DATOS:

CASO: OBRA RITMO NORMAL A.R.A.=A.P.A.

Pb= 43,789.98
Fpb= Apr-15
Po= 42,850.55
Fr= 0.97855 FACTOR D RELACION= Po/Pb= 0.ABCDE EXPRESADO CON 5 DECIMALES

INICIO DE OBRA: AGOSTO


TIEMPO= 3 MESES

AG.
1

S-3
30
VALORIZACIN N 01
Del 01 AL 31 De AGOSTO del 2015

OBRA: UBICACIN:
PROPIETARIO: FECHA:
SUPERVISOR:

ITEM DESCRIPCIN UND. CANT. P. UNIT. PARCIAL IMPORTE


ANTERIOR
CANT. IMPORTE
1.00 CONCRETEO ARMADO
1.01 COLUMNA
1.01.01 CONCRETO FC= 175 KG/CM2 M3 12.00 333.94 4,007.28
1.01.02 ENCOFRA. - DESENCOF. M2 60.00 42.00 2,520.00
1.01.03 ACERO CORRUGADO KG 800.00 4.94 3,952.00 10,479.28
1.02 VIGA
1.02.01 CONCRETO FC= 175 KG/CM2 M3 8.00 305.15 2,441.20
1.02.02 ENCOFRA. - DESENCOF. M2 40.00 46.53 1,861.20
1.02.03 ACERO CORRUGADO KG 500.00 4.94 2,470.00 6,772.40
1.03 LOSA ALIGERADA
1.03.01 CONCRETO FC= 175 KG/CM2 M3 9.00 279.22 2,512.98
1.03.02 ENCOFRA. - DESENCOF. M2 120.00 33.07 3,968.40
1.03.03 ACERO CORRUGADO KG 700.00 4.94 3,458.00
1.03.04 LADRILLO O.15x0.30x0.30 UND 1020.00 2.67 2,723.40 12,662.78
2.00 MUROS
2.01 LADRILLO KK 18 HCO. SOGA M2 30.00 48.84 1,465.20
2.02 LADRILLO KK 18 HCO. CABEZA M2 48.00 76.09 3,652.32 5,117.52
COSTO DIRECTO 35,031.98
GASTOS GENERALES ( 15% ) 5,254.80
UTILIDAD ( 10 % ) 3,503.20
SUBTOTAL 43,789.98
% DE AVANCE 100

A.R.A.=A.PA.

ACUMULADO= ANTERIOR + ACTUAL


SALDO= PRESUPUESTO-ACUMULADO
ACTUAL ACUMULADO SALDO %
CANT. IMPORTE CANT. IMPORTE CANT. IMPORTE AVANCE

12.00 4,007.28
42.00 1,764.00 42.00 1,764.00 18.00 756.00 70.0
800.00 3,952.00 800.00 3,952.00 100.0

8.00 2,441.20
40.00 1,861.20
500.00 2,470.00

9.00 2,512.98
120.00 3,968.40
700.00 3,458.00
1020.00 2,723.40

21.00 1,025.64 21.00 1,025.64 9.00 439.56 70.00


38.40 2,921.86 38.40 2,921.86 9.60 730.46 80.00
9,663.50 9,663.50 25,368.48
1,449.52 1,449.52 3,805.27
966.35 966.35 2,536.85
12,079.37 12,079.37 31,710.61
28% 28% 72%
FORMULA POLINOMICA

OBRA: AMPLIACION
CONTRATISTA: P.B= 43,789.98
ESPECIALIDAD: ESTRUCTURAS FECHA= JULIO
AREA GEOGRAFICA: 02
ABRIL
MONOMIO DESCRIPCION SIMBOLO I.U C.I % Io
1 CEMENTO P.T 1 21 72.93 367.31
PIEDRA CHANCADA CPM 5 0.133 17.29 216.5
MAQUINARIA NACIONAL 48 9.78 354.51
2 LADRILLO ARCILLA 17 11.93 676.62
LA 0.109
ARENA GRUESA 4 88.07 899.62
3 MADERA NACIONAL P/ENCOFRADO 43 0.103 89.32 599.6
DH
HERR. 37 10.68 296.12
4 ACERO CORRUGADO F 3 0.170 100.00 505.2
5 MANO DE OBRA INC. BS J 47 0.285 100.00 523.15
6 G.G.U G.G.U 39 0.200 100.00 411.5
JUL.
Ir K
367.31
219.12 0.133
357.00
670.56 0.109
899.81
608.33 0.104
298.50
458.09 0.154
523.15 0.285
417.07 0.203
0.988
CLCULO DE REINTEGROS Y DEDUCCIONES

OBRA:

SUPERVISOR:

CONTRATISTA:

PRESUPUESTO BASE:

PRESUPUESTO CONTRATADO:

FORMULA POLINOMICA UNICA

A= MONTO DEL ADELANTO DIRECTO (SIN IGV)

C= MONTO CONTRACTUAL (SIN IGV)

K= COEFICIENTE DE REAJUSTE FR= 0.97855


Ka = COEFICIENTE DE REAJUSTE AL MES DEL ADELANTO EN EFECTIVO FECHA:

D = DEDUCCION Ka=

VRC = V x K - A x V / C (K / Ka - 1)

Rprog= Vprog(K-1)
R= V ( K-1) Rreal= Vreal(K-1)
REINTEGROS

N FECHA Vpro Vre K-1 Rprog Rreal Rrecon.


1 AG. 11,820.27 11,820.27 -0.012 -143.56 -143.56 -143.56

DEDUCCIN

N FECHA Vpro Vre K Ka A/C Dprog Dreal Drecon

AMORTIZACIN

N FECHA Vreal % AMORT. DEUDA SALDO


CUADRO RESUMEN DE VALORIZACION N 01
DEL 01 AL 30 DE AGOSTO DEL 2015

OBRA:
SUPERVISOR:
CONTRATISTA:
PRESUPUESTO BASE: 43,789.98
PRESUPUESTO CONTRATADO: 42,850.55

VALORIZACION
MONTO CONTRATADO
DESCRIPCIN
SIN IGV (S/.) ANTERIOR (S/.)

VALORIZACIN (V) 42,850.55 0.00

TOTAL CONTRACTUAL
Avances en porcentaje

REAJUSTES (R) 0.00

DEDUCCIONES (D)
POR ADELANTO EN EFECTIVO
POR ADELANTO PARA MATERIALES

TOTAL DEDUCCIONES

VALORIZACIN BRUTA (VB = V + R - D)

AMORTIZACIONES (A)
AMORTIZACION DEL ADELANTO EN EFECTIVO
AMORTIZACION DEL ADELANTO PARA MATERIALES

TOTAL AMORTIZACIONES (A)

VALORIZACIN NETA (VN = VB - A)

RETENCIONES ( C )
FONDOS DE GARANTIA (5% X VB)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL

MONTO A PAGAR AL CONTRATISTA


EN EFECTIVO (VN-C)
MONTO POR I.G.V. (VN x 0,18)

MONTO TOTAL CON I.G.V.

TOTAL COMPROMISO DE PAGO>>>>>>>>>>>>>>>> S/. 13,778.51


DE VALORIZACION N 01
E AGOSTO DEL 2015

VALORIZACION
% DE AVANCE SALDO POR VALORIZAR
ACTUAL (S/.) ACUMULADO (S/.) ACUMULADO (S/.)

11,820.27 11,820.27 28% 31,030.28

-143.56 -143.56

0.00
0.00

0.00

11,676.71

0.00
0.00

0.00

11,676.71

11,676.71
2,101.81

13,778.51

S/. 13,778.51