for the
Program
1986
PLACE CORPS
for the
Introduction
Morocco
Belize Benin Lesotho
Nepal Costa Rica Botswana Liberia
Phillipines
Dominican
Burundi
Malawi
Thailand Republic
Tunisia Cameroon Mali
Eastern Carribean Central Mauritania
Yemen Ecuador African Niger
Guatemala Republic Senegal
Haiti Gambia Sierra leone
Honduras Ghana Swaziland
Jamaica Kenya Togo
Paraguay
MOROCCO
,r
ANT|IGUA MAIl
ST LUCIA
VINCENT
BURKINA FA,(
TUNISIA -
i
BARBADOS MARrA
DOMIICANGRENADINES
TURKS/CAICOS SENEGAL
HODRSGHANA
F KENYA THAILANOD
TOGO,
CAMEROON
l I
BOTSWANA
SWAZILANDOi
04 1 LESOTHO
FP/IG (178
Projects)
(44.2.)
Total Cost $431,025
FP - Food Production
Energy - Energy
Nutrition
a community's ability to
organize, plan, make groupdecisisions, and result in the commnuity
being more confident and able to transfer
technical skills to other tasks. PCV's these organizational and
play an important role of a
"facilitator" rather than a "doer" of
the project, a PCV helps to
transfer technical skills, enhance leadership
capacity, and increase
self-reliance.
fIm~mg-aQDo -
Projects which have significant contributions fran
in-kind and financial, are more likely the comunity, both
to succeed. During the
implementation phase of a project a PCV
may
paaticipants in new aid/or improved technicalbe instrumental in training
project. The transfer of skills during skills related to the
this training is essential for
the long term success of the project.
The content of a proposal should come from the cxmmunity
whenever possible. Some countries translate proposal formsorganization
so as to
increase cmMNnikty members unierstanding and participation
submitting the proposal. PCV's can
be exdtremely helpful in
in organizing
and writing a clear proposal.
Record Keepij -
already.
For each SPA project, a final report which reviews the project
whether the original goals were met, identifies lessons to see
learned and
discusses benefits of the project. While the final report
may be
written by the PCV, recommendations and camments should
be from
community members.
F P/I G
AFRICA 294 49% $2,593 $762,247
INTERAMERICA 11 38% $2,132 $236,634
NANEAP 82 44% $1,412 $115,757
WORLDWIDE 487 45% $2,289 $1,114,638
SED/IG
AFRICA 85 14% $2,940 $249,922
INTERAMERICA 91 31% $2,959 $269,293
NANEAP 19 10% $4,097 $77,847
WORLDWIDE 195 18% $3,062 $597,062
FP
AFRICA 80 13% $2,401 $192,089
INTERAMERICA 42 14% $2,790 $117,191
NANEAP 33 18% $1,431 $47,214
WORLDWIDE 155 14% $2,300 $356,494
ENERGY
AFRICA 36 6f' $2,926 $105,341
INTERAMERICA 18 6% $1,984 $35,717
NANEAP 6 3% $5,400 $32,397
WORLDWIDE 60 6% $2,891 $173,455
HEALTH
AFRICA 10 2% $1,383 $13,831
INTERAMERICA 6 2% $938 $5,625
NANEAP 3 2% $3,666 $10,997
WORLDWIDE 19 2% $1,603 $30,453
OTHER
AFRICA 94 16% $2,359 $221,790
INTERAMERICA 25 9% $1,826 $45,655
NANEAP 43 23% $1,608 $69,130
WORLDWIDE 162 15% $2,078 $336,575
TOTALS
AFRICA 599 100%
INTERAMERICA $2,579 $1,545,220
293 100% $2,424
NANEAP $710,115
186 100% $1,900
WORLDWIDE 1078 $353,342
100% $2,420 $2,608,677
TOTAL WORLDWIDE SPA PROJECTS
Percentage of Total Projects
Technical Assistance
nationals.
InterAmerica
Region received 44.7% of thie assistance,
Africa
received 35.7% and IANEAP received 19.5%.
Five editions of the SPA Network Newsletter were
published covering
SED, Health, Agroforestry, and Water Sanitation.
Project Design and Management Workshops were conducted
countries for staff, PCV's and HCN counterparts. in 8
The workshop goals
are to: 1)increase awareness of the importance
of community
involvement in project planning and implementation,
2)introduce
project management tools, 3)examine the appropriateness
of using
external assistance in community projects.
COUNTRY
ACTIVITY
AFRICA REGION
BENIN
Agro/Forestry In-Service Training
BURKINA FASO
Agro/Forestry Workshop
BURUNDI
Management/Marketing and SPA
CAMEROON
Consultant
THE GAMBIA
Cooperative Extension Seminar
MALAWI
Agro/Forestry In-Service Training
Beekeeping/Irrigation In-Service
Training
Water/Sanitation In-Service
MALI
Training
SENEGAL
Water Supply In-Service Training
SIERRA LEONE
Marine Fisheries Conference
TOGO
Small Bridge (With Benin)
In-Service Training
INTERAMERICA REGION
-------------
BELIZE
Project Design and Management Seminar
COSTA RICA
Small Enterprise Development Feasibility
Project Design and IST
DOMINICAN REPUBLIC
Carribean Fisheries Management Workshop
Institute Conference
Fishermans Conference
Fisheries Consultant/Turks
and Caicos
Training
Training
EASTERN CARRIBEAN
Dietetics In-Service Training
ECUADOR
Small Enterprise Development
Poultry In-Service Training
Workshop
Training
TECHNICAL ASSISTANCE FY 86
COUNTRY
ACTIVITY
HAITI
Project Design and Management
Consultant
Production Consultant
HONDURAS
Cacao Production In-Service
Forage In-Service Training
Training
Fisheries Consultant
Dried Flowers
Consultant
CPR Conference
PARAGUAY
SPA Project Design and Management IST
NANEAP REGION
NEPAL
Program Conference
PHILIPPINES
Agro-Forestry In-Service Training
THAILAND
Project Design and Management Workshop
REGIONAL
Workshop
Requests need not be lengthy but they need to show all components and
the logic used in planning for the activity.
Be c omplete
1. PCV's only
2. PCV's and HCN's (what sector and HCNs' relationship to PCV's.
3. PC staff.
4. Ministry Officials.
Try to pinpoint WHEN the activity will take place and its duration.
(if known),
and any rental or purchase
costs.
IAA abstract.
-Projects
that are rze-ed with an H or .HB designatioh
health Projects that are firgimi are the
specifically with health funds.
S.P.A. Data Base Codes
Primary and Secondary Classification Codes
3 - Food Production
4 - Energy
5- Other
6- Health
Activity Codes
300 - Gardens
800 - Postharvest
400 - Energy
This graph represents all of the Africa SPA projects since the beginning
of the program. Almost half of all SPA projects in Africa fall into
Food Producticon/Incme Generation category with an additional 13.4% the
address Food Production exclusively. Thus, Food Production representsthat
the most significant cxmpionent of the SPA program in the African region.
The list that precedes the IAA abstracts for each country presents
the
total cost for each project, including the SPA funding and the cxmmity
contribution.
Total Cost$221,790
IAA #:
IAA NAME:
** COUNTRY: BENIN
-83-680-004-
Taneko-Koko Small Fish
13116.00
-84-680-012-
Farming Project
School Latrines
-84-680-016-
286.00
Dendougou Pig-Raising
400.00
-84-680-017-
Project
250.00
-84-680-018-
Project
-84-680-020-
10295.00
-85-680-002-
School Water Supply & Garden
2400.00
4611.53
-85-680-003-
Implements
1638.55
-85-680-004-
Cistern
4000.00
-85-680-006-
Fruit Tree Orchard-Adjahoun
2716.67
688.58
-85-680-007-
District
904.00
-85-680-008-
Cistern
1569.46
-85-680-009-
Cistern
337.00
-85-680-010-
Nurseries
767.25
-85-680-011-
Waterline
1941.25
-85-680-012-
Cister
-85-680-013-
Anavie Rural Well
2038.00
-85-680-014-
Ko-Koumolou Health Center
1255.05
4789.00
-85-680-015-
Well
Ecole de Base/Cocundji
477.86
School Well
-85-680-016-
Pobe Nutrition Center
366.58
Chicken-Raising
-85-680-017-
Djoko Village Gardening &
295.54
-85-680-018-
Fruit Trees
-85-680-019-
Azowlisse Coop.Egg
3071.61
2309.00
-85-680-020-
Production Project
1397.86
-85-680-021-
Improvements
3795.30
-85-680-022-
Line
511.00
-85-680-023-
Cistern
-85-680-024-
School Gardening/Dangbo
1674.00
-85-680-025-
Ecole de Base/Yaranga
619.00
431.90
Garden/Pintard Pro
IAA #:
IAA NAME:
-85-680-026-
Za-Kpota Agricultural 1155.65
Storage
-86-680-001-
FSA/UNB Poultry Raising Demo 9085.00
Project
-86-680-002-
Ecole de Base/Toviklin-A 1645.00
Latrines,Cister
-86-680-003-
Kongou/Gansosso Small Bridge 1607.00
Construct.
-86-680-004-
Zou Province Latrines and 16142.00
Cisterns
-86-680-005-
CEMG/Zagnanado School 310.00
Cistern
COUNTRY: BENIN
IAA: 680-83-004
District of Kopargo
PCV NAME:
William Nall
Beneficiaries: Direct:
45 Indirect:
315
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity
Code:
710
Secondary: 1
SPA Contribution:
9500.00
Addressed:
Expected Code:31
Outcomes:
Increased food production and income generation
extension activities.
Spa Funds
Purchase of principal pieces
of equipment and
Used For:
materials for the refurbishment
of the fishery.
Case Study: N
COUNTRY: BENIN
IAA: 680-84-012
PROJECT TITLE:
School Latrines
PCV NAME:
Anne Markman, Kelly Stevenson
Beneficiaries: Direct:
260 Indirect: 0
Secondary: 1
SPA Contribution:
286.00
Inkind Labor:
0.00
Inkind Land:
0.00
Expected Code: 20
Outcomes:
Improved sanitation at schools.
Fertlizer for
local gardens.
Spa Funds
Purchase of non-local building
materials.
Used For:
Case Study,
N
COUNTRY: BENIN
IAA: 680-84-016
PROJECT TITLE:
Dendougou
COMMUNITY GROUP: Dendougou Pig-Raising Project
PCV NAME:
Primary School
Beneficiaries: Direct:
40 Indirect:
500
Implementation Period:
from:
10/01/83 to:
09/30/84
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity Code: 120
Secondary:
I
SPA Contribution:
400.00
Community Contribution:
400.00
Inkind Labor:
0.00
Inkind 0.00
Materials:
0.00
Inkind Land:
0.00
Problems
School would
like to improve boar for
Addressed:
with local breeding
sows.
provided.
Expected
Code:
43
Advanced
skills learned by students pig-raising
to villagers.
Spa Funds
Purchase
and transport
Used For: construction materials, of one improved boar,
feed, vaccines.
Case Study: N
COUNTRY: BENIN
IAA: 680-84-017
Secondary: 0
Expected Code: 31
involved in project.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-84-018
PROJECT TITLE:
Boukombe District Wells
COMIUNITY GROUP:
Boukombe Rural District
Beneiiciaries:
Direct: 6091
Indirect:
Implementation Period:
from: 10/01/83
to: 09/30/84
Project Complete? N
ACN Status: N
Ciassification- Primary:
3 Activity
Code: 510
Secondary: 6
SPA Contribution:
8578.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Due to
severe drought conditions,
currently avail-
Addressed:
abie water
sources are
inadequate and/or
unsanitary.
Objectives:
Construction of eight large-diameter
wells,
Expected Code: 24
Outcomes:
1) Readily available water for drinking
and gard
ening. 2) Improved nutrition and hygiene.
activities.
Spa Funds
Non-local building materials.
Case Study: N
COUNTRY: BENIN
IAA: 680-84-020
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 2
Inkind Land:
0.00
Addressed:
osition, rate of rainfall, and wood availability.
Expected Code: 13
Outcomes:
Students will learn fruit-tree management.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-002
PROJECT TITLE:
School Water
Supply & Garden Implements
Susan McGinn
Beneficiaries: Direct:
265
Indirect: 3700
Project Complete? N
ACN Status: N
Classification- Primary: 1
Activity Code: 550
Secondary:
6
SPA Contribution:
3111.55
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Lack of clean,
Addressed:
as
resources to permanent water source as well
Objectives: Installation of
clean, treated water supply
serve
three villages, helping to
of water and
garden tools.
Expected
Code: 23
school.
Income generating
potential. Self
sufficiency of school.
Case Study: N
Secondary: 6
Addressed:
Expected Code: 20
school.
Case Study: N
COUNTRY: BEJIN
IAA: 680-85-004
PROJECT TITLE:
Kouba Group Agricultural
COMMUNITY GROUP: Associacion CARITAS Dev. Project
de Kouaba
PCV NAME:
Tim Snowber
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from: 10/01/85
to: 09/30/86
Project Complete? 14
ACN Status: N
Classification- Primary:
1 Activity Code:
210
Secondary: 0
SPA Contribution:
4000.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Matcrials:
0.00
Inkind Land:
0.00
Problems
1) Low ag.production due to time-consuming,ineffi-
3) Lack of resources
to start poultry production
project.
house and
Expected Code:
34
Outcomes:
Increased agricultural production.
members.
Used For:
Grain mill, motor, miscellaneous expenses.
chickens.
Case Study: N
COUNTRY: BENIN
IAA: 680-85-005
Beneficiaries: Direct:
0 Indirect: 3000
Classification- Primary:
5 Activity Code: 510
Secondary: 6
SPA Contribution:
2129.17
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Lack of potable water for drinking
water.
Expected Code: 23
Outcomes:
Improved health of residents. Gardening
and tree
Spa Funds
Construction materials, transportation,
labor.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-006
PROJECT TITLE:
Fruit Tree Orchard-Adjahoun
COMMUNITY GROUP: Adjahoun Dist. District
Secondary: 0
SPA Contribution:
592.01
Community Contribution:
96.57
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Schools expressed need to generate
income.
Addressed:
Expected Code:
Outcomes:
Schools34
and expand
Improved diet.
Increased income.
costs.
Case Study: N
COUNTRY: BENIN
IAA: 680-85-007
COMMUNITY GROUP:
Ecole de Base Kokohoue
Beneficiaries: Direct:
164 Indirect: 0
Implementation Period:
from: 10/01/85 to: 09/30/86
Secondary: 6
SPA Contribution:
904.00
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed:
Objectives: Construction of
a 113 meter cement-mortar lined
Expected Code: 24
Used Fors
Case Study: N
COUNTRY: BENIN
IAA: 680-85-008
PCV NAME:
David Edmunds
Beneficiaries: Direct:
0 Indirect: 0
Project Complete? N
ACN Status: N
Secondary: 6
SPA Concribution:
1491.68
Inkind Labor:
0.00
Inkind M,
aterials: 0.00
Inkind Land:
0.00
Problems
No permanent water supply to
garden which supports
Addressed:
school canteen program.
improve
sanitation.
Expected Code: 24
Outcomes:
Permanent water supply will allow
for maintenance
sanitation.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-009
PROJECT TITLE:
Adjohoun District Village
COMMUNITY GROUP: Akpadanou & Azowlisse Nurseries
Villages
PCV NAME:
David Edmunds
Beneficiaries: Direct:
26 Indirect:
Project Complete? N
ACN Status: N
Classification- Primary:
2 Activity Code:
440
Secondary: 4
SPA Contribution:
337.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Villages participate in the
Addressed:
campaign; however, nurseries national reforestation
ver.
CARDER will provide technical supervision
villagers at of
the nurseries.
Expected Code: 43
Outcomes:
Seedlings provided for local reforestation.
now
provide firewood in the future.
Villagers will
Spa Funds
Purchase of building materials,
fertilizer, and
Case Study: N
COUNTRY: BENIN
IAA: 680-85-010
PROJECT TITLE:
Nalititingou Nursery School
COMMUNITY GROUP: Waterline
Nalititingou Nursery
School
PCV NAME:
Tim Snowber
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from:
10/01/85 to:
09/30/86
Project Complete? N
ACN Status: N
Classification- Primary:
5
Activity Code: 500
Secondary:
6
SPA Contribution:
767.25
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land: 0.00
Problems Nursery school at Natitingou
Addressed: was built without a
water source. This is a health
problem for the st
Objectives:
To extend a pipeline
150 meters and install
a
faucet at
the school.
Expected
Code: 20
Outcomes:
Decrease in health risks through
availability of
water,
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-011
PCV NAME:
David Edmunds
Beneficiaries: Direct:
0 Indirect:
0
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity Code:
540
Secondary: 6
SPA Contribution:
1841.25
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Primary school of Azowlisse has no water
Addressed: source
for consumption or
for the gardening
and fruit
tree projects.
the school.
Expected Code: 24
Outcomes:
Water will be supplied for drinking and agricultur
al projects.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-012
PROJECT TITLE:
Mono Village
Wells
PCV NAME:
Margot Kaeser
Beneficiaries: Direct:
6700 Indirect:
Project Complete? N
ACN Status: N
Secondary: 6
SPA Contribution:
1393.00
Inkind Labor:
250.00
Inkind Materials:
270.00
Inkind Land:
0.00
Problems
Water shortage in the area
even though the water
Addressed:
table is quite shallow.
of 10-15 meters.
The wells will be of a depth
lined.
Expected
Outcomes:
Code: 20
fight against
water-related disease.
Case Study: N
COUNTRY: BENIN
IAA: 680-85-013
PROJECT TITLE:
Anavie Rural Well
PCV NAME:
Phillip Kiekhafer
Beneficiaries: Direct:
0 Indirect: 0
Project Complete? N
ACN Status: N
Secondary: 6
SPA Contribution:
1174.94
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The Anavie well has fallen into
Addressed: the villagers with no sanitary disrepair, leaving
water source.
Expected Code: 20
Case Study: N
COUNTRY: BEININ
IAA: 680-85-014
PCV NAME:
David Edmunds
Beneficiaries: Direct:
800 Indirect:
0
Implementation Period:
from: 12/15/85
to: 09/30/86
Project Complete? N4
ACN Status: N
Secondary: 6
Total Project Costs: 4789.00
SPA Contribution: 3527.00
Community Contribution: 0.00
Inkind Labor: 1050.00
Inkind Materials: 212.00
Inkind Land: 0.00
Problems Water sources presently used by the health
Addressed:
are too distant and contaminated. center
Patients at the
Expected Code: 20
will improve.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-015
Beneficiaries: Direct:
250 Indirect: 0
Secondary: 6
SPA Contribution:
477.86
Inkind Labor:
0.00
Inkind Land:
0.00
Expected Code: 24
Outcomes:
School will have water for the students and for
the garden.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-016
PROJECT TITLE:
Pobe Nutrition Center Chicken-Raising
COMMUNITY GROUP:
Pobe Ctr for Ed.and Nutrition
PCV NAME:
Hugo Gonzalez
Beneficiaries: Direct:
60 Indirect: 0
Implementation Period:
from: 01/15/86 to:
09/30/86
Project Complete? N
ACN Status: N
110
Secondary: 0
SPA Contribution:
317.14
Inkind Labor:
0.00
Inkind Materials:
0.00
inkind Land:
0.00
education for
women.
the cooperative.
To teach chicken husbandry
techniques.
Expected Code:
41
Outcomes:
Women will be educated in poultry
raising.
project.
Used For:
Case Study: A
COUNTRY: BENIN
IAA: 680-85-017
PROJECT TITLE:
Djoko Village
Gardening & Fruit Trees
PCV NAM':
Elizabeth McLane
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from:
01/15/85 to:
09/30/86
Project Complete? N
ACN Status: 14
Classification- Primary:
3 Activity Code:
350
Secondary:
0
295.54
SPA Contribution:
295.54
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materialu:
0.00
Inkind Land:
0.00
Problems
The Kjoko GRVC
Addressed:
existing fruit
wants; to improve and expand its
tree orchard.
The group
grafting equipment and
gardening now needs
tools.
They also
Objectives:
To purchase
and implement grafting and
equipment to
increase production.
gardening
Also, to fence
the site.
Expected
Code: 41
Outcomes:
Fresh vegetables will be
available year-round
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-018
PROJECT TITLE:
Latrine and
Well Project
PCV NAME:
Brenda Hopkins
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from:
10/01/85 to:
09/30/86
Project Complete? N
ACN Status: N
Classification- Primary:
5
Activity Code:
510
Secondary:
6
SPA Contribution:
2303.71
Community Contribution:
767.90
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Elementary school
is in disrepair
Addressed: rain destroying the roof and due
to wind and
walls of
the school
building. There is
no latrine
and no water.
Expected
Code: 24
Outcomes:
Water will be available for drinking,
for the
sanitation at the
school.
Used For:
Case Study: N
Secondary: 6
Expected Code: 42
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-020
PROJECT TITLE:
Ouidah Agriculture Center
Improvements
Beneficiaries: Direct:
0 Indirect:
0
Project Complete? N
ACN Status: N
500
Secondary: 6
SPA Contribution:
1397.86
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Ouidah Agriculture Center has
no sanitary
Addressed:
es and no water system. The faciliti
a water
tower.
Expected Code: 24
Outcomes:
Improved hygiene and sanitation, which
will
Spa Funds
Materials, labor and transportation.
Used For:
Case Study: N
COUNTRY: BENI14
IAA: 680-85-021
PROJECT TITLE:
Ecole de Base/ Kaiteme Water
Line
COMMUNITY GROUP:
Ecole de Base/ Kaiteme
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 01/30/86 to: 09/30/86
Classification- Primary:
5 Activity Code: 550
Secondary: 6
SPA Contribution:
3795.30
Inkind Labor:
0.00
inkind Land:
0.00
Problems There is
a lack of clean, convenient water
sources
Addressed:
ior the school and neighboring villages.
the school.
Expected Code: 24
Outcomes:
School will have water for drinking and for
the ag
increase.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-022
PROJECT TITLE:
Ecole de Base/ Gnito School
Cistern
PCV NAME:
Sarah French
Beneficiaries: Direct:
258 Indirect: 0
Project Complete? N
ACN Status: N
Secondary: 6
SPA Contribution:
335.00
Inkird Labor:
71.00
Inkind Land:
0.00
Problems
The community, particulary the primary
Addressed:
has a scarcity of potable water school,
season.
This scarcity of water contributes
to
water-related disease.
Objectives: Construction of
a 16m concrete-lined
cistern at
completed by villagers.
Expected Code: 20
Outcomes:
Potable water will be made
available at the school
water-related disease.
Used For:
Case Study: N
COUNTRY: BENiN
IAA: 680-85-023
PROJECT TITLE:
Come District
Wells
PCV NAME:
Sarah French
Beneficiaries:
Direct: 5000
Indirect:
implementation Period:
rrom: 02/15/86
to:
09/30/86
Project Complete? N
ACII Status: N
Secondary: 6
SPA Contribution:
1344.00
Community Contribution:
0.00
Inkind Labor:
330.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Potable water
is
not readily available
Addressed:
school or in the villages. at
the
Objectives: Construction of
three
large diameter wells of
concrete lined.
Expected Code: 20
Outcomes:
Potable water:
will be more accessible
at the
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-024
PROJECT TITLE:
School Gardening/Dangbo
PCV NAME:
David Edmunds
Beneficiaries: Direcu:
0 Indirect: 0
Classification- Primary:
1 Activity Code:
310
Secondary: 6
SPA Contribution:
619.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Land:
0.00
Expected Code: 12
Outcomes:
Students will be trained in gardening
techniques.
nutrition.
Sale of surplus garden produce will
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-85-025
PROJECT TITLE:
Ecole de
Base/Yaranga Garden/Pintard
COMMUNITY GROUP: Ecole de Pro
Base/ Yaranga
PCV NAME:
Becky Qualls
Beneficiaries: Direct:
150 Indirect:
0
Implementation Period:
from:
04/15/86 to:
/ /
Project Complete? N
ACN Status: N
Classification- Primary:
Secondary:
6
431.90
SPA Contribution:
431.90
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Ecole de Base of Yaranga
Addressed:
and the students' needs a source of income
vitamins.
techniques.
Pro
duce will eventually stock
school canteen.
Expected Code: 32
Outcomes:
Agriculturalproduction
will increase and new
eventually have an
improved diet.
)pa Funds
Construction
materials, labor, transportation
Jsed For: poultry coop and fence;
for
tools.
:ase Study: N
COUNTRY:
BENIN
IAA: 680-85-026
PROJECT TITLE:
Za-Kpota
Agricultural Storage
COMMUNITY GROUP:
Za-Kpota
PCV NAME:
Clare Sartori
Beneficiaries:
Direct:
0 Indirect:
0
04/15/86 to:
/ /
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity Code:
810
Secondary:
0
SPA Contribution:
832.62
Community Contribution:
323.03
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Rats and termites
have caused great losses
Addressed:
peanut supply, in
facility.
Objectives:
Construction
of
a storeroom for peanuts
and other
agricultural products.
Expected
Code:
Outcomes:
Reduced40
Spa Funds
Construction
materials, labor and transportation.
Used For:
Case Study: N
Expected Code: 12
Case Study: N
COUNTRY: BENINI
IAA: 680-86-002
PROJECT TITLE:
Ecoie de Base'/Toviklin-A
Latrines,Cister
COMMUNITY GROUP:
Ecole de Base Toviklin-A
PCV NAME:
Dee Dee Carson
Beneficiaries:
Direct:
216 Indirect:
Implementation Period:
from: 05/15/86
to: 12/15/86
Classification- Primary:
5 Activity
Code:
560
Secondary: 6
SPA Contribution:
974.00
Community Contribution:
343.00
Inkind Labor:
328.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Potable water
is
scarce and sanitary
Addressed:
are poor because the conditions
Expected Code: 20
Outcomes:
Conditions will be more
sanitary at the school.
Spa Funds
Building materials and transport.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-86-003
PCV NAME:
Jay Zimmerman
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 05/15/86 to: 12/15/86
Project Complete? N
ACN Status: N
Classification- Primary:
2 Activity Code:
240
Secondary: 0
SPA Contribution:
1607.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Villagers are cut off from markets
Addressed: services during the rainy season. and government
A bridge would
bridge.
Expected Code:
34
Outcomes:
Goods and services will continue to circulate
local economy.
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-86-004
PROJECT TITLE:
Zou Province Latrines
and Cisterns
Beneficiaries: Direct:
0 Indirect:
0
Project Complete? N
ACN Status: N
560
Secondary: 6
SPA Contribution:
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Several area schools and clinics
Addressed: sanitation problems because experience severe
and
a safe water source.
Expected Code: 20
Used For:
Case Study: N
COUNTRY: BENIN
IAA: 680-86-005
PCV NAME:
Clare Sartori
Beneficiaries: Direct:
570 Indirect: 0
Secondary: 6
SPA Contribution:
310.00
Inkind Land:
0.00
Addressed: School.
The School needs water for drinking and
Expected Code: 20
Outcomes:
There will be water for drinking, for the school
Used For:
Case Study: N
** COUNTRY: BOTSWANA
-83-637-009- Lehututu Tannery Upgrade 3804.00
Project
-83-637-010- Bobonong Secondary School 700.00
Poultry Farm
-83-637-011- Okavango JCSS Agricultural 6700.00
Project
-83-637-012- PJSS Food Production Project 3790.00
-83-637-013- Serowe Market Shelter 2952.22
COUNTRY:
BOTSWANA
IAA: 637-83-009
PROJECT TITLE:
Lehututu Tannery Upgrade
COMMUNITY GROUP:
Lehututu Village Project
Dev.Committee
PCV NAME:
Linda Lang
Beneficiaries:
Direct:
0 Indirect: 2000
Implementation Period:
Project Complete? N
ACN Status: N
Classification- Primary:
Secondary: 0
Total Project Costs:
3804.00
SPA Contribution:
Community Contribution: 3804.00
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems Committee needs to expand
Addressed: and improve tannery
order to produce more in
Objectives:
To construct
6 outdoor tanning pits
skins; to construct
a for large game
Expected
Dutcomes:
Code: 34
Ised For:
ase Study: N
COUNTRY:
BOTSWANA
IAA: 637-83-010
PROJECT TITLE:
Bobonong
Secondary School Poultry
COMMUNITY GROUP: Bobonong Farm
Secondary School
PCV NAME:
Brian Smith
Beneficiaries: Direct:
440 Indirect:
0
06/10/85 to:
08/10/85
Project Complete? N
ACN Status:
N
Classification- Primary:
1 Activity Code:
110
Secondary:
6
700.00
SPA Contribution:
Community Contribution:
700.00
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The agriculture
dept. of the school determined
Addressed:
that the nutitional
needs as
well as
the education
school.
3bjectives: To contruct
and equip a chicken
iated structures for
a complete coop and assoc
poultry farm at
.xpected
Code: 23
be
a source of
revenue
the school.
for
pa Funds
Construction
materials, hens, feed,
vaccinations,
ise Study: N
COUNTRY: BOTSWANA
IAA: 637-83-011
Beneficiaries:
Direct: 0 Indirect: 2500
Secondary: 0
supply of eggs.
of piping.
Expected Code: 31
Outcomes:
Higher yield from garden as a result of decreased
Spa Funds
Construction materials and their transportation.
Used For:
Case Study: N
COUNTRY: BOTSWANA
IAA: 637-83-012
PROJECT TITLE:
PJSS Food Production Project
PCV NAME:
A. Braceras, C. Kimball
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 02/01/86 to:
07/27/86
Project Complete? N
ACN Status: N
Secondary: 6
Total Project Costs: 3790.00
SPA Contribution: 3790.00
Community Contribution: 0.00
Inkind Labor: 0.00
Inkind Materials: 0.00
Inkind Land: 0.00
Problems There are no eggs available for consumption,
Addressed:
is
there vegetable production nor
is
a need to improve the diets of
the villagers
of
a poultry system and a garden/orchard.
