 7.1 F-2 8.9

-26
50
-163.14
5.5
S

5
09 -20 6.80

325
4.4
9.5
101200 91
RL 185.10 PA -20
101200
DIAHA

1 in
5

-28
60
-37 NE

52
-38 4.2 -34 -314.903 -28 L

7.9

6
6 3.7
2.3 -31
-31 8.1
F

-28
97 -37 4 5.2 -155.79

-29
7.5 T-I
5.2 12 6
D-1 -44 4.6 9999 -212
NCCJ-10

7.5
9.2 -41 -38 45 .086
-35

54
-45 5 -32
1.3

08
4.2
5 6.3
MNN-5 0.5 -31
-43

1.6
M RL 189.04

4
1.6
64
8 -44 91 00 5.6
NCCJ-15
0.3

01
PA -34 -31

-29
435.6

31
7.8

5
96

RL 188.94 -38 4.8 -26

1.7
-45 8 27 43 -31 3.7 -218

-29
NE 1.4
RL 190.09

-27
6.0 -42 -33 6.2 32 .27

6.9
2 -44 9.0 82 0.8 31
-38

11
L 6.5 6

-30
96 -37
61

-45 2 1.9
-38 -35

8
5.4

5.8
5.7 68
1.9 1.7 -22
7

87
2 -41
-44
F9
-43 4.2 D 68 95 -33 -32 -27
2.2
BM- 190.64 M
4.25

XV -1
7.7 9.2 8.3 -31 6
-42

-45 6.4 0 13 51
85

I (T 3 P
-34 1 6.65
S

33
9.7

5.3 3 -352.02 -346.4

4.7
DIAHA
5 8 2
46

-41 6.43 -31 in

-29
-43

-44 3.4 1

) S AN
3
18

66 0.5
5.8
0.1

-38 -37 -32 -234.05


-45 8 0
F
91

5.0 4.2 7.99 9.1

EA EL 7.5 T-II
10 79 -35 80
3.8 1 in 4
PBG-7
-42

-45 -41 37 -33 -294.295


8.2
9.6

4.8 2.7
-42
M -366.369 -34 72 -33
39

1 39

-31
9.8 5.5 1.5 -31
M RL 164.76

8.1
49 -38 -36 22 17
-45 -37 8.6

52
4.5 6.8 4.8 37 -295.16
56 7.0 94
2 8 -34 -34
-42

-41 -31 6.8 0.2


-45 F-3
9.8

-42 52
4.3 -44 9.0
5.7 -38 -381.35 176
MN-3
03
XV
-33
JK-2
6

8 9.8 1 -36 -35 A 6.2 -301.957


22 5.1 25
2 39 -37 5.3 5.2 -34 I (C PA 24
-44
4.8 8.2
46
10 0
RL
F-3
XV 184.24
1.0 ) SE NE -318.03
RL 188.42
5

76 B 62 L
6.7

62 -43 -41 -36


-45 4.3 I (C PA AM
-43

1.0 4.9 -390.283 -310.41


3.9 4 -43
0.9 12 06 ) SE NE -34
8.6
-34
4.2
SH
05 L AF
19

-41 18 72
AM T PIL
MNN-16 -45
2.4
-44
3.7 -44 -42
2
-43
3.3
88
-38
-37
-36
4.7 -34
-33
8.32
-317.745 LA
79 70 3.7 9.4 1.7 8.7 57 R
RL 182.78 -45
12 89 3
-43
-41
4.7
5.2
92
28
-35 -35
3.1
6.6
56
-44 D- -43 20 -41 9.0 -34
2.9 1.2 -38 -37 0 86 -320.00
34 4.9 14 69 1.1 5.5 -400.80 -36 7.1
81 89 22 4.4 7.7 98 -33
(B 4.0
100800 -45
3.0 -44
) PA
-43
-41 MNN-2 20 75 8
F-4
88 -35
3.9
-34
7.6
7.5
85 100800
25 NE 5.5 XV -36
-45
5.4
84 L
1.3
09
-43
1.3
29
96 RL 177.31 -40
-38
I (C PANE
-36
6.2
27
2.3
16
13
-35
75
-336.92 -328.54
3.6 1.2 ) SE L
24

-42 6 7.2 3.8 -34 -311.42


D-1 22 -44
5.9 -43
4.4
32
-41
-40
15 -37
9.0 AM -36 -36
3.1
49 7.1
0.0
NCCJ-24
13

-45 45 8.8 18 -332.83


-45 39 1.0 67 1.4 8 18 -321.398
4.7
5 03 5.1
44
19 9 -37 -36 -36
12
-345.69
PA -44
6.2
07 -43 -43
-40
9.6
-40
1.8
-38
7.5
9.9
85 9.4
51
3.4
47 11 RL 186.92
25

42 -321.317
-477.810 NE -45
5.7
76
-44
6.2
56
3.8
42
0.6
14
-42
2.2
92 -42
7
XV
F-5
45
-36
9.1
-352.148
22m
L -45
5.3 33
-43
1.1
2.1
57
-41
0.4
57
I (C PANE
) SE L
-38
8.4 -38
3
16
-351.96
82
17

01 24 -40 3.06 -36 15 -36


-45 -44 -42
-477.620 5.25 5.5 2.0 AM 9.1 2.5
-485.98 2.2 -41 7 5
44 51 1.3 06
5

-43 -352.867
6.7

-45 2.0 -42 77 -33


-36
22
-44

5.6 24 3.38 -41 -39 8.3 -36


-44 0.9 98 2.3
0 -45 5.6 1.5 9.0 0
-485.534 4.7 77 14 86
-478.210 65 -43 -42
34
5

