UNIVERSIDAD CSAR VALLEJO

ESCUELA PROFESIONAL DE INGENIERA CIVIL

CONCRETO ARMADO II

CLCULO DE LA CAPACIDAD PORTANTE

ENSAYO TRIAXIAL

1 2 3

0.03 kg/cm 0.07 kg/cm 0.14 kg/cm

0.12 kg/cm 0.30 kg/cm

10 11 11

t 1= 0.033 kg/cm t 2= 0.078 kg/cm t 3= 0.157 kg/cm

s1= 0.015 kg/cm s2= 0.041 kg/cm s3= 0.091 kg/cm

ENSAYO s t
1 0.0154 0.0327
2 0.0412 0.0776
3 0.0914 0.1569

GRAFICO
0.170

0.150

0.130

0.110

0.090

0.070
0.150

0.130

0.110

0.090

0.070

0.050

0.030
0.010 0.020 0.030 0.040 0.050 0.060 0.070 0.080 0.090 0.100
0.157 0.033 0.124
tg f1 = = f1 = 58.54
0.091 0.015 0.076

0.157 0.078 0.079


tg f2 = = f2 = 57.68 fP = 58.78
0.091 0.041 0.050

0.078 0.033 0.045


tg f3 = = f3 = 60.11
0.041 0.015 0.026

0.033 = 0.015 tan (60)+ C1 C1 = 0.0073


0.078 = 0.041 tan (60)+ C2 C2 = 0.0096 Cp = 0.00772
0.157 = 0.091 tan (60)+ C3 C3 = 0.0062

DENSIDAD DE CAMPO
1 Lectura Speedy: 2.5
2 Correccin Speedy: 1.025 Lec. Spd. + 0.3481
3 W% 2.91
4 Densidad de arena (gr/cm ): 3
1.41
5 Peso arena + Frasco + Cono (gr) antes: 6800.28
6 Peso arena + Frasco+ Cono (gr) despues: 2390.9
7 Peso arena hoyo + Peso arena cono (gr): 4409.38
8 Peso arena cono (gr): 1722.5
9 Peso de la arena en el hoyo (gr): 2686.88
10 Volumen del hoyo (cm ): 3
1905.6
11 Peso del neto del suelo (gr): 3900.27
12 Peso especifico humedo (gr/cm ): 3
2.05
13 Peso especifico seco (gr/cm ): 3
1.99 MXIMA DENSIDAD
SECA
MAXIMA DENSIDAD SECA (g) = 1.99 gr/cm

CLCULO DE LA CAPACIDAD PORTANTE:

_= 1.3 _++0.4

B= 1.00 m
C= 0.0772 tn/m
Df = 1.60 m
q= 3.18

f Nc Nq Ng
67
50.00 347.50 415.14 1072.80
68

sp = 2209.368 sin factor de seguridad F= 3

sp = 736.46 tn/m 10000


1000
sp = 73.65 kg/cm 736456.07
3

0.65 kg/cm

0.157 kg/cm

0.091 kg/cm
MXIMA DENSIDAD
SECA
UNIVERSIDAD CSAR VALLEJO
ESCUELA PROFESIONAL DE INGENIERA CIVIL

CONCRETO ARMADO II

CLCULO DE LA CAPACIDAD PORTANTE

DATOS DE ENSAYO: "CORTE DIRECTO"


CAJA:
ENSAYO F. NORMAL (N) F. CORTE (N)
1 44.145 102.416
2 88.29 141.264
25 mm
3 215.82 215.428 ###
4 431.64 409.666 60 mm

MOLDE METLICO A= 36.00 cm


Peso del molde 2572.00 gr

ENSAYO N T s t 88.29 114.639


282.528 197.061
1 4.50 10.44 0.125 0.290 CAJA: 6 mm x 6 mm 423.792 247.098
2 9.00 14.40 0.250 0.400 AREA = 36.00 mm2
3 22.00 21.96 0.611 0.610
4 44.00 41.76 1.222 1.160