Poultry
Expected Code: 21
that knowledge of
Case Study: N
COUNTRY: BOTSt'AINA
lAA: -637-83-013-
Beneficiaries: Direct:
10 Indirect: 2500
Secondary: 3
Objectives: To build
a 2 x 5 m market shelter
Expected Code: 34
in a centralized location.
Case Study: N
IAA 8:
IAA NAME:
-83-686-025-
Siniena Weaving and Dyeing
1400.00
200.00
-83-686-026-
Project
-83-686-027-
Bombore Pepiniere and Garden
9500.00
2700.00
-83-686-028-
Project
1800.00
-83-686-030-
Raising Project
800.00
-84-686-012-
Project
-85-686-020-
2037.00
3327.00
-85-686-029-
Poutry Project
-85-686-031-
Leo Community Center Project
4400.00
-85-686-032-
10000.00
-86-686-033-
2580.00
6002.40
Mill
Secondary: 0
Expected Code: 34
weaving centers.
Used For:
Case Study: N
COU: .coux
I,,,Y
),-..
3L3U,:iAiI.A FAVSG
:fA-6
- u -i3 - 2 5-
PCV UAA;U£:
WiijLiam Brawner
i)rect: 16 Indirect: 0
impLyLenjjion Period:
ifro,i:
0'/01/85 co:
07/31/86
Cormmaunit-y CouiLribution:
0.00
Jbjective2 : To e-CLabiii
a iuual. seaving and dyeing
including
a credit fund.
project
Some looms will be provi
ded on credit Dy ORD.
Profit
remaining will be
Expecteu Code: 32
L,-e:
Ouo 'omen wii± gain the ability
to earn a significant
nutrition of
their families.
Used For:
Case Study: N
PROJECT TITLE:
Leo PJA Credit Fund Project
COMMUNITY GROUP:
FJA de Leo
PCV NAME:
Tom Trieman
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from: 09/01/85
to: 08/31/86
Project Complete? N
ACN Status: N
Classification- Primary:
2 Activity
Code: 270
Secondary: 0
SPA Contribution:
9500.00
Community Contrioution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems There is
a need in the
area for small
Addressed:
such as gardening, small projects
animal
raising, animal
acies. There is
a need to extend credit to
these
worthy undertakiigs.
Expected Code:
43
Outcomes: Credit agent wi-L
be trained in bookkeeping
and
of
income and increased standard of
living.
Used For:
Case Study: N
IAA: 686-83-027
PROJECT TITLE:
Bombore Pepiniere
and Garden Project
COMMUNITY GROUP:
Bombore
PCV NAME:
John Waite
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 09/01/85
to: 08/01/86
Classification- Primary:
1 Activity
Code:
530
Secondary: 0
SPA Contribution:
2700.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
People of Pombore have no
local source
Addressed:
and vegcetables,
and are of fruits
sources.
Objectives:
To construct irrigation
system to lift water from
orchadd ind
4arden projects. Secondary
source will
Expected Code:
40
Used For:
Case Study: N
COMMUNITY GROUP:
Centre de Formation
PCV NAME:
Rachel Robitailie
Beneficiaries:
Direct: 110 Indirect: 0
Classification- Primary:
1 Activity Code: 110
Secondary: 0
SPA Contribution:
1800.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Four villages of the region suffer
Addressed:
poor diets and have very limited frow protein
income earning
potential.
Expected Code: 23
Outcomes:
Dissemination of knowledge about
poultry-raising
the
centers;
improved nutrition for the communities.
Case Study: N
PROJECT TITLE:
Fada N'Gourma ORD
Poultry Project
COMMUNITY GROUP:
ORD of Fada
N'Gourma
PCV NAME:
Rachel Robitailie
Beneficiaries: Direct:
10 Indirect:
0
Implementation Period:
from: 12/01/85
to: 11/30/86
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity
Code: 110
Secondary: 6
SPA Contribution:
800.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems Nutrition of
the people in
the
Addressed:
the salaries of ORD personnel area is poor, and
are insufficient to
Expected Code:
Outcomes:
Supply 21
Used For:
Case Study: N
PROJECT TITLE:
Haba Well and Garden Project
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 6
SPA Contribution:
1600.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems Unavailability of
water. Wells previously con-
successful.
Expected Code: 23
Generation of
income from sale of vegetables.
Case Study: N
PCV NAME:
Pam Stello
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 03/01/85 to:
03/01/86
Project Complete? N
ACN Status: N
110
Secondary: 0
SPA Contribution:
2800.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Area has suffered poor harvests
due to drought.
Addressed:
This has caused emmigration
to neighboring
season.
Objectives: To build
two wells and a chicken
coop for meat and
egg production.
Expected Code: 14
Outc'omes:
Students and members will learn improved methods
of chicken raising.
sales of products.
Used For:
Case Study: N
PROJECT TITLE:
Grain Mill and Cereal Store
PCV NAME:
Louis Verchot
Beneficiaries: Direct:
8000 Indirect: 0
Implementation Period:
from: 12/01/85 to: 11/30/86
Classification- Primary:
1 Activity Code: 260
Secondary: 0
SPA Contribution:
4400.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems There is
no grain mill in Koukouldi, so women
Expected Code: 34
Spa Funds
Mill, motor, parts, installation.
Used For:
Case Study: N
COMiI1UIITY GROUP:
Secondary: 0
Inkind Labor:
0.00
Inkind Materials: 0.00
inkind Land: 0.00
Probiems Deo suffer.; from the lack of basic infrastructure
Addressed: necessary to accommodate large scale seminars and
training sessions.
The gov't services that are
E."pected Code: 41
Outcomes: Long-term impact of project will be
the dissemin
ation of information and the consequent passing-on
of knowledge gained at
the various seminars.
Used For:
Case Study: N
COMMUNITY GROUP:
Beneficiaries: Direct:
103 Indirect:
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
2300.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems People of
area have low protein intake
Addressed:
have limited income generating and also
potentiz.l. Although
vaccination
pure breeds.
Expected
Outcomes:
Code: 31
stock and
vaccination programs.
Used For:
Case Study: N
IAA: 686-86-033
PROJECT TITLE:
Sassia
Women's Group Grain Mill
COMMUNITY GROUP:
Sassia
Women's Group
PCV NAME:
Beneficiaries: Direct:
300 Indirect:
i000
06/01/86 to:
05/31/87
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity Code:
260
Secondary: 0
6002.40
SPA Contribution:
5850.00
Community Contribution:
152.40
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Women spend 2-5 hrs per
day hand
Addressed: or
walk 7km to pay for grinding. grinding grains,
time to tend
to all of
these
chores.
Objectives: To install
a
grain mill with a diesel
motor. The ORD of Tenado Hatz E75
will
train the
women in
Expected
Code: 40
Outcomes:
Women will spend less time preparing
grain and
more time on
ag.production.
in women's group.
Spa Funds
Purchase, delivery,
Used For:
fuel and material and installation of mill;
Case Study: N
** COUNTRY: CAMEROON
-84-694-010- Metta Sector/Momo Co-op Tool 2466.00
Project
-84-694-011- moghamo Sector/Momo Women's 1457.50
Garden Tools
-85-694-001- Ngie Sector/Momo Womens Coop 2604.00
Tool Proj
-85-694-002- Yoko Fishculture Project 5935.00
-85-694-003- Kapsiki Mogode Women's Field 5570.30
Project
-85-694-004- Grinding Machines for Bagara 2817.00
Women Co-op
-85-694-005- Mavoumay Sweet Potato 2966.60
Development
-85-694-006- Fisheries Development 18164.50
Project Phase III
-85-694-007- Improved Breed Chicken Prod. 3005.00
Project
COUNTRY: CAMEROON
IAA: 694-84-010
PCV NAME:
E Griffen Jack/Ronae Wilkerson
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 08/01/85
to: 08/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity Code:
210
Secondary: 0
SPA Contribution:
2466.00
Community ContributioN:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
lack of
hand tools and a lack of means
for trans
porting their crops and supplies.
merit
to village groups. Push-pushes and
wheel
Expected Code: 43
profits.
Spa Funds
Purchase of tools and implements
and garden
Case Study: N
COUNTRY: CAMEROON
IAA: 694-84-011
PROJECT TITLE:
Moghamo Sector/Momo
Women's Garden Tools
COMMUNITY kROUP:
Moghamo Secotr/Momo
PCV NAME:
Women Coop
Beneficiaries:
Direct:
160 Indirect:
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACN Status: N
Secondary:
0
SPA Contribution:
1457.50
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The women need tools
Addressed:
well as
the means for managing food crops as
and market.
and carts;
to enable women to
expand their farms
to allow a greater
Expected Code:
43
Outcomes:
Increased profit due to better
cultivation as
a
Better use of
Spa Funds
Hand tools, garden
equipment.
Used For:
Case Study: N
Secondary: 0
Expected Code: 43
income.
Used For:
Ca.;e iudy: N
COUNITRY: CAMEROON
IAA: -694-85-002-
fish industry.
Expected Code: 40
industry.
Case Study: N
COUNTRY: CAMEROON
IAA: 694-85-003
PROJECT TITLE:
Kapsiki
Mogode Women's Field Project
PCV NAME:
Dawn Chappell
Beneficiaries:
Direct:
30 Indirect:
0
Implementation Period:
from:
10/01/85 to:
09/30/86
Project Complete? N
ACN Status: N
Classification- Primary:
I Activity Code:
210
Secondary:
4
SPA Contribution:
5570.30
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The Kapsiki Mogode
Addressed: Women's group want to
improve
Objectives:
To have two cultivation
periods using peanuts and
potatoes in
the rainy season
dry season;
trees will be and vegetables in the
Expected
Code: 41
Outcomes:
Increased food production/availability
year round;
Introduction of improved
farm techniques/agro
forestry will increase production/income.
wood will be
more available.
Fire
Used For:
and supplies.
Case Study: N
COUNTRY:
CAMEROON
IAA: 694-85-004
PROJECT TITLE:
Grinding Machines
for Bagara Women Co-op
feneiciaries: Direct:
0 Indirect:
0
Implementation Period:
from: 06/25/85
to: 03/15/86
Project Complete? N
ACN Status: N
Classification- Primary:
1
Activity Code:
260
Secondary: 0
SPA Contribution:
2041.00
Community Contribution:
776.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Women need a steady source
Addressed:
market is
unsure of income. The local
Objectives:
To purchase and
install
a grinding machine
millet that will
free the women for
to begin other
income.
Expected
Code: 34
Outcomes:
With increased
income,
women will purchase
ments and seed stock
to improve imple
agricultural
Spa Funds
Grinding machine;
materials and labor to construct
Case Study: N
COUNTRY: CAMEROO1
IAA: -694-85-005-
Secondary: 0
the land.
Expected Code:-34
continuous basis.
Case Study: N
COUNTRY: CAMEROON
IAA: 694-85-006
COMMUNITY GROUP:
Fish Association of Ndelele
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 01/00/86 to: 03/00/86
Secondary: 6
SPA Contribution:
if done by hand.
To create a source
of income year round; to create
Expected Code: 23
Used For:
of diesel and oil, wook to construct "monks"
drainage structures.
Case Study: N
COUJTRY: CAiEr.OOu4
fAA: -694-85-007-
13e-neficiaries:
Direc: 0 Indirect: 0
Implementation Period:
from: 04/01/36 to: 08/01/86
Secondary: 6
SPA Contribution:
1655.00
Inkind Land:
0.00
project.
Expected Code: 32
Outcomes: Increased
revenue and better nutrition through
sale of chickens.
Case Studyi N
IAA #:
IAA NAME:
-84-635-004-
Garden Orchard Project/Sare 1217.00
Mbye/Mansali
Garden
-84-635-C18-
Sotokoi Bee Project 210.00
-84-635-019-
Bessi Young Farmers School 293.20
Garden/orch.
Project
-84-635-026-
G2rden Orchard -- Amendment 809.00
Growers' Assoc.
Garden Project
Garden/Orchard
Kafo
IAA: 635-84-001
PROJECT TITLE:
Trees, Trees
COMMUNITY GROUP: Kuntair and More Trees
PCV NAME:
Mary Reinhold
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from:
09/01/84 to:
09/30/84
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity Code: 350
Secondary:
0
SPA Contribution:
2017.14
Community Contribution:
770.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The village would
like to begin
an orchard
Addressed: in order
to become more self-sufficient project
to nurture the
trees.
to fence trees.
Expected
Code: 14
Outcomes:
Skills in orchard production and maintenance;
increased self-sufficiency.
Case Study: N
COUNTRY:
THE GAMBIA
IAA: 635-84-004
PROJECT TITLE:
Garden Orchard Project/Sare
Mbye/Mansali
PCV NAME:
Michael Hurst
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from: 08/00/84
to: 09/00/84
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
910.00
Community Contribution:
307.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The societies lack the funds to
Addressed:
hectare community garden, build a one
garden.
Objectives:
To clear and fence
a one
hectare garden plot;
to
garden implements.
Expected Code: 34
Outcomes:
Increased food production and income
from produce.
Used For:
Case Study: N
IAA: 635-64-015
PROJECT TITLE:
Sololo Viliage
Woodlot and Garden
COMMUNITY GROUP:
Young Farmers &
Women Societie
PCV NAME:
Julia Morris
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from: 11/00/84
to: 12/00/84
Project Complete? N
ACN Statjs: N
.lassification- Primary:
1 Activity
Code:
510
Secondary: 6
SPA Contribution:
250.00
Community Contribution:
125.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
'roblems
The people of Sololo need assistance in digging
better nutrition.
garden/orchard.
Wells will be built
with cement
xpected Code: 23
atcomes:
Improved level of nutrition as a
result of dry
season gardenihg;
cash income generated
from sale
of
excess produce; better maintenance
of fencing
3ed For:
ise Study: N
Secondary 6
village.
beekeeping technology.
Expected Code: 32
Used For:
Case Study: N
COUNTRY:
THE GAMBIA
IAA: 635-84-019
PROJECT TITLE:
Bessi Young Farmers
School Garden/orch.
COMMUNITY GROUP:
Young Farmers' Club
PCV NAME:
Richard Marx
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from: 08/15/84
to: 03/15/V5
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity
Code:
0
Secondary: 0
SPA Contribution:
293.20
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materiais:
0.00
Inkind Land:
0.00
Addressed:
Objectives:
Expected Code:
0
Outcomes:
Spa Funds
Used For:
Case Study: N
01/28/85 to:
03/01/85
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity
Code:
310
Secondary:
6
SPA Contribution:
340.00
Community Contribution:
230.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The people cf
the
Mt.
Addressed:
of materials necessary Caramel School
are in need
program to
improve the nutritional
quality of the
lunches.
Expected Code:
21
Outcomes:
Better general
health of students
as
a result of
lunches; better
Spa Funds
Tools, materials,
seeds.
Used For:
Case Study: N
Secondary: 6
further away.
Expected Code: 20
Outcomes:
Better health as a result of a safe, sanitary
water supply.
Used For:
Case Study: N
Secondary: 6
garden.
Expected Code: 23
Case Study: N
COUNTRY: THE GAMBIA
IAA: 635-84-026
Secondary: 0
Expected Code: 23
pobibilities.
Used rt :
Case Study: N
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 0
Inkind Land:
0.00
Addressed:
able funds for building a 1 hectare community
Expected Code: 34
Spa Funds
Materials, well pumping machine, transportation.
Used For:
Case Study: N
PROJECT TITLE:
Jarra East Vegetable Growers'
Assoc.
COMMUNITY GROUP:
Jarra East Veg. Growers'
Assn.
Beneficiaries: Direct:
0 Indirect: 0
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The villagers lack the materials
needed to begin a
garden irrigation.
Expected Code: 34
Outcomes:
Increased vegetable garden production, increased
income.
Used For:
Case Study: N
COUNTRY:
THE GAMBIA
IAA: 635-85-102
PROJEC
TITLE:
Seed Store
COMMUNITY GROUP. Village Facility
Development Committee
PCV NA IE:
Gregg M. Burtis
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 12/07/85
to: 03/25/86
Project Complete? N
ACN Status: 1,
Ciassification- Primary:
1 Activity Code: 810
Secondary: 0
7717.46
SPA Contribution:
4234.46
Community Contribution:
3483.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The villages
need
a nearby seed storage
Addressed: as the current facility,
one
is 4 kilometers away
frequently unable to accomodate and
ng in seeds rotting or
Objectives: To construct
a seed store in the area
Expected
Outcomes:
Code: 34
Spa Funds
Materials,
transportation
Used For:
Case Study: N
Secondary: 0
Addressed: facilities.
storing seeds.
Expected Code: 34
Used For:
Case Study: N
PROJECT TITLE:
Tabajang Sub-Dispensary
Beneficiaries: Direct:
0 Indirect: 6350
Secondary: 6
SPA Contribution:
5025.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
The village requires funds for the
Addressed:
and furnishing of a sub-dispensary.
construction
erecting building.
Expected Code: 20
Outcomes:
Not available.
Used For:
Case Study: N
PCV NAME:
Judie Jackson
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 6
SPA Contribution:
603.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The women of Bafi-N'JoLes need to construct a
Addressed: den and adjacent well in order to promote dry
gar-
wire; -.
o construct a 22 meter cement lined well;
packets).
Expected Code: 32
Outcomes:
Increased income and nutritional status as
a
Spa Funds
Labor, materials, seeds, transportation, travel.
Used For:
Case Study: N
COMMUNITY GROUP:
Kalaza Women's Society
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 01/01/86 to:
03/30/86
Project Complete? N
ACN Status: N
340
Secondary: 6
SPA Contribution:
2536.19
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The women need funds for construction of
Addressed:
area for the purpose of improving a garden
nutrition of the
to construct a
Expected Code: 32
Outcomes:
Increase in income and in nutritional
status
Spa Funds
Materials, tools, labor, transportation,
travel.
Used For:
Case Study: N
PROJECT TITLE:
Mansajang Kunda Tesito Garden/Orchard
Secondary: 6
Problems
Tne village needs a means o generating income as
Addressed: weli as
improving nutritional status.
Expected Code: 32
Outcomes: Increase in
income and in health resulting from
Used For:
Case Study: N
Secondary: 0
SPA Contribution:
343.00
Inkind Labo,:
0.00
Inkina Land:
0.00
Prob±e.ns
The Society needs to relocate their garden;
the
cLeated, it wiii
require a source of irrigation.
E;xpected Code: 32
Outcoiaes3:
Increased food production and income generation.
Spa Funds
Materials, labor, transportation, trave±.
Used For:
Case Study: N
Beneficiaries: Direct:
0 Indirect:
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
4142.85
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The program participants
Addressed:
S.P.A. projects.
Because need to
secure cement for
of economic
the country, cement dealers currently changes in
as a reserve stock
cement
Used For:
Case Study: N
IAA:
635-8s-113
PROJECT TITLE:
PCV NAMEs:
Paul Clements
Beneficiaries:
Direct:
20 Indirect:
ImPlementatilon 0
Period:
from:
05/01/86
to:
Project Complete? 07/25/86
N
ACN Status:
Classification-
N
Primary: 1 Activity
Code: 340
Secondary: 6
Total Project
SPA Contribution:Costs: 2160.00
Community 1680.00
Contribution:
Inkind Labor: 480.00
Inkind Materials: 0.00
Inkind Land: 0.00
Problems 0.00
Addressed:
Many farmers in the
trained in
to supplement
techniques
and income.
Objectives:
To set up
a model garden;
farmers. to other
Outcomes:
Use of
improved
the community; gardening
techniques
their
Spa Funds
Materials
transportation.
Used For:
Case Study:
N
PROJECT TITLE:
Markec Project
COMMUNITY GROUP:
Viliage of Berending
Beneficiaries:
Direct: 0 Indirect: 0
Secondary: 0
SPA Contribution:
451.00
Inkind Labor:
0.00
inkind Land:
0.00
Problems
Tne Vi±±age needs materia~- to compoete a market
Addressed: project that was
started but
never finioied.
Expected Code: 43
Outcomes: Utilization of
market buioding.
Used For:
Case Study: N
** COUiTRY: GHANA
-85-541-001-
Biakove ';lomen'L. Cassava
430.00
Gra ter
-,5-641-003-
Sogakofe Secondary School 2283.35
Pouitry Pro 3 .
-65-641-004-
Beyoro Beekeeping Project
750.00
-j5-641-007-
jamas BacKyard Rabbitry
626.00
-85-641-008-
St. Francis Garden Fence
310.00
-85-641-009-
Adiembra Pubiic Toiiets
805.00
Project
-85-641-010-
Akuapem Small-Scaie
2911.00
Industries
-85-641-011-
Atwa Rainwater Catchment
5210.78
Pond
COUNTRY: GHANA
IAA: 641-85-001
PROJECT TITLE:
Blakove Women's Cassava Grater
Beneficiaries: Direct:
0 Indirect:
0
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
308.33
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Women's group needs grater to process
cassava into
Addressed:
Gori for income generation.
grater.
Expected Code: 34
Outcomes:
Women will be able to expand production,
reinvest
Spa Funds
Purchase of the grater and transportation.
Used For:
Case Study: N
COUNTRY: GHANA
IAA: 641-85-003
PROJECT TITLE:
Sogakofe Secondary
School Poultry Proj.
Beneficiaries:
Direct:
0 Indirect:
0
Project Complete? 14
ACN Status: N
Secondary: 0
SPA Contribution:
750.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The school needs a source of income
Addressed:
buy the needed furniture.
in order to
Objectives:
To begin a poultry project at the
school, and to
ExpecLed Code: 34
Outcomes:
Project will be self-sustaining
and the profit
Spa Funds
Items for poultry productions:
starter feed,
Used For:
chicks, feeders & waterers, medicine,
repairs.
Case Study: N
COUNTRY: GHANA
IAA: 641-85-004
PCV NAME:
Beneficiaries:
Direct: 27 Indirect: 0
Classification- Primary:
1 Activity Code: 140
Secondary: 0
SPA Contribution:
750.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Funds are needed to initiate a beekeeping
project
pollination.
area by
Expected Code:
31
Outcomes:
Production of honey and wax, income generation
and
Spa Funds
Lumber and top bars to construct
hives.
Used For:
Case Study: N
COUNTRY: GHANA
IAA: 641-85-005
PROJECT TITLE:
Water Supply and Piggery
for School Farm
COMMUNITY GROUP:
Holy Child School Cape
Coast
Beneficiaries:
Direct: 0 Indirect: 0
Classification- Primary:
5 Activity Code:
50
Secondary: 0
SPA Contribution:
566.67
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
School is attempting to address the problem
Addressed:
food production by teaching of
Objectives:
To replace decayed piping
that supplies water
to
functional.
Expected Code: 13
experience.
It will also provide a source
income through the sale of crops that
are of
produced
Used For:
Case Study: N
COUNTRY: GHANA
IAA: 641-85-006
PROJECT TITLE:
NORBAG Apiculture
PCV NAME:
Julie Dahlen
Beneficiaries:
Direct: 0 Indirect: 0
Implementation Period:
from: / / to: / /
Project Complete? N ACN Status: U
Classification- Primary:
1 Activity Code:
140
Secondary: 0
SPA Contribution:
677.50
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Since tne NORBAG is newly formed,
they do not have
Addressed:
the funds for project development.
They lack the
Expected Code: 34
beeswax.
Spa Funds
Materials for beehives and apiculture
equipment.
Used For:
Case Study: N
COUNTRY: GHANA
IAA: 641-85-007
PROJECT TITLE:
Jamas Backyard Rabbitry
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 01/24/86
to: 02/24/86
Project Compiete? N
ACN Status: N
Secondary: 0
SPA Contribution:
626.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Deaf school is lacking
a protein supply for the
Expected Code: 24
Outcomes:
Increased meat availability; community involvement
Used For:
Case Study: N
COUNTRY: GHANA
IAA: 641-85-008
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 0
Inkind Land:
0.00
Addressed: thieves.
Objectives: To construct
a fence around the vegetable garden
at the school.
Expected Code: 30
Used For:
Case Study: N
COUNTRY: GHA1A
IAA: 641-85-009
PCV NAME:
James Buzzeli
Beneficiaries:
Direct:
500 Indirect:
560
Secondary: 6
SPA Contribution:
305.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Public toilet currently in
Addressed:
open pit covered with logs, use consists of
an
and is
infested with
Facility is
constructed in sections so
that it can
be moved
when necessary.
Expected Code: 20
Outcomes:
Because of privacy and sanitary
considerations,
Spa Funds
Construction materials,
labor, transportation.
Used For:
Case Study: N
COUNTRY: GHANA
IAA: 641-85-010
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 2
Problems
There is a need to improve processing methods for
Addressed: converting
raw materials to consumeable products
in this zone.
establish groups ti
. will operate industries in
Expected Code: 31
Outcomes:
Profitable industries will be established whose
Used For:
site and to purchase motors to drive machinery.
Case Study: N
COUNTRY: GHANA
IAA: 641-85-011
PROJECT TITLE:
Atwa Rainwater Catchment
Pond
COMMUNITY GROUP:
Project Complete? N
ACN Status: N
Secondary: 6
SPA Contribution:
5210.78
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
followed.
Expected Code: 31
Outcomes:
Pond will supply water year-round and will serve
Used For:
Case Study: N
** COUNTRY: KENYA
- -615-
0.00
-83-615-918-A
Kahatia Secondary School:
2771.86
Water Tank
-83-615-929-
Solar Electric Lighting
9178.60
Instal.& Trainin
Water Proj.
Tilapia Project
-83-615-938-
Iriga Self-Help Group
173.00
Project--Tilapia
-83-615-939-
Pusu Women's Group Heifer
7236.00
Project
-83-615-940-
Metkel Sec. School Water
2516.65
Catchment Tanks
-83-615-941-
Kithimani Prim.School
2140.52
Self-Help Group
-83-615-942-
North Imenti Fish Project
3772.00
-83-615-943-
Integrated Aquaculture
973.00
Program
-83-615-944-
Muruka Primary School Water
4738.38
Tank
-83-615-945-
Mugecha Primary School
-83-615-946-
2562.71
Catchment
-83-615-947-
Kagaari Honey Fish Farmer's
221.95
Apicult.Proj
-83-615-948-
PCEA Mumo Water Project
1243.12
-83-615-949-
Maseno Polytechnic Water
2526.32
Projects
-83-615-950-
Laikipia Dist.Water for Tree
1608.69
Nurseries
Tanks
-83-615-958-
National Youth Service
378.00
Nursery
-83-615-959-
St. Christopher's Women
1913.28
Dairy Project
-83-615-960-
Ruai Mikati Women's Group
6449.38
(Bakery)
-85-615-962-
Bungoma Agroforestry Project
1134.00
-85-615-963-
Barazani Secondary School
195.47
Poultry Proj.
-85-615-964-
Wareng Poultry Farm
1199.37
Sewing Business
Keeping Scheme
IAA f:
IAA NAME:
-85-615-967-
Upendo Women's Group Chicken 3641.85
-85-615-968-
Project
Biogas Demonstration
1333.33
-85-615-970-
Amani Beekeeping Project
-85-615-971-
266.50
-85-615-972-
Lusava Youth Grp & Wekhanalu 425.00
Women's Grp
-85-615-973-
Kibwezi Parrish Development 767.00
-85-615-974-
Project
Water Tank
-85-615-975-
Tool Repair
-85-615-977-
781.25
-85-615-978-
Kimbo Women's Multipurpose 1738.00
-85-615-980-
Coop Poultry
-85-615-982-
Kibwezi
-85-615-984-
633.00
Tilapia-Duck Project,
1339.12
Kimilili Division
-85-615-986-
Upendo Bakers
-85-615-988-
4278.69
Abayo Women's
6545.00
Irrigation/Vegetable Proj.
HA-86-615-954-
HA-86-615-955-
Keringet Women's Group
1463.33
HA-86-615-956-
Pipeline Ext.
Self-Help Group
HA-86-615-969-
Waita Hurambee Water Tank
3127.50
Project
HA-86-615-976-
Water Tank Project
IIA-86-615-979-
702.13
fA-86-615-981-
1125.00
HA-86-615-983-
2581.31
919.73
Water Tank
-86-615-985-
Rain Tank Construction
HA-86-615-987-
921.00
Water Project
COUNTRY: KENYA
IAA: 615-83-918
PROJECT TITLE:
Kahatia Secondary School: Water
Tank
COMMUNITY GROUP:
Kahatia Secondary School
Beneficiaries:
Direct: 304 Indirect: 0
Classification- Primary:
5 Activity Code: 540
Secondary: 6
SPA Contribution:
2240.00
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed:
meet the demands of the school. Current tanks
can
Expected Code: 21
Outcomes:
In addition to providing water, this project will
serve as
a water catchment demonstration.
Case Study: N
COUNTRY: KENYA
IAA: 615-83-929
PROJECT TITLE:
Solar Electric Lighting Instal.& Trainin
Beneficiaries: Direct:
426 Indirect: 0
Secondary: 0
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed:
demonstrate solar electricity applications to
Expected Code: 40
Outcomes:
Through the installation of photovoltaics and
Spa Funds
Purchase of solar cell modules and inverters;
support costs.
Case Study: N
COUNTRY: KENYA
IAA: 615-83-936
PCV NAME:
Terry L. Severson
Beneficiaries:
Direct:
100 Indirect:
Implementation Period:
from: 10/01/85
to: 12/01/85
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity Code:
540
Secondary: 0
SPA Contribution:
898.00
Objectives: To build
a 100,000 liter
ferrocement water
tank
Expected Code:
31
nursery.
Case Study: N
COUNTRY: KENYA
IAA: 615-83-937
COMMUNITY GROUP:
Kirinyaga Fish
Farmers' Assoc.
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 08/01/85
to: 12/01/85
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
58.00
Community Contribution:
53.85
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Fish currently used in fishculture
Addressed:
do not meet the needs in
the region
of
the fishfarmers.Fishfarm
ers need a larger
fish with more
flesh to be mark
etable. Carp culture is
viable,
but natural repro
duction is
rare and art.rep.is not
implemented.
Kirinyaga District.
