SUMMARY
Esmat Ali I have 17 years of experience within Oil/Gas & Petrochemical and Power Plants industry as Q.A/Q.C Manager, Plant Inspector,
Q.A./Q.C. Manager API 510 Pressure vessel Inspector, API 570 Piping Inspector, Q.A/Q.C Engineer, Welding Inspector and NDT Inspector for on shore
and offshore production facilities for several petroleum companies and power generation companies including:
Smoha
ALJAZEEL Co. BP (Iraq)
Alexandria
RATBAA CO. - ENI, ZFOD (Iraq)
OBJECTIVE
I have conversant with International codes such as Saudi Aramco Standard , ASME IX/ VIII Div.1/ IIA/ IIC/ I / V,
ASME B31.1/ B31.3/B31.8 B16.5 , AWS D1.1, ASTM, API 570 , API 510 , API650, API 1104, DNV 2000 , etc
- Review the Contractor's look-ahead schedule to assist in the planning of coverage of the work activities
- Attend as an observer both the Contractor's Internal Quality Audit and the closing meeting.
- Interview Contractor's proposed Q.C and NDT candidates and may also disqualify any individual or agency
- Monitor the Contractor training program to ensure that all Contractor and Sub-Contractor personnel are familiar with the project
- Reviewing and Preparation of Inspection and Test Plans (ITP) as per Specification and Client requirements.
- Reviewing and preparing the WPS for SMAW, GTAW, and GMAW, FCAW & SAW process according to
ASME Sec-IX, AWS D1.1 & BS EN 288 Standards for Carbon Steel, Alloy Steel, Stainless Steel and Dissimilar
Page 2 of 8
Material.
- Witnessing and Certifying the Welder Performance Qualifications Test (WPQT). Controlling/monitoring the
material Identification starting from preparation to delivery. Responsible for QC activities of shop floor as well as
- Inspecting the pipe Spools (for C.S, S.S, FRP and GRP) as per the drawing and documented same.
- Monitoring the Backing system for welding consumables and Pre heating and Inter pass temperature of Welds.
- Conducting Visual Inspection on Welds and parent material. Co-ordination with NDE works as per requirements.
- Conducting PT, MT for Surface checks and Sub surface Checks. Conducting Ultrasonic Test for Laminar Check and
- Preparation of Hydro static Test Packages and Pneumatic Test reports. Conducting Vacuum Test for Decks and
documented same.
EMPLOYMENT HISTORY
Pay attention to detail and be capable of recommending and approving repairs as well as
performing visual inspection of completed work.
Study equipment leak regulations applicable to location and industry standard and code.
Drive a vehicle safely in an oil and gas facility and field sites.
Maintain a positive relationship between client, facility and customer; and promote
a positive attitude towards coworkers
1. QA-4 A pipe line extended from Qatif area to Abqaiq area ( approximately 200 KM long)
2. MGS Eastern Region Expansion SRG-2 for sales gas filtration stations. Stations are located at
BARRI Area.
3. SHY-1 A pipe lines Extended from Shedgum area at Arabian gulf to Yanboa at red sea
( approximately 1200 KM long)
4. 4- UBTG-4 A pipe lines Extended from Shedgum area to Barri area.( approximately 200 KM long)
36"" Slug Catcher -Elgamil compressor (pipe spools interconnection). (PETROBEL Co.)
8" Early Production Line (PETROBEL Co. )
MWP5 platform hook up (piping) and firefighting (PETROBEL Co.)
8" pipeline (submarine line and land portion) from Shore to AMER #4 platform. (GPC Co.)
8" riser and AMER #4 hook up. (GPC Co.)
24" pipe line from temsah # 4 platform to temsah #N platform ( PETROBEL Co.)
26" pipe line from Nouras #A platform to subsea PLEM @Barboni platform. (PETROBEL Co.)
Maintenance and construction welding activities for on/off shore facilities
(PETROBEL Co.) including :
- Platform. c. 18? Spools replacement @Badri #C platform.
- Separator #103 mechanical repair @ October complex.
- Vessel #2610 mechanical repair plant.
- Critical path #2 heat ex-changer .set #1 replacement @process.
- Closed drain system replacement @S/Ali plant.
- 18" scaled portion spools replacement @ Badri #c platform.
- Suction of C-oil pump piping @R/Sh plant.
- Separator # A mechanical repair @ Badri #C .platform
Fabrication of Launcher Receiver Pig Trap (GUPCO Co.)for the following projects:
- 20? Trunk line M36-B to shore (MWF)
- 20? Water injection line M36-B to M1-T.
- 8? De-souring Gas P/L M36-1 to M3.
Page 7 of 8
Professional Skills
Ability to deal with all different cultures: Expert
Ability to use PC: Advanced
Ability to Driving in Under Oil & gas restricted rules: Expert
Ability to work in team work: Expert
ability to work under pressure and hard work: Expert
ability to follow safety rules under Oil & Gas regulations: Expert
Languages
Arabic: Native
English: Fluent