Anda di halaman 1dari 10

CALENDARIO DE AVANCE DE OBRA ACELERADO

Proyecto: "CONSTRUCCION DE PISTAS, VEREDAS, MURO CONTENCION Y PONTON EN LA AVENIDA MICAELA BASTIDAS, Y DE LA ASOCIACION REYNA INMACULADA, DISTRITO DE TAMBURCO - ABANCAY - APURIMAC"
Tiempo de Ejecucin: 63 DIAS CALENDARIOS
EMPRESA : CONSOSRCIO SANTA ROSA
1 MES 2 MES 3 MES 4 MES

Item
SAL DO POR
DESCRIPCION PRESUPUESTO VA LO RIZAR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

RED DE ALCANTARILLADO HUARIPAMPA UND METRADOPRECIO PARCIAL SUB TOTAL S/. M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M L M M J V S D L M

01 RESERVORIO PROYECTADO RP-01 (V=600 M3) 373,319.81


01.01 RESERVORIO PROYECTADO 250,144.12
01.01.01 OBRAS PRELIMINARES 17,486.30
01.01.01. MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA GBL 1.00 4,144.94 4,144.94 0.00
4,144.94 0.00 0.00 0.00
01.01.01. CONSTRUCCION PROVISIONAL DE ALMACEN DE OBRA m2 25.00 156.57 3,914.25
3,914.25 0.00 0.00 0.00
01.01.01. TRAZO Y REPLANTEO INICIAL DEL PROYECTO, P/RESEVORIO-CISTERNA O SIM. CON EST. TOTAL m2 118.11 1.07 126.38 1,200.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.01. TRAZO Y REPLANTEO FINAL DE OBRA P/RESERVORIO-CISTERNA O SIMILAR m2 118.11 0.77 90.94
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.01. FLETE TERRESTRE GLB 1.00 9,209.79 9,209.79
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.02 MOVIMIENTO DE TIERRAS 30,478.45 2,155.84
01.01.02. EXCAVACION MASIVA A MAQUINA EN TERRENO SEMIROCOSO/RETRO .5Y3 M3. 483.88 18.66 9,029.20
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.02. REFINE Y NIVELACION EN TERRENO SEMIROCOSO M2. 118.11 7.33 865.75 1,583.09
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.02. RELLENO C/MATERIAL PROPIO COMPACTADO m3 12.86 16.49 212.06
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.02. RETIRO Y ACOMODO MANUAL DE MATERIAL EXCEDENTE EN ZONA ALEDAA m3 588.77 34.60 20,371.44 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.03 CONCRETO SIMPLE 3,881.59
01.01.03. CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES m3 9.48 409.45 3,881.59 2,047.93
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.04 CONCRETO ARMADO 162,640.66
01.01.04. CONCRETO PRE MEZCLADO F'C=280 KG/CM2 EN ZAPATAS m3 23.38 503.72 11,776.97 3,649.06
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.04. ENCOFRADO Y DESENCOFRADO PARA ZAPATAS CIRCULARES M2. 21.11 53.37 1,126.64
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.04. ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS (HABILITADO Y COLOCADO, INC. DESPERD.) KG. 1,864.54 5.06 9,434.57 2,441.29
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.04. CONCRETO PRE MEZCLADO F'C=280 KG/CM2 EN LOSAS DE FONDO (INC. IMPERMEABILIZANTE m3 16.30 517.52 8,435.58
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.04. ENCOFRADO (INCLUYE HABILITACION DE MADERA) PARA LOSAS DE FONDO-PISO m2 2.77 34.08 94.40 35,662.09
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.04. ACERO ESTRUCTURAL TRABAJADO P/LOSA DE FONDO-CAMARA (COSTO PROM. INCLUY DESP.) KG. 1,741.45 5.75 10,013.34
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.04. CONCRETO PRE MEZCLADO F'C=280 KG/CM2 EN MUROS (INC. ADITIVO IMPERMEABILIZANTE) m3 52.42 555.69 29,129.27 387,934.17
#DIV/0! 0.00 #DIV/0! #DIV/0!