Expected Code:
34
fish and
its cultivation.
Spa Funds
Purchase of fingerlings.
Used For:
Case Studys N
COUNTRY: KENYA
IAA: 615-83-938
PROJECT TITLE:
Iriga Self-Help Group Project--Tilapia
COMMUNITY GROUP:
Iriga Self-Help Group
PCV NAME:
Jayne Brim
Beneficiaries: Direct:
0 Indirect:
200
09/01/85 to:
12/01/85
Project Complete? N
ACN Status: N
Classification- Primary:
I
Activity Code:
710
Secondary:
0
SPA Contribution:
58.00
Community Contribution:
115.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The current fishculture development
Addressed: suited to
the fish is
un
climatic conditions of
the
area and
is too prolific.
Expected
Code: 34
Outcomes:
Since Tilapia reproduce
in
pond situations, the
available source of
fingerlings
to
the region will
Spa Funds
Purchase of 1000
Tilapia Nilotica fingerlings.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: -615-83-939
Addressed:
ion, for more income, for awareness of low product
Objectives: To select 10
group members to accept and maintain
cattle
Expected Code: 0
Outcomes:
Improved nutrition of recipients and families;
Case Study: N
COUNTRY: KENYA
IAA: 615-83-940
PROJECT TITLE:
Metkel Sec. School Water
Catchment Tanks
PCV NAME:
John Binigamon
Beneficiaries: Direct:
130 Indirect:
Project Complete? N
ACN Status: N
Classification- Primary:
5 Activity Code:
540
Secondary: 6
SPA Contribution:
1596.58
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
of water.
Objectives:
Build 2 10,000 gallon tanks.
Expected Code: 21
Outcomes:
Water will be supplied for
many school needs.
Spa Funds
Construction materials, transportation
and labor
Case Study: N
COUNTRY: KENYA
IAA: 615-83-941
PROJECT TITLE:
Kithimani Prim.School
COMMUNITY GROUP: Kithimani Primary Self-Help Group
PCV NAME:
School
Alex Silverman
Implementation Period:
from:
12/01/85 to: 02/01/86
Project Complete? N
ACN Status: 14
Secondary: 6
SPA Contribution:
1616.15
Community Contribution:
524.37
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
School is in area
Addressed: by drought. Water that has been seriously affected
as water for
a tree
nursery.
liter tank to
Expected
Outcomes:
Code:
School 21
Used For:
Case Study: N
PROJECT
E: North Imenti
COMIMUNITY -.iOUP: Various indiv.Fish Project
and groups
?CV NAME:
John S. Howley
3eneficiar-es: Direct:
0 Indirect:
000
irpiemenc:Lion Period:
from:
12/01/85 to:
05/01/86
Secondary: 0
SPA Contribution:
1886.00
Community Contribution:
1886.00
inKind Labor:
0.00
inkind Materiais:
0.00
inkind Land:
0.00
Probiems
Productivity of fishculture
in
Addressea: livision is quite low.
In order the north Imenti
to raise product
ivity, fishcuiture efforts must
be intensified
Objectives:
Purchase and transport
Tiiapia fingerlings to
a school;
to excavate & construct
new fish ponds.
Expected
Code: 31
Outcomes:
Improved management of culture
ponds; institute
Case Scuuy:
COUNTRY: KENYA
IAA: 615-83-943
PROJECT TITLE:
Integrated Aquaculture Program
PCV NAME:
Alf Haukenes
Beneficiaries: Direct:
30 Indirect:
Implementation Feriod:
from: 12/01/85 to:
02/01/86
Project Complete? N
ACN Status: N
110
Secondary: 6
SPA Contribution:
671.25
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Group wants to increase production
Addressed:
their 400m pond, which is potential of
chicken coop to
supply chicken manure
as
increasing production.
Expected Code: 32
Outcomes:
Group will learn
care of layer hens and
marketing
Used For:
ing hens; supplies to begin
production.
Case Study: N
COUNTRY: KENYA
IAA: 615-83-944
PROJECT TITLE:
Muruka Primary School
Water Tank
COMMUNITY GROUP:
Muruka Primary School
PCV NAME:
Thomas Truck
Beneficiaries: Direct:
1000 Indirect:
Implementation Period:
from: 12/01/85 to: 02/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
4 Activity
Code:
540
Secondary: 6
SPA Contribution:
3439.13
Community Contribution:
1299.25
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Addressed:
able and potential health is unreli-
deforestation.
Objectives:
To construct two 100m
combined hemisphere/cylinder
ferrocement tanks at
the school. This
would pro
vide sufficient clean water for drinking
plus
Expected Code: 21
Outcomes:
In addition to the provision of water,
the project
construction.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-83-945
PROJECT TITLE:
Mugecha Primary Schoo.
CO14MUNITY GROUP:
Mugecha Primary Schoo±
PCV NAHE:
Thomas Truck
Beneficiaries:
Direct:
816 Indirect:
Implementation Period:
from: 12/01/85
to: 02/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
2 Activity
Code:
540
Secondary: 6
SPA Contribution:
1881.84
Community Contribution:
680.87
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
School needs sanitary, reliable source
Addressed:
for
tree nursery irrigation of
water
ferrocement tank at
the school. This
would provide
Expected Code:
21
Outcomes:
In addition to provision of water,
tne project
wili be used
to train students in
tank
construction.
Used For:
Case Study: N
COUNTRY:
KENYA
IAA: 615-83-946
PROJECT TITLE:
Eldoro
High School Roof Catchment
COMMUNITY GROUP:
Eldoro
Hign School
PCV NAME:
Orlando Romero
Beneficiaries:
Direct:
240 Indirect: 0
Implementation Period: from: 01/01/86 to: 02/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
5 Activity Code:
540
Secondary:
6
1939.55
SPA Contribution:
1533.30
Community Contribution:
406.25
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Current water
source is insufficient
to
Addressed: needs of
the school. All meet the
Objectives:
To build a roof-catchment,
72,000 liter strong
block water tank at
the
school. Existing borehole
Expected
Code: 24
Outcomes:
Tank will store enough water
to supply the needs
of
the school for 30 day
periods. This will be
a
Spa Funds
Construction materials,
transportation, labor.
Used For:
Case Studys N
COUNTRY: KENYA
IAA: 615-83-947
PROJECT TITLE:
Kagaari Honey Fish Farmer's Apicult.Proj
Beneficiaries: Direct:
3 Indirect: 0
Implementation Period:
from: 02/01/86 to: / /
Project Complete? N ACN Status: N
Secondary: 6
SPA Contribution:
162.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Group needs a project to diversify and increase
Expected Code: 31
Enterprises, Thika.
Case Study: N
COUNTRY: KENYA
IAA: -615-83-948
PROJECT TITLE:
PCEA Mumo Water Project
COMMUNITY GROUP:
PCEA Mumo Water Project
Group
Classification- Primary:
3 Activity
Code:
0
Secondary: 0
SPA Contribution:
977.50
Community Contribution:
0.00
Inkind Labor:
265.62
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Water
source is needed to
irrigate vegetable gard-
Addressed:
ens year round, as
the people
find it difficult to
A substantial
amount of excavation
and
construct
ion has already been completed.
Objectives:
To build an irrigation
system
to serve 362 acres.
Expected Code:
0
Outcomes:
Irrigation system will allow for year-round
veg
etable production which will be both
a source of
Case Study: N
COUNTRY: KENYA
IAA: 615-83-949
PROJECT TITLE:
Maseno Polytechnic
COMMUNITY GROUP: Water Projects
Maseno Village
PCV NAME: Polytechnic
Mary Moband
Beneficiaries: Direct:
233 Indirect:
0
Implementation Period:
from: 02/01/86
to:
04/01/86
Project Complete? 11
ACN Status:
N
Classification- Primary:
5 Activity Code:
540
Secondary:
6
SPA Contribution:
2564.32
1860.00
Community Contribution:
704.32
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Polytechnic
Addressed:
age facility.has no permanent water source or
stor
Springs currently in
ease carrying potential. use have dis
Polytechnic needs reli
able, adequate source
of water.
Objectives:
To build
3 water catchment tanks
nic, to enclose one at the polytech
of the springs in
a
and to build cement spring box
use labor of students
community members.
and
Expected
Code: 21
Outcomes:
Tanks will provide water
for
tho campus;
AT
tion & experience for educa
students; demonqtration
masonry and metal work of
of
clean water.
Spa Funds
Construction
materials for tanks.
Used For:
water storage Spring box and
jars.
Case Study: N
COUNTRY: KENYA
IAA: 615-83-950
PROJECT TITLE:
Laikipia Dist.Water
for
Tree Nurseries
COMMUNITY GROUP:
Laikipia Primary
Scilools
PCV NAME:
Sally Resnick
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 01/01/86
to: 04/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity
Code: 540
Secondary: 4
SPA Contribution:
1400.00
Community Contribution:
208.69
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Several primary schools
in the
Addressed:
permanent water storage district have no
requirements.
Objectives:
To construct 3
500-gallon tanks at four primary
schools.
Expected Code:
34
Outcomes:
Schools will be supplied with water
storage fac
ilities in order
to implement
tree
nurseries nnd
a source of
3pa Funds
Construction materials
and transportation.
ned For:
Case Study: N
COUNTRY: KENYA
IAA: 615-83-951
PROJECT TITLE:
Mitaboni Health
Center Water Tanks
COMMUNITY GROUP:
Mitaboni Health
Center
PCV NAME:
Deanna L. Cathcart
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 02/01/86
to: 04/01/86
Project Complete? 1
ACN Status: 11
Classification- Primary:
5 Activity
Code:
540
Secondary: 6
SPA Contribution:
2735.00
Community Contribution:
924.50
Inkind Labor:
0.00
Inkind Materials:
0.00
Iakind [,and:
0.00
supply,
as 9 of 13 water
tanks
have rusted out,
resuiting in:
closure of maternity
ward; spread of
Objectives:
To repair metai
tanks,
turning them into permanent
Expected Code: 21
Outcomes:
Project will allow local fundis
and students to
ferrocemont
catchment tank.
Case Study: N
COUNTRY: KENYA
IAA: 615-83-953
School
PCV NAME:
Charles Juhn
Beneficiaries:
Direct: 506
Indirect:
0
Implementation Period:
from: 02/01/86
to: 05/01/86
Project Complete? N
ACN Status: U
Classification- Primary:
5 Activity Code:
540
Secondary: 6
SPA Contribution:
420.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
School needs reliable water
source on site. A comp
Addressed:
rehensive tree planting scheme
has been implement
ed and needs water. Students also need sanitary
source of
water for drinking.
school.
Expected Code: 21
Outcomes:
In addition to providing water, project will serve
catchment construction.
Used For:
Case Study: N
1AA: -615-83-95il
PROJ!"CT Tjj: Liunal Yuutil Service Iur:;ery
CUNIUIYY GROUP:
i flC cyiu.,:
L ,)iruCL: ) ifldLc±CL: 0
i±;
Problems; TheLLue
11. 1lUL eLnuu'!i Water available to irrigate
Addressed: the gLoup'., Jeediing nursery. The only
other
source oL Leudling2
it,90 kn away.
Expected Code: 34
Case Study: N
COUNTRY: KENYA
IAA: -615-83-959-
COMMUNITY GROUP:
St. Christopher's
Womens Group
PCV NAME:
Ricardo Sitchin
Beneficiaries:
Direct:
25 Indirect:
150
Implementation Period:
from: 03/15/86
to: 06/01/86
Secondary: 3
SPA Contribution:
1447.13
Community Contribution:
466.15
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
There is little commercial dairy
Addressed: farming;
milk
areas.
Objectives:
fo build an
animal shed,
purchase a second grade
cow
and buy supplies
to start commercial
milk
production.
Expected Code: 34
Outcomes:
The women will have
themselves and to
Invest in other
income
generating projects.
Spa Funds
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-83-960
PROJECT TITLE:
Ruai Mikati Women's Group (Bakery)
Beneficiaries:
Direct: 26 Indirect: 0
Secondary: 1
SPA Contribution:
4793.13
Inkind Land:
0.00
Addressed:
and needs improved equipment for increased pro
duction.
They also lack means to transport the
bread.
Expected Code: 31
Outcomes: Project will provide bread for the women and their
bread.
Case Study: N
COUNTRY: KENYA
IAA: 615-83-961
Beneficiaries: Direct:
240 Indirect: 0
Implementation Period:
from: 04/15/86 to: 07/15/86
Secondary: 6
SPA Contribution:
1900.00
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed:
needed to grow fruits and vegetables as well as
cattle in order
to resolve a nutrition imbalance
Objectives: To implement
a micro irrigation scheme of approx.
Expected Code: 32
practices.
Case Study: N
COUNTRY: KENYA
IAA: 615-85-962
PROJECT TITLE:
Bungoma
Agroforestry Project
COMMUNITY GROUP: 16
separate
PCV NAME:
groups
Tom Sullivan
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACN Status:
N
Classification- Primary:
4 Activity Code:
440
Secondary:
0
SPA Contribution:
1134.00
1134.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
inkind Land:
0.00
Problems
As result
of severe
fuelwood shortage
Addressed: quent deforestation, and
conse
local
self-help groups
mandated to
start tree were
Objectives: To purchase
tools
for 16 self-help
to increase
seedling production. group nurseries
species will
also be although timber
erected.
Expected
Code: 40
Outcomes:
Tools will be used
to create
more labor efficient,
productive nurseries.
The seedlings will be
for
outplanting in agroforestry used
reforestation efforts.
Used For:
Case Study: N
COUNTRY:
KENYA
IAA: 615-85-963
PROJECT TITLE:
Barazani
Secondary School Poultry Proj.
COMMUNITY GROUP:
Barazani
Secondary School
PCV NAME:
Lisa Engstrom
Beneficiaries: Direct:
125
Indirect:
0
05/01/86 to:
06/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
1
Activity Code:
110
Secondary:
0
SPA Contribution:
130.00
Community Contribution:
65.47
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Techniques of
raising poultry
Addressed: crude. Few eggs
are left for in the area are
consumption, as
most
are
hatched. Due to predation
and disease, few
laying hens.
Expected
Code: 32
Outcomes:
Production of
one egg per
chicken per day, giving
students an
egg twice a week.
Profit may be rein
vested to expand the project
in the future. Pro
ject will serve as
a model
for private chicken
projects.
Spa Funds
Construction materials,
Used For:
supplies to construct equipment, transportation,
Case Study: N
COUNTRY: KENYA
IAA: 615-85-964
PROJECT TTTLE:
Wareng Poultry Farm
PCV NAME:
W. Hodding Carter
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: / / to: / /
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity
Code: 110
Secondary: 0
SPA Contribution:
900.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
experience in an agri
culture program.
Objectives: To construct
a chicken house
complete with feeding
troughs
and coops for 100 chickens.
Expected Code:
31
Outcomes:
This will be a demo project for the students,
can gain hands-on experience in construction who
and
Spa Funds
Materials to construct
the
chicken project.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-85-965
Beneficiaries: Direct:
78 Indirect: 0
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
560.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
There is a need for a sewing business that
Addressed: is con-
venient to
the village. The Mwangaza Women's
would like to start such a business, but they Group
lack
the funds.
for
Expected Code: 31
Outcomes:
Women will learn sewing and business
management,
Spa Funds
Sewing machines and a sewing instructor.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-85-966
PROJECT TITLE:
Mlondo Women's Group Pig Keeping Scheme
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: / / to: / /
Project Complete? 1N ACN Status: N
Secondary: 0
SPA Contribution:
1365.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems Group's
current pig-raising project is overcrowded
Addressed: with 17
pigs in a six stall structure. Group wants
to do so.
Objectives: To build an
additional 6 stalls
to accommodate
various markets.
Expected Code: 31
Spa Funds
Building materials, transportation, labor.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-85-967
PROJECT TITLE:
Upendo Women's
Group Chicken Project
COMMUNITY GROUP:
Upendo Women's
Group
PCV NAME:
Ricardo Sitchin
Beneficiaries:
Direct:
29 Indirect:
0
Project Complete? N
ACN Status: N
Classification- Primary:
I Activity
Code:
110
Secondary: 0
SPA Contribution:
2960.00
Community Contribution:
681.85
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Group lacks funds to reconstruct
a chicken project
Addressed:
that was destroyed
by a predator.
Objectives:
To build a chicken
coop for 275 chickens;construct
provide water.
Expected Code:
32
Outcomes:
Group will have a source of income
and community
Case Study: N
Expected Code: 40
fixtures.
Case Study: N
Secondary: 0
Expected Code: 31
production skills.
Case Study: N
COUNTRY: KENYA
IAA: 615-85-971
PROJECT TITLE:
Ola Bule Water
COMMUNITY GROUP: Ola Bule Women'sKiosk
Group
PCV NAME:
Bruce Stowe
Beneficiaries: Direct:
450 Indirect:
/ / to: / /
Project Complete? N
ACN Status: N
Secondary:
6
SPA Contribution:
548.78
Community Contribution:
180.47
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
There is
a need for
a permanent, safe water source
Addressed:
in the area,
as current
standing rain water in
use
is likely to
be contaminated.
Expected
Code: 32
Outcomes:
Women will
save time and will learn
management and bookkeeping skills. small business
available.
Used For:
to take water to
the kiosk
site.
Case Study: N
COU':1"T: ',J
:AA: -1-592
f 1"L~
C0, o~U.c L1 Y O Ut il G~rp & :-I Lj ~
Cuizoup
iZl: Ua~aup :. F1 UY a l ~~ 'L
I'CV LI.S nZ rr
U1 Je1)nij Vo ra J1111
i iCCL: 215 ±n~rc.
0
Ac
UcOfldaL Y: 6
TOz L'uJocL: COLL.-:
SPA CLciu .457.oo
47O
01
Comm~unity COntr,)bution: 06.00
Inkitic JLabor: 00
Ilmu-nd Land:~~. 0.00
0.00
Objective0 j: To
inj~~ a til-CO Hlydro ram
Iitli wvater froimi -Irrigation purp,
a ShIIa.l. nearby U ed
river.
C~xpectua
Code:
42
OULC~~nIC.:
If L I L
V e ge iab
Iraprolved le prod uc t io
n .
nutriion of ffarnly
'nowledge Of mninteanC
memuer6
Group t, Ill tLciL Ofl Hydro ram.
-and 10i.0 Other
group~j in the
Spa~ FUndL
""CCo iyuio
RflarI pump, maerialo,
tran..jportation.
Cazie Study: uj
COUNTRY: KE1NYA IAA: 615-85-973
Secondary: 0
in tank construction.
Expected Code: 10
Used For:
Case Study: N
! AA :- 15 5 - 7 -
SPA Colj:,Ibution:
1025.00
inkiud Labor:
0.00
Inkind i1ateriai.; : 0.00
Zxpected Code:
21
construction techniques.
Spa Funds
Materials, labor, transportation,
food.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-85-975
PROJECT TITLE:
Tool Repair
COMMUNITY GROUP:
Maseno Youth Polytechnic
PCV NAME:
Craig Modahl
Beneficiaries:
Direct: 250
Indirect:
0
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
562.50
Community Contribution:
218.75
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Power tools used by the
Polytechnic have fallen
Addressed:
into disrepair and need
to be repaired. Polytech
nic trains graduates in technical and
business
Expected Code:
31
Outcomes:
Increased income for the polytechnic from projects
wood
Spa Funds
Parts to repair jointer/planer/moulder
combination
Case Study: N
COUNTRY: KENYA
IAA: 615-85-977
PROJECT TITLE:
Agroforestry Tree
Nurseries
PCV NAME:
Robert East
Beneficiaries: Direct:
0 Indirect:
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACN Status: N
Secondary:
2
SPA Contribution:
865.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Deforestation, erosion
and desertification are con
declining. Implementation of
agroforestry scheme
Objectives:
+o equip the 17
nurseries with tools to increase
areas
and implement
Expected
Outcomes:
Code:
43
water table.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-85-978
Secondary: 6
sale.
roof/catchment tanks.
Expected Code: 32
Cd For3
CMe Study: N
COUNTRY: KENYA
IAA: 615-85-980
Beneficiaries: Direct:
5 Indirect: 0
Secondary: 0
SPA Contribution:
865.00
Inkind Labor:
0.00
Inkind Land:
0.00
machines.
Expected Code: 34
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-85-982
Beneficiaries: Direct:
25 Indirect: 0
Implementation Period:
from: / / to: / /
Project Complete? N ACN Status: N
Classification- Primary:
2 Activity Code: 280
Secondary: 0
SPA Contribution:
633.00
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed:
ing and marketing skills. They also need
money to
Objectives:
To start the project by providing sufficient
wool
for 50
sweaters. Profit will be reinvested with
Expected Code: 31
Used For:
Case Study: N
COLI:JTRY: K1i-NYA
I AA: -615-U5-984
iPOJiXT TITLL: Tilapia-Duck Project, Riimili±i Division
O*UiT2Y GROUP: Xii. Young Farlers
PCV HAII1: Amanda Cleriunts
!c ici irie: DiI ctL: 122 illdirect: 400
i£;ieenLaLion PeiLoJ: £Zo1n: to:
1lrojec CoLq 1 e? : ACU JLatus: 1
Caification- Pimary: 1 AcLivity Code: 710
Secondary: 0
Total ProjccL Cots: 1339.12
CoIMmurity Contribution:
351.56
ksh
from sale of klsil, and 7,000 ksh from ducks.
iExpected Code:
13
OuLcomes:
Group wi.L± learn skills in pond
construction and
management, raising ducks and tilapia.
Project shouLd serve as impetus to try new
ways to
maximize production.
Used For:
PCV 4" pipe, nired labor.
Case Study: N
COUNTRY: KENYA IAA: 615-85-986
Secondary: 0
Inkind Land:
0.00
Addressed: There is
a high demand in their community. They
Expected Code: 31
Outcomes:
The women will gain skills in baking, maintaining
Case Study: N
COUNTRY: KENYA
IAA: 615-85-988
Beneficiaries: Direct:
32 Indirect: 0
Secondary: 0
Inkind Land:
0.00
Problems
The group wants to initiate an irrigation project
reliable rainfall.
construct a 3'
x4'
water tank (1500 gallons); to
fruit trees.
Expected Code: 31
Case Study: N
COUNTRY: KENYA
IAA: 615-86-954
Beneficiaries: Direct:
0 Indirect: 0
Classification- Primary:
6 Activity Code: 510
Secondary: 0
SPA Contribution:
4100.00
Inkind Labor:
0.00
Inkind Land:
0.00
water
of clean water.
Expected Code: 24
Case Study: N
COUNTRY: KENYA
IAA:
615-86-955
PROJECT TITLE:
Reringet Women's
COMMUNITY GROUP: Group Pipeline Ext.
Keringet Women's
PCV NAME:
Group
Richard T. Boehne
Beneficiaries:
Direct:
200 Indirect:
Implementation
Period:
05/01/86
Project Complete?
N
ACN Status: N
Classification-
Primary: 6 Activity
Code:
550
Secondary:
0
SPA Contribution:
1463.33
Community Contribution:
1065.00
Inkind Labor:
398.33
Inkind Materials:
0.00
Inkind Land:
0.00
0.00
Problems
Only
about half of
the
Addressed:
access people of Keringet
to treatedwater. Water capacity have
as great as
the demand is twice
to the pipeline.
Objectives: To extend
the pipeline 1.6 kilometers
public stand pipes.
with two
Expected
Code:
20
Outcomes:
Fifty families will
gain access
to a
source and will clean water
Kenya government.
Spa Funds
Materials
to construct pipeline
Used For:
pipes.
and two stand
Case Study: N
Secondary: 1
Expected Code: 23
Case Study: N
COUNTRY: KENYA
IAA: 615-86-969
COMMUNITY GROUP:
Waita Hurambee Sec. School
PCV NAME:
Susan Carol Lisker
Beneficiaries:
Direct: 183 Indirect: 0
Implementation Period:
from: / / /
to: /
Project Compiete? J ACN Status: N
Classification- Primary:
6 Activity Code: 540
Secondary: 0
SPA Contribution:
2085.00
Inkind Laber:
0.00
Inkind Land:
0.00
Problems
Community of Waita is plagued by recurring drought
supply.
Expected Code: 24
Outcomes:
Health will improve with availability
of sanitary
Spa Funds
Materials, labor, transportation to
build tanks.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-86-976
PROJECT TITLE:
Water
Tank Project
COMMUNITY GROUP:
Kiptere
Secondary School
PCV NAME:
Belinda Hatzenbuhler
Beneficiaries:
Direct:
60 Indirect:
0
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACN Status: N
Classification- Primary:
Secondary:
3
702.13
SPA Contribution:
525.00
Community Contribution:
177.13
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
School has
no
readily available source
Addressed:
support sci~ool of water to
or
its plan to expand to
laboratory and a kitchen;also include a
generation project.
Objectives: To build a
rain catchment tank
at
the school.
Expected
Code: 24.
Outcomes:
Water will allow for expansion and
enrollment will
increase.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-86-979
PROJECT TITLE:
Rough Stone
COMMUNITY GROUP: Getarwet Water Tank
Secondary School
PCV NAME:
Susan Ensel
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACN Status: N
Classification- Primary:
6 Activity Code:
540
Secondary:
0
1125.00
SPA Contribution:
625.00
Community Contribution:
500.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
School has no
Addressed:
program. The water supply for its school lunch
tank at
the school leaks
and is
irreparable.
Expected
Code: 24
Outcomes:
School will gain a water
source for the lunch
Used For:
tank.
Case Study: N
Secondary: 0
health problems.
Expected Code: 20
improve.
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-86-983
Secondary: 3
Objectives: To build
a 35m rough stone rain catchment tank at
the school.
Expected Code: 21
Used For:
Case Study: N
COUNTRY: KENYA
IAA: 615-86-985
Secondary: 6
costs.
Expected Code: 20
source.
Spa Funds
Materials, tools and labor for construction of
Case Study: N
Secondary: 0
Expected Code: 20
Used For:
Case Study: N
** COUNTRY: LESOTHO
-83-632-140- Mahobong Storage Shed
333.00
-84-632-070-
Communal Gardens at Seforong 19697.00
Poultry Proj.
COUNTRY: LESOTIIO
IAA: 632-83-140
PROJECT TITLE:
Mahobong
Storage Shed
PCV NAME:
James Marthaler
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period: from: 07/17/85 to: 07/21/85
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity Code:
250
Secondary:
0
333.00
SPA Contribution:
333.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The club has
long been lacking storage
Addressed: for their gardening tools facilities
transporting materials.
Objectives: To transport
the construction materials
from
Maseru to Mahobong.
Expected
Code: 34
increase effective
gardening..
Used For:
Case Study: N
COUNTRY: LESOTHO
IAA: 632-84-070
PROJECT TITLE:
Communal Gardens
at
Serorong
COMMUNITY GROUP:
Seforong Women's
Int.Dev.Proj.
PCV NAME
Alan Parsons
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from:
08/15/86 to: 09/15/86
Secondary:
6
SPA Contribution:
9861.00
Community Contribution:
9836.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The Seforong Valley is
one of
Addressed: the driest areas of
malnutrition.
Objectives:
To create three communal
gardens with fences and
water supplies.
Expected Code: 23
Outcomes:
The production of produce will
help to combat
malnutrition.
generation.
Used For:
at three sites.
Case Study: Y
COUNTRY: LESOTIHO
IAA: 632-84-110
Secondary: 6
Problems
School needs to address problems including: lack
Addressed:
of protein in lunch program; income-generation for
source
to make school more self-sufficient(food re
Objectives: To implement an
egg-iaying poultry project by con
structing a 30'x 18' chicken house. Project will
Expected Code: 21
Outcomes:
Project will provide protein to both school and
Used For:
Case Study: N
COUNTRY: LESOTIO
IAA: 632-85-010
PROJECT TITLE:
Young Farmers Club
Project Complete? N
ACJ Status: 11
Classification- Primary:
1 AcLivity Code:
250
Secondary: 0
SPA Contribution:
2459.98
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Club needs meeting place to coordinate
Addressed:
nutrition, conservation construction, gardening,
woodworking,
Objectives: To build
a small block building
and supply it with
for
tank.
Expected Code: 41
Outcomes:
Project will increase the club's
ability to be an
Case Study: N
** COUNTRY: LIBERIA
- -669- - Farina Mill Project 11468.13
- -669-001- Madina Latrines 4500.00
- -669-002- Margibi Wells Coop 1931.00
- -669-003- Fumah Well Project 1473.00
- -669-030- Tap Soap Industry 12575.00
- -669-031- BW1 Water Reservoir 3302.50
- -669-032- BWI Rice Mill 6841.70
- -669-033- St. Dominic's Mission 451.00
COUITRY: LIBERIA
IAA: -669-
PCV h\ IE
BeneticiaLieu:
Direct: 38 Indirect: 44
3PA Contribution:
7048.13
Inkind Land:
0.00
Probiem,-
The coop wouid iike to purcha-e a cassava
AduruL;ud: tor producing farina which will -tore grinder
Expected Code:
Outcomes:
Highr 34
to sell.
Spa Funds
Cassava grinder, roaster pan,
high pressure water
Used For:
pump, zinc, nails, cement.
Case Study: N
Beneficiaries: Direct:
600 Indirect: 0
Implementation Period:
from: 03/20/86 to: 02/39/87
Classification- Primary:
5 Activity Code: 560
Secondary: 6
SPA Contribution:
2500.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
The town needs materials to build latrines to
Addressed: combat
sanitation p)roblems. Currently the people
get water from a source very close to the toilet
Expec ed Code: 20
Outcoaes: Better neilth as a result of clean water.
Used For:
Case Study: N
COUNTRY:
LIBERIA
IAA: 669-
-002
PROJECT TITLE:
Margibi
COMMUNITY GROUP:
Margibi Wells Coop
Wells Coop
PCV NAME:
Anthony Jenks
Beneficiaries:
Direct:
480 Indirect:
0
Implementation Period:
from: 03/06/86
to: 09/06/86
Project Complete? N
ACN Status:
N
Classification- Primary:
5 Activity Code:
510
Secondary:
6
1931.00
SPA Contribution:
1337.00
Community Contribution:
594.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Laid:
0.00
Problems
The village
needs to build wells
Objectives:
To construct
7 hand dug, ferrocement
lined wells,
each 30'
deep.
