SMMBahan A0
SMMBahan A0
Control System
Perencanaan Produksi
1. MPS
2. BOM
3. Inventory record file
1) Item master data
2) Inventory status
3) Subsidiary data
Struktur Produk
Status awal material M4
MRP Time-Phased Quantity
Requirements
MRP Solution
MRP Solution
Capasity Planning
Capasity Adjustment for Short Time
Employment levels
Number of temporary workers
Number of work shift
Number of labor hours
Inventory stockpilling
Order backlogs
Workload through subcontracting
Capasity Adjustment for Long Time
Job traveler
Employee time sheet
Operation tear strip
Prepunched cards
Automated and Semi-Automated Data
Collection System
One centralized terminal
Satellite terminals
Workstations terminals
Inventory Control