ENCOFRA DO (INC L. HAB IL ITACIN DE MADERA) CARAVISTA PARA MURO CILNDRICO DE C UBA 17,162.47
01.01.04. m2 349.47 49.11
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.04. ACERO ESTRUCTURAL TRABAJADO PARA MUROS REFORZADOS (INC. HABILITACION) kg 8,525.84 5.52 47,062.64 28,874.98
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.04. CONCRETO F'C=245 KG/CM2. PARA VIGAS Y DINTELES m3 5.23 592.90 3,100.87
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.04. ENCOFRADO Y DESENCOFRADO P/VIGAS CIRCULARES M2. 27.30 96.30 2,628.99 27,706.64
1,314.50 1,011.15 0.00 0.00
01.01.04. ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES kg 445.56 5.73 2,553.06
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
CONC RETO F'C =245 KG/CM2 P/CPUL AS ESFR IC AS ( CEMENTO P-I) DESDE 5.01 A 10 METROS S.N.T.
01.01.04. m3 7.85 590.12 4,632.44 27,102.38
#DIV/0! 0.00 #DIV/0! #DIV/0!
ENCOFRA DO (I/HA BIL ITACIN) DE CUBIERTA ESFRIC A DESDE 5.01 A 10 METROS S.N.T.
01.01.04. m2 86.87 66.51 5,777.72
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
ACERO ESTRUC T. TRABAJADO P/CUB IERTA ESF. 5,01 A 10 M S.N.T(COSTO PROM .I/DESPERD) 3,180.78 2,742.52
01.01.04. KG. 526.62 6.04
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.04. ADITIVO DESMOLDEADOR PARA ENCOFRADOS TIPO CARAVISTA m2 432.92 7.94 3,437.38
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.04. CURADO DE CONCRETO CON ADITIVO m2 594.91 5.20 3,093.53
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS 16,234.35 4,850.63
01.01.05. APLICACION DE 1 CAPA DE XIPEX CONCENTRADO P/IMPERMEABILIZACION INTERIOR DE ESTR m2 336.74 25.69 8,650.85
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.05. APLICACION DE 2 CAPA DE XIPEX CONCENTRADO P/IMPERMEABILIZACION INTERIOR DE ESTR m2 336.74 21.79 7,337.56 8,274.78
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.05. PINTADO CON EMULSION ASFALTICA DE SUPERFICIES EN CONTACTO C/EL TERRENO M2. 21.11 11.65 245.93
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.06 PISOS Y PAVIMENTOS 9,973.12 17,770.54
01.01.06. VEREDA DE CONCRETO F'C=175 KG/CM2, E=0.10 M PASTA 1:2 (C-1) C/EMPLEO DE MEZCLADO m2 29.86 49.70 1,484.04
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.06. ENCOFRADO (I/HABILITACION DE MADERA) P/VEREDAS Y RAMPAS m2 4.87 53.85 262.25
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.06. CONC RETO F'C 210 KG/CM2 P/CANALETA DE DRENAJE (CEMENTO P- I) m3 10.32 650.34 6,711.51 1,680.72
#DIV/0! 0.00 #DIV/0! #DIV/0!
