I PEKERJAAN PERSIAPAN
1 Pengukuran & bouwplank 1.00 Ls
2 Pengadaan Air Kerja 1.00 Ls
3 Pengadaan Barak Kerja 1.00 Ls
4 Pembersihan Lapangan 1.00 Ls
SUB TOTAL PEKERJAAN PERSIAPAN
B. LANTAI 2
1 Pek. Beton Kolom L 15x30
a. Cor Beton 1 : 2 : 3 4.86 m3
b. Bekisting 48.60 m2
c. Pembesian 1,099.71 Kg
2 Pek. Kolom Praktis 15 x 15 cm
a. Cor Beton 1 : 2 : 3 2.23 m3
b. Bekisting 29.70 m2
c. Pembesian 421.65 Kg
3 Pek. Ringbalk 15x30
a. Cor Beton 1 : 2 : 3 6.30 m3
b. Bekisting 84.00 m2
c. Pembesian 1,190.17 Kg
4 Pek. Plat beton Topi-Topi 10 cm
a. Cor Beton 1 : 2 : 3 13.10 m3
b. Bekisting 131.00 m2
c. Perancah 131.00 m2
d. Pembesian 2,152.80 Kg
5 Pek. Balok Latei Kusen 15x15
a. Cor Beton 1 : 2 : 3 2.14 m3
b. Bekisting 28.50 m2
c. Pembesian 320.80 Kg
JUMLAH PEKERJAAN BETON LANTAI 2
VI PEKERJAAN KERAMIK
1 Pek. Pasang Keramik Lantai 1 Granite 60x60 205.50 m2
2 Pek. Pasang Keramik Lantai 2 Granite 60x60 198.60 m2
3 Pek. Pasang Keramik Kamar Mandi 30x30 95.30 m2
4 Pek. Pasang Keramik Dinding Kamar mandi uk.30x60 83.25 m2
5 Pek. Pasang Keramik 20x20 21.00 m2
6 Plint Keramik 10x30 331.00 m'
JUMLAH PEKERJAAN KERAMIK
X PEKERJAAN SANITASI
A. Septictank
1 Pasangan Batubata m2
2 Plesteran dan acian m2
3 Cor Beton Tutup Septicktank m3
4 Bekisting m2
5 Perancah m2
6 Pembesian kg
7 Saluran Air Tinja AW 4" m'
8 Closet Jongkok + Dudukan bh
B Saluran Air
1 Saluran Air Kotor AW 3" m'
2 Saluran Air Hujan AW 3" m'
3 Saluran Air Bersih AW 3/4" m'
4 Kran Air bh
5 Shower bh
6 Washtafel bh
7 Bathtube bh
8 Floordrain bh
9 Pompa Air bh
JUMLAH PEKERJAAN SANITASI
XI PEKERJAAN TANGGA
A Tangga Lengkung
1 Galian Pondasi Tanah Biasa m3
2 Urugan Pasir m2
3 Urugan Kembali Pondasi m3
4 Lantai Kerja m2
5 Pek. tangga
a. Cor Beton 1:2:3 m3
b. Cetakan Beton Kayu Tahun m2
c. Pembesian kg
6 Railing Tangga m'
7 Exspose Beton m2
8 Keramik Tangga m2
B Tangga Lt 1 ke Roof Garden
1 Galian Pondasi Tanah Biasa m3
2 Urugan Pasir m2
3 Urugan Kembali Pondasi m3
4 Lantai Kerja m2
5 Pek. tangga
a. Cor Beton 1:2:3 m3
b. Cetakan Beton Kayu Tahun m2
c. Pembesian kg
6 Exspose Beton m2
7 Keramik Tangga m2
C Tangga Roof Garden ke Lantai 2
1 Galian Pondasi Tanah Biasa m3
2 Urugan Pasir m2
3 Urugan Kembali Pondasi m3
4 Lantai Kerja m2
5 Pek. tangga
a. Cor Beton 1:2:3 m3
b. Cetakan Beton Kayu Tahun m2
c. Pembesian kg
6 Exspose Beton m2
7 Keramik Tangga m2
JUMLAH PEKERJAAN TANGGA
XII KELISTRIKAN
1 Titik Lampu bh
2 Saklar Ganda bh
3 Saklar tunggal bh
4 Stop Kontak bh
5 Box MCB (4 Grup) bh
6 Instalasi Titik Lampu ttk
7 Stop Kontak AC bh
8 Penyambungan Daya 2200 watt Ls
9 Instalasi Titik Stop Kontak ttk
JUMLAH PEKERJAAN KELISTRIKAN
JUMLAH
DIBULATKAN
TERBILANG :
AN BIAYA (RAB)
AL PERUMAHAN RAFFLES
017
Rp2,500,000 Rp2,500,000
Rp1,500,000 Rp1,500,000