Expected
Code: 21
Outcomes:
Clean, reliable water
of people; skills in
well-digging and well
Case Study: N
COUNTRY: LIBERIA
IAA: 669- -003
PROJECT TITLE: Fumah
COMMUNITY GROUP: Fumah Well Project
Development Committee
PCV NAME:
Julie Peterson
Beneficiaries: Direct:
6'0 Indirect:
0
Implementation Period:
Project Complete? N
ACN Status:
N
Classification- Primary:
5 Activity Code:
510
Secondary:
6
1473.00
SPA Contribution:
920.00
Community Contribution:
553.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The 4 towns
of Fumah
want
Addressed: to switch from contaminatedto build hand-dug wells
creek water
as their
Objectives: To construct
4 hand-dug wells
--
community; each well one for each
will be ferrocement
and 30'
deep.
Expected
Code: 21
Outcomes:
Skills in well construction
and maintenance;
better health.
Spa Funds
Cement, buckets,
construction materials,
Used Por:
labor.
skilled
Case Study: 1
Secondary: 6
Addressed:
bulk materials to begin fuliscale production. The
Objectives:
To provide bulk materials for soap production; to
Expected Code: 34
Case Study: N
COUNTRY: LIBERIA
IAA: 669- -031
PROJECT TITLE:
BWI Water Reservoir
COMMUNITY GROUP:
Booker Washington Institute
PCV NAME:
Ray Studer
Beneficiaries: Direct:
0 Indirect: 900
Implementation Period:
from: 06/19/86
to: 06/19/87
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity Code:
100
Secondary: 0
SPA Contribution:
2402.50
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
BWI needs to construct a water reservoir
Addressed:
tic tank for the animal facilities.
and sep-
This facility
fail
repeatedly.
Expected Code:
41
Outcomes:
Healthy environment; smaller
operational costs by
facilitating the
use collection of manures for
as fertilizers; students will gain practical
use
Spa Funds Concrete blocks, cement, sand, 4" PVC pipe and
Case Study: N
COUNTRY: LIBERIA
IAA: 669- -032
PROJECT TITLE:
BWI Rice Mill
COMMUNITY GROUP:
Booker Washington Institute
PCV NAME:
Ray Studer
Beneficiaries:
Direct: 0 Indirect: 900
Implementation Period;
from: 06/19/86
to: 06/19/87
Piject Complete? N
ACN Status: N
Secondary: 3
SPA Contribution:
3561.70
facilities.
The mill will also provide
a supply
Expected Code: 31
Outcomes:
Reduction of post-harvest losses and
therefore
to area farmers
to reduce their losses;
instructio
Spa Funds
Cement, sand, rock, construction
materials.
Used For:
,ase Study: N
COUNTRY: LIBERIA
IAA: 669- -033
PROJECT TITLE:
St. Dominic's Mission
COMMUNITY GROUP:
St. Dominic's Mission
PCV NAME:
John J. Clayton
Beneficiaries: Direct:
450 Indirect:
0
Implementation Period:
from: 05/22/86 to: 05/22/87
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity Code:
310
Secc.r, iry: 0
SPA Contribution:
251.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind 'and:
0.00
Problems
The mission school needs funds for materials
Addressed:
develop agriculture program begun to
I yr ago.
a compost starter;
construct
a raised bed garden plot.
Expected Code:
14
Outcomes:
Students will have increased skills in garden
Spa Funds
Sawdust, manure, cement, labor,
50 booklets.
Used For:
Case Study: N
** COUNTRY: MALI
- -688-036- Kafara Integrated Well and 3370.00
Garden Proj.
- -688-037- Sansanding Garden Well 922.00
- -688-038- Ziziangoiodougou Community 760.00
Well
- -688-U39- Niame Potato Cooperative 138.00
- -688-040- Improved Bread Oven Design 94.00
- -688-041- Garden Wall for Markala 2300.00
Ecole Fondamenta
- -688-042- Kebila Wells # 3 6712.00
- -688-043- Kifosso School Garden 1295.00
Project
- -688-044- Diema Garden Well 1250.00
- -688-045- Kankole Well Project 2532.00
- -688-046- Zambougou Well Project 1276.51
- -688-047- Karan Well Improvement 1403.00
Project
COUNTRY: MALI
IAA: 688- -036
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 04/15/85 to: 04/14/86
"lassification- Primary:
1 Activity Code: 340
Secondary: 6
SPA Contribution:
3054.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
The village lacks a sufficient source of water for
Addressed:
year round gardening and for human consumption
Objectives: Construction of a 10
m, fully lined cement
well;
Expected Code: 21
Outcomes:
Inceased income and nutrition; Construction
skills
Used For:
Case Study: N
COUNTRY: HALI
IAA: 688- -037
PROJECT TITLE:
Sansanding Garden
Well
COMMUNITY GROUP:
Mossi Quartier of Sansanding
Beneficiaries:
Direct: 180 Indirect; 0
Implementation Period:
from: 04/00/85 to: 05/00/85
Classification- Primary:
1 Activity
Code: 510
Secondary: 0
Total Project Costs: 922.00
SPA Contribution: 553.00
Community Contribution: 369.00
Inkind Labor: 0.00
Inkind Materials: 0.00
Inkind Land: 0.00
Problems The people need a stable and
Addressed:
water to
increase production permanent source of
of their garden.
The
traditional wells
in use often dry
up and
collapse.
Objectives:
To construct a cement reinforced
well of
raise the income of the community beyond 16 m;
to
subsis
tence levels.
Expected Code: 30
Outcomes:
To expand the garden by
1 hectare and to add new
crops;
to become more self-sufficient.
Used For:
Case Study: N
Secondary: 6
lining.
Expected Code: 20
Used For:
Case Study: N
OUNTRY: MALI
IAA: 688- -039
eneficiaries: Direct:
5 Indirect: 2000
Seconddry: 6
SPA Contribution:
138.00
Inkind Labor:
0.00
Inkind Land:
o.UO
4ddressed:
garden during the dry season from March to May
due
5xpected Code: 32
)utcomes:
Higher standards of health, education, etc.
as a
Spa Funds
Watering cans, seeds, transportation.
Ised For:
:as Studys N
Secondary: 1
Expected Code: 34
Used For:
Case 3tudy: N
COUNTRY: MALI
IAA: 688- -041
PROJECT TITLE:
Garden Wall
for Markala
Ecole Fondamenta
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from: 10/30/85
to: 10/29/86
Project Complete? N
ACN Status: n
Classification- Primary:
1 Activity
Code:
310
Secondary: 0
SPA Contribution:
1271.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The school needs to enclose the garden
Addressed:
it from wind-blown sand, to protect
Objectives: To build
an enclosure
1.8 m high of cement and mud
by 50%.
Expected Code:
31
Outcomes:
Additional
revenue to be used for
school supplies
such as
animal husbandry projects;
expanded range
opportunity
Spa Funds
Materials, labor, transportation.
Used For:
:ase Study: N
Secondary: 6
wells.
Expected Code: 23
healthier populations.
Used For:
Case Study3 N
COUNTRY: MALI
IAA: 688- -043
Secondary: 6
Inkind Land:
0.00
Expected Code: 32
Used For:
build the water basins and the connecting hose.
Case Study: N
L B - i
nd-4': Land " -
444fc
' -- >44 :7D44-4
-,
-- ----- 4
4 44~4
....
DR,>:C TI LE .e r.a r ] I
°n S m y
Addres~ed: -10 dning/4- r-
- . .. .. . .4Pr
44O
easily Le r e by C _ 44T,
.': :. . _eco n ry
: 0 l ,c n r t . : ,; ,'; : : '' :
Obiec-t. ve_.,, To
. coL.::c a.. 0is inru i t m. 4
~4444
o_
C wp~~o
.e i:
:0444442 e11 o-r,i c:e :, w .c 1-i 444 44
4~1 4
:,:
E)'-.,c:, .. '
: Co e 34-
PCV NAME:
William Potter
Beneficiaries: Direct:
588 Indirect:
Project Complete? N
ACN Status: N
Secondary: 6
SPA Contribution:
1588.00
Community Contribution:
944.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
?roblems
There is no clean, reliable,
\ddressed: water during the dry adequate source
of
are impossible.
)bjectives: To construct a 20
meter
concrete reinforces well
xpected Code; 23
utcomes:
Decrease in the loss of livestock,
their use for animal traction, meat,increase in
water.
sed For:
ase Study: N
Secondary: 6
water shortages.
Expected Code: 32
Used For:
Case Study: N
COUNTRY: MALI
IAA: 688- -047
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 6
requirements.
community wells.
Expected Code: 23
Outcomes:
Decreased amount of sickness, higher productivity;
Used For:
Case Study: N
SPA PROGRAM SUMMARY
IAA #: IAA NAME:
** COUNTRY: MAURITANIA
-84-682-001- Echueig Recessional Dam 8000.00
Project
-84-682-003- Gouraye Stilling Basin 4750.00
Repair
-84-682-004- Babae-Darto Thioubalel 9918.00
Irrigated Perim.
-84-682-005- Sin Thiane Jamma Garden 8018.13
Project
-85-682-002- Waloum-Nere Garden Tools and .506.00
Well
COUNTRY: MAURITANIA IAA: 682-84-001
Secondary: 0
irrigation.
Expected Code: 34
Outcomes:
People will become more stable and self-sufficient
Used For:
Case Study: N
COUNTRY: MAURITANIA
IAA: 682-84-003
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 0
Inkind Land:
0.00
Problems
Stilling basins and canal entryways which are
Addressed:
integral parts of the irrigated perimeters have
Expected Code: 30
Outcomes:
Higher yields and lower production costs.
Used For:
Case Study: N
COUNTRY:
MAURITANIA
IAA: 682-84-004
PROJECT TITLE:
Babae-Darto
Thioubalel Irrigated Perim.
PCV NAME:
R. Lawrence Caperton
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
Project Complete? N
ACN Status: N
Classification- Primary:
Secondary:
0
9918.00
SPA Contribution:
9918.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Drought has
reduced agricultural productivity
Addressed:
the area
and in
The Darto-Thioubulel
coop.
perimeters.
Expected
Code: 34
Outcomes:
Renewed and expanded production
perimeters and improved on
the cooperative
Spa Funds
2 pumps, spare
parts, diesel fuel for the
Used For:
season, inland first
Case Study: N
COUNTRY: MAURITANIA
IAA: 682-84-005
PROJECT TITLE:
Sin Thiane Jamma Garden Project
COMMUNITY GROUP:
Sin Thiane Samma Garden
PCV NAME: Coop.
Margaret Kavanagh
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from:
11/01/84 to: 10/01/85
Project Complete? N
ACN Status: N
Secondary:
0
SPA Contribution:
8018.13
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Cooperative needs
sufficient water supply in order
Addressed:
to expand their
garden from 3/4 hectare to two
vegetable garden.
Expected
Code: 34
Outcomes:
Vegetable production will increase
in the dry
Spa Funds
Diesel pump and
accessories.
Used For:
Case Study: N
COUNTRY: MAURITANIA
IAA: 682-85-002
COMMUNITY GROUP:
Beneficiaries: Direct:
0 Indirect: 800
Implementation Period:
from: 11/01/84 to: 11/01/85
Secondary: 6
SPA Contribution:
1506.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Drought has destroyed traditional crops an4 animal
productive.
Expected Code: 32
improve as a result.
Used For:
shovels, hoes, picks, small gardening tools, and
a wheel barrow.
Case Study: N
IAA #:
IAA NAME:
** COUNTRY: NIGER
-83-683-001- Tahoua Poultry Project 5818.18
-83-683-002- Reestablishing Manioc 3716.00
Farming
-83-683-003- Toroni Gardens 988.49
-83-683-004- Loba Tree Plantation 3507.35
-83-683-005- Toula Gardening Project 941.81
-83-683-006- Guidimoni Wells Project 11575.36
-83-683-007- Magaria Wells 3200.00
-83-683-008- Mare Koudram Garden Project 6369.14
-83-683-009- Torodi School Gardens 2000.00
-83-683-010- Kourangousaou Omnibus 2239.00
-83-683-011- Attababa Hoira Garden 536.42
-84-683-001- Doukou Doukou Gardening 3300.00
Project
-84-683-002- Cuvette Development 10000.00
-84-683-003- Well Installation at Lache 5102.00
-84-683-004- Gaya Small Enterprise 215.00
Project
-84-683-006- Kouragnousaou Phase II 5100.00
-84-683-007- Zindarou Trees 9830.00
-84-683-008- Nogare Trees 250.00
-84-683-011- Birni N'Gaoure School Garden 2353.00
& Nursery
-85-683-001- Kouderam Cooperative 7697.52
-85-683-002- C.A.T./Zinder Lab Tech. 2219.76
Training
-85-683-003- Madarounfa Fruit Trees 3290.00
-85-683-004- Birni N'Konni Fruit 3198.97
Cooperative
-85-683-005- Tillabery Stoves and Trees 1589.00
-85-683-006- Mari Wells 2174.00
-85-683-007- Guidan Magaji Wells 1127.00
-85-683-008- Guidan Roumdji School 6227.00
Nurseries
-85-683-009- Toula Aquaculture, Revised 3400.00
4-683-005
-85-683-010- Intakachin Well 2857.14
-85-683-011- CEG Winde Break 597.00
-85-683-012- Improved Stoves - Tanout 2103.00
-85-683-013- Dogon Dutchi CEG II Garden 1626.92
COUNTRY: NIGER
IAA: 683-83-001
PROJECT TITLE:
Tahoua Poultry
COMMUNITY GROUP: Tahoua Women's Project
Association
PCV NAME:
Brian Raines
Beneficiaries: Direct:
50 Indirect:
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity
Code: 110
Secondary: 0
SPA Contribution:
5818.18
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Women's association would
Addressed:
project for income. like to begin a poultry
Expected Code: 34
cooperative efforts.
and transportation.
Case Study: N
COUNTRY: NIGER
IAA: 683-83-002
Secondary: 0
manioc cuttings.
Expected Code: 41
Outcomes:
Farmers will be trained in use of ag.chemicals.
Case Study: N
COUNTRY: NIGER
IAA:
683-83-003
PROJI:CT TITLE:
Toroni Gardens
COt1ltIUNITY CROUP:
Elder men
PCV NAME:
David Lefkowitz
[neLiciaries:
Direct:
30 Indirect:
ImPlvmentatlon
Period: from:
10/01/84
to: 07/01/85
Projcct Compiete?
N
ACM Status: N
Cia"Ification_ Primary:
1 Activity Code:
340
Secondary:
6
SPA Contribution:
988.49
Community Contribution:
988.49
Inkind Labor:
0.00
Inkind 0.00
Materials:
Inkind Land:
0.00
PobWi=s
0.00
practlces coupled
funds
to construct w/insufficient
concrete wells
in
Bogjotu.
ObjeCLiVe: To provide
experti>e
digging 3 cement-iinedand materialq necessary for
be used
future years.
Expected
Code:
Outcomes: People 21
will learn
irrigation
techniques; village and gardening
Spa Punds
Vegetable
seeds, plants, tools,
Used For:
transport.
supplies, labor,
Case Study: N
COUNTRY: NIGER
IAA: 683-83-004
PROJECT TITLE:
Loba Tree Plantation
PCV NAME:
Jeff Barnes
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 11/01/84 to:
05/01/85
Project Complete? N
ACN Status: N
Classification- Primary:
4 Activity Code: 510
Secondary: 0
SPA Contribution:
3507.35
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Objectives:
To construct a cement-lined well
for
use as the
Expected Code: 40
Outcomes:
Tree production for reforestation.
Used For:
Case Study: N
COUNTRY: NIGER
IAA: 683-83-005
PROJECT TITLE:
Toula
Gardening Project
COMMUNITY GROUP:
Toula
Villagers
PCV NAME:
Richard Kastner
Beneficiaries: Direct:
180 Indirect:
0
Implementation Period:
from: 10/01/84 to:
05/01/85
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity Code:
320
Secondary:
0
941.81
SPA Contribution:
941.81
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
As result
of drought, crop failures
Addressed:
that people have shown
to begin a gardening
ject but they need basic pro
inputs to start.
Objectives: To establish
work
a 5 x 30m plot.
Expected
Code: 34
Outcomes:
Produce from the gardens
will help make them self
sufficient in food.
Spa Funds
Seeds, hand
tools, fencing, fertilizer.
Used For:
Case Study: N
COUNTRY: NIGER
IAA: 683-83-006
PROJECT TITLE:
Guidimoni
COMMUNITY GROUP:
Samaria Wells Project
of Guidimoni
PCV NAME:
Myriam Kaplan
Beneficiaries: Direct:
0 Indirect: 8600
Implementation Period:
Project Complete? N
ACN Status: N
Classification- Primary:
5 Activity Code:
510
Secondary:
6
11575.36
SPA Contribution:
9167.00
Community Contribution:
2408.36
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Water
sources
25%
of the people have
access to
sanitary
well water. There is
cidence of intestinal high in
disease and infant malnutri
tion.
Objectives: To build
8 concrete wells that
will provide the
Expected
Code: 20
Outcomes:
Improved health and
increased production.
Spa Funds
Constructino
materials, fuel, labor,
well-digging
Used For:
equipment.
Case Study: N
"xPcced Code: 23
ouucowes: Noc specified.
Case Study: N
PROJECT TITLE:
Mare Koudram Gardien Project
PCV NAME:
Ilark Suilivan
Beneiciaries: Direct:
29 Indirect:
0
inkind Labor:
(hOC)
inkind rateriais: 0.00
inkind Lano: 0.00
Problems; People :tb:igt primarily o, miliet and sorghum and
Addresced: Liie drouyjL1t .Ias prompted .. iLmy to consider
emmigra
tion. People Lrc interesLud in vegetable
gardens
yet they iacl tL.c means Lo begin.
Expected Code: 34
Outcomes:
To expand cuitivation and
increase available
food;
Case Study: N
COUNTRY: NIGER
IAA: 683-83-009
PROJECT TITLE:
Torodi School Gardens
COMMUNITY GROUP:
Students, Teachers, Parents
PCV NAME:
David Lefkowitz
Beneficiaries: Direct:
460 Indirect:
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
2000.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The students and teachers
of
the 2 primary schools
Addressed:
want
to begin a school
garden/orchard to help
a variety of vegetables;
fence the
garden; dig 15m
well, 1 m
in diameter; teach basic
orchard/garden
ing techniques.
Expected Code: 13
Outcomes:
Students will have garden/orchard
skills;
skills
Used For:
trees,
Case Study: N
COUNTRY:
NIGER
IAA: 683-83-010
PROJECT TITLE:
Kourangousaou
Omnibus
COMMUNITY GROUP:
villagers
PCV NAME:
David Levin
Beneficiaries: Direct:
100 Indirect:
350
Implementation Period:
from: 01/18/85
to: 01/17/86
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
2239.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
As a result of pilot projects
Addressed:
poultry raising, people in gardening and
and plant
fruit trees
as a demonstracion.
Expected Code: 34
increase.
Casi Study: N
COUNTRY: NIGER
IAA: 683-83-011
Beneficiaries: Direct:
12 Indirect: 0
Secondary: 0
SPA Contribution:
525.87
Inkind Labor:
0.00
Inkind Land:
0.00
Expected Code: 40
Case Study: N
COUNTRY: NIGER
IAA: 683-84-001
PROJECT TITLE:
Doukou Doukou Gardening Project
Beneficiaries: Direct:
D Indirect: 0
Classification- Primary:
1 Activity Code: 340
Secondary: 0
SPA Contribution:
3300.00
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed:
ing and fruit tree intiative has begun.
Expected Code: 31
Outcomes:
Increased production; potential for income
gener
ation.
Spa Funds
Fence, seeds and cuttings, materials,
tools, gas.
Used For:
Case Study: N
COUNTRY: NIGER
IAA: 683-84-002
PROJECT TITLE:
Cuvette
Development
PCV NAME:
Mack Posely
Beneficiaries:
Direct:
0 Indirect:
1200
Implementation Period:
from:
06/19/85 to:
06/19/86
Project Complete? N
ACN Status: N
Classification- Primary:
3
Activity Code:
510
Secondary:
0
SPA Contribution:
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Villages of Kouble,
Addressed:
60 hectare cuvette. Houdel, and Zoudi border on a
production is
lack of water.
Demand for produce
materials.
Expected
Code: 40
Spa Funds
Well digging, labor,
tools, transport, plant
Used For:
materials, ag. chemicals,
medical supplies.
Case Study: N
COUNTRY: NIGER
IAA: 683-84-003
PROJECT TITLE:
Well Installation
at Lache
COMMUNITY GROUP:
villagers
PCV NAME:
Mack Posely
Beneficiaries: Direct:
450
Indirect:
0
06/19/85 to:
06/19/86
Project Complete? N
ACN Status: N
Classification- Primary: 3
Activity Code:
340
Secondary:
0
SPA Contribution:
5102.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Lache is an agricultural village
Addressed:
traditional wells. that has 2
dry.
Objectives:
To install a
concrete well 30
meters deep.
will be introduced and time Gardens
water
can be used for more
productive pursuits.
Expected
Code: 40
agricultural productivity
will improve.
Spa Funds
Equipment, transport,
materials, labor.
Used For:
Case Study: N
COUNTRY: NIGER
IAA: 683-84-004
Beneficiaries: Direct:
2 Indirect: 0
Implementation Period:
from: 06/19/85 to: 06/19/86
Secondary: 0
SPA Contribution:
215.00
Inkind Labor:
0.00
Inkind Land:
0.00
Expected Code: 30
available credit.
Spa Funds To establish loan fund that will pay for materials
Case Study: N
COU1ITRY: NlIGER
IAA: -683-84-006-
Beneficiaries:
Direct: 700 Indirect: 0
Implementation Period:
from: 06/19/85 to:
06/19/86
Secondary: 0
SPA Contribution:
5100.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
see 83-683-010
Addressed:
ACH attached.
Objectives:
To further enable farmers to find
alternate
Expected Code:
34
Outcomes:
Increased food production and income.
Case Study: N
COUNTRY: NIGER
IAA: 683-84-007
PROJECT TITLE:
Zindarou Trees
COMMUNITY GROUP:
Zindarou Village
Beneficiaries: Direct:
900 Indirect:
Implementation Period:
from: 06/19/85
to: 06/19/86
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
9830.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Villagers of Zindarou travel many
Addressed:
search of firewood for kilometers in
produce seedlings.
Expected Code:
40
Outcomes:
Fuelwood will be locally available.
After the
fifth year,
revenues from fuelwood
sale will make
Spa Funds
Purchase of gardening
tools, nursery materials,
Case Study: N
Secondary: 0
SPA Contribution:
250.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Village of Nogare has grown considerably
and they
Addressed:
want to begin a tree project.
Expected Code: 40
Used For:
Case Study: N
Secondary: 0
will be supplied.
Expected Code: 14
Used For:
Case Study: N
COUITRY: "lIGER
IAA: 683-85-001
PROJE1CT TITLE:
Kouderam Cooperative
PCV NA.!E:
Mark Suilivan
Isip-Lementation Period:
from: 10/00/85 to: 02/00/86
CiassiLication- Primary:
3 Activity Code: 340
Secondary: 2
SPA Contribution:
7697.52
inkind Labor:
0.00
Inkind Land:
0.00
Addcesued:
methods in dry season farming. The traditional
of the viiagers.
Expected Code: 13
Outcomes:
To establish a successful contra-saison program
by
encouraging cooperation.
Spa Funds
Wells construction, tools, transportation,
Case Study: N
/U
COUNTRY: NIGER
IAA: 683-85-002
Beneficiaries: Direct:
25 Indirect: 0
Secondary: 6
SPA Contribution:
2219.76
Inkind Land:
0.00
Problems
Hospital has determined that its tuberculosis
Expected Code: 21
Outcomes:
Greater success at diagnosing and controlling TB.
Used For:
Case Study: N
liiplementa.ion Period:
from: 12/01/85 to: 12/01/86
Secondary: 0
SPA Contribution:
3290.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Land around Madarounfa is underutilized.
Addressed:
trees
and providing info on improved cultivation
Expected Code: 14
Outcomes:
Increased fruit production.
Used For:
Case Study: N
COUNTRY: NIGER
IAA: 683-85-004
Secondary: 0
to continue production.
will be offerred.
Expected Code: 34
Used For:
Case Study: N
COUNTRY: NIGER
IAA: 683-85-005
PCV NAME:
Eric Breidenbach
Beneficiaries:
Direct: 12 Indirect: 0
Implementation Period:
from: 01/16/86 to: 09/30/86
Secondary: 0
SPA Contribution:
1144.00
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed: which is
compounded by inefficient wood stoves and
Objectives:
In 6 villages there will be demonstrations
on how
Expected Code: 40
Used For:
Case Study: N
COUNTRY: NIGER
IAA: 683-35-006
PROJECT TITLE:
Mari Wells
PCV NAME:
Eric Breidenbach
Beneficiaries: Direct:
100 Tjd~iecL: 0
Implementation Period:
from: 01/15/86 to: 09/30/86
Secondary: 6
SPA Contribution:
2174.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Dry season gardening could increase food prod.uc-
Addressed: tion in
this drought stricken area but
the village
lacks
a reliable source of irrigation water.
Expected Code: 20
Outcomes:
Village nutrition will be improved with
produce
Case Study: N
COUNTRY: NIGER
IAA: 683-85-007
PROJECT TITLE:
Guidan Magaji Wells
PCV NAME:
John Klingler
Beneficiaries: Direct:
607 Indirect:
0
02/00/86
Project Complete? N
ACN Status: N
510
Secondary: 6
SPA Contribution:
865.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The village wells,
Addressed:
water, are not linedtheandsole source of potable
Expected Code: 24
Outcomes:
The village will have a dependable
source of
potable water.
Spa Funds
Salary of skilled well-digger
and purchase of
Case Study: N
COUNTRY: NIGER
IAA: 683-85-008
Secondary: 0
nursery projects.
technical advice.
Expected Code: 13
Case Study: N
COULITRY: '-il R
IAA: -363-85-009-
L.i)ectCd Coue: 34
Outcomes: Tie aquaculture project wi±i be financially and
tec'nlical.Ly sef-supporting so that outside
a~siscancc ;:i-;i no -onger be needed.
Case dtudy: N
COUNTRY: NIGER
IAA:
-683-85-010-
PROJECT TITLE:
Intakachin
COMMUNITY GROUP:
Villagers
Well.
PCV NAME:
Don Beckley
Beneficiaries: Direct:
350 Indirect:
0
Implementation Period:
Project Complete? N
ACN Status:
1i
Classification- Primary:
Secondary:
6
2857.14
SPA Contribution:
2857.14
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The village uses
unsanitary
Addressed: health of especially water endangering the
Objectives: Construction
of
a reinforced concrete
well 30-35 rm
deep.
Expected
Code: 24
Outcomes:
The health of the villagers
will improve;
the vil
lagers will be able
to start gardens.
Used For:
Case Study: N
COUNTRY: LiIGER
IAA: -683-85-011-
Ouallam
Beneficiaries:
Direct:
640
Indirect:
0
Implementation Period:
from:
03/15/86 to:
10/31/86
Project Complete? N
ACN Status: N
Classification- Primary:
1
Activity Code:
310
Secondary:
0
SPA Contribution:
464.00
Community Contribution:
57.00
Inkind Labor:
76.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The success of
the two schools'
Addressed:
thwarted by annual garden projects is
plantations.
Also, there
trees.
Expected
Code: 43
Outcomes:
The schools' projects will
be protected from sand
storms and will produce better
crops.
Crops from
Spa Funds
Purchase of fruit
trees, chemicals, irrigation
Case Study: N
COUNTRY: NIGER
IAA: -683-85-012-
Beneficiaries;: Direct:
20 Indirect: 700
Implementation Period:
from: 04/00/6' to: 04/00/87
Secondary: 0
Expected Code: 14
Case Study: N
COU11TRY: NIGER
IAA: -6d3-85-013-
Benuficiaries:
Direct: 300 Indirect: 860
Secondary: 0
SPA Contribution:
1626.92
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
harsh and
The CEG II
school;
to include courses and student-teacher
activities in gardening.
'xpected Code: 14
)utcomes:
The students will learn agriculture
techniques.
sed For:
ase Study: N
IAA #:
IAA NAME:
** COUNTRY: SENEGAL
-83-685-017-
NDiaye Bopp Water Basin
-85-685-060-
Wells
0.00
5355.45
Construction/Agroforestry
-85-685-065-
Project
1136.70
-85-685-067-
Group
-85-685-068-
Gardens
-85-685-069-
Machine
-85-685-071-
3062.00
-85-685-073-
Repairs
-85-685-074-
Mbane Garden Well
2875.14
976.76
Health Hut
-86-685-075-
Pass Ngent Well and Garden
-86-685-076- Namene Amar Community Millet
6576.03
3661.55
-86-685-078-
Machine
-86-685-080-
and Repair
-86-685-081-
1983.00
-86-685-082-
Garden
-86-685-083-
Ndiongue Fall Comm. Millet
2453.80
3207.90
-86-685-084-
Machine
-86-685-085-
Renovation
-86-685-086-
1660.36
-86-685-087-
Village Woodlot
-86-685-088-
129.27
-86-685-089-
Well Reparation and
539.83
-86-685-090-
Deepening
Well Deepening
-86-685-091-
1096.79
Well deepening
2042.17
-86-685-092-
Millet Machine
-86-685-093-
2397.47
-86-685-094-
Center
-86-685-095-
5402.08
Wells Repair/Hanene
1325.57
-86-685-096-
Village Nursery and Woodlot
-86-685-097-
Well Repair and Garden
777.45
1847.11
-86-685-098-
Construction
Well Repair
-86-685-099-
Wells Repair
1141.62
868.48
COU.:TRY: S2IEGAL
1AA: -035-35-060-
COLniUNITY CROUP:
PCV NAIE:
Therese Giawacki
01wKueiClIries:
Direct: 150 Indirect: 0
Project CodpiLete? n
ACN Status: N
Classification- Primary:
1 Activity
Code: 340
Secondary: 0
SPA Contribution:
3896.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
ProbiLems
Drought has caused declining productivity
Addressed:
income from traditional in and
nutrition and
Objectives: To construct
two wells,
one
in the village and one
agroforestry project.