-359.70
78 3.4 -40
MN-1
1.1

MNN-11 -46
2.9
-43 61 F-6 -41 2.7
-45

-45 94 XV 0.4 17
-45
I PANE 32
-485.580 3.0 9.1 2.9 21

RL 170.14
2 15 5.2
2 -44
24 -42
3.82 (C -40
23
-38 -359.05 RL 196.26
-478.580 -46
2.7 -45 -45
6.6
7.90
5 -43
MNN-9 1
) SE L
AM
-41
1.19
2
5.4
21
5.8
04
-36
8.5
35
-485.206 26 9.2 45 3.5 67
RL 185.39
27

-46 81 29 -42 -40 -358.81


2.2 3.7 -41 7.0 -37
-478.170 28 46 3.29 57 -370.50
-44 -43 6.1
36

3.6 7 23
-485.03 -46 8.4 -44 -359.35
4.1 83 8.9 34 -41 -374.159
-42 -40
-485.76 27 70 -43 5.1 5.8 8.2 -368.202 -361.86
-479.750 -45 -45 4.5 26 07 47
-46 7.3 7.4 D- 69 26
75 60 14 -38
-485.78 5.3 -41 -358.194
08 -44 (A 9.1
6.3 38
) PA
150m
-485.94 8.4 -43 -42
38

-478.790 -472.074 5.9 72 -358.28


09 8.0
8.6

-46 -45 NE 04 72 -41


7.6 -45 -368.966
30

-31

5.4 -44
L 4.6
35 7.6
-40

-501.480 46 9.1 -43 62


40
-484.35 -480.070 94 -42
NCCJ-27
5.7

-46 -46 6.3


-45 9.2
73

74
9.10

5.4 4.3 7.4 01


100400 09 9 55
RL 193.53 100400
-31

-427.26 -367.980
-486.46
31

-45 -44
7.8 9.9 -43 -42 -41
75 50 8.47 9.7 -42
-45 1.3 5.2
9 84 92
-496.082 4.6 32 92
36 -42
-45 8.1
9.3 -43 69
09 8.44 -363.499
NCCJ-14
.58

-45 -43
9.7 9 3.4
318

6 2
-43
-46
0.1
29 7.0
68
RL 185.02
20 -45
2.1
-46
1.30 -46 48
318
.301
MNN-14 JBK-5
MNN-10 -46
0.73
1.0
6
-45
RL 197.99 RL 171.87
1.99
RL 182.24 9
-46
0.1
99

NCJJ-3
RL 184.99
KA MNN-7
TR
IR RL 188.53
IVE
R
100000 MGE-1 100000
RL 186.39
N.Dr
MNN-12
RL 183.09 MND-4
RL 176.10

MNN-15 MND-16
RL 177.61 MND-11 m
RL 186.05 RL 177.10 m 15
30

F3
JK-7
MND-1 RL 170.67
RL 183.00

99600 99600

a
F3
JBK-4
RL 165.15
MNN-17
RL 177.06

b
F3
CBM-4 NCJJ-30 MND-9 NCJJ-5
MND-6 RL 188.10 10m RL 166.80 RL 176.45
RL 178.88 N.Dr
MND-2

KARI JORE
RL 171.37
NCJJ-4

m
RL 164.17

15
99200 99200
CBM-3

TISCO
MND-14
RL 168.45

NCJJ-1
RL 172.68
NCJJ-2 6m
MND-3
RL 168.85
RL 177.90
MND-5
RL 168.05
MND-12
RL 161.01
CBM-10
98800 98800

MND-13
RL 171.52

MND-10
RL 173.74
INDEX NCJJ-6
MND-8
RL 156.54
RL 163.32
MND-19
RL 162.65
F2

98400 WORKINGS OF XVI-TOP SECTION NCJJ-7 98400


RL 169.34
MND-17
WORKINGS OF XVI-BOT SECTION RL 166.02

MND-7
500 M Hz RL 163.59
KATR

BORE HOLE
MND-15
I RIVE

ROADS JK-4
RL 160.24
RL 148.61
RIVER / NALA
R

DYKE DAMODAR RIVER


98000 98000
FAULTS
MND-18
BLOCK BOUNDARY RL 153.90

SECTOR BOUNDARY

SHAFT PILLAR

BARRIER

97600 97600

PARBATPUR BLOCK
All dimensions are in meters.

97200 97200

96800 96800
82400

82800

83200

83600

84000

84400

84800

85200

85600

86000

86400

86800

87200

87600

88800
ANNEXURE - VI

NATURE OF IMMEDIATE ROOF AND FLOOR ROCKS OF COAL SEAMS AT


MOONIDIH MINE, JHARIA COALFIELD, DHANBAD
Seam Roof Rock Floor Rock Depth Range
(meter)
XVIII Generally intercalation of Generally intercalation of 80-590
shale and sandstone but at shale and sandstone but at
places carbonaceous shale. places varies to shale and
carbonaceous shale.
XVII Top Interclation of shale and Intercalation of shale and 120-640
sandstone. sandstone.
XVII Bot Intercalation of shale and Intercalation of shale and 140-650
sandstone. sandstone.
XVI Top Generally intercalation of Generally intercalation of 230-780
shale and sandstone but at shale and sandstone but at
few places carbonaceous few places carbon
shale.
XVI Bot Generally sandstone but at Genrally intercalation of 240-790
few places intercalation of Shale and sandstone but
shale and sandstone. at places varies to
sandstone.
XV Top Generally carbonaceous Generally standstone but 310-900
shale to shale but few places varies to alternating shale
alternating shale and and sandstone and at few
sandstone places carbonaceous
shale or shale.
XV Bot Generally sandstone but Generally intercalation of 320-910
varies to alternating shale shale and sandstone but
and stone varies to sandstone.

Anda mungkin juga menyukai