0.61 - 0.29 0.32


tg f1 = = .------->> f1 = 33.36
0.61 - 0.13 0.49

0.61 - 0.40 0.21


tg f2 = = .------->> f2 = 30.18
tg f2 = = .------->> f2 = 30.18
0.61 - 0.25 0.36

PROMEDIO: fP = 34.96
0.40 - 0.29 0.11
tg f3 = = .------->> f3 = 41.35
0.25 - 0.13 0.13

tg f4 = .------->> f4 = 0.00

tg f5 =

0.290 = 0.125 tan (36)+ C1 .----->> C1 = 0.203


0.400 = 0.250 tan (36)+ C2 .----->> C2 = 0.225
0.610 = 0.611 tan (36)+ C3 .----->> C3 = 0.183
1.160 = 1.222 tan (36)+ C4 .----->> C4 = 1.160

Volumen proctor estandar: V= 943.4 cm3 HUMEDAD vs DENSID


Volumen proctor modificado V = 2124.040 cm3 1.770
1.765
1.760
Restamos el peso del molde: P= 1701.7 gr 1.755
1.750
1.745
ENSAYO 1 2 3 4 1.740
1.735
S. hum. 1688.2 1735 1865.6 1897 1.730
gh 1.79 1.84 1.98 2.01 w% gd 1.725
1.720
7.5 1.66 1.715
P. agua 3.28 4.19 5.17 6.7 10.0 1.67 1.710
1.705
S. seco 43.68 41.85 42.19 42.26 12.3 1.76 1.700
w% 7.5 10.0 12.3 15.9 15.9 1.74 1.695
1.690
gd 1.66 1.67 1.76 1.74 1.685
1.680
MDS = 1.764 1.675
1.670
1.665
CAPACIDAD PORTANTE B= 1 1.660
q= 3.1752 1.655
1.650
_= _++0.4 C= 2 1.645
1.640
1.635
1.630
g 1.625
1.620
f Nc Nq Ng 1.615
7.0 8.0 9.0 10.0 11.0 12.0 13.0
21.00 18.92 8.26 4.31
34.96 37.77 21.24 15.20
22.00 20.27 9.19 5.09

sp = 176.376 sin factor de seguridad f= 3


sp = 58.7921 tn/m2

sp = 5.87921 kg/cm2

10000
1000
58792
9.00 11.69
28.80 20.09
43.20 25.19

GRAFICA: s vs t:
as
0.700

0.600

0.500

0.400

0.300

0.200

0.100

0.000
0.000 0.125 0.250 0.375 0.500 0.625 0.750

UMEDAD vs DENSIDAD

0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0


UNIVERSIDAD CSAR VALLEJO
ESCUELA PROFESIONAL DE INGENIERA CIVIL

CONCRETO ARMADO II

CLCULO DE LA CAPACIDAD PORTANTE

Se tiene los resultados de 2 pruebas triaxiales sobre una arcilla saturada que se van a usar como
relleno de una cimentacin:

Esfuerzo desviador:

s3 = 50 KN/m
Ds = 40 KN/m

Esfuerzo de confinamiento:

s3 = 105 KN/m
Ds = 70 KN/m

s1 = 50 + 40 = 90.00

s1 = 105 + 70 = 175

Ecuaciones:

l 90 = 50 *tg( 45 + f/2) + 2C*tg( 45 + f/2) * (-1)


l 175 = 105 *tg( 45 + f/2) + 2C*tg( 45 + f/2)

85 = 55 *tg( 45 + f/2)

1.24 = tg ( 45 + f/2)

51 = (45+ f/2)

f = 12.37

Calculamos "C":

12.37
175 - 105 *tg 45 +
2
C=
12.37
2 *tg 45 +
2

12.727
C=
2.486
C =5.12 KN/m

C =0.52 tn/m
Capacidad portante del suelo:

_= 1.3 _++0.4

B = 1.00 m
C = 0.52 tn/m
Df = 1.65 m
g s = 1.99
q = 3.28

f Nc Nq Ng
12.00 10.76 3.29 0.85
12.37 11.00 3.42 0.92
13.00 11.41 3.63 1.04

sp = 19.410 sin factor de seguridad F= 3

sp = 6.47 tn/m
###
sp = 0.65 kg/cm ###
###
UNIVERSIDAD CSAR VALLEJO
ESCUELA PROFESIONAL DE INGENIERA CIVIL

CONCRETO ARMADO II

DISEO DE UNA LOSA DE CIMENTACION

*SUELO: *CONCRETO A:

