SEISMIC ANALYSIS

FRAME A CROSS-SECTION DIRECTION


Description: A Two-Storey BPO Building which is square in plan has a series of special moment
resisting frames around the perimeter of the building. The floor loads and the frame dimensions
are shown in figure. The static seismic analysis was done in order to analyze the effects of
seismic and wind forces to the structure. The computed design stresses, and support reactions
will be used later for the design of structural components of the building. Portal Method was used
by the researchers for the structural analysis of Special Moment Resisting Frame.

Design Criteria:

Importance Factor I
Category III, special occupancy = 2.9
Seismic Zone Factor 2
Zone 4 = 0.40
Structural System Factor Rw
Rw = 10
Soil Profile Factor S = 1.25
CT = C/RW
Computation of Loadings:
Slab = 160 mm. (thickness)
Beam = 300mm x 400mm (base x height)
Column = 600mm x 600mm. (Column Dimension)
Dead Loads per Floor:
Tributary Area = (5m. x 23m.) =115m2

Roof Loading

Slab 0.125m. 0.77 kN/m3 115m2 11.068kN


3
Beam 0.25m 0.4m. 23.54 kN/m 52m 122.408kN
Column 0.25m 0.4m 23.54 kN/m3 45m 105.93kN
2
Ceiling 0.29 kN/m 115m2 33.35kN
Utility 0.04 kN/m2 115m2 4.6kN
2
Finishing 0.77 kN/m 115m2 88.55kN

Total Load 365.906kN


Roof Deck Loading

Slab 0.125m. 23.54 kN/m3 115m2 338.3875kN


Beam 0.25m 0.4m. 23.54 kN/m3 52m 122.408kN
3
Column 0.25m 0.4m 23.54 kN/m 45m 105.93kN
2
Ceiling 0.29 kN/m 115m2 33.35kN
Utility 0.04 kN/m2 115m2 4.6kN
2
Finishing 0.77 kN/m 115m2 88.55kN

Parapet 1.43 kN/m2 115m2 164.45kN


Total
Load 857.6755kN

2nd Floor Loading

Slab 0.125m. 23.54 kN/m3 115m2 338.3875kN


Beam 0.25m 0.4m. 23.54 kN/m3 52m 122.408kN
3
Column 0.25m 0.4m 23.54 kN/m 45m 105.93kN
2
Ceiling 0.29 kN/m 115m2 33.35kN
Utility 0.04 kN/m2 115m2 4.6kN
2
Finishing 0.77 kN/m 115m2 88.55kN
Perimeter
Wall 2.6 kN/m2 115 m2 299kN
2 2
Partition 2.1 kN/m 115 m 241.5kN
Total Load 1233.72 kN

Ground Floor Loading

23.54
Slab 0.125m. kN/m3 115m2 338.3875kN
Beam 0.25m 0.4m. 23.54 kN/m3 52m 122.408kN
3
Column 0.25m 0.4m 23.54 kN/m 45m 105.93kN
Ceiling 0.29 kN/m2 115m2 33.35kN
2
Utility 0.04 kN/m 115m2 4.6kN
Finishing 0.77 kN/m2 115m2 88.55kN
Perimeter
Wall 2.6 kN/m2 115 m2 299kN
Partition 2.1 kN/m2 115 m2 241.5kN
Total Load 1233.72 kN
W = total seismic dead load
Rw = 10 for Concrete Moment Resisting Frame System (NSCP 2001 Ed.)
Z = 0.4
I=1
(0.4)(1)(2.74)(5395.077 )
v=
= 10

v = 591.30 kN (Total Base Shear of the Structure)


4. Ft = 0.07 TV but not to exceed 0.25 V
Ft = 0 (When T is 0.7 sec. or less.)

Wxhx ( )
=
Floor V-Ft Wx (kN) hx(m) (kN.m)

Roof 591.30 kN 365.906kN 9.5 3476.107 153.72 kN


Roof Deck 591.30 kN 857.6755kN 6.5 5574.890 246.54 kN
Second 591.30 kN 1233.72 kN 3.5 m 4318.02 190.95 kN
Ground 591.30 kN 1233.72 kN 0m 0 0 kN
Total 3691.0215 kN 13369.01

Computation of Lateral Forces


Earthquake Forces:
Fx @ Roof Slab = 153.72 kN
Fx @ Roof Deck Floor = 246.54 kN
Fx @ Second Floor = 190.95 kN
Fx @ Ground Floor = 0 kN

Floor Dead Loads Storey Height (hx)


Roof 365.906kN 9.5 m
Roof Deck 857.6755kN 6.5
2nd Floor 1233.72 kN 3.5 m
Ground Floor 1233.72 kN 0m
3691.0215 kN
Design of Base Shear:
1. T = fundamental period of vibration, in seconds, of the structure for the direction under
consideration T = C1(hn)
T = C1(hn)
Ct = 0.0731 for RC Structures
T = 0.073(9.5) = 0.39 sec. < 0.70 sec.
Solving for the factor accounts for structural response as a function of the neutral period and
stiffness of the structures, C:
1.25
C= 2
3

S = site coefficient for soil


T= fundamental period of vibration in seconds
C should not exceed 2.75 and this value maybe used for any structure without regard to
soil type of structure period. Except for those requirements where code prescribed forces are

scale up by 3 ( ) the minimum value of the ratio shall be 0.075.
8

1.25 1.25 (1.25)


= 2 = 2 = 2.92
3 (0.39) 3

Note: the value of C should not exceed 2.75 and this value may be used for any structure without
regard to soil type of structure period. Except for those requirement where code prescribed are

scale up by 3 ( ) the minimum value of the ratio shall be 0.075.
8

Solving for the total Design Base Shear, V:



V=

Z = seismic zone factor


I = importance factor
Rw = numerical coefficient
FRAME A LONGITUDINAL DIRECTION

Description: A Two-Storey BPO Building which is square in plan has a series of special moment
resisting frames around the perimeter of the building. The floor loads and the frame dimensions
are shown in figure. The static seismic analysis was done in order to analyze the effects of
seismic and wind forces to the structure. The computed design stresses, and support reactions
will be used later for the design of structural components of the building. Portal Method was used
by the researchers for the structural analysis of Special Moment Resisting Frame.