ENCOFRA DO (INC L. HAB IL ITACIN DE MADERA) PARA CANALETA DE DRENAJE 1,515.32
01.01.06. m2 23.11 65.57
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.07 CARPINTERIA METALICA Y HERRERIA 1,712.20
01.01.07. ESCALERA DE TUBO Fo Go C/PARANTES DE 1 1/2" X PELDAOS DE 3/4" ML. 5.40 147.73 797.74 691.92
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.07. MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISMO DE SEGURIDAD und 1.00 414.06 414.06
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.07. VENTILACION CON TUBERIA DE ACERO SEGUN DISEO DN 100 und 4.00 125.10 500.40 3,468.97
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.08 PINTURA 2,827.32
01.01.08. PINTADO EXTERIOR DE RESERVORIO APOYADO INCL. MENSAJE M2. 280.21 10.09 2,827.32 66,184.81
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.09 ADITAMENTOS VARIOS 2,243.73
01.01.09. WATER STOP DE NEOPRENE DE 6". PROVISION Y COLOCADO DE JUNTA ML. 125.38 14.75 1,849.36 4,842.07
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.09. PROVISION Y COLOCADO DE SELLO IGAS NEGRO 1" x 1" m 27.33 14.43 394.37
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.10 PRUEBA DE CALIDAD 2,666.40 6,989.13
01.01.10. PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 30.00 28.34 850.20
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.10. PRUEBA HIDRAULICA CON LINEA DE INGRESO (CAPTACION) m3 400.00 2.31 924.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.01.10. EVACUACION DEL AGUA DE PRUEBA CON LINEA DE SALIDA m3 400.00 0.80 320.00 2,375.60
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.01.10. LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS m2 249.87 2.29 572.20
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02 CASETA DEL RESERVORIO RAP-01 (V=600 M3) 55,419.12 4,213.00
01.02.01 OBRAS PRELIMINARES 2,472.86
01.02.01. TRAZO Y REPLANTEO INICIAL DEL PROYECTO CON ESTACIN TOTAL m2 40.17 1.07 42.98 4,979.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.01. REPLANTEO FINAL DE LA OBRA CON ESTACIN TOTAL m2 40.17 0.96 38.56
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.01. ACARREO DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR - CASETA DE RES GLB 1.00 2,391.31 2,391.31
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.02 MOVIMIENTO DE TIERRAS 776.07 2,305.98
EXC AVACIONES TERRENO SEMIROCOSO HA STA 1.50 M PROF.
01.02.02. m3 7.25 55.01 398.82
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.02. REFINE Y NIVELACION EN TERRENO SEMIROCOSO M2. 8.70 7.33 63.77 1,269.84
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.02. RETIRO Y ACOMODO MANUAL DE MATERIAL EXCEDENTE EN ZONA ALEDAA m3 9.06 34.60 313.48
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.03 OBRAS DE CONCRETO SIMPLE 581.18 0.00
01.02.03. CONCRETO P/SOBRECIMIENTO 1:8 CEMENTO-HORMIGON + 25% P.M. m3 0.73 304.83 222.53
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.03. ENCOFRADO Y DESENCOF (INCL HABILIT DE MADERA) PARA SOBRECIMIENTOS m2 9.77 36.71 358.66
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04 OBRAS DE CONCRETO ARMADO 22,436.37 0.00
01.02.04. CIMIENTO CORRIDO C/MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 7.43 253.47 1,883.28
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04. ACERO ESTRUCTURAL TRABAJADO PARA CIMIENTO REFORZADO KG. 207.72 5.75 1,194.39 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.04. CONCRETO F'C=210 KG/CM2 PARA ANCLAJES Y/O DADOS CEMENTO T-I m3 0.45 427.51 192.38
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04. ENCOFRADO0 Y DESENCOFRADO (INC. HAB. DE MADERA) PARA ANCLAJES Y/O DADOS m2 3.90 43.22 168.56 1,999.13
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.04. ACERO ESTRUCTURAL TRABAJADO PARA ANCLAJES Y/O DADOS kg 47.40 5.52 261.65
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04. CONCRETO F'C=210 KG/CM2 PARA LOSAS DE FONDO - PISO (CEMENTO P-I) M3. 20.29 490.60 9,954.27 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
ACERO ESTRUC . TRABAJADO P/LOSA DE PISO (COSTO PROM. INCL. DESPERDIC IOS)
01.02.04. KG. 95.13 5.75 547.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04. CONCRETO F'C=210 KG/CM2. P/COLUMNAS (CEMENTO P-I) m3 0.86 525.12 451.60 2,088.78
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.04. ENCOFRADO Y DESENCOFRADO NORMAL P/ COLUMNAS m2 17.89 55.87 999.51
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04. ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS (COSTO PROM. INCL DESPERDICIOS) kg 270.06 5.75 1,552.85 798.75
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.04. CONCRETO F'C=210 KG/CM2. P/ VIGAS Y DINTELES m3 0.57 536.96 306.07
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04. ENCOFRADO Y DESENCOFRADO P/VIGAS RECTAS Y DINTELES m2 3.75 64.30 241.13 27.20
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.04. ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES kg 77.89 5.73 446.31
