DIRECTION & SCRAPER RUN STAGE-1

CLEANING & GAUGING


(FROM VALVE STATION-2 TO BAPCO REFINERY SCRAPER)

4" ISOLATION FLANGE ISOLATION FLANGE 4"


4" 30" AB-PIPELINE
1" 2" 2" 2" 1"

257-D-0002

BRUSH MAGNETIC BRUSH GAUGE 1"


SCRAPER SCRAPER SCRAPER 4" 4"
6" 20"
TEMPORARY PERMANENT
PIG LAUNCHER PIG RECEIVER
AT VALVE STATION-2 AT BAPCO REFINERY