Design Criteria:

Importance Factor I
Category III, special occupancy = 2.9
Seismic Zone Factor 2
Zone 4 = 0.40
Structural System Factor Rw
Rw = 10
Soil Profile Factor S = 1.25
CT = C/RW
Computation of Loadings:
Slab = 160 mm. (thickness)
Beam = 300mm x 400mm (base x height)
Column = 600mm x 600mm. (Column Dimension)

Dead Loads per Floor:


Tributary Area = (5m. x 25m.) =125 m2
Roof Loading

Slab 0.125m. 0.77 kN/m3 125m2 12.03kN


3
Beam 0.25m 0.4m. 23.54 kN/m 60m 141.24kN
3
Column 0.25m 0.4m 23.54 kN/m 51m 96.04kN
Ceiling 0.29 kN/m2 125m2 36.25kN
2 2
Utility 0.04 kN/m 125m 5kN
Finishing 0.77 kN/m2 125m2 96.25kN

Total Load 386.81kN


Roof Deck Loading

Slab 0.125m. 23.54 kN/m3 125m2 367.8125kN


3
Beam 0.25m 0.4m. 23.54 kN/m 60m 112.992kN
Column 0.25m 0.4m 23.54 kN/m3 51m 141.24kN
2 2
Ceiling 0.29 kN/m 125m 36.25kN
Utility 0.04 kN/m2 125m2 5kN
Finishing 0.77 kN/m2 125m2 96.25kN

Parapet 1.43 kN/m2 125m2 178.75kN

Tota Load 938.2945kN

2nd Floor Loading

Slab 0.125m. 23.54 kN/m3 125m2 338.3875kN


3
Beam 0.25m 0.4m. 23.54 kN/m 60m 112.992kN
Column 0.25m 0.4m 23.54 kN/m3 51m 105.93kN
2 2
Ceiling 0.29 kN/m 125m 33.35kN
Utility 0.04 kN/m2 125m2 4.6kN
2 2
Finishing 0.77 kN/m 125m 88.55kN
Perimeter
Wall 2.6 kN/m2 125 m2 325kN
Partition 2.1 kN/m2 125 m2 262.5kN
Total Load 1271.3095 kN

Ground Floor Loading

Slab 0.125m. 23.54 kN/m3 125m2 338.3875kN


Beam 0.2m 0.4m. 23.54 kN/m3 60m 112.992kN
3
Column 0.25m 0.4m 23.54 kN/m 51m 105.93kN
2 2
Ceiling 0.29 kN/m 125m 33.35kN
Utility 0.04 kN/m2 125m2 4.6kN
2 2
Finishing 0.77 kN/m 125m 88.55kN
Perimeter
Wall 2.6 kN/m2 125 m2 325kN
2 2
Partition 2.1 kN/m 125 m 262.5kN
Total Load 1271.3095 kN
W = total seismic dead load
Rw = 10 for Concrete Moment Resisting Frame System (NSCP 2001 Ed.)
Z = 0.4
I=1
(0.4)(1)(2.74)(5395.077 )
v=
= 10

v = 591.30 kN (Total Base Shear of the Structure)


4. Ft = 0.07 TV but not to exceed 0.25 V
Ft = 0 (When T is 0.7 sec. or less.)

Wxhx ( )
=
Floor V-Ft Wx (kN) hx(m) (kN.m)

Roof 591.30 kN 386.81kN 9.5 3674.69 152.74 kN


Roof Deck 591.30 kN 938.2945kN 6.5 6098.91 253.52 kN
Second 591.30 kN 1271.3095 kN 3.5 m 4449.58 184.96 kN
Ground 591.30 kN 1271.3095 kN 0m 0 0 kN
Total 3867.7235 kN 14223.18

Computation of Lateral Forces


Earthquake Forces:
Fx @ Roof = 152.74 kN
Fx @ Roof Deck = 253.52 kN
Fx @ Second Floor = 184.96 kN
Fx @ Ground Floor = 0 kN

Floor Dead Loads Storey Height (hx)


Roof 386.81kN 9.5 m
Roof Deck 938.2945kN 6.5
2nd Floor 1271.3095 kN 3.5 m
Ground Floor 1271.3095 kN 0m
3867.7235 kN
Design of Base Shear:
1. T = fundamental period of vibration, in seconds, of the structure for the direction under
consideration T = C1(hn)
T = C1(hn)
Ct = 0.0731 for RC Structures
T = 0.073(9.5) = 0.39 sec. < 0.70 sec.
Solving for the factor accounts for structural response as a function of the neutral period and
stiffness of the structures, C:
1.25
C= 2
3

S = site coefficient for soil


T= fundamental period of vibration in seconds
C should not exceed 2.75 and this value maybe used for any structure without regard to
soil type of structure period. Except for those requirements where code prescribed forces are

scale up by 3 ( ) the minimum value of the ratio shall be 0.075.
8

1.25 1.25 (1.25)


= 2 = 2 = 2.92
3 (0.39) 3

Note: the value of C should not exceed 2.75 and this value may be used for any structure without
regard to soil type of structure period. Except for those requirement where code prescribed are

scale up by 3 ( ) the minimum value of the ratio shall be 0.075.
8

Solving for the total Design Base Shear, V:



V=

Z = seismic zone factor


I = importance factor