_________________________________________________________
Main activities of the period (ALL):
Nighttime operations mainly on UT4, UT3, VST and
VISTA
_________________________________________________________
Additional activities of the period (i.e. documentation, projects,
ODs) (ALL):
Trained Robinson Faez on TCS at UT3 from June 28 to July4,
getting back very good response and outcome, showed by
our characterization of telescope performance on its
altitude axis and how this affected the long term strong and
extreme elongation visible in VISIR. See PPRS-069355.
_________________________________________________________
Commissioning activities of the period (ALL):
UT4 TIO partial support to GRAAL and 4LGSF.
_________________________________________________
Training Activities (ALL):
- Talks attended:
None.
- Training attended:
None.
On ASM :
On UT3 :
TCS:
SPHERE:
VISIR:
VIMOS:
None
On VISTA :
TCS :
VIRCAM :
None
On VST :
TCS:
PPRS-069071 Left Observing Door not closing during shutdown
On Hold
PPRS-069084 IA refused to converge afterfirst exposure while
observing a target at ~73 altitude Assigned
PPRS-069094 Error reply in execution of WRTABER Assigned
OMEGACAM:
None.
On UT4 :
TCS:
DSM:
MUSE:
None
SINFONI :
None
HAWKI:
LGSF:
PPRS-068805 LTA:SHUTTERS Output shutter refused to OPEN
Closed
On UT4 we have had many problems with Field Stabilization when
we started guiding, mainly observable on MUSE and SINFONI. We
think this is due to some issue introduced by M2 DSM.
_________________________________________________________
Daytime Operations Issues (Operations Specialists):
- N/A
_________________________________________________________
Scheduling Issues:
- None
_________________________________________________________
Technical problems of the period (ALL):
- None.
_________________________________________________________
I.O.T. Activities (ALL):
- None
_________________________________________________________
General issues / request (ALL)
- None.
Date: 25/07/2017