Capacidad portante: s p = 0.647 kg/cm2 Fluencia del acero:


Peso del suelo: g sl = 1.9 tn/m3 R. del concreto:
Desplante: Df = 1.65 m Concreto armado:
Sobrecarga: s/c = 0.3 tn/m2 Concreto simple:

COLUMNA: b (cm) t (cm)


Tpica 50 50

A B C

14.5

0.28 m
130 190 160
3

140 175 185


2

8.0

130 150 150


1
2.72 2.285
6.5 6.5
4.00 m 5.00 m 4.00 m

Lmite de propiedad

Eje A-1/A-3 A-2 B-1 B-2 B-3 C-1 C-2 C-3


PD = 70.0 80.0 80.0 95.0 100.0 80.0 100.0 90.0
PL = 60.0 60.0 70.0 80.0 90.0 70.0 85.0 70.0
Pserv. = 130.0 140.0 150.0 175.0 190.0 150.0 185.0 160.0
*COLUMNA MAS CARGADA:

EJE CARGA Pu

PD 1 = 100.0 tn
B-3 190.0
PL 1 = 90.0 tn

Calculo de las excentricidades en "Y-Y":

Carga: 620.00 tn 655.00 tn

0.250 m 3.50 m 3.50 m


7.50 m

1880 Xg = 655 ( 4 ) + 605 ( 7 )

Yg = 3.47 m L= 7.50 m

Calculo de las dimensiones finales de la losa de cimentacin:

Ldisponible = 7.50 m
B= 8.00 m Xg = 4.00 m
Lmaximo = 8.750 m
Y= 4 - 3.5 - 0.03

Y= 0.47 Y' = 0.53

Calculo de las excentricidades en "X-X":

Carga: 400.00 tn 515.00 tn 495.00 tn

0.250 m 4.00 m 5.00 m 4.00 m


13.50 m

1880 Xg = 515 ( 4 ) + 495 ( 9 ) + 470 ( 13 )

Xg = 6.72 m L = 13.50 m
L/2 = 7.25 L= 14.50

Dimensiones finales de la platea:

B= 8.00 m L= 14.50 m

Calculamos la longitud de desarrollo:

f D A 0.20 m
C: 1.91 cm 2.85 cm
Z: 1.27 cm 1.27 cm

1.65 m

ld = 44.17
0.08*db*fy
= 44.17 cm
(^ )

L. desarrollo:
0.004*db*fy = 32.00 cm

20.00 cm = 20.00 cm

Altura total de la losa de cimentacin:

H = +/2+2 _+

H = 55.16 60 cm

Esfuerzo neto del terreno:

_=_______/

snt = 2.25 tn/m2

Verificacin por Punzonamiento: f= 0.75

Elegimos la columna mas cargada para el anlisis: "C-03"

COL-B3 = 50 x 50 PD = 100.0 tn PL =

1.- =0.27(2+4/ ^ _ )(^


)_0

2.- =0.27(2+()/_0 )(^ )_0

3.- =1.06(^ )_0

Donde:

L. mayor col. *Valores de a :


b'a = = 1
L. menor col.

d= peralte efectivo
=__/2
a= 40 a=
d= 51.9 cm

b0 = perimetro del rea crtica

96.54

d/2 25.93
50

Z= 101.87 50
d/2

25.93

25.93 25.93 x= 19.68

b0 = 446.82 cm

=0.27(2+4/ ^ _ )(^
1.- )_0

fVc = 408.03 tn

2.- =0.27(2+()/_0 )(^ )_0

fVc = 451.76 tn

3.- =1.06(^ )_0

fVc = 266.98 tn

=__

* Pu = 293.00 tn

* s u = F.M*sneto

F.M = 1.542

su = 3.477 tn/m2

* A0 = 1.02 x 1.16 = 1.18 m2


Vu = 293.0 - 1.184 x 3.5 = 288.88 tn

Para la verificacin por punzonamiento se debe cumplir que:

f Vc Vu

266.98 tn 288.88 tn RECALCULAR

bo = 2 50 + d + 2 50 + d + 19.68

bo = 4 *d + 239

288.88 = 0.75 1.06 210 4 *d + 239 *d

d= 54.59

H= 54.59 + 7.5 + 0.635

H= 62.725 = 65 cm

Verificacin por Corte: f= 0.65

=0.53(^ )_

1.75
3.5

_=_
2.45

2 + 0.25 + 0.20
wu = 12.2 tn/m 2.45

_=_()
d= 0.55
y= 1.75

Vud = 14.7 tn

=0.53(^ )_

bw = 3.50

fVc = 90.62 tn

Para la verificacin por corte se debe cumplir que:

f Vc Vud

90.62 tn 14.65 tn Ok!!!