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04. CONCRETO F'C=210 KG/CM2 P/ LOSAS MACIZAS (CEMENTO TIPO I ) M3. 3.51 447.79 1,571.74 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.04. ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS M2. 25.82 47.12 1,216.64
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.04. ACERO ESTRUC. TRABAJ. P/LOSAS MACIZAS (COSTO PROM INCL DESP.) KG. 252.00 5.75 1,449.00 18.84
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.05 TABIQUERIA Y ALBAILERIA 4,473.18
01.02.05. MUROS DE LADRILLO KING KONG DE ARCILLA DE CABEZA C/M 1:4 X 1.5CM. m2 30.09 148.66 4,473.18 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.06 REVOQUES, ENLUCIDOS Y MOLDURAS 3,316.74
01.02.06. TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5 CM (INCLUYE COLUMNAS EMPOTRADAS) m2 36.34 32.06 1,165.06 0.01
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.06. TARRAJEO INTERIOR C/MORTERO 1:5 X 1.5 CM (INCL. COLUMNAS EMPOTRADAS) m2 33.43 31.20 1,043.02
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.06. CIELO RASOS INCLUYE VIGAS EMPOTRADAS C/MORTERO 1:4 x 1.5 CM m2 25.82 36.61 945.27 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.06. VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 14.80 11.04 163.39
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.07 ZOCALOS Y CONTRAZOCALOS 175.98 11,689.00
01.02.07. CONTRAZCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2 CM X 0.30 M m 14.00 12.57 175.98
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.08 PISOS Y PAVIMENTOS 6,903.29
01.02.08. VEREDA DE CONCRETO F'C=175 KG/CM2, E=0.10 M PASTA 1:2 (C-1) C/EMPLEO DE MEZCLADO m2 13.84 49.70 687.85 151.64
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.08. ENCOFRADO (I/HABILITACION DE MADERA) P/VEREDAS Y RAMPAS m2 2.38 53.85 128.16
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
ACERO ESTRUC . TRABAJADO P/VEREDAS (COSTO PROM. INCL . DESPERDICIOS) 575.29 579.51
01.02.08. KG. 100.05 5.75
#DIV/0! 0.00 #DIV/0! #DIV/0!
CONC RETO F'C 210 KG/CM2 P/CANALETA DE DRENAJE (CEMENTO P- I)
01.02.08. m3 6.58 650.34 4,279.24
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
ENCOFRA DO (INC L. HAB IL ITACIN DE MADERA) PARA CANALETA DE DRENAJE
01.02.08. m2 12.00 65.57 786.84 850.01
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.08. CONCRETO F'C=210 KG/CM2. PARA GRADAS (CEMENTO T-I) m3 0.69 510.42 352.19
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.08. ENCOFRADO Y DESENCOFRADO (I/HAB. DE MADERA) P/GRADAS Y/O PISO SIMPLE m2 2.49 37.64 93.72 5,694.69
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.09 COBERTURAS 1,010.29
01.02.09. COBERTURA DE LADRILLO PASTELERO ASENTADO C/BARRO FRAGUADO CON MEZCLA C:A m2 25.59 39.48 1,010.29 52,494.55
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.10 PINTURA 1,300.51
01.02.10. PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2 36.34 12.75 463.34 117,664.32
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.10. PINTURA VINILICA EN MUROS INTERIORES 2 MANOS m2 33.43 12.63 422.22
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.10. PINTADO DE CIELO RASO C/LATEX VINILICO (VINILATEX O SIMILAR) M2. 25.82 12.39 319.91 17,804.54
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.10. PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE) m2 4.20 13.36 56.11
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.10. PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC.+2 ESMALTE) m2 2.40 8.11 19.46 1,710.06
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.10. PINTADO DE MALLAS METALICAS (2 MANOS ANTIC.+2 ESMALTE) m2 2.40 8.11 19.46
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.11 CARPINTERIA METALICA Y HERRERIA 11,666.71 98,177.85
01.02.11. MARCO Y TAPA DE PLANCHA LAC ESTRIADA DE 3/16" CON MECANISMO DE SEGURIDAD S/DIS m2 0.49 1,106.32 542.10
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.11. ESCALERA DE TUBO Fo Go C/PARANTES DE 1 1/2" X PELDAOS DE 3/4" ML. 7.00 147.73 1,034.11
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.11. VENTANA DE FIERRO C/PERFIL DE 1"X1/8"FIJA+REF. "T" DE 1" m2 1.60 280.75 449.20 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.11. MALLA METALICA PROTECTORA CON ALAMBRE N 12 X COCADAS DE 1" m2 1.60 93.57 149.71
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.11. PUERTA METLICA LAC 1/16" CON MARCO DE 2" X 2" X 1/4" Y PERFILES "T" 2"X2"X1/4" m2 4.20 1,277.43 5,365.21 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.11. REJILLA REMOVIBLE PLATINA 1 1/4" X 1/4" m2 12.36 333.85 4,126.39
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.12 CERRAJERIA 232.52 0.00
01.02.12. CERRADURA PARA EXTERIOR, C/LLAVES INTER. Y EXTERIOR DE 3 GOLPES und 1.00 125.00 125.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.12. CANDADO INCLUYENDO ALDABAS und 1.00 15.00 15.00 0.00
#DIV/0! 0.00 #DIV/0! #DIV/0!
