(1)SCOPE OF WORKS.
(b)On completion of the hacking works, the surface of the raw concrete
had been steel brushed clean including de-rusting for the removal of
the loosed rust pattern for the steel reinforcement bars were inspected
and uprooted de-rusted to equitable cleanliness.
(c) Thereafter the surface of the treated concrete area were applied
QUICSEAL 514H with the scope of remedial works to be carried out
with QUICSEAL 514H application all in accordance with the
specification and methodology of application following the
manufacturers recommendation.
(d) The surface of the underside of the completed / treated concrete was
painted accordingly.
(e) The balance of the formwork installation was removed and the
surrounding area was cleaned and the repair works as completed
accordingly.
(2)CONCLUSION
The final inspection as carried out on the 10 th January 2017 indicate the works as
completed was satisfactory and the overall strength of the affected concrete slab is
maintained to support the load imposed as designed and catered for.
INTER-PROJECT CONSORTIUM
ENGINEERS INDUSTRIAL & DEVELOPMENT CONSULTANTS
300 TANJONG KATONG ROAD #05-15, SINGAPORE 437083
TEL: 67486896 FAX: 67439554 Email: interproject68@gmail.com
PHOTOS AS TAKEN :
10 JANUARY 2017
INTER-PROJECT CONSORTIUM
ENGINEERS INDUSTRIAL & DEVELOPMENT CONSULTANTS
300 TANJONG KATONG ROAD #05-15, SINGAPORE 437083
TEL: 67486896 FAX: 67439554 Email: interproject68@gmail.com
REPAIR MATERIALS
QUICSEAL 514H
APPLICATION
PROPOSED REMEDIAL WORKS TO REPAIR ALL AFFECTED
AREAS OF THE UNDERSIDE OF THE CONCRETE SLAB
EXPOSING THE RUSTED REINFORCED CONCRETE BARS OF
THE UNDERSIDE OF THE CAR PARK CONCRETE SLAB AT
LEVEL 1 TO LEVEL 2 OF DRIVEWAY CARPARK ENTRANCE TO
THE ROYAL PLAZA CARPARK
PREPARED BY:
INTER-PROJECT CONSORTIUM
ENGINEERS INDUSTRIAL &
DEVELOPMENT CONSULTANTS
300 TANJONG KATONG ROAD
#05-15, SINGAPORE 437083
TEL: 67486896
FAX: 67439554
Email: interproject68@gmail.com
DATE:
10 JANUARY 2017