PEMILIK KONSULTAN PROYEK KONTRAKTOR

PEMBANGUNAN TOL BATANG -


SEMARANG
PEKERJAAN : SUMMARY TANAH
PT. WASKITA KARYA

RECAPITULATION OF FIELD DENSITY TEST

( Methode Sand Cone )

PACKAGE : Pembangunan Jalan Tol Batang - Semarang Seksi 3 ( Sta. 414 + 300 s.d 425 + 300 )
CONTRACTOR : PT. Waskita Karya ( Persero ) Tbk.
CONSULTAN : PT. Virama Karya.
MATERIAL : BORROW ex Sta. 406+700
MONTH : DESEMBER - JANUARI
LOCATION : MAIN ROAD

Max Dry Optimum Dry


Water Density
Density Moisture Density Spec.
No. TGL. TES Layer/lokasi Sta.
(d max) Content Content ( Field ) Field
( Gr / Cm3 ) (%) (%) ( Gr / Cm3 ) (%) (%)
1 29 - 12 - 2016 layer 2 416+050 LT 1,330 33,80 31,00 1,300 97,73 95,0
2 layer 2 416+050 RT 1,330 33,80 32,00 1,288 96,83 95,0
3 layer 2 416+100 LT 1,330 33,80 32,00 1,296 97,45 95,0
4 layer 2 416+100 RT 1,330 33,80 32,00 1,301 97,84 95,0
5 10 - 01 - 2017 layer 3 416+050 LT 1,330 33,80 32,00 1,280 96,25 95,0
6 layer 3 416+050 RT 1,330 33,80 32,00 1,294 97,29 95,0
7 layer 3 416+100 LT 1,330 33,80 31,00 1,296 97,41 95,0
8 layer 3 416+100 RT 1,330 33,80 33,00 1,308 98,34 95,0

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


PT. Jasamarga Semarang - Batang Konsultan Kontractor
PT. Virama Karya PT.Waskita Karya ( Persero ) Tbk
PEMILIK KONSULTAN PROYEK KONTRAKTOR
PEMBANGUNAN TOL BATANG -
SEMARANG
PEKERJAAN : SUMMARY TANAH
PT. WASKITA KARYA

2,000

1,500

1,000
1 2 3 4 5 6 7 8

39,00

36,00

33,00

30,00
1 2 3 4 5 6 7 8

105,00

100,00

95,00

90,00
1 2 3 4 5 6 7 8