Expected Code:
Outcomes:
Water 43
generating
as
a wind-break for the garden/orchard.
installation of pump.
Case Study: N
End of Report
COUNTRY: SZEGAL
IAA: -685-85-065-
COMIUJITY GROUP:
Impielentation Period:
from: 09/01/35
to: 10/01/85
550
Secondary: 0
SPA Contribution:
566.11
Community Contribution:
0.00
Inkind Labor:
899.75
Inkind flaterials:
0.00
Inkind Land:
0.00
Problems
A more efficient system of pulling
Addressed:
to supply water
for fruit water is
needed
tree/fuelwood reforest
ation nursery, vegetable gardening,
henna planta
tion, and an indigenous piant project.
Currently,
Objectives:
To consuruct a platform
on
the well, w/steel cross
use in project.
Expected Code:
43
Outcomes:
Additional
.-
ater
suppiied should make the nursery
more productive.
henna project.
Case Study: N
End of Report
COUNTRlY: S "i1.!GArL
PO JENU
i'L' GROUPj : DG ard e n i cj o
u n' . GL U
0
0
~ A~ c~u
Coi.1'nunILY cuLLbU
10.1
:C
22.5
Inkid Ljabor:
inkini .laZL-laL 0 .00
Ink ind Land: 3.00
J.00
r eL;
Oi A :;'urdy,* Lonc
AddeLI-Jd:to !-, needed a.-oulld U-1e
keel. OUL allim.,J. ;WOTmez' garden
3afden jPrOvjdC-a
Prof it. ZOOd and
Lx~jecLe6 Code: 32
Ouo~ae~:
Protected garden wjj.i
drovide
a sOurce of
ion and ijrofit.
nlutrit
C."a3uy
fReor
COU:!V' y:
1 AA: -5 J - j7 -
PROJEC 2 '2GL: GarJn Too±j. ZoV Coimmunity Carden6
CO1:wi:*'y"2 ';CXJ?: Youti Group,
PCV c4:
'ne.L Owen-
DCe 2
ic.L:-i".]: D.L2cc: 0 Indirecc: 0
i;,P±c-.en*~on
PLcr. od: from: 10/01/35 Lo: 11/01/85
ProjecL Co;A.pIUC?
AC" Statue: !I
Cla& i~icailou- PLimazy: 3 Activity Code:
320
SeOcondary:
0
Cosmaunity Con'LrijbuLionj:
2.00
[1"ino Labor:
0.00
n;..nd ;ace.aL: 0.00
iLnkind !,and: 0.00
Oducivit gardening po
Objectives: To purcaase
garden coois: watering cans,
rakes,
6iloveC1s, picks.
Expected
Code: 41
Case Study: 1N
End of Report
COUNTRY: Si..EGAL
IAA: -685-85-068-
XpecLed Code: 43
Outcomes: Uze of grinder -doud not on.Ly
heIp them to "ave
tiie, -c wou~d a±so be an income-generazing
activity til-oug user fees . Deveioprment
cou.Ld expand suchl as purchaiing activtieL-,
medical supplies
for tiie diLpenjary.
Sna Fund.- ilotor, riiic machine, fuel, construction iaterial
Us :'or: and transporzaioon.
Ca.' Study: :1
lnu of Re-port
COU.J.i'RY : 3", .U2
rAA : -, 5 - -0
..... C" ', 'ii:
CneLiar~i~e
: Direct:
0 1100 indirect: 0
Impiementation
Period: from: 01/15/85 to: 02/28/85
Project Cori).ete? j
ACH Status: N
Secondary:
u
Problems;
'2ne woi;en in the viliage need
a millet grinder, as
Objectives:
A machine millet
grinder wili
be installed in
the
people.
Expected Code: 43
Outcomes:
Women will have free time to engage in income
community projects.
Spa Funds
Purchase of mill,
engine and replacement parts.
Used For:
Case Study: N
End of Report
PCV L~.ura
LA.: 1f. Chanberj
PrUbie
1-
Parents Auoociation would like
to
egin a coi±cc-
AddLeOzd: tive gardei Lor student ,. The two
are too Lar Lrom lie Lchooi existLjing W/L.;iL
to be functional water
sources. A well i6 needed for this project aL well
a:3 for the vii.age'K basic water needsi
ObjectivLu:
To build a 20 meter
well for the cnoo. and garden
project.
LXJLUCLCU Code: 41
Case Study: N
t-nd of Report
COUi]TRY: SEAIEGAL
IAA: -685-85-073-
Beneficiariesi: Direct:
0 Indirect: 600
Secondary: 6
Inkind Land:
0.00
Expected Code: 34
a source of income.
Case Study: N
End of Report
COUITRY: SENEGAL
IAA: -685-85-074-
Secondary: 0
of 1/2 hectare.
Expected Code: 34
Used For:
Case Study: N
End of Report
COUITRY: SENEGAL
IAA: HA-685-86-00I-
COIMUNITY GROUP:
Beneficiaries:
Direct: 0 Indirect: 850
Impiementation Period:
from: 05/01/86 to: 06/01/86
Secondary: 0
SPA Contribution:
976.76
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
inkind Land:
0.00
Problems
There is high incidence of
disease and maladies
Addressed:
for which there is no
local
medical facility,
adjacent
to hut for sanitation & education.
Births
may eventually be performed at hut.
Expected Code:
26
Outcomes:
Improved health, reduced disease, transfer
of
sanitation practices.
the facility.
Case Study: N
COUNTRY: SENEGAL
IAA: -685-86-075-
Implementation Period:
from: 02/03/06 to: 04/15/86
Secondary: 6
SPA Contribution:
4738.03
Inkind Land:
0.00
Problems A new
well is needed in order to supply
water
to
depend.
Expected Code: 14
Outcomes:
Transfer of well digging skills, establishment
of
of Service
Case Study: N
End of Report
COUNTRY: SENEGAL
IAA: -685-86-076-
PROJECT TITLE:
Namene Amar Community Millet Machine
Beneficiaries: Direct:
314 Indirect: 0
Secondary: 0
SPA Contribution:
2853.52
Inkind Haterials:
0.00
Inkind Land:
0.00
Objectives: To implement
a millet grinder
and a building to
Expected Code:
41
Outcomes:
Women will be able to prusue other activities
Used For:
Case Study: N
End of Report
COUNTRY: SENEGAL
IAA: -685-86-078-
PROJECT TITLE:
Dioufana ';ells Construction and Repair
COMMUNITY GROUP:
Wells Committee of Dioufana
PCV NAME:
Jack Kuiculien
Beneficiarie;:
Direct: 96 Indirect: 0
Classification- Primary:
3 Activity Code: 520
Secondary: 6
SPA Contribution:
2019.80
Inkind Land:
0.00
suffer as a consequence.
deep.
Expected Code: 46
Outcomes:
Welis will provide water for the community
and the
Used For:
Case Study: N
End of Report
COU11TRY: 8IAEGAL
IAA: -685-86-080-
PROJECT TITLE:
One New Weil
COMMUNITY GROUP:
Village of Tambanandin
Beneficiaries: Direct:
200 Indirect: 0
Impiementation Period:
from: 03/30/86 to: 06/30/86
Secondary: 6
SPA Contribution:
1508.00
Inkind Labor:
205.00
Inkind Land:
0.00
Addressed:
five wells, four of which are brackish; none are
Expected Code: 24
other activities.
Case Study: N
End of Report
(\
COUNTRY: SENEGAL
IAA: -635-86-081-
Secondary: 0
Expected Code: 34
Used For:
Case Study: N
End of Report
COUIiTRY: SFIZEGATL
IAA: -685-86-082-
COMMUNITY
GROUP: Bele
PCV iNANE:
Kenneth Bolton
Beneficiaries: Direct:
0 Indirect:
561
Classification- Primary:
3 Activity
Code:
520
Secondary: 0
SPA Contribution:
1835.21
Community Contribution:
0.00
Inkind Labor:
618.59
Addressed:
of village. Additional to meet needs
water
sources are needed in
order
to develop gardening initiatives.
Objectives:
Two wells in the
Expected Code:
40
Outcomes:
Project will deversify the water
supply and will
Used For:
Case Study: N
End of Report
I LI~
"-
,4444 ' 44lK' '' 4' ' 4 4
44~~~44~~~46 5~ 4-44'44
.40"5 4 3 34' 4' 4
P '44 ~ 2E&-
"I44444444 ;u Co m. .LLt ich A'-'
'444' 11T 4'uioa G44"JP u me ru 4,LLU
P R4 , 4
44 HE :44 4 4'4
Oaa.1b"On 242.8 I?
1"Rnd&abCr 0r00
ce"4442'
0#P6,44 ~
Sccoa
~ 901" 4
Vo~iPoetC~~; 30.04444
COU...Y: SE.;A
Lit: -685-26-0,4-
Secondary: 6
Inkind Land:
0.00
?Wdressed:
0- eigiity wei.s , iive are cemaena _inec, a_-- lave
per odica-±.
Expecte6 Code: 40
Used For:
Case Study: 11
End of Repor6
COUNTRY: SENEIGAL
IAA: -685-86-085-
Secondary: 6
SPA Contribution:
1199.28
Inkind Labor:
446.68
Inkind Land:
0.00
Addressed: needs of
the village, which has increased in pop
lation. There is
a weekly market attended by many
location.
Objectives: To construct
a 10 meter deep well
in the
center
village.
Expected Code: 42
Spa Funds
Construction materials, tools, transportation
and
Case Study: N
End of Report
COUIMTRY: 10j][ I T
IAA: -685-'6-086-
Secondary: 6
SPA Contribution:
1612.25
Community Contribution: 0.00
Inkind Labor: 1095.10
inkind Land:
0.00
Problems Village is plagued withl
aging wells
that yield an
Used For:
labor to comlete the improvements.
Case Study: N
End of Report
COU'ITRY: SEMiGti
C.lazz.is~icacion-
4 civA"C2: )
2Qcoiidcry: 0
SPACo Wio:
inkiaL~ Labor: 0C
onl zreap~
o P;i )JeCL ~ce~z1
and eilergy ---ent oil woou co-.L0-c#;;Ofl. :ooho i
bc 5001u and ;ui±L ,Lroduc-- 700 ciee6 Aor ota
incj in the f.*urt jeajon.
Expected Code: 140
Outcomes~ Project wi~i z,2upp~y~~vo n ;.i... A±
zicop deforeitacoii.
Case Study: :1
E~nd of Relpor '.
're--1 Pzo C ecn.;r,:Uc .IoI t.
Expeted 0d. 42
080mal mresi aedaaes will reslt# iswve heaei
cuo "ftv
COIJIITRY : SE:,'x 1 , L
IAA: -6,85-35-039-
nursery.
Expected Code: 42
Outcomes:
A clean, reliable year-round
water source which
will allow dry season gardening.
Used For:
Case Study: N
End of Report
COU:ITRY: j, J
iAA: -585-6-090-
Secondary: 0
SPA ConLribuLion:
570.33
project. The
wuii currently in use is insufficient to meet
the
demand for water for this project.
Expected Code: 32
improve.
Spa Funds
Labor, piping, watering cans, rakes,
pesticide
Case Study: N
End of Report
-L '
4 : ! - 4 + , 4 4 444 '4444 * 44-4 4+/ 44 . 4 -,,. . _ .. , . - . . +
4AA -48 -6 0 1
i~iap~-I c iar i L ii
'
rOcto- ,h"n4~c if-360-
:/::
:;
-eri-d 6- 1- 1A3i: o: 05/31/86
Secondary: 6
SPA Contribution:
1515.07
Coimunity Contribution:
527.10
....
Inkind Labor:
0.00
to start a -44
-
Used'For:4
Case Study: N
-End
of Report . . . . . ..
4 . . . 44
. . . . . .. .. . . <.. ... . .. 4444, ?.. . ?;.j{+,.+
2"
.4-....":
'r'+"
Objec:ive: ..
')o
bui.Ld
a bui.ding Zor millet machine ana motor.
-
Income generated from milling operations will be
Ctie SIuUY: I,
RLO '
,x A.fld&
COUIJTRY: L:;GI
IAA: -685-i;6-093-.
I2CV N1AME:
I.Lura Li;c,'1c.ie
i~bL.
B0GZ0 iiariul: ii.LreLC: 1idrOCLc:
0
IhlplerdQnLt;4ion !POliod:
foi:05/01/.16
05o0/6
PEOJOct CorapIJe.Cot_?
;ICI
ACjZJUUL:
CLaj~lijjCajion. Prial.y:
2 Ac L.v i.Ly
Code: ?20
oecC~ldaty:
3
Tutai PI:0jU~cCL~~
SPA COfILCiijUcjoII -770.5
2715.01
COMIunim iLi~jiao1r 1650.31
Inkind IUiaccria4i_:
1lkin Tajnd:
0.00
0.00
Problemb
VIi.LdI(JL W~iiI0fl j:
Addressed: iflcuiie £oL LlliL L
,0QJuJrig Jiay, Ut genleratn
aiijjj
Ca,,;e Study: Il
1!Thd of ReporL
COUITRY: SEDIEGAL
PROJLCT T
ITLE: Vi-Lage olmen's
o Center
COILIU.IITY GROUP: Vli-'agje oif IIdine
PCV [JAil: Chery± Peteron
Deneficiarieo,: Dicect:
53 indirect:
250
Objectives:
To construct a 6.5
materials, transport.
Case Study: 11
COHMiUIIITY GRUrJP Vii .ag o1t Nanw.nQ
PCV JAN'E: Bieck2 Nc)criatLL
Expected Code~: 42
oJutcomes: Weiiz± wii proviae £iucrberon JouLcc Ac wa~ter cr
tho People.
Case Study: 11
EnId of Reupor t
COU .2,1Y - i:[ ,, i
I AA: -6,S-,6-O ):'j-
implemlenation Pel'od:
i10iol: 05/01/86 to:
08/01/86
Cla;uii.±cazio- Primary:
3 Activity Code: 440
Secondary: 4
Toot±Ai
Project Co..ts: 777.45
SPA Concribui±on:
395.95
inkind Labor:
0.00
lnlind IHaterials:
0.00
inkind Land:
0.00
Objective.: To eztabliuij
3 nur';ery/garden/wood'ots
that wiil
reforestation workshop.
Expected Code:
14
Outcomes:
Increased vegetable production;
reforestation
inimlaciveL.
Used For:
Case Study: N
End of Report
Inkind Labor:
719.65
dikficult for
the villagers to meet
basiic
food and
Objectives:
To repair the existing
cement lined well by dig
ging deeply into the water table
to obtain 3-4
Expected Code:
43
Outcomes:; Source of
vegetables for consumption,
and eventu
ally income generation throughout
the year.
Used For:
Case Study: N
End of Report
CO/I[IU;iITY GROUP:
VA..-la9C oIL Diala-Diam
PC%7 II COL11(I± ±uL, 8annine
g
-SPA Contribution:
462.43
Garden basin
has been built.
xpected
utcomes:
Code:
43
sed For:
xse StuLly: N
id of Report
C 0 ...... . . .
fleneficiarxe*:
Direct: 0 Indirect: 350
Secondary 6
SPA Contribution:
492.77
Inkxnd Labor:
0 00
Inkind Land:
0.00
i ,it
so . a.
hat
.
'
Objectives: To deepen and
repair one well
meters of water.
Expected Code: 42
1 1t
'!
. .- '
Used For:
Case Studyi N4
End of Report
** COUNTRY: SWAZILAND
-84-645-122- Hluti Sewing and Knitting 3476.00
Workshop
-84-645-123- Entfonjeni High School 1262.00
Beekeeping Proj.
-85-645-128- L.F.T.C. Beekeeping Center 10000.0
I - 1AA: 2 64 04
Expeted Code: 13
Outcomes: tlomen are expected to make uniforrat for
schools. Evqntualiy they ill expand aix
their',oper- 44
q ,Cas'St'dy-41
End ofRepor
COU.iI%'Y:
..'A: *:,iLA:J
-6 45- ,-123
Beneficiarjes:
DIcec,.: 6 IndirecL: 0
.LmpiementaJon
Period: fzom:
04/19/U6 to:
Plzojec' Coip.ete? I ACI 3tatus: Ii
C.Lilcation-
Primary: 1 Acti.viLy Code: 140
Secondary:
0
Community Contribution:
0.00
receive training.
Expected
Code: 13
Case Study: I!
End of Report
COUN4TRY: SWAZILAND)Bo~opnjCne
PROJE&
COMMUNITYTITLE: L.F.T.C. BeeleopinC
GROUP: Lutheran F'aireiL., Trng. nter
Conter
".
/ eneficiaries: Direct: 40 indirect; -0;---
ImlmnainPeriod: f~romn:
to:
Project Comlpictu? 11 ACH Statuu: 11
~:Classification- Primary:
1 Activity Code:
140
Secondary: 0-
I
F Inkind Land:
enterpri~e.
sorkshop for
Northern SwaZiland. I
Spa F'unds
Workshop tools and supplie",
Used For: materiala to develop harvesting Luuppi
es,- K "":"%";
Case Study: 1n
End of Report
** COUNTRY: TOGO
-83-693-007- Solar Wood Drying Kiln 8050.00
Graneries
-83-693-013-
Wonougba Cistern Project
1765.00
-83-693-016-
Tchekpo School Latrine
520.00
-84-693-003-
N'Dama Rural Cattle Breeding 13000.00
Project
-84-693-005-
Women's Cloth Mill
3927.00
-84-693-007-
Women's Cloth Mill--I,a Binah 2658.00
-84-693-008-
Orchard of Grafted Mangoes 804.00
-84-693-009-
Motorized Rice Husker
5137.00
-84-693-010-
Kara Improved Stove Project 7027.00
-84-693-011-
Solar Food Dryer 850.00
-84-693-012-
Pig-Raising in Tabiele
627.00
-84-693-013-
access road to ayokope 7400.00
-84-693-014-
Kelegougan Agricultural 1380.00
Water Pump
-84-693-015-
Farm Group Project 740.00
-85-693-001-
Farm to Market Road -- flaho 18744.99
-85-693-002-
Massokope Barrage Project
9999.99
-85-693-003-
Animal Project 830.00
COUNTRY: TOjO
IAA: -693-B3-007-
T otal
Project Cost.;: 8050.00
SPA Contribution:
6000.00
i! now
dried at a kiln in another town.
cent.er.
Expected Code:
31
teak.
Thus will allow increased production
and
demonstrate the
use of an alternative
energy
source.
components.
Used For:
Case Study: 1
End of Report
COUNTRY: TOGO
IAA: -593-J3-011-
Secondary: 0
SPA Contribution:
50.00
Community Contribution:
50.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Villagers do not have graneries
to store a portion
Addressed:
of their harvest for times
of famine.
Expected Code: 41
Outcomes:
Graneries will encourage
peasants to prepare for
Used For:
Case Study: N
End of Report
COUNTRY: TOGO
IAA: -693-83-011-
Beneficiaries:
Direct:
1200 Indirect:
Secondary: 2
SPA Contribution:
1425.00
Community Contribution:
340.00
Inkind Labor:
0.00
Problems
Wonougba agricultural project encourages
Addres3ed: eratively
run market gardens and coop-
animal husbandry,
participation.
one
in Attiyi and the other in Ghendji.
Expected Code: 43
Outcomes:
Cisterns will make possible the development of
Market garden
Used For:
Case Study: N
End of Report
Cl
COUNTRY: TOGO
IAA: -693-83-016-
SPA Contribution:
520.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Mlaterials: 0.00
Inkind Land:
0.00
Problems
School does not have a latrine and
Addressed: students are
defecating in
the surrounding fields.
School's old
Expected Code:
20
Outcomes:
Sanitation at the school will improve.
Spa Funds
Purchase of building
materials and
for masons'
Case Study: 11
End of Report
COUNTRY: TOGO
IAA: -693-8,4-003-
PCV NAME:
Beneficiaries:
Direct:
200 Indirect:
0
Implementation Period:
from:
09/28/35 to:
09/28/86
Classification- Primary:
3 Aciivity Code: 210
Secondary:
2
SPA Contribution:
4125.00
Community Contribution:
6000.00
Inkind Labor:
875.00
Inkind /lateriais:
0.00
Inkind Land:
0.00
Problems
Quality of local
herds suffers because there
Addressed:
no
local cattle is
breeding program.
Expected
Code: 40
Outcomes:
Quality of local herds wil,
improve. Cattle weight
and reproduction will
increase.
Farmers will be
Spa Funds
Purchase of
13 bulls and feed supplemento.
Used For:
Case Study: N
End of Report
COUNITRY: TOGO
IAA: -693-84-005-
Secondary: 0
SPA Contribution:
1876.00
Community Contribution:
421.00
Inkind Labor:
1000.00
inkind Materials:
630.00
Inkind Land:
0.00
Problems
Women have no regular
means
Addressed: for earning cash and
woman
weaving for
income generating, could teach
of capital
to build a cloth
mill.
Objectives:
Cloth mill will
be built and equipped in Pana.
Expected
Code: 31
Outcomes:
Economic situation of
women
and their families
Used For:
labor.
Case Study: 11
COU1NTRY: TOGO
IAA: -693-34-007-
BeneficiarLeu: Direct:
12 indirect.:
50
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Owner of group's work aop has decided
to
Addressed: for other purposesj. ;omen could continue use it
working
individually at home, but they fear
iosing Lhe
solidarity of the group.
Expected Code:
43
Used For:
Case Study: 11
End of Report
COUNTRY: TOGO
IAA: -693-84-008-
PROJECT TiTLE:
Orchard of Grafted
Mangoes
Beneficiaries:
Direct:
3000 Indirect:
Impementation Per.od:
frow: 06/01/85
to: 06/01/86
Classification- Primary:
1 Activity
Code: 350
Secondary: 6
SPA Contribution:
804.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Togolese
Expected Code: 42
to
fund other
projects.
Spa Funds
Purchase of 150 mango trees and
orchard equipment.
Used For:
Case Study: N
End of Report
/'
COUiJTRY: TOGO
IAA: -693-d4-009-
Iinplementation Period:
froim:
to:
Project Complete? N
ACN Status: N
Classification- Primary:
2 Activity
Code:
260
Secondary: 3
SPA Contribution:
5000.00
Community Contribution:
62.00
Inkind Labor:
50.00
Inkind Materials:
25.00
Inkind Land:
0.00
Problems
Rice produced by women's ag.
group
Addressed: must be trans-
ported 20
km by taxi to be husked
or the
women
must:
do it manually. Group wants
its own rice
small shelter in
the village of
Kpele-ele.
Expected Code: 43
Outcomes:
Women farmers will
spend less time and energy to
husk
rice. The women's group will
financially
Spa Funds
Purchase of rice husker,
cement, and transport
Case Study: N
End of Report
COUITRY: TOGO
IAA: -693-84-010-
Implementation Period:
from: 04/01/85
to: 04/01/86
Project Complete? H
ACN Status: 11
SPA Contribution:
6290.00
Community Contribution:
737.00
Inkind Labor:
0.00
Inkind laterials:
0.00
Inkind Land:
0.00
an office
Expected Code: 14
Used For:
Case Study: N
End of Report
AjiLC' 11(2.J:
1o L' Food Dryer
,reiciarIes: i)-ect:
0 Indirect: 0
UdaJ.LemeInLon PerLud: from: 05/01/85 to:
.(condurt : 3
llk ilid
Ia or 4: 0.00
inkind Land:
0.00
EX)ectCed Code: 14
OuLcomies: Tueting of
the solar food dryer wiil indicate
if
Used For:
Case Study: N
End of Report
the project.
>Expected Code: 43
Outcomes:
After first year the project will be financially
Cape Study: N
End of Report
1I-
'
COUNTRY: TOGO
IAA: -693-84-013-
PROJECT TITLE:
access road
to ayokope
PCV INANE:
Ron Ion
Beneficiaries: DirecL:
5000
indirect:
9999
Implementation Period:
from:
/ / to:
Project Complete? E
ACII Status,: 11
C-4.jification- Primary: 1
Activity Code:
0
Secondary:
0
SPA Concribution:
7400.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind laterials:
0.00
Inkind Land:
0.00
Problems
Farm to market access road
Addressed:
ie year round, is
currentiy inaccessib
due to lack of
two smaii bridges.
.xpected Code:
)utcomes:
ability 0
sed For:
A Study: 1
iad of Report
COUNTRY: TOGO
.AA, -693-84-01,1-
PROJECT TITLE: Kielegougan Agricuitural Water
COIIIIUITY GROUP: Pump
IoLegougan Wojomen's Ag. Coop
PCV iJA :
!;efeiciaries: Direct: 60 Indirect: 0
1mp.Lemen tation Period: from:
to:
2 Activity Code:
530
Secondary:
1
Total Project Costs:
1380.00
SPA Contribution:
1169.00
Community Contribution:
211.00
inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Irobiems Coop lacks easily accessible water
have to
carry water frum
day.
river to an
existing
cistern on
their farm.
Kpected
Code: 40
Itcomes:
Coop's activities will expand
to include market
gardening during
the dry
season, increased sugar
;ed For:
se Study: U
d of Report
+4'4
4' .+ + 4 4 4
44 + o, + . . + .: !
. .
. . . i " . ] : 1 £:' : " . ,
- , ' 2' 4
e? nE ateTR ..
c a L u. 4
,44.44
A 4
-~4'
4
4
-
4 -+
. .
.....
. .L. . :'"+<"
....4+4
'. " ...
+ r_ 4-.. .:
4 ,',,
'----... . . - 4-4
::'44Cpr+ - ,,
4+ 44 j.,
-4',:+ 4 4
- 4 4 ' 4- _ . ".-. - +.
' '-' i)I+~~r
".4-<i-iO
4--4'"4-4
+/++
+ + Secondary: 0
+.. +++' +' ++
Iy. '
ii .. . .
in
I,ind Labor: { ..
ii ~Inkind Matd : 0n
0:.:
i :+...........
ProbieTs "
Group
g
1nk- do farmer
Land u ipre ejtabiiscthed
0.0- a
to r a '4e4d
Addressod: grUen, but have no
fund...to Purcha:4ed--ad
"4
-
Ciabii
Ii
+cat ...
on- Pr ++in
ar :1+
Acc
iV+.t Co io 0 fertivizee 2r the:
Secondary:
rst
easo..
0 2+ , { > )'
+++
+: /+
4r\ 4.4 4
seffnigatr h is er
For:0 InkncLeor
Iukinc
L++
+++'Leri"
:': ++] 00
''1a
.....
'--
+ 'r -- 4 4-++
jExpected Code : 0 3
. .W
- . !44-4+
4-+44 4-
69v
Ender
Reportd
~'iij~ ~o ' -
ICnase Ld.'Suy
COUi4TRY: TOSGO
PRJ 2ITLE: ~~
~~9d < '4 ~ ~cd-
Ci" A'C~O' : !,. ItI
:-
: ::( :.LI(:!:
COMIIUJITY GRO.UP: 1(o i,toave,' 1&voulto Vi.Lage
Secondary: 0
.nkind Labor:
-0.00
crossings;
Expected Code: 0
Used--For: crossings
Case Study: N
IAA: -693-85-002-
PCV NAIIE:
Bill Shaw,
lHeteficia..:±Q Direct: 1000
Indirect:
0
11,1i:)wem;fuation Period:
from:
05/00/86 to: 02/00/87
Secondary:
0
SPA Contribution:
9999.99
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Addressed:
markets.
Objectives: To build an
earthen
dam and roadway; to flood and
Expected Code: 0
Outcomes:
Increased income from ability to rach market;
round food
source
and varied
sou._
of nutrition;
villagers will
learn new construction
skills.
Used For:
Case Study: N
End of Report
COUJTRY: TOGO
IAA: -693-8J5-003-
Beneficiarjes:
Direct:
300 Indirect:
5000
Clasification- Primary:
1 Activity
Code:
0
Secondary: 6
SPA Contribution:
830.00
CoRmunity Coutribucion:
0.00
Inkind Labor:
0.00
Inkind Materia..:
0.00
Inkind Land:
0.00
purchase of chicks.
Expected Code: 0
Case Study: N
End of Report
contribution.
IAA #:
IAA NAME:
** COUNTRY: BELIZE
-83-505-008-
Water/Irrigation Project
-83-505-012-
Mopon Woodworkers
3500.00
1010.00
-83-505-014-
Association
8944.45
-83-505-015-
Fund
Insect Identification
1000.00
-83-505-016-
Control
-84-505-005-
Women's Cooperative of
486.92
4640.61
-84-505-006-
Hopkins Village
5491.07
-84-505-007-
Technology
9999.00
-84-505-008-
Marketing
Water Project
-85-505-001-
Belmopan Compreh.School
3631.78
9270.00
-85-505-002-
Comp.Sci.Lab.
-85-505-003-
Toledo Crafts and Pottery
974.53
-85-505-006-
Belize Herb Center
2168.98
-85-505-007-
Barrack Fish Market
1159.65
10000.00
-85-505-008-
Improvement Project
-85-505-009-
Project
374-1 77
-85-505-010-
Improvement
554.80
2600.00
-85-505-013-
Typewriter
Dev.in Beliz
-85-505-014-
Toledo Comm.Coll. Computer
10750.00
-85-505-015-
Trng.Center
4035.31
& Poultry
COUNTRY: BELIZE
IAA: -505-83-008
Secondary: 0
Objectives:
Expected Code: 0
Outcomes:
Spa Funds
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-83-012
PROJECT TITLE:
Mopon Woodworkers Association
PCV NAME:
John Guerette
Beneficiaries: Direct:
27 Indirect:
Project Complete? N
ACN Status: N
23
Secondary: 0
SPA Contribution:
1010.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land2
0.00
Problems
The Mopon Woodworking Association,
Addressed: lop woodworking skills and created to deve
construct function
fur
Objectives:
To equip the association with
the needed tools so
Expected Code: 31
Outcomes:
Tools will allow production
to begin and the
rating skill.