01.02.12. BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 6.00 15.42 92.52
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.02.13 ADITAMENTOS VARIOS 73.42 0.00
01.02.13. PROVISION Y COLOCADO DE TECKNOPORT DE 1" PINTADO CON ASFALTO RC-60 m2 4.74 15.49 73.42
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03 CAJA REBOSE LIMPIA (RAP-01) 3,534.95
01.03.01 OBRAS PRELIMINARES 391.09
01.03.01. TRAZO Y REPLANTEO INICIAL P/CAMARA und 1.76 124.01 218.26
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.01. REPLANTEO FINAL DE LA OBRA P/CAMARA und 1.76 98.20 172.83
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.02 MOVIMIENTO DE TIERRAS 627.59
EXC AVACIONES TERRENO SEMIROCOSO HA STA 1.50 M PROF.
01.03.02. m3 7.92 55.01 435.68
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.02. REFINE Y NIVELACION EN TERRENO SEMIROCOSO M2. 5.37 7.33 39.36
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.02. RELLENO C/MATERIAL PROPIO COMPACTADO m3 1.76 16.49 29.02
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.02. RETIRO Y ACOMODO MANUAL DE MATERIAL EXCEDENTE EN ZONA ALEDAA m3 3.57 34.60 123.52
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.03 OBRAS DE CONCRETO 1,843.28
01.03.03. CIMIENTO CORRIDO C/MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 0.23 253.47 58.30
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.03. CONCRETO F'C=210 KG/CM2 PARA LOSAS DE FONDO - PISO (CEMENTO P-I) M3. 0.35 490.60 171.71
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.03. ENCOFRADO (INCLUYE HABILITACION DE MADERA) PARA LOSAS DE FONDO-PISO m2 0.93 34.08 31.69
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.03. ACERO ESTRUCTURAL TRABAJADO P/LOSA DE FONDO-CAMARA (COSTO PROM. INCLUY DESP.) KG. 16.25 5.75 93.44
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.03. CONCRETO F'C=210 KG/CM2 PARA MURO DE BUZONES, CAMARAS, CAJAS (CEMENTO TIPO I ) M3. 0.94 501.04 470.98
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.03. ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS m2 13.20 52.92 698.54
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.03. ACERO ESTRUCTURAL TRABAJADO PARA MUROS REFORZADOS (INC. HABILITACION) kg 57.72 5.52 318.61
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.04 REVOQUES, ENLUCIDOS Y MOLDURAS 318.70
01.03.04. TARRAJEO CON IMPERMEABILIZANTE P/MUROS-FONDO LOSA PISO, MUROS EN CAMARAS m2 7.76 41.07 318.70
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.05 CARPINTERIA METALICA Y HERRERIA 297.31
01.03.05. REJILLA METALICA DE MARCO 2"x2"x1/2" PL 2 1/2"x1/2" (CAJA DE REBOSE) m2 0.63 471.92 297.31
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.03.06 ADITAMENTOS VARIOS 56.99
01.03.06. TAPA DE CONCRETO ARMADO FC 210 KG/CM2 DE ESPESOR = 10 CM m2 0.63 90.46 56.99
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04 SUMINISTRO 57,213.24
01.04.01 CANASTILLA BB BRONCE DE SUCCION DN 150 MM und 1.00 382.80 382.80
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.02 BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 150MM und 1.00 62.22 62.22
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.03 VALVULA AIRE AUTOMATICA ROSCADA ESFERA DE ACERO INOXIDABLE DN 50MM und 1.00 508.00 508.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.04 SUMI. UNION FLEXIBLE TIPO DRESSER DE 6" (150MM) und 4.00 211.61 846.44
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.05 TEE DE HIERRO DUCTIL DE 3 BRIDAS PN16 DN 150MM X 150MM und 2.00 404.85 809.70
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.06 CODO BB 1/8 HIERRO DUCTIL PN 16 DN 150 MM und 5.00 293.11 1,465.55