Verificacin por Aplastamiento: fcol = 0.85

=_/

293.00 tn
Pu =
0.65

Pu = 450.77

* Para la columna:

_=^

Pncol = 0.85 (210 ) ( 2500 )


1000

Pncol = 446.25 tn recalcular

0.85 210 b
= 451 tn
1000

b= 50.253 50

* Para la zapata:

_=^ (_2/_1
)_1
_=^ (_2/_1
)_1

Pnzap = 0.85 (210 ) ( 2500 ) (2)


1000

Pnzap = 892.5 tn
Diseo por flexin:

direccion X - X

Carga: 400.00 tn 515.00 tn 495.00 tn

R1 R2 R3

0.25 m 4.00 m 5.00 m 4.00 m

Wu = 12.17 tn/m

su = 3.477 B= 3.50 m L = 14.50 m

R1 = 339.87 tn R2 = 540.60 tn R3 = 303.64 tn

Diagrama de momentos obtenidos:

83.29 tn/m 56.18 tn/m

### 113.86 tn/m

Clculo del acero de refuerzo:

_=

_=

Asmin = 0.0033 ( 350 ) ( 55 )

Asmin = 63.69 cm

Nmero de varillas:

Nvarillas = 63.69 cm
= 51 varillas
1.27 cm

Usar: 51 f 1/2"

Verificacin:

amin = 63.7 x 4200


0.85 (210 ) (350)

amin = 4.28 cm

Mumin = 0.9 (64) (4200) ( 54.6 - 4.28 )


1E+05 2.00

Mumin = 126.27 tn/m ok

Separacin entre varillas:

8.00 - 0.15
S= = 0.15 m
51 varillas
direccion Y - Y

Carga: 620.00 tn 655.00 tn

R1 R2

0.25 m 3.50 m 3.50 m

Wu = 15.65 tn/m

su = 3.477 B = 4.50 m L = 8.00 m

R1 = 339.87 tn R2 = 540.60 tn

Diagrama de momentos obtenidos:

83.29 tn/m 56.18 tn/m

### 113.86 tn/m 72.35 tn/m

Clculo del acero de refuerzo:

_=

Asmin = 0.0033 ( 450 ) ( 55 )


Asmin = 81.89 cm

Nmero de varillas:

Nvarillas = 81.89 cm
= 65 varillas
1.27 cm

Usar: 65 f 1/2"

Verificacin:

amin = 81.9 x 4200


0.85 (210 ) (450)

amin = 4.28 cm

Mumin = 0.9 4.28


(82) (4200) ( 54.6 - )
1E+05 2.00

Mumin = 162.34 tn/m ok

Separacin entre varillas:

14.5 - 0.15
S= = 0.22 m
65 varillas
Esquema y distribucin final de refuerzo:

f 1/2" @ 0.15

f 1/2" @ 0.22
LLEJO
RA CIVIL

NTACION

*CONCRETO A:

fy = 4200 kg/cm
2

f'c = 210 kg/cm2


g ca = 2.4 tn/m3
g cs = 2.4 tn/m3

0.72 m
140
0.53 m

3.50 m

155

3.50 m

175

0.47 m
1.50 m
0.47 m

1.50 m
6.5

4.00 m

C-3 D-1 D-2 D-3


90.0 95.0 95.0 80.0
70.0 80.0 60.0 60.0
160.0 175.0 155.0 140.0
605.00 tn

m 0.250 m

470.00 tn

4.00 m 0.250 m
0.20 m

1.65 m
PL = 90.0 tn

30 a= 20
_=_
470.00 tn

R4

4.00 m 0.250 m

14.50 m

R4 = 303.64 tn

56.18 tn/m

72.35 tn/m
605.00 tn

R3

0.25 m

R3 = 303.64 tn

72.35 tn/m
@ 0.22