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-83-014
PROJECT TITLE:
Catering Facility
and Loan Fund
George LeBord
Beneficiaries: Direct:
0 Indirect:
Project Complete? 1
ACN Status: N
Secondary: 2
SPA Contribution:
8944.45
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
There is no readily available
Addressed:
income-generating projects credit for financing
of graduating students.
enterprises.
To establish catering
a source of income for BJSA and for facilities as
women's groups
Expected
Outcomes:
Code: 34
Spa Funds
Revolving credit fund.
Catering equipment includ-
Used For:
ing gas stove, gas refrigerator,
4 butane tanks,
sink.
Case Study: N
COUNTRY: BELIZE
IAA: 505-83-015
PROJECT TITLE:
Insect Identification
Control
Expected Code: 13
Outcomes:
Project will help accomplish the
identification
phase of
the National Agricultural
Pest Survey
Spa Funds
Insect and plant pathogen
identification.
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-83-016
COMMUNITY GROUP:
Belize Energy Development
Comm
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 08/01/84 to: 10/01/84
Project Complete? N
ACN Status: N
400
Secondary: 4
SPA Contribution:
486.92
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The BEDC would like to construct
Addressed:
hydropower display which indicatesa micro-
applications in
Belize.
Expected Code: 10
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-84-005
PROJECT TITLE:
Women's Cooperative of
Hopkins Village
Betty Jo Heinrich
Beneficiaries: Direct:
0 Indirect:
0
20
Secondary: 1
SPA Contribution:
4640.61
Inkind Labor:
0.00
Inkind Materials:
0.00
Ir.kind Land:
0.00
and chickens.
They
Objectives:
To provide necessary implements
for coop,including
equipment.
Expected Code: 30
Outcomes:
Income generation for
the women, and preparation
Spa Funds
Materials to repair coop
building; fencematerials
Used For:
tools, fertilizer and
insecticide
ror the garden;
Case Study: N
,)
COUNTRY:
BELIZE
IAA: 505-84-006
PROJECT TITLE:
Girls
in
Science and Technology
PCV NAME:
James Dwight
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACN Status: N
Classification- Primary:
4 Activity Code: 400
Secondary: 2
Total Project Costs:
5491.07
SPA Contribution:
5491.07
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems Currently, there is a marked
Addressed:
Resource development. need for Energy
In addition,
marked underachievment there is
a
of girls in science.
Objectives: To promote
interest and opportunity
women to work in energy for young
resource development
by creating an
atmosphere
of scientific inquiry
Expected
Code: 14
Outcomes:
Increased numbers of women
working in energy
resource development.
Used For:
Case Study: N
COUNTRY:
BELIZE
IAA: 505-84-007
PROJECT TITLE:
Dairy Production
COMIIUNITY GROUP: and Marketing
Tonay Welch/Aaron
Achen
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
05/08/86
Project Complete?
N
ACN Status:
N
Classification-
Primary:
1 Activity Code:
280
Secondary:
0
SPA Contribution:
9999.00
Community Contribution:
9999.00
0.00
Inkind Labor:
Inkind Materials:
0.00
Inkind Land:
0.00
0.00
Problems
Punta
Gorda Town needs
a dairy production
project.
Objectives: To begin
milk production with
the number of cows 4 cows
and increase
to 10 by the end
of the first
year.
Expected
Code:
34
reliance on imported
3) Increased fresh milk items.
production.
Spa Funds
Materials
to construct a milking
Used For:
izing and shed, pasteur-
packaging machinery.
Case Study: N
I
"
'1)
COUNTRY: BELIZE
IAA: 505-84-008
PROJECT TITLE:
Water Project
COMMUNITY GROUP:
Hopkins Community Organization
PCV NAME:
Betty Jo Heinrich
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 09/01/85 to: 12/01/85
Secondary: 0
SPA Contribution:
3631.78
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
The village's two reservoirs are damaged and there
Objectives:
To repair the reservoirs as an immediate
solution
Expected Code: 40
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-001
PROJECT TITLE:
Belmopan Compreh.School
Comp.Sci.Lab.
COMMUNITY GROUP:
Belmopan Schools
PCV NAME:
Marvin Schultz
Beneficiaries: Direct:
0 Indirect:
0
Project Complete? N
ACN Status: N
Classification- Primary:
5 Activity
Code:
23
Secondary: 0
SPA Contribution:
7670.00
operaters, there
are no
training facilities.
Objectives: To establish
a Computer
Science Lab. at the Bel
mopan Comprehensive School.
Lab will
consist of 4
Expected Code:
10
Outcomes:
Trained manpower to fill Belize's need
for
computer workers.
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-002
PROJECT TITLE:
Succotz Women's
Group
COMMUNITY GROUP:
Succotz Women's
Group
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 09/01/85
to: 08/31/86
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
974.53
Community Contribution:
A.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
There is
a lack of Belize traditional
Addressed: items being
generation.
Expected Code:
10
Outcomes:
Women will have the
opportunity to learn while
Spa Funds
Sewing machine, iron and ironing
board, material,
Used For:
thread, tools and implements.
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-003
PROJECT TITLE:
Toledo Crafts and Pottery
COMMUNITY GROUP:
Toledo C & P Project Assoc.
PCV NAME:
Del Gish
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: 09/01/85
to: 08/31/86
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
1513.24
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
While the community
relies on clay products, there
Addressed:
is no pottery produced
in the San Antonio area. A
equipment to
begin.
Objectives:
To establish
a pottery production unit
to make and
Expected Code:
43
keep.
Spa Funds
Potter's wheel, kiln
and roof cover, maintenance.
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-005
COMMUNITY GROUP:
Orange Walk East Comm.Dev.Com.
Beneficiaries:
Direct: 0 Indirect: 0
Implementation Period:
from: 11/14/85 to: 02/28/86
Classification- Primary:
3 Activity Code: 300
Secondary: 0
SPA Contribution:
2168.98
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
The Orange Walk East Development Committee
Addressed:
to begin a home garden project. The projectwants
seeks
Expected Code: 42
Outcomes:
1) Increased vegetable production will reduce dep
endancy on imported food and improve nutrition.
kit.
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-006
PROJECT TITLE:
Belize Herb Center
PCV NAME:
Dr. William Fraenkel
Beneficiaries: Direct:
1 Indirect: 0
Implementation Period:
from: 11/01/85 to: 09/01/86
Secondary: 0
SPA Contribution:
1159.65
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed: but is
becoming a lost art.
The availability
of
Objectives: To
improve the condition of the herb
vendor's
stall.
Products will be presented in a more
descriptions.
This is expected to attract cust
omers
and improve business.
Expected Code: 30
of customers.
This should inspire an overall
Spa Funds
Materials for stall renovation.
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-007
PROJECT TITLE:
Barrack
Fish Market Improvement
COMMUNITY GROUP:
Barrack Project
PCV NAME:
David Wheeiock
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 03/01/86 to: 06/30/86
Project Compiete? !I
ACN Status: iN
Classification- Primary:
1 Activity Code: 230
Secondary:
6
10000.00
SPA Contribution:
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The same
seawall used
Addressed: by fishermen as fish-stalls
Objectives:
To construct
a jetty and platform 20
feet off in
Expected
Code: 34
Outcomes:
New facility is expected
to enhance the market
abiiity of seafood.
The
sea-wall area
will be
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-008
PROJECT TITLE:
Toledo Small Farmer Cocoa Project
COMMUNITY GROUP:
Toledo Cocoa Growers Assoc.
PCV NAME:
Doug Dooling
Beneficiaries: Direct:
200 Indirect:
Implementation Period:
from:
03/01/86 to: 02/28/86
Project Complete? N
ACN Status: N
Classification- Primary:
3 Activity
Code:
210
Secondary: 1
SPA Contribution:
Community Contribution:
7693.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The current constraint
Addressed:
cocoa is
due to limited to expansion of commercial
access to basic aa.inputs
Expected Code: 43
Outcomes:
Conversion of dispersed traditional cocoa
to income generating producers farms
of high quality
Spa Funds
Materials including
seeds and bags, pesticides,
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-009
PROJECT TITLE:
Ringtail Village Road Improvement
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 2
SPA Contribution:
2522.07
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
An unfinished road has caused considerable delay
Addressed: in
the continued development of the farms and
cover.
Expected Code: 40
Spa Funds
Equipment operator salaries, fuel and lubricants,
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-010
PROJECT TITLE:
Calla Creek Water Project
COMMUNITY GROUP:
Committee for Betterment
of CC
Beneficiaries: Direct:
60 Indirect: 300
Implementation Period:
from: 04/04/86 to: 04/03/87
Project Complete? N
ACN Status: N
Classification- Primary:
5 Activity Code:
540
Secondary: 6
SPA Contribution:
1815.89
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Addressed: water.
Expected Code: 24
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-011
PROJECT TITLE:
Maypen Village Women's
Group Wine Dist.
COMMUNITY GROUP:
Maypen Village Women's
Group
Beneficiaries: Direct:
8 Indirect:
0
ImplementatiLon Period:
from: 04/04/86
to: 04/04/87
Project Complete? N
ACN Status: N
Classification- Primary:
2 Activity Code:
280
Secondary: 0
SPA Contribution:
554.80
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Women's group of Maypen produces and sells
Addressed: wine.
Ultimate goal
is nationwide distribution.
Expected Code:
43
Spa Funds
Bottles, bottle caps, labels, promotion,
Used
packaging
Case Study: N
1)
COUNTRY: BELIZE
IAA: 505-85-012
PROJECT TITLE:
Toledo Community
College Typewriter
COMMUNITY GROUP:
Toledo Community
Coliege
PCV NAME:
Harriet Perkins
Beneficiaries: Direct:
350 Indirect:
Implementation Period:
from: 04/04/86
to: 04/03/87
Project Complete? :J
ACN Status: N
Classification- Primary:
5 Activity
Code:
230
Secondary: 0
SPA Contribution:
2600.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
to train all
students, adults interested
allow availability of
typewriters , and
for extra
practice.
Project will help train
individuals
for jobs.
Expected Code: 13
Outcomes:
An increase in trained people with
typing skills.
Used For:
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-013
PROJECT TITLE:
Coastal Wind Regime Asses.& Dev.in Beliz
PCV NAME:
Glen Ashlozk
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 04/04/86 to: 04/03/87
Secondary: 2
SPA Contribution:
8395.46
Community.Contribution: 3150.04
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed:
making it impossible to assess the feasibility
of
projects.
There is need for data to make accurate
Expected Code: 14
Outcomes:
This is first crucial step toward planned develop
ment of wind resources in Belize.
Case Study: N
COUNTRY: BELIZE
IAA: -505-83-014
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 2
enterprises.
To establish catering facilities as
Expected Code: 34
sink.
Case Study: N
COUNTRY: BELIZE
IAA: 505-85-015
PROJECT TITLE:
Stella Marris School Garden & Poultry
PCV NAME:
Davis Patterson
Implementation Period:
from: 04/08/86 to: 04/07/87
Secondary: 6
SPA Contribution:
4035.31
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
Disabled students do not have the capabilities
to
pilot project to
teach these people self-suffi
ciency in growing food, but they don't have the
Objectives: To construct
a shed to house poultry and shelter
the program.
Expected Code: 24
consumption.
Case Study: N
IAA #:
IAA NAME:
** COUNTRY:COSTA RICA
-85-515-004- Chicken Production Project
5760.83
CoopeTrojas
Beneficiaries: Direct:
16 Indirect: 280
Secondary: 0
SPA Contribution:
760.83
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
The Sahara community needs an income generating
Expected Code: 31
Outcomes:
Skills in raising and marketing chickens;
fresh
families.
first 10 weeks.
Case Study: N
PCV NAME:
Secondary: 3
yields.
Expected Code: 34
Used For:
Case Study: N
Beneficiaries: Direct:
20 Indirect: 0
Implementation Period:
from: 05/06/86 to: 06/15/86
Secondary: 6
SPA Contribution:
2242.94
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The farmers lack any income generating activities
Addressed:
during the six month dry season
from November to
Objectives: To install
an
hydraulic ram and water
distribution
of each farm.
Expected Code: 32
Outcomes:
Skills for installing and maintaining hydraulic
Case Study: N
IAA #:
IAA NAME:
-84-517-008-
Gozuela Farmlands
-85-517-004-
5802.00
Fish Floats
1635.86
-85-517-011-
Project
Zinc Roofing
-85-517-016-
214.76
Cooperative Fishing
15074.49
-85-517-032-
Equipment
Fingerling Distribution
2973.15
-85-517-036-
Center
HA-86-517-001-
1496.64
AMELIORES
HA-86-517-001-A
wells projects
1017.56
-86-517-002-
Artisan Catalogue
540.00
-86-517-003-
2007.30
703.57
IIA-86-517-005-
Production
1824.82
-86-517-006-
Letrinas
-86-517-007-
Bridge Construction
1439.00
2044.26
-86-517-009-
El Maranito
4544.31
PROJECT TITLE:
Gozuela Farmlands
Beneficiaries: Direct:
24 Indirect: 500
Secondary: 0
Problems
Farmers and their families suffer from malnutri-
it for cultivation.
Expected Code: 24
Case Study: N
PROJECT TITLE:
Fish Floats
COMMUNITY GROUP:
PC Inland Fisheries Program
PCV NAME:
Beneficiaries:
Direct: 14 Indirect: 150
Impiementation Period:
from: 05/30/86 to:
/ /
Project Complete? N
ACN Status: N
Ciassification- Primary:
5 Activity Code: 710
Secondary: 0
SPA Contribution:
353.57
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
harvesting of fish
ponds.
Objectives:
To buy enough floats to complete
the nets for the
volunteers in
the country. Individual volunteers
wili construct
the nets for use in harvesting
and
Expected Code:
13
Spa Funds
330 1" fish net floats.
Used For:
Case Study: N
IAA: 517-85-005
PROJECT TITLE:
Demonstration
COMMUNITY GROUP: Fishfarmers Aquaculture Project
of Bani
PCV NAME:
Beneficiaries: Direct:
8 Indirect: 200
Implementation Period:
from: / / to: / /
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity Code: 710
Secondary:
0
SPA Contribution:
1635.86
Community Contribution:
645.97
Inkind Labor:
989.89
Inkind Materials:
0.00
Inkind Land:
0.00
0.00
Problems
Fish farmers
Addressed:
large enough of Bani have small ponds that are not
to be economically feasible.
ponds are very expensive Large
Objectives:
To choose
8 independent
pay half the constructionfarmers who are willing to
of additional ponds
Expected
Code: 13
Outcomes:
Communitywill
learn: Aquaculture management
construction techniques and
enterprise.
Used For:
Case Study: N
IAA: 517-85-011
PROJECT TITLE:
Zinc Roofing
Anne Kepple
Beneficiaries: Direct:
0
Indirect:
1000
Project Complete? N
ACN Statu6: N
Classification- Primary:
2
Activity Code: 280
Secondary:
0
SPA Contribution:
Communi.ty Contribution:
214.76
0.00
Iniind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Women's Center
Addressed:
finished so thatsewing center building needs to be
income generation.
of income and
a portion of a cooperative source
Expected
Code: 31
Outcomes:
Roofing, building
and sewing
eloped. The Centro de Madres skills will be dev
will increase their
income.
Spa Funds
Roofing materials.
Used For:
Case Study: N
Implementation Period:
from: 10/01/65
to: 03/01/86
Secondary: 0
SPA Contribution:
1174.49
Community Contribution:
0.00
to intermediaries.
Expected Code:
34
Outcomes:
Greater capacity to catch fish.
Used For:
Case Study: N
IAA: 517-85-032
PROJECT TITLE:
Fingerling Distribution
COMMUNITY GROUP: La Asoc.de Pisc.de Center
Daryl T. Smith
Beneficiaries: Direct:
9 Indirect: 8000
Implementation Period:
from: 12/01/85
to: 12/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity
Code: 710
Secondary: 0
SPA Contribution:
973.15
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Fish farmers of Jara
Bacoa have no local source
Addressed:
of fingerlings.
It is
nearly impossible to obtain
fish because of
the road conditions.
Expected Code: 40
Outcomes:
Increased production
of fish.
Used For:
Case Study: N
IAA: 517-85-036
PROJECT TITLE:
Yerba Buena
COMMUNITY GROUP: Community of Water Project
PCV NAME:
Yerba Buena
Nancy Consolloy
Project Complete? N
ACN Status: N
Secondary:
6
SPA Contribution:
3355.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Town lacks a safe,
Addressed:
Rain catchment convenient water source.
Expected
Outcomes:
Code:
Because34
Spa Funds
Purchase of construction
materials for water
Case Study: N
IAA: 517-85-043
PROJECT TITLE:
Diving
Course/Equipment
PCV NAME:
Jay A. Patchen
Beneficiaries:
Direct:
24 Indirect:
0
Implementation Period:
from:
02/18/86 to:
03/05/86
Project Complete? N
ACN Status: N
Classification- Primary:
2 Activity Code: 230
Secondary:
6
1496.64
SPA Contribution:
1496.64
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Fisherman have
Addressed: diving accidents suffered many fatalities from
techniques.
Expected
Outcomes:
Code: 13
Case Study: N
IAA: HA-51.7-86-001
Addressed: ens
Expected Code: 0
Outcomes:
Spa Funds
Used For:
Case Study: n
IAA: IHA-517-86-001
PROJECT TITLE:
AMELIORES
COMMUNITY GROUP:
PRE COOPERATIVE
PCV NAME:
WAYNE JUDSON
Beneficiaries:
Direct: 25 Indirect: 200
Implementation Period:
from: 09/01/86 to:
Classification- Primary:
6 Activity Code: 0
Secondary: 0
SPA Contribution:
617.55
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Addressed:
GARDENS
Expected Code: 0
Outcomes: BETTER NUTRITION
REDUCED INCIDENCE OF WATER BORNE DISEASES
Spa Funds
SKILLED LABOR, CONSTRUCTION SUPPLIES
Used For:
Case Study: N
COUNTRY: DOMINICAN
REPUB
IAA: 517-86-002
PROJECT TITLE:
Artisan
COMMUNITY GROUP: Mujeres Catalogue
Aplicadas
a la Indust
PCV NAME:
Tim Weaver
Beneficiaries: Direct:
135 Indirect:
0
Implementation Period:
11/30/86
Project Complete? N
ACN Status:
N
Classification- Primary:
2 Activity Code:
280
Secondary:
0
SPA Contribution:
2007.30
1824.82
Community Contribution:
182.48
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Mujeres
Aplicadas
a la Industria
Addressed:
to show need a catalogue
reached in person.
Objectives: To print
a catalogue of the
group's products to
Expected
Code: 34
Outcomes:
Increase in sales in domestic
and foreign markets.
Used For:
Case Study: N
IAA: 517-86-003
PROJECT TITLE:
Improved
COMMUNITY GROUP: Community Sailing Canoe
of Poorer Fishermen
PCV NAME:
Michael Goss
Beneficiaries: Direct:
0 Indirect:
i00
Implementation Period:
Project Complete? N
ACN Status: N
Classification- Primary:
I Activity Code: 280
Secondary:
6
SPA Contribution:
525.55
Community Contribution:
310.22
215.33
Inkind Labor:
Inkind Materials:
0.00
Inkind Land:
0.00
0.00
Problems
Local fishermen
Addressed:
limited in of the poorer class
their production by the are severely
materialn
uncomplicated construction along with an
Expected
Outcomes:
Code: 13
fishermen's
sea waters, making possible access
to deep
income.
Used For:
Case Study: N
IAA: -517-86-005-
PROJECT TITLE:
Intensive Gardening Production
PCV NAME:
Ruben G. Ubinas
Beneficiaries: Direct:
16 Indirect: 500
Implementation Period:
from: / / /
to: /
Project Complete? 11 ACN Status:
N
Classification- Primary:
1 Activity Code: 300
Secondary: 6
SPA Contribution:
178.57
Inkind Labor:
0.00
Addressed:
Lagunas, and a lack of knowiedge of
vegetable
health.
Objectives:
To prepare land and introduce intensive
gardening
organic methods.
Expected Code: 32
diet.
Used For:
Case Study: N
PROJECT TITLE:
Nueva Union de Agua y Letrinas
PCV NAME:
Glen Alano Milstein
Beneficiaries: Direct:
61 Indirect: 245
Secondary: 1
SPA Contribution:
1824.82
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
No source of clean, permanently available
water.
Expected Code: 21
techniques.
Used For:
Case Study: N
IAA: 517-86-006
PROJECT TITLE:
Rural Latrine Construction
Patricia Butler
Beneficiaries: Direct:
138 Indirect:
Implementation Period:
from: 06/01/86
to: 08/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
6 Activity
Code: 560
Secondary: 0
SPA Contribution:
910.00
Community Contribution:
529.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Uncontained human waste
Addressed:
and food sources has which contaminates water
of
latrines.
Expected Code:
Outcomes:
Water 21
improve.
Spa Funds
Building materials.
Used For:
Case Study: N
IAA: 517-86-006
PROJECT TITLE:
Yerba Buena
Aquaduct
COMMUNITY GROUP:
Community of Yerba Buena
PCV NAME:
Nancy Consollon
Beneficiaries: Direct:
0 Indirect:
600
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACN Status: N
Secondary: 6
SPA Contribution:
1446.43
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Funds are needed for completion of
Addressed:
Buena Aquaduct for a the Yerba
families.
Expected Code: 23
Outcomes:
Clean water for the community,
better health.
Used For:
Case Study: N
IAA: 517-86-007
PROJECT TITLE:
Bridge Construction
COMMUNITY GROUP:
Community of Loma de Ia Sal
PCV NAME:
Kevin Thibodeau
Beneficiaries: Direct:
0 Indirect:
500
Ciassification- Primary:
1 Activity
Code: 240
Secondary: 6
SPA
Contribution:
892.86
Inkind Labor:
0.00
Inkind Material-
0.00
Inkind Land:
0.00
Problems
Community has nutrition and income
Addressed: problems due to
its isolated generation
location across
a
products and
to allow people to get
to health
Expected Code:
32
Outcomes:
Access to markets, health
facilities, schools.
construction.
Used For:
Case Study: N
Beneficiaries:
Direct:
0 Indirect: 400
Impiementation Period:
from: / / to: / /
Project Complete? N
AC1 Status: N
Classification- Primary:
6 Activity Code: 550
Secondary: 1
SPA Contribution:
935.71
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
ProbLems
Funds are needed to complete a water
Addressed: system which
Expected Code: 24
Used For:
Case Study: N
IAA: 517-86-008
PROJECT TITLE:
Aquaduct
for El Manguito & El Maranito
Beneficiaries: Direct:
0 Indirect:
400
Implementation Period:
Project Complete? N
ACN Status:
N
Classification- Primary:
6 Activity Code: 550
Secondary:
3
2044.26
SPA Contribution:
796.43
Community Contribution:
1247.83
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
There is currently
Addressed:
the Associacion no source of clean water,
would like to establish a and
production.
Objectives: Installation
of
a gravity fed piped water
originating from an already system
system.
Expected
Outcomes:
Code: 21
I)Project will
increase capacity for
animal production.
Health gardening and
Used For:
Case Study: N
IAA: 517-86-009
PROJECT TITLE:
Ortega Well
Construction
PCV NAME:
Timothy M. Callaghan
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from:
06/01/86 to:
08/01/86
Project Complete? N
ACN Status: N
Classification- Primary: 3
Activity Code: 510
Secondary:
6
SPA Contribution:
1673.32
Community Contribution:
2870.99
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
water source.
Expected
Code: 21
Outcomes:
1) Food production will increase
will become and the community
planning will be
gained.
Used For:
Case Study: N
IAA #:
IAA NAME:
** COUNTRY: PARAGUAY
-83-526-017-
Potrero Ybate Bakery Project
-84-526-018- 2326.16
1366.38
-84-526-019-
Proj. Phase II
Cooperative Center
-84-526-020-
5423.91
284.34
8 4 Project
- -526-021-A
Assoc. Agric.
35 Credit Users
741.50
-84-526-022-
La Pastora Citrus Nursery
-84-526-023-
1232.14
Vaccine Refrigerator
-84-526-024-
302.24
-84-526-025-
1197.37
Revolving Fund
-84-526-026-
12800.00
Agricultural Center of
San
3784.27
-84-526-027-
Juan
Dairyman Project
-84-526-028-
9474.89
Prouotion of Savings
&
163.00
Credit Cooperativ
-84-526-029-
Credit Revolving Fund
-84-526-030-
5114.38
Cooperative Coops of
5390.15
-85-526-031-
Torrescue
Farmers'
Coop Warehouse
-85-526-032-
10257.00
TesL !arketing
-85-526-033-
783.83
1lo±oses Silo
-85-526-034-
3157.88
-85-526-035-
1394.45
Starcii Production
-85-526-037-
1972.00
-85-526-038-
895.00
Project Support
29082.00
4)
COUNTRY: PARAGUAY
IAA: 526-83-017
COMMUNITY GROUP:
Potrero Ybate Bakery
Committee
PCV NAME:
Brian Willis
Beneficiaries:
Direct:
4 Indirect: 800
Implementation Period:
from: 05/01/84
to: 04/01/85
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity
Code:
280
Secondary: 0
SPA Contribution:
1050.66
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The committee needs a secure
Addressed: eration. At the same time, themeans of income gen-
area lacks
of fresh, nutritional bread. The women of a supply
the Com
mittee lack capital for start-up funds and
equip
ment.
chairperson to be
run by the 4 women who
comprise
Expected Code: 31
Spa Funds
Equipment and services of a professional
Used For:
supervise and assist in the construction baker to
members
how to bake.
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-84-018
Beneficiaries: Direct:
0 indirect: 0
Secondary: 0
SPA Contribution:
799.72
Inkind Labor:
0.00
Inkind Land:
0.00
Problems
The farmers of Valenzuela do not have
Addressed:
low-cost grain storage facilities. A enough local
prototype
Objectives: To
assess the potential market for silos,
deter
mine feasibility of producing silos locally, pro
cure funds; build a simple workshop, supply tools,
3xpected Code: 30
Outcomes:
Greater profit from grain sales, resulting
from
Used For:
Case Study: N
BeneficiarLe ,: Dlicc
: 60 indirect:
0
Implementalon L
SPA Contribution:
3043.48
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Coop needs a storage, office and grocery
Addressed:
to provide a secure, enclosed complex
products;
to store pesticides, herbicides,
seeds;
Losses occur
from lack of storage faci
store,
Expected Code: 34
Outcomes:
Grocery store will make available
a greater var
iety of food, farm inputs and hardware.
Storage
Case Study: N
COU'JTRY: PARAGUAY
IAA: 526-34-020
Secondary: 0
SPA Contribution:
155.34
Inkind Labor:
0.00
Inkind Land:
0.00
uje of hybrid
corn. Funds are needed for seed,
±2:Decte d Code: 31
Used For:
Case Study: 11
COUNTRY: PARAGUAY
IAA: -526-84-021-A
PROJECT TITLE:
Assoc. Agric. Credit Ujers
35
COMMUNITY GROUP:
Same
PCV NAME:
Juan Aranda
Beneficiaries: Direct:
0 Indirect:
0
09/01/84 co:
11/30/84
Project Complete? N
ACN Status: I
Classification- Primary: 2
Activity Code: 280
Secondary:
0
SPA Contribution:
224.30
Community Contribution:
151.36
to consumrdr.
In
Objectives:
To build a store
for AUCA 35
to sell koodscuzks.
Expected
Code: 34
Outcomes:
AUCA will have an
income source and another
prices.
Used For:
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-84-022
PROJECT TITLE:
La Pastora Citrus
Nursery
COMMUNITY GROUP:
PCV NAME:
Linda Regimbal
Beneficiaries: Direct:
0 Indirect:
0
implementation Period:
from: 10/01/84 to: 09/01/85
Project Complete? N
ACN Status: N
Secondary: 6
SPA Contribution:
513.03
Community Contribution:
719.11
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Cancrosis and Tristeza are affecting
Addressed: much of the
citrus techniques.
system and
a seed bed.
Expected Code: 32
Outcomes:
The 7500
trees will
be dispersed throughout the
labor; tools;
transportation.
.Case Study: N
COUNTRY: PARAGUAY
1AA: 526-14-023
PROJECT TITLE:
Vaccine Refrigerator
COMMUNITY GROUP:
Pro-Vaccine Commission
PCV NAME:
Russ Hardison
Beneficiaries: Direct:
1 Indirect: 0
Implementation Period:
from: 11/01/84 to: 10/01/85
Secondary: 0
SPA Contribution:
302.24
Inkind Labor:
0.00
Inkind Materiais:
0.00
Inkind Land:
0.00
Problems There is
serious problem wit- animal diseases
Addressed:
the area, and vaccines are not
in
readily available.
erator.
Expected Code: 40
Outcomes:
Project will make vaccine available to combat
Used For:
Case Study: H
Beneiiciarieu:
Direct:
0 Indirect:
0
iip±uientaLioI
Pr.oU: Lrom: 11/01/84 to: 09/01/85
PlrujecL Comp-ete? * ACj Status: II
Secondary: 0
SPA Contribution:
640.86
Inkind Labor:
0.00
Inkind Materlais:
0.00
Inkind Land:
0.00
Problems
Store would like to expand operations
Addressed:
basic farm implements, as farmers to include
must travel
to
.tock.
Objectives: To buy
tools to be stocked at
the AUCA #28 coop.
store.
Expected Code:
Outcomes:
Project34
tools.
Spa Funds
Purchase of farm implements.