Rp2,500,000 Rp2,500,000
Rp3,000,000 Rp3,000,000
Rp9,500,000
Rp55,000 Rp5,762,900
Rp45,000 Rp2,430,000
Rp37,500 Rp1,012,500
Rp240,000 Rp1,071,360
Rp800,000 Rp1,785,600
Rp240,000 Rp1,375,200
Rp27,500 Rp1,455,483
Rp145,000 Rp4,350,000
Rp240,000 Rp2,160,000
Rp75,000 Rp59,585,625
Rp80,988,668
Rp525,000 Rp15,750,000
Rp675,000 Rp64,462,500
Rp105,000 Rp80,220,000
Rp115,000 Rp59,570,000
Rp62,000 Rp94,736,000
Rp67,000 Rp69,412,000
Rp750,000 Rp16,575,000
Rp400,725,500
Rp950,000 Rp12,722,400
Rp190,000 Rp8,481,600
Rp11,000 Rp21,312,500
Rp950,000 Rp12,825,000
Rp190,000 Rp8,550,000
Rp11,000 Rp23,932,700
Rp950,000 Rp15,390,000
Rp190,000 Rp13,680,000
Rp11,000 Rp42,010,100
Rp950,000 Rp1,881,000
Rp180,000 Rp4,752,000
Rp11,000 Rp3,541,010
Rp950,000 Rp7,620,900
Rp190,000 Rp29,032,000
Rp11,000 Rp47,636,600
Rp950,000 Rp2,308,500
Rp190,000 Rp8,550,000
Rp11,000 Rp10,803,100
Rp950,000 Rp3,441,375
Rp180,000 Rp8,694,000
Rp11,000 Rp6,475,700
Rp950,000 Rp34,200,000
Rp180,000 Rp56,160,000
Rp60,000 Rp18,720,000
Rp11,000 Rp43,797,600
Rp446,518,085
Rp950,000 Rp4,617,000
Rp190,000 Rp9,234,000
Rp11,000 Rp12,096,810
Rp950,000 Rp2,116,125
Rp180,000 Rp5,346,000
Rp11,000 Rp4,638,150
Rp950,000 Rp5,985,000
Rp180,000 Rp15,120,000
Rp11,000 Rp13,091,870
Rp950,000 Rp12,445,000
Rp180,000 Rp23,580,000
Rp60,000 Rp7,860,000
Rp11,000 Rp23,680,800
Rp950,000 Rp2,030,625
Rp180,000 Rp5,130,000
Rp11,000 Rp3,528,800
Rp150,500,180
Rp85,000 Rp15,626,400
Rp2,000,000 Rp48,000,000
Rp165,000 Rp10,890,000
Rp85,000 Rp1,657,500
Rp1,000,000 Rp3,000,000
Rp165,000 Rp649,688
Rp85,000 Rp525,300
Rp900,000 Rp900,000
Rp165,000 Rp199,155
Rp85,000 Rp265,200
Rp650,000 Rp650,000
Rp165,000 Rp36,086
Rp85,000 Rp550,800
Rp165,000 Rp290,400
Rp650,000 Rp1,950,000
Rp450,000 Rp1,350,000
Rp85,000 Rp6,092,800
Rp1,100,000 Rp15,400,000
Rp85,000 Rp793,900
Rp1,400,000 Rp1,400,000
Rp165,000 Rp119,196
Rp650,000 Rp650,000
Rp85,000 Rp793,900
Rp1,100,000 Rp1,100,000
Rp165,000 Rp97,350
Rp550,000 Rp550,000
Rp85,000 Rp3,481,600
Rp3,500,000 Rp14,000,000
Rp345,000 Rp10,510,080
Rp141,529,354
Rp335,000 Rp68,842,500
Rp335,000 Rp66,531,000
Rp165,000 Rp15,724,500
Rp291,000 Rp24,225,750
Rp135,000 Rp2,835,000
Rp45,000 Rp14,895,000
Rp193,053,750
Rp75,000.00 Rp25,275,000.00
Rp60,000.00 Rp3,960,000.00
Rp135,000.00 Rp45,495,000.00
Rp35,000.00 Rp2,135,000.00
Rp76,865,000
Rp95,000.00 Rp48,925,000.00
Rp9,000.00 Rp2,979,000.00
Rp17,500.00 Rp9,012,500.00
Rp60,916,500
Rp27,500 Rp70,510,000
Rp0
Rp0
Rp70,510,000
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0.00
Rp0.00
Rp250,000.00 Rp12,000,000.00
Rp0.00
Rp175,000.00 Rp7,962,500.00
Rp0.00
Rp255,000.00 Rp18,615,000.00
Rp0.00
Rp0.00
Rp0.00
Rp125,000.00 Rp7,227,500.00
Rp240,000.00 Rp1,387,680.00
Rp47,192,680.00
Rp1,678,299,717
NG :