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.07 MEDIDOR DE CAUDAL TIPO TUBULAR BRIDADO DE 6"(150 MM) und 1.00 6,563.60 6,563.60
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.08 TRANSICIN DE ACERO CAMPANA-BRIDA DN 150 MM und 3.00 268.79 806.37
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.09 CODO BB 1/4 HIERRO DUCTIL PN 16 DN 150 MM und 3.00 297.54 892.62
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.10 CODO BB 1/4 HIERRO DUCTIL PN 16 DN 200 MM und 2.00 465.43 930.86
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.11 CODO BB 1/8 HIERRO DUCTIL PN 16 DN 200 MM und 2.00 444.03 888.06
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.12 TEE DE HIERRO DUCTIL DE 3 BRIDAS PN16 DN 200MM X 200MM und 1.00 729.52 729.52
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.13 SUMI. UNION FLEXIBLE TIPO DRESSER DE 8" (200MM) und 1.00 248.00 248.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.14 VLVULA CPTA.BB, HO.DCTIL CIERRE ELST. VSTAGO ACERO INOXIDABLE DN 150MM und 4.00 341.90 1,367.60
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.15 VLVULA CPTA.BB, HO.DCTIL CIERRE ELST. VSTAGO ACERO INOXIDABLE DN 200MM und 1.00 1,223.61 1,223.61
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.16 SUM BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 8" (200MM) und 2.00 96.89 193.78
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.17 VLVULA CPTA.CC, HO.DCTIL CIERRE ELST. VSTAGO ACERO INOXIDABLE DN 50MM und 1.00 328.70 328.70
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.18 VLVULA ALTITUD HD BRIDADA DN 150 und 2.00 5,980.00 11,960.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.19 BRIDA DE ACERO SCH-40 DE ANCLAJE DN 150 MM und 7.00 71.93 503.51
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.20 BRIDA DE ACERO SCH-40 DE ANCLAJE DN 200 MM und 2.00 248.40 496.80
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.21 REGLA GRADUADA-INDICADOR DE NIVELES PARA RESERVORIO und 1.00 1,731.33 1,731.33
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.22 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 150 MM und 35.00 60.12 2,104.20
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.23 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 200MM und 12.00 97.65 1,171.80
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.24 EMPAQUETADURA DE JEBE ENLONADO DE 150MM und 39.00 7.00 273.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.25 EMPAQUETADURA DE JEBE ENLONADO DE 200MM und 12.00 8.50 102.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.26 PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 150MM. und 312.00 1.95 608.40
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.27 PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 200MM. und 96.00 2.13 204.48
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.28 TUBERIA DE ACERO SCHEDULE - 40 P/EQ. DN 150MM INC. 1% DESP ML. 29.32 131.48 3,854.99
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.04.29 TUBERIA DE ACERO SCHEDULE - 40 P/EQ. DN 200MM INC. 1% DESP ML. 12.45 281.55 3,505.30
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
CLORINADOR DE PRESION DIRECTA
01.04.30 und 1.00 12,450.00 12,450.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05 INSTALACIONES ELECTRICAS RAP-01(CHACCA) 7,008.37
01.05.01 TRABAJOS PRELIMINARES 1,130.89
01.05.01. TRAZO Y REPLANTEO (ELCTRICO)-RESERVORIO APOYADO GLB 1.00 1,130.89 1,130.89
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.02 INSTALACIONES ELCTRICAS (CABLEADO) 168.81
01.05.02. SUMINISTRO E INSTALACIN DE CONDUCTOR DE Cu DE 2.5mm2 THW m 50.10 1.70 85.17