Used For:
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-84-025
PROJECT TITLE:
Revolving Fund
COMMUNITY GROUP:
United Christian
Missionary
PCV NAME:
Johnny Colon, Andrew Fainer
Beneficiaries: Direct:
0 Indirect,
0
Implementation Period:
from:
01/01/85 to:
10/01/85
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
9800.00
Community Contribution:
3000.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
small workshops.
agroforestry,
Expected Code:
34
Outcomes:
To promote new group formation, a technical
Spa Funds
Working capital for
the revolving fund.
Used For:
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-84-026
PROJECT TITLE:
Agricultural Center
of
San Juan
COMIUNITY GROUP:
Agricultural Ctr.
of San
Juan
Beneficiaries: Direct:
0 Indirect: 0
Project Complete? 1;
ACN Status: 11
Classification- Primary:
1 Activity Code: 210
Secondary: 0
SPA Contribution:
3491.94
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Addressed:
supplies. The few supplies that
are available in
Expected Code:
14
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-84-027
PCV NAME:
Beneficiaries: Direct:
9 Indirect: 0
Implementation Period:
from: 03/01/85 to: 10/01/85
Secondary: 0
Inkind Land:
0.00
Problems
San Pedro has large population of beef-cattle that
Expected Code: 34
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-84-028
Beneficiaries: Direct:
280 Indirect: 0
Secondary: 0
Expected Code: 34
Used For:
to open new
accounts and to augment old accounts.
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-84-029
PROJECT TITLE:
Credit Revolving
COMMUNITY GROUP:
Centro Paraguayo Fund
de Cooper.
Beneficiaries:
Direct:
0 Indirect:
0
Implementation Period:
from: 11/01/84
to: 10/01/85
Classification- Primary:
2 Activity
Code:
270
Secondary: 0
SPA Contribution:
3733.13
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
CPC promotes social
cooperation among rural pro-
Addressed:
ducers, stressing
self-help initiatives. There is
and Caazapa.
Objectives: To expand a
rotating
fund
to provide credit to
farmers for
the purchase of agricultural
and labor costs as wel± as
the inputs
provision of start
ing capital for small
grocery
stores
that would
Expected Code: 30
Outcomes:
Individual farmer will be able
on his
own plot of land by reducing
his need to
work for
a wage on a large farm.
Used For:
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-84-030
COMMUIJITY GROUP:
Comite of Torrescue
Secondary: 0
SPA Contribution:
3542.58
Inkind Labor:
0.00
inkind Materials:
0.00
Inkind Land:
0.00
Problems
People of Torrescue are almost
Addressed: on cotton, soy and
corn as totally dependent
to meat
and eggs.
built.
Expected Code: 34
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-85-031
PROJECT TITLE:
Farmers' Coop Warehouse
COMMUNITY GROUP:
Coop de Produccion Agricola
PCV NAME:
Karen Hansen
Beneficiaries:
Direct: 143 Indirect: 1000
Implementation Period:
from: 06/26/85 to:
12/30/85
Project Complete?? N
AC1 Status: N
Secondary: 0
SPA Contribution:
5847.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Coop works to give locai farmers
fair prices for
Addressed:
cotton & tobacco crops, and
provides consumer good
Objectives: To build
a 375m warehouse for
Expected Code:
34
Outcomes:
Coop will be strengthened in
its work of providing
they buy.
Spa Funds
Purchase of building materials and
consumer goods.
Used For:
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-85-032
Beneficiaries:
Direct: 8 Indirect: 0
Implementation Period:
from: 08/01/85 to: 07/01/86
Secondary: 0
SPA Contribution:
783.83
Inkind Labor:
0.00
Inkind Land:
0.00
Addressed: operation to
include the production of clothing.
Expected Code: 34
Outcomes:
Variety and quality of products will increase;
making.
Used For:
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-85-033
PROJECT TITLE:
Moiasses Silo
PCV NAME:
Torn Winter
Beneficiaries: Direct:
25 Indirect:
0
Implementation Period:
from: 08/20/85 to: 08/15/86
Project Complete? N
ACN Status: I
Clasjification- Primary:
2 Activity Code:
210
Secondary: 0
SPA Contribution:
2034.66
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Seasonal fluctuations in
molasses production
Addressed:
market conditions; dependence and
molasses storage.
Expected Code:
34
Case Study: N
COUJTRY:
PARAGUAY
IAA: 526-85-034
COMMUNITY GROUP:
Isla Alta
Comitee of Beekeeper
PCV NAME:
Lauren Spurrier
Beneficiaries:
Direct:
20 Indirect:
0
Implementation Period:
from:
09/02/85 to:
09/01/86
Project Complete? N
ACN Status: N
Classification- Primary:
I Activity Code:
140
Secondary:
3
SPA Contribution:
995.95
Community Contribution:
398.50
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
High population density;
low
ag. productivity;
Addressed:
dependence
on
a monocrop economy.
Objectives:
To construct
and equip 80 beehives
for
the
committee;
income supplement
of 117.OOOG per
individual
in 5 years.
Expected
Code: 34
Outcomes:
Enhanced group organization
and collective
strength.
Commercialization of honey
as an alternative cash
crop.
Case Study: N
COUnTRY: PARAGUAY
IAA: 526-85-035
PROJECT TITLE:
Starch Production
Secondary: 1
SPA Contribution:
1972.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Addressed:
processing honey, plus need for
diversified income
source.
Expected Code:
34
Outcomes:
Machinery already belonging to the coop will
be
starch.
Used For:
Case Study: N
COUNTRY: PARAGUAY
IAA: 526-85-037
PROJECT TITLE:
Home Products Factory
COMUNITY GROUP:
Union Perla
del Sur
implertentation Period:
from: 09/09/85 to: 04/01/86
Project Complete? N
ACM Status: N
Classification- Primary:
1 Activity Code:
820
Secondary: 6
Totai Project Costs: 895.00
SPA Contribution: 427.00
Community Contribution: 468.00
Inkind Labor: 0.00
Inkind Materials: 0.00
Inkind Land: 0.00
Probiems Group needs a workshop and processing equipment
vegetables.
Objectives:
Small workshop will be built.
Equipment for drying
nearby market.
Expected Code: 32
Outcomes: Source of
stable work & income for group
members.
Case Study: N
COUNTRY: PARAGUAY
IAA: -526-85-038
PROJECT TITLE:
Project Support
COMMUNITY GROUP:
Fund.Paraguaya de
Coop.y Des.
PCV NAME:
Juan Aranda
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period: from:
12/01/85 to: 11/30/86
Project Complete? N
ACN Status: N
Classification- Primary:
2 Activity Code:
0
Secondary:
0
SPA Contribution:
10000.00
Community Contribution:
19082.0
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Addressed:
Objectives:
Expected
Code:* 0
Outcomes:
Spa Funds
Used For:
Case Study: N
** COUNTRY: MOROCCO
-84-378-006- Inezgane Municipal Library 7980.40
COUNTRY: MOROCCO
IAA: -378-84-006
PROJECT TITLE:
Inezgane Municipal
COMMUNITY GROUP: City of Inezgane
Library
PCV NAME:
Ross llarrer
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period:
from: / / to: 05/31/85
Project Complete? N
ACN Status: N
Secondary: 0
SPA Contribution:
7980.40
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
There is
no library
in the city or small
Addressed: ing communities. One half of a city-owned surround
building
large.
Expected Code:
Outcomes:
Library 0
cultural
opportunities.
Spa Funds
Used For:
Case Study: N
IAA #:
IAA NAME:
** COUNTRY: PHILIPPINES
-85-492-008- Pawa Well Project 1420.32
-85-492-009- Kapangan Central Bayanihan 9693.00
Water Project
-85-492-010- Seed Production Center 3520.00
-85-492-011- Rubber and Coffee Processing 9177.08
Plant
-86-492-001- Seed/Seedling Dispersal - 3224.07
Self-Reliance
-86-492-002- Goat Raising Project
HA-86-492-002- 1100.00
Tinoc Water Project 11922.00
-86-492-003- Rabbit Raising Project
HA-86-492-003- 264.24
Waterworks Project for Butoy 1990.00
-86-492-004- Community Poultry Raising 1000.00
Project
HA-86-492-005- Copias Potable Water Project
-86-492-006- 305.45
Integrated Farming 13504.42
Demonstration
-86-492-007- Swine Dispersal Project
-86-492-008- 650.00
Alimit Water Pump Irrigation 5004.71
Project
-86-492-009- Blower and Thresher Project 2258.23
COUNTRY: PHILIPPINES
IAA: 492-85-008
PROJECT TITLE:
Pawa Weli Project
COMMUNITY GROUP:
Pawa Rural Waterworks Assoc.
Beneficiaries:
Direct: 0 Indirect: 0
Implementation Period:
from: 08/01/85 to: 01/31/86
Project Complete? N
ACN Status: N
Secondary: 6
SPA Contribution:
1418.32
Inkind Labor:
1.00
Inkind Materials:
0.00
Inkind Land:
1.00
Expected Code: 20
Outcomes:
Health will improve as the availability of clean
infection.
The water will also allow for the
Used For:
rebar, plywood and lumber.
This will be used
to
Case Study: N
COUNTRY: PHILIPPINES
IAA: 492-85-009
Beneficiaries: Ditect:
0 Indirect: 0
Secondary: 6
Problems
The absence of clean drinking water contributes to
Expected Code: 23
Outcomes:
Decrease water born diseases; meet domestic water
Used For:
ferrocement reservoir, disuribution lines.
Case Study: N
COUNTRY: PHILIPPINES
...
8CT TITLE:
Seed Production
Center
P,
Cy NAME: Barbara Bellows
Beneficiaries: Direct:
0 Indirect:_.
--. .
Project Complete? N
ACN Status: N
Classification. Primary: 0
Activity Code:
0
Secondary: 0
SPA Contribution:
3520.00
Community Contribution:
0.00
Inkind Labor:
0.00
-:
Inkind Land : , .
0.00 - i
-
Pr b e s
g i ul u a production: is iimited by
l:;ack?
ofi:f "it:: ;i.-!!? ?,..'?:- !;
:
'
Addrsse: wterforirrgatin,
ow vaiabiityof good
pesticides;
byar
lackho
Code: 0
NN
J I'
/! ". .. ...
.4.'.
' "-"' :':'.
,,7 tI:
COUNTRY: PHILIPPINES
IAA: 492-35-011
PROJECT TITLE:
Rubber
and Coffee Processing Plant
COMMUNITY GROUP:
Malagila
Smahang Nayon
PCV 2NAME:
Michael F. Keller
Beneficiaries: Direct:
0 Indirect:
Implementation Period:
from:
09/01/85
to: 04/14/86
Project Complete? N
ACN Status: N
Classification- Primary:
2
Activity Code:
280
Secondary:
0
SPA Contribution:
9177.08
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Samahang Nayon
members do not have adequate
Addressed:
cessing facilities pro-
farmers
are being forced to
a water tank;
construct a
Expected
Code: 34
Outcomes:
Higher profit from processed
goods;
other groups
self-help projects.
Spa Funds
Building materials.
Used For:
Case Study: N
COUNTRY: PIILIPPINES
IAA: 492-86-001
COMMUNITY GROUP:
PCV NAME:
Jan Farmer
Beneficiaries: Direct:
160 Indirect:
Implementation Period:
from: 10/00/85
to: 01/00/86
Project Complete? N
ACN Status: U
Classification- Primary:
4 Activity Code:
440
Secondary: 1
SPA Contribution:
3224.07
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materiais:
0.00
Inkind Land:
0.00
Problems
The Int. Social Forestry Program has cited
Addressed: soil
degradation as
a major prob±em in this forested
requiring leasees to
piant 1/4 of land
in
trees.
Objectives: To plant
trees on
upland farms
to stabilize soi±;
to decrease dependency on
commercial fertilizers
a
long
run enhance crop production.
Expected Code:
34
Outcomes:
Increased truit production for consumption
and in
come; dcjroased erosion and
a rise in
the water
table.
Case Study: N
CJIJ'I'4 92 -,, ?i
-AI
Seconua rv: 2
and 8 does.
Expected Code: 23
miik;
improved general health; incereased income
Used For:
Case Study: 14
COUNTRY: PHILIPPINES
IAA: 492-86-002
PROJECT TITLE:
Tinoc Water Pro3ect
COMMUNITY GROUP:
Tinoc Water Association
Implementation Period:
t..om: 04/04/86
to: 09/04/86
Secondary: 1
SPA Contribution:
8942.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Tinoc lacks an adequate
year round water supply.
accessible by air
or foot --
no
roads.
Expected Code: 20
Outcomes:
To provide 100% of the population with a year
round supply of drinking water; the potential
to
system.
Case Study: N
iA\A: -,492-063-003-
-L-
Dneficiarie1: Direct:
0 Indirecc:
0
1;Jplemnta-ion Period:
frorii: / / to: / /
ProjecW Cormplete? Il
ACi Status: N
Ciaujiiicanion1-
Primary: 1 Activity Code:
130
Secondary: 0
SPA ContribuLion:
2G4.24
Community Contribution:
0.00
Ink'nd Land:
0.00
Problems
The rabbit raising groups
Addressed:
dependabie, pcofit-making of Surigao need a
on raising rabbits.
Expected Code: 31
Outcomes:
Increased common interests between participating
Spa Funds
Rabbit shelter materials,
rabbits, instructional
Case Study: N
Beneficiaries: Direct:
0 Indirect: 0
Secondary: 0
Addressed:
system does not provide adequate supply year-round
Expected Code: 21
system.
Used For:
Case Study: N
COUJIYRY: PiILIPPINES)
i A: -492-6G-00
'ROJJC'i' TIT.,,: Coui.munity Poultry Raising Project
CO[iNU,J'TY G!'OUP: H!±Th Worez Orjg/3cnerai Luna
PCV iuA'11: Laure LatiZop
Seconuary: 6
SPA Contribution:
i000.00
Dctd
Z2;:pc Code: 32
Ou;c 0e: Increased generai hea±tn and standard of .living;
technical ski.ls in poultry raising w.iii be
passed on.
Spa Funds
Chicks, feeds and medicines, materials, travel.
Used For:
Case Study: 1
COJNTRY: PHILIPPINES
'AA: 492-8G-005
PROJECT TITLE:
Copias Potable Water Project
COMMUNITY GROUP:
Village of Copias
PCV NAME:
David Yannacci
Beneficiaries:
Direct:
108 Indirect:
0
Implementation Period:
from:
/ / to: / /
Project Complete? N
ACNi Status: 11
Classification- Primary:
6 Activity Code: 550
Secondary:
1
305.45
SPA Contribution:
305.45
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Ink4.nd Land:
0.00
Problems
Project will
construct
a
Addressed:
piped water sanitary spring box and
system to be used for domestic a
Objectives: To construct
sanitary spring box
to seal
source from contamination; water
for distribution.
Expected
Code: 23
Outcomes:
Better health conditions,
potential for
income
health awareness.
Used For:
Case Study: N
.AA: -492-860-003-
Secondac-y:
0
SPA COnLCibUuion:
6000.00
Ccm1umiunity
Contribution:
0.00
inkind Labor:
6704.42
Inkind Nlateriajo:
0.00
inkind Land:
0.00
Expected
Code: 41
Outcomes:
Increased standard of
living in
terms of
income
in ecologicaiy sound
farming practices; dc
Spa Funds
Seeds, seedlings,
fertilizers, materials,
Used For:
stock, insecticides, live-
bookkeeping training,
administration.
Case Study: N
COUNTRY: PHILIPPINES
IAA: -492-86-007
Secondary: 0
Objectives:
Purchase 15 swine; provide training for swine
Spa Funds
Used For:
Case Study: 1N
:A, -4 ) 2 - :, 0 0 J -
CV£.
O
I
'1icj u
i- ,.)Il c : 1..1 -LAu.rct: 342
± ;,. C.a~
,i u.LoIA Pr-o): 'l'OI: / / co: / /
Sucondary; S
i 11d L-).ab :
120.00
inkind ila1e. aij: 100.00
Iiakinu Land: 0.O0
Proiems t'eiabe r, need .. nel' irigatio which Wi±l
1y.ei
Addressed: enable uLQ i U achieve Iful u ±izawon of 1
dectares o Lariand. The oid Ci yaclon system
;;a i dejtroyeu L)' a torm.
Expected Coda: 41
Outcomes:
Better standardj of living; community
sense of
development.
Spa Funds
Used For:
Case Study: N
COUiITRY: PIIILIPPI."JE.S
iAA: -492-86-009-
PROJECT TITLE:
B.ower and
Tfhreslier Project
COiIflIey GR1OUP:
PCV NAL:
Gregg R. Baker
B3ueLic.ariu6:
Direct:
700
Indirect:
2100
imiplementation Period:
from:
06/01/86
to: 06/01/87
Projuct Complete? Nj
ACN Status: 11
CIaLsifilcation- Primary:
2 Activity Code:
280
Secondary:
0
SPA Contribution:
303.53
Community Contribution:
0.00
Inkind Labor:
1954.70
Inkind Materials:
0.00
inkind Land:
0.00
Problems
Project will
initiate a rice
Addressed:
farmers can increase business whereby
at
a profit to the National
Food Authority.
Objectives: To purchase a
scale, three threshers and
will work in
conjunction
Expected
Code: 31
Outcomes:
Increased income
to farmers,
a sense of self
sufficiency.
Spa Funds
A scale, 3 threshers
and a blower for processing
Case Study: N
4
SPA PROGRAM SUMMARY
IAA #:
IAA NAME:
** COUNTRY: THAILAND
-84-493-072-
Fish-Rice Paddy Integration 680.75
-84-493-073-
Raising Mix-Breed Chickens
661.79
for Nutrition
-84-493-074-
PVC Wells
--84-493-075-
402.26
-84-493-079-
Fish and Rice Together
-84-493-080-
262.74
-84-493-081-
First Aid-Dental
1017.00
Hygiene/Rural Schools
-84-4[3-087-
Improved Irrigation
1226.00
System/Khao Kayai
-84-493-088-
Sheep Fence Project
-84-493-089-
121.41
Supplementary Food
292.11
-84-493-091-
Fruit Tree and Plant
251.82
Propagation
-84-493-092-
4 H Store
-85-493-001-
875.00
Bank Project
-85-493-002-
Chicken Husbandry 2
-85-493-003-
76.02
Schools
-85-493-004-
Mungbeans for Nutrition
-85-493-005-
153.26
Parasite Survey
-85-493-006-
Water Resource Project
-85-493-007-
493.17
Chicken Husbandry 3
142.26
-85-493-008-
Broiler Chickens at Home
-85-493-009-
322.00
-85-493-010-
YK Rice Mill
-85-493-011-
4495.00
Beekeeping Proj
-85-493-012-
Home Mushroom Project
-85-493-013-
160.00
(8 4-493-087)
-85-493-014- Integrated Farming System
-85-493-015-
282.86
-85--493-01.6-
Chicken Bank
-85-493-017-
912.00
Oil Eval.
-85-493-018-
Lath Growing House
-85-493-019- 2926.81
-85-493-020-
Canal Repair, Stream Mal Soi
-85-493-021-
450.00
-85-493-022-
Fruit Tree Nursery
-85-493-023- 1168.61
Beekeeping
123.00
-85-493-024-
Fruit Tree Nursery
-85-493-025-
1153.85
-85-493-026-
Meat and Eggs
-85-493-027-
4 H Camp Housing and
835.53
Latrines
PROJECT TITLB:
Fish-Rice Paddy Integration
Secondary: 6
SPA Contribution:
680.75
Inkind Labor:
0.00
inkind Land:
0.00
Objectives:
To dig 800 sq mtr ponds; to prepare fields
to
fish;
to stock fish and plant rice in prepared
Expected Code: 32
Used For:
Case Study: 14
End of Report
~ ~~~T r 1 a a P
- e r a a~~ aia
a a-a-~q-
PIRIOJ-nd
'2 .1E r e i : tC .i '4c;' i -'.
' .
NN • I TY G RO D.:i s C i, 0 1. U, o .. -' < . ' : ¢ :
e f. .. a 1: .e j,
... .0
SPA'nC-'C ol:3
. .n i. e. .t %,
" 0
5 7 ..
a'u
P ect :Compiete?
Inkin ,I.Labor C11 St, ...3160730 " : / .;.:
. Sec ondary :
,,
,.,, ;:
,,:
, :em~i
The project eei, to : 2
.2 .
'
ese ddrt ,ThAdr
~sat-_ed,
,:.Perio prov
de
, . . . .. ,, , - . nu o.d u oc e a Til.emore
i ;-br oo d i c ,ke .n ; -L . l; .:: ';. , ,,. 1
/oze /...
prote~niuin;
ip~r~oed 0.00in
0•etie; To provide 500 Rlhode irs, an6 spcay-llIl
Red lchia Vaccinate
- them and. rai"O -. a.
t.o :
womn;incrLad
ii~ii: !ical, in wler 35 4 pou':::"--try
cl'icebe di.,.,i:.'buted to each 3.00.L
ofL tile paedn'W II4ae&1
villges; npoes.kto. train at~i1Lo u Ln
o ~proer....an
mx .,:'-.'pat-,i,
,::
. e-, . e
"f e din vil-ayec6 re hc e
.Lotjroec
g o f .c hiic ke
Code: :20ns.
' '' "
,G1.79
' ....
'ut.,. e... .. proved
Im, avaiiabzii
ants smal .: y and qal' it7:}
316.00 a o, ;iocal:,oi
n the omr.unite~.d
4 O jeStudy
tie_ To
pav d
14o ~ *S~l~ R d CiiJ~
LC 11&
d.o eothe n a~ h; o
.....
ri, ,00 Chicks, chiken feed, VaccinIZAtoOL
~ 4
e3-0puty
cateillt o a h o t e P r icuped,
Se tor: coan.Bport.tion.
- :e.>o.: r &Ln t n in
rj tion
Wb. i
fi
, i nLo
cc Co
eUr pl
,-jU::
,.e
...
Buie a:
dL QCoL:
ro: 2000 cl0 0 odiruct:
! u. e:. vei. 0 1 o c ro m: / / to: / /
KI'roj ccc CornpJite?
F2€,nc
TL:,-.IIt 1; A, cSta,-uz:
a-ma 5
y5ied
Code:
510
Seconda vy: e
SPA
C
Ofl1:ibOtjO : 402.2
SPA ~nc:;Lutill:402.
C 4iiuQ..tY ContrlbU~ion: 26
0.00
11kind L'abor:
0.00
0.00
pr jec
~.'h to provide the1 a 1iU1oLth
~L;Q:
10e1,1 1'ih
Ianm
, wth CJ.e a riIat er
;i o1
coo, inq anzd batiuanc. C.Leanl I-ater iL, cUzrrntly
"cza;:C0
'GbjGcL-ive6. To coflicAuct 30
tube/PVC tILA.-ti
Expected Code: 20
Outcomdes:
C.Laeln W'azer LUpy wi'. resul~t inimr~Poved healtii 4
Spa Funcdu
PVC pipa, joints, glue,
L1zod Fov.:
hand pumaps.
'4
1' L
COUNTRY: TiEAILi:,D
IAA: -493-04-075-
PROJECT TITLE:
Backyard Vegetab.Le Gardening
COiMUNITY GROUP:
Public Weiare
Benef1iciaries: Direct:
0 Indirect: 0
Implementation Period:
from: / / to: / /
Project Compete? !,T
ACi] Status:
Classification- Primary:
1 Activity Code:
300
JecondaLy: 6
SPA Contribution:
191.55
Community Contribution:
0.00
Inkind !Labor: 0.00
Inkind Materials:
0.00
inkind Land:
0.00
Problems
Several families in the Uiiho"4
:arasoi
Addressed:
interested in growing vegetab-e. are
for
iome consump
tion and Zor sale to the iocaL ;'arket and need
Expected Code: 13
Used For:
Case Study: N
End of Report
COUNTRY: THAILAND
IAA: -493-84-079-
Beneficiaries: Direct:
2 Indirect: 0
Secondary: 0
Expected Code: 31
Spa Funds
Skilled labor, screening for inlets, fingerlings.
Used For:
Case Study: N
End of Report
:17, 1iy' r .
:.. .
ZAA: ~ "'93
~ - ;,)
I- 00
PCV CIA.
.. Iiam J.
Dro ,.n
Ai-
DeXCeic-zile:
1e;rec :
150 inirect:
750
:IoLJct Co;,pece? U
AC:; Status: I.
C-ja.sifcflo-
PL2;ac'ry: 1 Acti'V¢y
Code: 110
econday: 3
inkind lUateriais :
125.00
inkind Land:
0.00
Probiems
Y-iiaiei.bers
wiii raise, care
excelient
food source to viilages
that normally do
Objectives:
To raise and sell
600
broiler chickens; the
4 chicken pens.
Expected
Code: 12
Outcomes:
Y-N members will have hands
on experience in
Spa Funds
Chickens, feed, vaccinations,
Used For:
booklets on
Case Study: N
End of Report
i2: -4 3
PROJC TL:
Fi- Aid- n £IYgiene/Rura:.
1a±
Sciioo.jL
COI;;UJI'iY GROUP:
.LjL rcictUatii Oifice
PCV -IA'IE: './i.LL iail 13ro0 11
Dleneficiarie:: Direcc:
0 niaoic*Lec: 3200
C-i'-i .ication-
:xuconaary: 6
SPA Conuribuiuon:
906.00
Community Con'Cribution:
0.00
inkinu Labor:
0.00
Inkind Ilaterialsi:
111.00
inkind Land:
0.00
Problems
Viiiage liealth station workers
Addressed:
teach basic first aid and oralneed assistance to
hygiene to village
scnooi ciiidren.
aid books
to
vide toothbrushes/paste to teach orai
hygiene.
pro
Expected Code: 21
Outcomes:
Students will have first hand
knowledge of first
learn
practices.
Used For:
Case Study: N
End of Report
COUWTRY: THAILAID
IAA: -493-84-087-
PROJECT TITLE:
Improved Irrigation
System/Khao Kayai
PCV NAME:
William Cox
Beneficiaries:
Direct:
0 Indirect: 1000
Implementation Period:
from: / / to: / /
Project Complete? 1
ACN Status: 11
530
Secondary: 0
SPA Contribution:
674.00
Inkind Labor:
552.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
The current irrigation delivery
Addressed:
ditch with no permanent turnout system is an
earth
siphon tubes;
to show
Expected Code: 10
Outcomes:
Increased knowledge of soil conseravation
and
Used For:
Case Study: N
End of Report
1r)
COUNTRY: THAILAUD
IAA: -493-84-088-
Beneficiaries: Direct:
0 Indirect: 0
Implementation Period:
from: 09/00/85 to: / /
Project Complete? N ACH Status: N
Secondary: 0
SPA Contribution:
83.46
Inkind Labor:
37.95
Inkind Land:
0.00
Problems
The Ban Nong Ku School needs to construct
a fence
Addressed:
that will effectively protect their sheep
from
Expected Code: 40
Spa Funds
Chicken wire, construction materials.
Used For:
Case Study: N
End of Report
j~~ &3
C.~ ca oz . z>L a & ': 3 JV.
.CL C o d ec: 320
0~yea;i;~
eaaiew~z tile
g~rO-v.ing peanutj,. &.nu-- ral ~i C. IcQe06
Expectedj Code: 21
OutcoiaeL: B';L aeaitcii due to )3Lil~IZ1 J
iUoo
and
IflCrea.Eeci aw;arenez, of u~i~jacL
Spa Funds
I'leavy duty
food bi.ender, s3oybeans,
sugar, vanLia,
Case Study: !4
End of Report
COU:"TR Y :
cAA: . U...
-493- i-
WY "i.C
1 .' ±.TTIT
: FruiL Tree -jib P-ai-c -Lo,)acja,ion
PCV i:AIl: Roger ilerzei
9/01/35 LU: / /
£ 'ojec CoL.pcc(e? !
1CI "-"uu: !
Cij.iicaC-1-n
PLiIaiy: 3
AcLtvLcy Code:
350
Secondary: 2
Totai
Pro~ect Cor-t.,: 251.32
.:
13G.02
Co;,iauai ,"
y Conribucon:
0.00
akiand Labor:
75.03
L11,ind iiauecia.i
: ,10.00
ikUnd hand:
0.00
PLober.Ii 1
.i
,1i sciioo
needs fruit trees to
Addreo.Jjud: experience in agricuiturai fLor
practical
studies.
The students
abl;e to practice
JKi.£ ±5
Objec Ive:
eT aba s
a T.tango orchard
to
use Ln teaching
Spa Fun&;
50 mango trees; 100
seed±ings
Used For: fertijizer, bamboo, water pipe,for
root stock;
transportation.
Case Study: i
End oi Report
COUNTRY: THAILALID
IAA: -493-84-092-
PROJECT TITLE:
4 11 Store
COMMUNITY GROUP: 4 II
Beneficiaries:
Direct: 30 Indirect: 200
Secondary: 2
Community Contribution:
0.00
Inkind Labor:
363.00
Inkirid Niateriajs: 0.00
Inkind Land: 400.00
Expected Code:
41
Used For:
Case Study: U
End of Report
COU'.dTRY: TIAiLA:]D
IAA: -493-85-001-
Secondary: 0
SPA Contribution:
805.61
Cc.,mmunity Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
production.
The group has been together
for 2 yrs
Objectives:
To obtain two quality breeding
sows, breed them &
2 piglets
Expected Code:
14
Outcomes:
Skill in breeding, producing
and selling swine;
program of project to
continue thru
the year
as
Case Study: N
End of Report
iAA: -493-65-002-
.:ucond ry: 0
76.02
SPA ConLLibution:
76.02
Courmujiity ConuribL.LUoI:
0.00
Inkind .'Jabor: 0.00
Inkind iiaturiaS:
0.00
Inkind L:rand:
0.00
1)rob ems
The village iia, been selected
Addressed: chicken project using modern for
a 41! broiler
feeding, vaccination
a large flock on
a
commerciai
basis.
They need
funding to begin.
Objectives: To
renovate a
coop at
the village shcool
50 broiLer chickens and raise
to
market weight in
a
period.
The chicks wili
45 day
be fed concentrated
commercial
feed.