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.02. SUMINISTRO E INSTALACIN DE CONDUCTOR DE Cu DE 4mm2 THW m 38.72 2.16 83.64
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.03 PUESTA A TIERRA 1,279.84
01.05.03. SUMINISTRO E INSTALACIN DE PUESTA A TIERRA PARA INSTALACIONES ELCTRICAS und 1.00 1,249.40 1,249.40
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.03. SUMINISTRO E INSTALACIN DE CONDUCTOR DE Cu DE 10mm2 THW m 7.37 4.13 30.44
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.04 TABLEROS DE DISTRIBUCIN 1,663.82
01.05.04. SUMINISTRO E INSTALACIN DE TABLERO ELECTRICO TRIFSICO ADOSADO METLICO 60 HZ und 1.00 1,663.82 1,663.82
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.05 INSTALACIONES ELCTRICAS GENERALES 1,191.06
01.05.05. ILUMINACIN Y TOMACORRIENTES 453.32
01.05.05. SUMINISTRO E INSTALACIN DE LUMINARIA HERMTICA CON 02 LMPARAS FLURESCENTES und 2.00 104.18 208.36
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.05. SUMINISTRO E INSTALACIN DE TOMACORRIENTE DOBLE CON TOMA A TIERRA DE 15A, 2 und 2.00 25.14 50.28
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.05. SUMINISTRO E INSTALACIN DE INTERRUPTOR SIMPLE UNIPOLAR DE 15A, 220V DE MATER und 1.00 20.14 20.14
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.05. SUMINISTRO E INSTALACIN DE LAMPARA FLUORESCENTE COMPACTA 20 W und 3.00 58.18 174.54
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.05. TUBERIAS Y CANALIZACIONES 237.74
01.05.05. SUMINISTRO E INSTALACIN DE TUBERA ELECTRICA DE PVC-SAP DE 20 mm DIAM. m 36.13 6.58 237.74
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.06 PRUEBAS Y PUESTA EN SERVICIO 500.00
01.05.06. PRUEBAS Y PUESTA EN SERVICIO DE LAS INSTALACIONES ELECTRICAS DE BAJA TENSIN (RES GLB 1.00 500.00 500.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.07 SISTEMA DE ALIMENTACIN EN BAJA TENSIN 1,573.96
01.05.07. CABLES Y CANALIZACIONES ELCTRICAS 673.96
01.05.07. SUMINISTRO E INSTALACIN DE CONDUCTOR DE Cu DE 6mm2 NYY TRIPLE m 18.00 11.32 203.76
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.07. SUMINISTRO E INSTALACIN DE TUBERA ELECTRICA DE PVC-SAP DE 25 mm DIAM. m 6.00 7.51 45.06
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.07. DUCTO DE CONCRETO DE 2 VAS m 11.00 8.50 93.50
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.07. EXCAVACIN A PULSO DE ZANJA DE 0.60 x 0.60 M EN TERRENO SEMIRROCOSO m 11.00 10.76 118.36
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.07. RELLENO COMPACTADO Y NIVELACIN DE ZANJA DE 0.60X0.60M EN TERRENO SEMIRROCOS m 11.00 18.55 204.05
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.07. SUMINISTRO E INSTALACIN EN ZANJA DE CINTA DE SEALIZACIN m 11.00 0.53 5.83
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.07. CAJA DE FIERRO GALVANIZADO 100X100X55 MM. INC. TAPA und 1.00 3.40 3.40
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
01.05.07. CONEXIONES ELCTRICAS 900.00
01.05.07. DOTACIN DE Y CONEXIN A NUEVO SUMINISTRO ELCTRICO EN BAJA TENSIN PROPORCI GLB 1.00 900.00 900.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02 CERCO PERIMETRICO 72,305.64 72,305.64
02.01 OBRAS PRELIMINARES 451.35
02.01.01 TRAZO Y REPLANTEO INICIAL P/CERCO PERIMETRICO (CON EQUIPO) m 90.00 0.74 66.60
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.01.02 REPLANTEO FINAL DE LA OBRA P/CERCO PERIMETRICO (CON EQUIPO) m 90.00 0.15 13.50
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.01.03 LIMPIEZA TERRENO MANUAL m2 135.00 2.75 371.25
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.02 MOVIMIENTO DE TIERRAS 2,862.81