Expected
Code: 43
Outcomes:
411 club members will
learn
to manage a -Large flock
of chickens
on a commercial
basis;
healthier
chickens.
Spa Funds
Chickens,
feed, vaccine, antibiotic,
plastic
Used For:
waterers.
Case Study: 1
End of Report
COU:TRY: T:;iILAuD
IAA: -493-('j5-003
PROJ>.,CT TVL,: Vcge.able Garudening ror
CO11"lU.,,.'y GROU)LP: V -il gu Sc1iloo Schooi.;
Z
PCV "ANIT"
: >7a2
Tene~ci.Lie.:
Di:(ect:
500 indirect: 2550
Objectives: To
establi.Li
students in
use of insecticides to train
fertilizers and
in raising and chemical
vegetabies;
to produce
schooi.
Expected
Code: 12
Outcomes:
Increased
awareness
of
good nutrition; gardening
skiiis
to enable students
to
begin gardens at home
and
better nutrition as
a
result of availability
of fresh vegetabies;
increased
income from sale
of vegetables.
Spa Funds
Vegetable
seeds, fertilizer, insecticide, sprayer,
Used For:
watering cans.
Case Study: N
End of Report
COU14TRY: '2IAILAiij
IAA: -493-85-004-
PROJECT TITLE:
'.Iungbean,
for N-utrition
COI1IUNITY GRZOUP: 5 Womlen's
Groups
PCV iAMIE:
Richard B. Smith
Beneifciarie;: Direct:
100
Indirect: 5000
09/09/85 to:
/ /
Project Complete? N
ACIJ Status: i.
Classification- Primary:
3
Activity Code:
320
Secondary:
6
SPA Contribution:
153.26
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problems
Five women's groups will be
Addressed: source of nutrition growing mungbeans as
a
growing would
also serve as
a form of soil
improvement.
to promote soil
conser
vation practices;
to promote
mungbean consumption;
Expected
Code: 12
Outcomes:
Better nutrition from mungbeans
as
a food source;
gardening skills;
use of improved
soil cultivation
it
the women will begin to
cultivate is hoped that
mungbeans at
home.
Spa Funds
Fertilizer and
land preparation.
Used For:
Case Study: N
End of Report
COUNTRY: TIIAILAND
IAA: -493-85-005-
PRGUECT TITLE: Suppielaentary Fund for Parasite Survey
COiiNUJiITY
GROUP: Bungkan H1ospital
SPA Conribution :
500.00
Inkind Land:
0.00
in progress as
Expected Code:
34
construction.
Case Study: 11
End of Report
COU.4TRY: TiAiLA;-D
IAA:
-493-,15-006
PROj"CT TITLE: la er Reource Project
COmm:1IiUIy kGROUP:
:-Onf orma± Educaz-on
PCV !IA;.I: Cencer
Joh B. Broc eurft
Beneficiarie.: Dirocc:
150 indirect:
400
Impiemenuation Periom:
03/20/(;5 ;o: / /
Project Cojap.eQte?
AC.: Statu : I
Classification-
Primary:
5 Act.v 1 t Coue: 350
Seconua 7: G
debris.
Expected
Code:
Outcomes: 42
hea-th of vi.L±agers;
source will encourage water
howe gardening.
Spa Funds
Cement,
600 m of PCV pipe,
Used For: assorted couplings
tools, transportation.
and
Case Study:
n
End of Report
COUJRY: L1AILAj'D
IAA:
-493-85-007-
COIIU-iTY .- 1Z\OUP: 4
If of Ban !,ietung
PCV :IA l :
Russei. T. Capen
Deneiciazieu:
Direct:
4u Indirect:
102
imp.ementation
. riod:
/ /
Project Complete? >,
Secondary:
0
Cohmiunity Contribu±lon:
142.26
0.00
±Lnkind Labor:
0.00
ProbLems
Thie viiiages
,a:ave
been
Addressed: cicken projects. Ciub seiected a1 sitef
2or 411
Objectives: To establish
2 chicken
duccion methods to
raiseprojects using modern pro
100
commercial feed, vaccinated;
broi-Lers in coops fed
feeding troughs; to
give to construct bamboo
training on
chicken
husbandry.
Expected
Code:
14
care of chickens.
Spa Funds
100 chicks,
vaccine, feed, waterers,
Used For:
medications.
feeder,
Case Study: V
End of Report
COUNTRY: T!HAILT\IID
IAA: -493-85-003-
PROJECT TITLE:
BiroiJer Cilickens; at oe
PCV I
L: Vaierie Cro22
Beneficlarie2: Direct:
21 Indirecz:
0
Secondary: 0
SPA Contribu:.on:
225.00
Community Contribution:
12.00
inkind Labor:
0.0o
Inkind iaterials:
05.00
inkind Land:
0.00
2r-om
Spa Funds
Chicks, feed, medicine, vaccinations.
Used For:
Case Study: 1;
End of Report
COUIriRY: YiIAiLA±:D
IAiA: -493-85-009-
PCV IIAIM:
Linda Seyler
Leneficlzaries:
Direct: 226
indirecc:
0
Ciassiflcacion- Primary:
3 Activity Code:
620
Secondary: 6
SPA Contribution:
375.00
Community Contribution:
20.00
inkind Labor:
0.00
inkind lateriais:
0.00
Inkind Land:
0.00
Problems
host of the children come
to school
Addressed:
and do not eat until with no lunch
Objectives:
To engage children in
gardening, cooking and chick
raising activities
to provide staples
for lunches:
Expected Code:
42
Outcomes:
Children will learn gardening, cooking,
chicken
raising and organizational skills;
improved nutri
tion for children;
reinforce cooperation
village; nutrition education for within
teachers and
students.
Spa Funds
Kitchen and gardening
equipment; rotating fund;
Used For:
chickens and vaccinations.
Case Study: N
End of Report
iA A : - 9 - 5 O O
PROJ:2CT TY:"
ia,,;ao
:;an
%- .
3
Ai :
PCV .'A,r! 0:n
e ' _oe r
-iIndLict: 3, iflrect: 70
--aplcu,.Leacifl
?eriod: £rL'o,:
09/05/85 L: / /
Projecu COmp e ?
.a
Ccauion-
J .nary: 1 Activity Code:
250
['Oecondary: 0
ToL&- Proje--t CojzLs: 4495.00
''PA Cont ibulIon: 665.00
CoM1u1unity Contribution:
1750.00
inkind Labor:
1120.00
pro
a, rice
torcomposting and
.ias
undertaken ocher projects fertimizer. Group
successfully.
Ovjeciive a:
To purcjlase
625
s mtr
tract of land
const
ct a building 8 for mill;
to
Expected
Code: 31
Outcomes:
Source of
employment and
income for rural youth
may sliow
the trend of
employment elsewhere.
Used For:
rock
Case Study: N
End of Report
CGU:'iT~y:
C~iU.~r JflUP
2 u Pr..r ;i
"C1
So..
1., rL: c.!~ccza
ObjecLive:;:
'A) 1prOVluc JefnLo~oLnd i.U~j- or iflLLUCLiOfl
Ill ba.jic iuwznod-. Of beekuepiny
uLinj foreign ecCL
andJ Ladnyj LLUL~ILIivC~ LaO ItakL*
.1nio aVaib.C to
coniauiity ad ' tudeit.,L
Lxp0Cced CUode: 13
Czi e Study: N
"rid of Report
COUNTRY: THAILAND
IAA: -493-85-012-
PCV NAIE:
John R. Emerzian
Beneficiaries:
Direct:
382 Indirect:
Implementation Period:
from: 10/31/85
to: / /
Project Complete? N
ACN Status: N
Classification- Primary:
1 Activity Code:
0
Secondary: 0
SPA Contribution:
160.00
Inkind Labor:
0.00
Inkind Materials:
0.00
Inkind Land:
0.00
Problem
Mushrooms
are a valued food but mushroom
Addressed:
tion is only
an occassional
cultiva-
venture in this
area.
spore equipment
to the school.
Need
other supplie
Objectives:
To provide basic education
on mushroom and spore
propogation to
classes and FFT members.
will innoculate 100 bags of media;
Members
mushrooms will
Expected Code:
0
Outcomes:
Members will learn mushroom
propogation;
home
projects will be
initiated;
new source
of income
Used For:
Case Study: 1
End of Report
COUNTRY: THAILAND
IAA: -493-85-013-
PCV 1A1W. I:
Wii±iam Cox
i Direct: 0 indirect:
0
iaplemenLation Period: from: / / to:
ProecL Compliee? H ACI Status: N
CiaL
aification- Primary:
3 Activity
Code:
530
Seconda ry: 4
Totai Project Cost:s: 1230.78
SPA Concribution:
676.78
Community Contribution:
0.00
Inkind Liaterials:
0.00
Inkind Land:
0.00
Problems See project 84-493-087.
This award
is for
Objectives :
Expected Code:
10
Outcomes:
Spa Fundsj
Used For:
Case Study: N
End of Report
-'LlC~
.A
YC!;u ....
Y -*'j -,( Ui~a
C1'.
L ; C
1 Ac~.
1 .~Cuue:. 320
~Con Z
z?2.
cu Oi
nA , nu
_ b u3.
ilki
C)\Q
7i L
11 CJ;.61LC
LCQr L 'c Zroo-
C& Lu VCbjv
. ; ., * / UI c c - COI c~ 5
J~e C Lk Couc : 14
LCih:
me L. UCaciojj oajiJlin
boi-Ldisly
tCmLu~
Ca L; 6u y:
11CA C)1 P !)J
cc~:~:uj 11'Uw~ Pul-Uie T~~ihai-,aic,
()A:C~~. fY'Fr
11 L!~uC.O~
r :C_/ 2Lb La:
P~ujic
~ cc~y~
C h12 L: L :1
C.C ca
0i
11- ') _i&Il: 1,ActiviLtY Code: 110
'2o&~ 2Olcct
5D7.36
SPA Co.1c,:Z-:zon~: 503-35
C0,1l~ Collr ribu -Jon: 0.00
.Ll ll -,abc):
941.00
Tr;u iLce :I i -: 0.00
1ii.;llu Land 0).00
Prob.Le.,ib '', 10 V
&,'a z4~cCu.curzu co.i-ege
Add.:.z~u nucivc ;ianL' uo
raisa
c ,ickcen.: to rzaiLc caill to)
cdUC, ,.on co.. -- roz Ozflet solc oj.
E':Pected Code: 31
Outcomej: Locza4 . Z~iir wii.± iave e:xampie ' o foiJ.OI;
i.. 1)aVc PraCC-ciA I construcc.o ; tudent
caicr':cn p.roducion~ 'skiiis;; 1 .nk±u and
students educational
expen&c,: wil-, be dc.-frayed.
Ca~c Study: 14
2
Report
End of
COUNTRY: THAILAMD
IAA: -493-85-016-
Implementation Period:
fromn: 12/26/85
to: / /
Project Compiete? I ACNJ SLacu:: :,
Ciassification- Primary: 1 Activity
Code: 110
Secondary: 6
Total Pcoject Cois: 912.00
SPA Cointribucion: 762.00
Comrmunity Contribution: 0.00
Inkiicd Labor: 0.00
inkind IMaueriaiL;: 150.00
Inkind Land: 0.00
Problems Tie students need to learn about raising
Addressed: and care
purchased; 2
chicken houses wiii be built.
Expected Code: 42
Outcomes:
Improved quality of chickens; improved
through use
of cnicken in school
iunch nutrition
perpetuating
Case Study: N
End of Report
COUNTRY: TIAILAND
IAA: -493-85-017-
PROJECT TITLE:
Crude Elulsified Neeni Seed Oil
COIIfIUIIITY GROUP: Evai.
Farners of Suphanburi
PCV IHANIE:
Gary Carl Jahn
Beneficiaries.:
Direct:
0 Indirect:
0
Secondary: 0
SPA Contribution:
375.00
Community Contribution:
0.00
Inkind Labor:
0.00
Inkind Mlaterials:
450.00
Inkind Land:
0.00
Problems
Farmers need pesticide.
Addressed:
will show it is untoxic, Field test of Neem oil
environmentally safe,
economical method as
alternative
to
expensive
synthetic insecticides
now in use.
Neem tree is
abundant in this
rice growing region.
to sample
nucleus of
each plot and evaluate
results.
Expected Code: 10
Outcomes:
Neem seed oil production is practical
for pest
control; passing on
of technology
to farmers;
Case Study: N
End of Report
COU. 'I,'2A
,''< '..
1c 1.QW
(.
L-Lf~L±tU
C
0
U'L)
e&'AI'dL
4LiLi ± lod ro: 07/00O/85t: //
ProjccLU Cj 1.i.LUL:~ ~~ c~
? C~J
C
~ ii o ~ :~i~ .': 2
L CLivt, Code: 310
.j!-c L)nd a -1: 3
i Lo..i'rjoCCL CO jL :
2 926
S3PA CollL L 'bU L1.
JJ
1196.di1
CoimufyCOInLiUcIoji: 0.00
.1Ln1K.L.nd Labor: 1030.0o
NrIlid a~La.:0.00
Objt2CLIVe.',
onlJLCUCL
aI LiALlh-Growfl
9 house for int'Lruction:
)~rIJ(~L&~re Jearcfi,
growing of
anId vecietabiej and s~eeds, fjowejrsr fruit
iallLlicc budding and grafting ,
O1- iaCiJILy, L2aieL
and bu~iinesL.
lilLilaemll, je0'. ifLQccticidce; and
fcrLiiizor ,.
~x peCLed Coue: 13
Outcom~e-: VoCac.onai ~k±.in variou.,-
iiorciCUiturai areas;
Icoie from saLeaj.
Caz'Je study: li
End Of RePorL
....
4 - 44. B U
- .'
- ,,.
...
.
. ...
r.
Cot)t IU I" Cr'Pau' it! Cont.L all P : Z O .O0
L3,"
,- ,.
e 3n2nd
, i. :
. 2'a
0
--
LOI j a~'r..i).ecs 342
ieetirezC
OOiyti~ipoig
:C; a-'':jr~L
Ian
10 11 P f I faa L:! A c O,od
O0 : 5
C0U1_U Co wTo~a.~
PA .-.. , Projct
u~ Pruc t07.00
. 0a0orD
on
...
1P. de
rObjeccies 1 C o n ri purc
o has
:0 e o
0 .0 0: / /
PLO i h o a",
TO;:
L, .c.,cuc:
111.. j
: C aC: Sux~ery; 0 7 i:~ec
0 tldltaaot
1Wuirid iNatea!iw:
,[.
i 'iund Land: 0.00
-
.C" 00
,!i
3 Ac iv ty
P Oi1,L, Tii L~io." ..
wouud .L±;L toCo
..e; 35
~y
. ..... . ...
proOgaleL Erujt
a
teec
Ad 'rud ra
mns oi
rood production
or tudei:g,. .
theil
4, to aav o...oney..
0bjcctiveL;: To
con -zcucL a
auLery; to teach z,,Vudent:
propogation; :studenut, about
tak~e f ruit tceej aim
_i.L
to p.Lant; nur~cr1,' v.iii be u,.;ed
Va 1LiQi" Of fruit- uree-. to gcraz bctte~r
!-xpecied
Ouccomes:
Cod: 12
.. Case 44::..
Study:
11
Endl
44i4444.
of- )eporL ...
S.
4
4 4_
i AA: 93-s3 5- 0 0
:. 0
-iO,,.,j '±.t' ,E: Canal.
il!y "";!.OU!: Fa-e I, uk
Coi[j*;I/i )a±-, L reai ilai
(1ang Jam Yalt Soi
PCV
1:A;I
!.)avid A..
Lroring
;3e2Crcrij-: JJrecu:
400
Indirecu:
0
P;ojccU CormoecL? I
ACJ ScuzuL:
uL
.JucOlU&ry: 0
450.00
Coiuuni y Cuncribuion:
0.00
inkind Labo:
0.00
Inkind 1ateriais:
0.00
Inkind Land:
0.00
ProbiemL;
Farmers need to
repair a washed-out
AddiLeJed:
canai Which deiivers section of a
witli cement.
Expected
Code: 43
Outcomes:
The repair of the canal will facilitate
the
Used For:
Case Study: N
End of Report
!A)ia:
iieneiciaiI± DirocL: 70 Ind.ecc: 0
Ji'cp. ex ±on
?er~oa: fL.old: 01/13/"6 to: / /
PirojecL Col'ip±.ete? I; AC] Status: fl
Sconda r , : 0
Toui Project Costs:
278.00
Coia.munil-y Contribution:
0.00
d Labor: 0.00
Inkind ilateriais:
0.00
Objloctlve-: TO
tke excesz flow froi.- a ailai- creek and de iver
ic co adjacent watez.rhed wihere 3 or 4 re.ervoli:6
can oe fi.zed usin 9 100 r.i o. 4" p.astic
between 2 re.;ervoir, crossing a deep pipe Laid
uicgging a dirt chanei connecting 2 cnanei and
other reservoir
ixpected Code: 14
Outcomezj: Crop seaon wii± be proolonged; farmers
wi±Ji learn
wter iuanagement skiis.
U-;cd For:
Case Study: N
End of Report
P E I u L;:c..
F' 4 0 V,
SPA C 1Col . 1
'''ut4
i~i.:'
"S P A r, z:_ :._o - w- d J Loo._b e .l . :...
: :. . . 'C
fruitj'TX~JFxUles e'' :" : > :" "":.e .. " :;.
.... nutrients,,rC!e?fOrgO.fc:tree grlGJ)j
ada
w...i g
frui
a.
ta
nurL
ore o
... ._ 4_
e na.w u!
ing ,R'spiu
on .n ...." -""g.
o ta"
/ , b - .. O"-- -: '
io okn 17tI he' trees. ';' 4. :'''
. ..... ... .. Code: 31 . .. . .. 4...
:* %::" >,7
, O;
... tCO"ner:.:
........
......
A.di.iona..
.nt ....
... ...i
.n.,..-.. .... ...... r e. g.
.u..,. ga. n..... ,4:*.
. .. .. .n.d... e. - ...
r.:.:>v',
. . xvi::,
,.. . :,,::
.' /.,:.....
.. -4:'"<":
!.,:,<.,.<,
4 .4
Spa Fued
CO cioi " aterial". - . .- , ..
44|444
.
COL PRY: '~A .\~
"COIU JY 'SROEJ"P]D""::
U5-0 23op~
-t3 i L;'Sutoie'
. CV A 11 : Ro Sciili .. .
Ih~1C~i~L:Dj'rect 0 Indirect: 0
ii.. L em enlt~a~ion P e:io : .ror .,:
1 / J5/1
, ti o: 0 ,1 1 6d7
P.je t O, e :A C , Si at u j:
..
C-ja~
' , fic ajo n-... P' d ary:
S~~econ ry: . !0 Acuiv.ky CooUu: 140
.,... " ;...
o 2! Pro ec ' os- ,: 123.00
SPA ConCoibution: 123.00
k C0o'-u.,. uni butiy
Inkind Conzributi-:
Labor: o : 0.00
rikind ;later-Lai-- 0.00
0.00
Inkind L nd : 0.00
u oerii 'ie meibe want o begin
Aadresje6: ,;oucce of income aparL Lirombeekeeping to provide a
rice production.
MV
Case Study: N
En~d of Report
' ,4"
IA -93,85-024-'
44"
Beneficiarie-:
D)rect:-
ImpLemenoatOI Perio"uj
JL0. O/01/ 3 CO: 06/01/-7
Pro-ject bAColt? A,' taion:
i~i C om mu ni ty C on t r i bu z io n : 4
and:------------------
0.00
Probiemls
The ciiool would
like t-o
begin a -ruit cre
Addreissed:
nursery as a learning iabora-tory for Leaching new
tecuiiues o*z Zruit tcree cu.L~uro and advance
propogation method- such a-: improved
ra.i.ny, etc
Objectiveb:
o iniate !fuit
tree nlurery
,.be w
.. oc .:
E::'Pectod Code: 13
Outcomes: "hno11edge oZ upgraded ,arn.
improve
p"ractice;
. .
'*.i', .. .
crop yieldb of
noca.L
rms
wii. dents
have akilli in sarting and maintaining
a
nursery -- grafting, iaeringr rooting of
cuttings. -
Sr
Spa Funds,
Contrution materials,
fu it tree.
d ierti.lZ er
Cause stuay.: 1
4i_
- 493-6
A
- 25
PnOJrC:
R ig. Cowae rrciai: C.i cken Iezat
C' !U
CRo0,: D-oi Tao 1t, aorSc, g16
ooi.
S ete?
Primary:
Seconda ry : 32 ctivty Cod: 110
+ ". .
SPA Contribuc.on:
738.07
Comrunity Contribution: 0.00
In1killd Labor:
0.00
Expected Code:
Outcomes:
Project41
'"33
Used For:
V
Case Study: 11
End of Report
+ :+ + + : -."' ' -3
-W3
C Ilccnit)y uZ iuto:
OI1 04/38
Cu-iinduit CuacbUL
[Inkincj LJbu:
j 0.00
0.00
I Lob1Q I I L -Lhoi wIflenz., grOujx Wuu.ld Ii.ie
Lo produce
vecjotaeC
AidrLQ:'jed: yea&s.-round i~or incorjt alld Iraproved nutriLjion.
Fr ando guroup-wln.invgeal
rdcin
Lource
oficm
ilrtu
rmya-on
gadnntjii4
n u t*~
wil exeiec
14U4oil beJ
4:
FU*l Petcdz
'10j
'AA: -3.1)3-63-0 27 -
COINILNITY
PCV ; Ii :-l 1;RULUJP: rayo ag ejoz'±cu.turu
i Al oi i
Cen'cer
blldic,,rieu: i)irecu: 500 ndi~ecu;
0
Projecu CO,
"u I,LL
:
J
Cajsification- Prii~ary: 1 ActiviLy
Code: 250
COcolu' Cy: 0
Tota PzojecL Cocci:
835.53
SPA Contribuion:
d35.53
Inkind Labor:
0.00
Inkind LiauerLaik:
0.00
use by groups.
ObjectLive:
To build a dormitory
to houuse 30 people;
to buiLd
Expected Code: 40
crop profits.
Spa Funds Consuruction irateriai:, materi±.,L for septic
Used For: system.
Caz;e Study: H
COUNTRY: THAILAND
IAA: -493-85-090
COMMUNITY GROUP:
PCV NAME:
Beneficiaries: Direct:
0 Indirect:
0
Implementation Period: from: / / to:
SPA Contribution:
0.00
Inkind Land:
0.00
Addressed:
Objectives:
Expected Code: 0
Outcomes:
Spa Funds
Used For:
Case Study: N
** COUNTRY:
TUNISIA
-85-364-007- Sheltered Workshop for the 4625.00
Deaf, Blind,
Training Center
Renovation
Wax Melter
Development
of OEP
IAA: -364-85-003>
PROJECT TITLE:
: ed J1or Iiop
:;or tll,2.eh D~d
PCV iJANEL:
Lorrz~l Pllc
C .i~
i ia- io P iiar y : 2 ' Cod~ : 2 3 0
CC)±
SecondaL .: 0
riotaj. ProjeLC L Co---c::
435.-.0
lndJ1.%710UaI:; necuu an
co gonerate
inlcom1 e.
Objective6,: To eLLtabf-.L")
a ';orkL;nop Lo t-eacia 2evng,
.ceal.-iir toLifLn, wojdwu'.-Ajig a1c6 i.acraiau
weavirng,
iiandicapied. UiLL1maceLi~, a Sila. . ce~ai. -o t.w
be 1 L j. w-
'J1±ci~
t
1:0~ L110 manuiac-L-ured Joc.
Expected
Cou% : 31
Outcomes: The participantj 'Ji.LJ. i"ve
4 3ource ok in~come and
aiiiJ L~earn variout. iandicraJt s 1; i 1,
Case Study: i1
End of Report
,AX
COUNiTRY: 3 TU:ISi]
IAA: - 64-8]5-00d-
PR0OJ:2CT TLL: Fi..ILies
COj]ViL;';jY G]ROljp: instcLute Technical Library
laLLol)a.L Ajgrono,,ique
PCV 1A;1,;. ,liw Leake
Beneciarie
i.)ireci:
75 indirect: 0
11,ij-,Ceen4a 0 Io PLeriod: Jom: / / UO: 01/01/86
Project Co'.lP..ete? ;AC. Stacu.: 'I
C1a11i-lol-
Prniiary: 3 ActLvLiy Code:
700
Secondary: 0
442.00
SPA ConcribuL on:
Co-ialunijy Con-cfbution:
4452.00
0.00
Inkinu Labor:
0.00
fnicind
9.00
9atiais:
Inkind Land:
0.00
Expec-ed
Code: 14
Outcome,;:
Tne IUAT fisneries department wili be
to
educate its students better abie
for the fisheries industry
Fisheries
couid augment
Tunisias food production
considerably.
Spa Funds
Books, periodicals,
and shipping costs.
Used For:
Case Study: 1
End of Report
COUUlTRY: TUK-.ILSIA
IAA: -364-15-009-
CONM:Iu:JmY Ins~P:m
beneric~aL-ic(9
ile1: 0 fdiCQoc.: 0
Inl.Le~eruacoi)eLod:~roal 1001/K3 u:01/01/86
Projec- o,
~ ce A ~ 2Su~
ind
nU 1o 1:o 0 .0 0
I nlki nu jiacCd ± 0 .00G
Case SLuoy:
CO .1JTfY
RiA
LAA: -35, - o-0 -
PCV :..I2:
Dav LU : wu'. oII
BeiLc£1~~cii
DilrecL: I oJi rec: 0
In[ci,ientaz:io Period:
LLom: 10/01/"5 tO: 01/01/86
Project Coui.)iete? ', AC:! SLaru : N
.s iC&La.od - PL 1 (ctivit> Code: 710
Secondu,:
Spa Funds
Diesel pumlP,
meat grinder, sturiiizer, PVC i)ipes
Used For: and fittzicj..,oxygqen buttLt.e and Luguiator,
raterial, Lr flpating caye.;, netLgkJ,
j.oiyotLe
teuin and tiberglass.
Case Study: N
End of Report
A
COUJTRY: 2'U:iISIA
IAA: -364-1)5-0l-
e c a ierec*: 0 lndlirecL: 0
Proocc Compiete?
I ACh* Status: J
Addressed:
hjooves
trimmed periodically.
assume control of
dairymen.
Expected Code: 13
Outcomes:
Improved health of the cattle,
longer life span of
Spa Funds
Portable squeeze
cattle chute and transportation
Used For:
of chute to site.
Case Study: 11
End of Report
)k
11 4
<0,
il U,, rIia:c. t- ....
0i Z'
I "'.d -I S.0Ch : . ;a . l e L
C% A 1 1;:) !
.- ,44
4-Cizu
IL*caI i n-Il:. mrla'y,
,4econda ry: 3 2.Ac 1vity . ode,:-:,1 0.
:- . Tocai Projec C ;
--.SPA Contribution:.
725 00J.
i :500.00
i
-. Sn4k
n' Contribution:
~Couiimiiity ",abo L : 0 . 00
> O000 ,
..
.,
Iirind Land
0,00
, ode . 13
4.......4414
- - e .-
.... -h;,e in
!,i";>i
!<r i:
egizo n c°..uid .
w x
m..-,la,.eriai
i. -'Y jiei.e ter,.,r
Uinu u dL
Sp 4 a r :}tlractor, " wiLal
Ie
.... Fo r :
. .d iaI-ii to b:u.-,df
a 2nd ;,.<<:>,,u
..
4.,f.:
rame e:,:tractor, aind ia ri.......
t r a
L "to ...
. . . a>'......
,ldOf R Q-L L
Study
1;,::L"L
0 •~~ J\ Li
4. - J 44T
COULRY: jzU,
IjA
PCV NAil:
John Cook
Bunejici.Vc : i)irecL: 0 indirecL: 0
i;1p eolnujdc±o PuLiod: Lom: 09/00/35 to: 06/00/86
ProjecL CuiapletL? N ACH Stalu : l
CcPrijmary: 1 Activity Code: 100
6econdary: 0
'ioULi ProjecL CosLt,;: 4980.00
SPA ConLribution:
4980.00
In~ind Labor:
0.00
bees
Expected Code:
14
Outcomes: Introduction of
new
ideas about construction,
applications -- all of
which may be integrated
Case Study: 1
End of Report
COUINTRY: 'U til...
IAA: -364-dG6-027-
PROJECY TITLE: 2ducationai DUec*eepilg Team oZ OEP
B31eneiciC.aries: Direct:
150 inzdirecI: 0
Secondary: 0
S'A Conlribucton:
4999.88
Case Study: i
End ot Report
COUNWTY: TUUISIA
PlrojecL Pro.)LLQ
J C
-ct
S)Ocnda ry:
Totu.i l~jc Co ,z: A
SPTA COfzribui.uii: 13
Cutirunity Co 'W5
'rbutiii 0.030
nkn ",a . 0.0
Inki
Ll Cn6C Qi;3.00
Jflitnd LcAnd: .0c
Probiern, T1 boeer u ~at~ pr'c tQ.c ~ i~i~
Addeekz;ed: iziciude h~~ ;oee,~ Clico
cy ae not
a~le zo rineiricu ti-io Lquiplionll,.
CaLie Study: i
I4 z
Cia-334-3atTU .zSoty:
'IU y GiR U P
ol: El Dibanu
CI - .-;1C
PCV CoA: 13.ri Sanders
o
n: 1 7iiIdirc 100
* uplu4ont
tionl PL nriod:
rof
02/20/b6 to: 10/20/,;'.
Coiomunity Con"ribution:
0.00
hiind Labor:
0.00
Objcctive,: Con.-ruct.-on
or a 4.2
m.eter Z.Lat-oottom bo.-- pro
eedby oath and -aii. A.i~io, to enict thle
iad oa uudenti at :'r
be do onE;t rated
to the dZliiermen.
Enpected Code.: 13
Used For:
ion instructionL(translation)
. .<
S u y if,.S.
IS,
"5' '-A