02.02.01 EXCAVACION MANUAL EN T.N. HASTA 1.5m m3 39.92 31.44 1,255.08
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.02.02 RELLENO C/MATERIAL PROPIO COMPACTADO m3 4.44 16.49 73.22
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.02.03 RETIRO Y ACOMODO MANUAL DE MATERIAL EXCEDENTE EN ZONA ALEDAA m3 44.35 34.60 1,534.51
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.03 OBRAS DE CONCRETO SIMPLE 15,052.40
02.03.01 CIMIENTO CORRIDO C/MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 31.05 253.47 7,870.24
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.03.02 CONCRETO P/SOBRECIMIENTO 1:8 CEMENTO-HORMIGON + 25% P.M. m3 9.04 304.83 2,755.66
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.03.03 ENCOFRADO Y DESENCOF (INCL HABILIT DE MADERA) PARA SOBRECIMIENTOS m2 120.58 36.71 4,426.49
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.04 OBRAS DE CONCRETO ARMADO 16,247.76
02.04.01 CONCRETO F'C=210 KG/CM2. P/COLUMNAS (CEMENTO P-I) m3 5.29 525.12 2,777.88
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL P/ COLUMNAS m2 57.30 55.87 3,201.35
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.04.03 ACERO ESTRUCTURAL TRABAJADO P/COLUMNAS (COSTO PROM. INCL DESPERDICIOS) kg 669.89 5.75 3,851.87
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.04.04 CONCRETO F'C=210 KG/CM2. P/ VIGAS Y DINTELES m3 2.59 536.96 1,390.73
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.04.05 ENCOFRADO Y DESENCOFRADO P/VIGAS CIRCULARES M2. 34.56 96.30 3,328.13
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.04.06 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES kg 296.30 5.73 1,697.80
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.05 MUROS Y TABIQUES DE ALBAILERIA 18,976.70
02.05.01 MURO DE LADRILLO KK DE ARCILLA D/SOGA CARAVISTA C/MORTERO 1:4 X 1.5 CM M2. 197.38 93.75 18,504.38
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.05.02 ALAMBRE NEGRO N8 P/CONFINAMIENTO DE MUROS ML. 230.40 2.05 472.32
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.06 REVOQUES, ENLUCIDOS Y MOLDURAS 3,631.11
02.06.01 TARRAJEO DE SUPERF. COLUMNAS INDEPENDIENTES (EN EXTERIORES) m2 57.30 35.68 2,044.46
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.06.02 TARRAJEO SUPERFICIE DE VIGAS INDEPENDIENTES (EN EXTERIOR) m2 34.56 45.91 1,586.65
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.07 CARPINTERIA METALICA Y HERRERIA 12,723.68
02.07.01 PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS Y TUBO FG 4" "PUERTA GARAJE" M2. 16.00 795.23 12,723.68
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.08 CERRAJERIA 928.54
02.08.01 CANDADO INCLUYENDO ALDABAS und 1.00 15.00 15.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.08.02 BISAGRAS TUBULARES und 6.00 143.05 858.30
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.08.03 PICAPORTE DE FIERRO REDONDO DE 1/2" X 1.10 M. und 2.00 27.62 55.24
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.09 PINTURA 1,205.02
02.09.01 PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE) m2 18.00 13.36 240.48
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.09.02 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2 75.65 12.75 964.54
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.10 ADITAMENTOS VARIOS 84.58
02.10.01 PROVISION Y COLOCADO DE TECKNOPORT DE 1" PINTADO CON ASFALTO RC-60 m2 5.46 15.49 84.58
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
02.11 PRUEBAS DE CALIDAD 141.70
02.11.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 5.00 28.34 141.70
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03 LINEA DE CONDUCCION (VARIANTE 1,500.00 ML) 53,824.96 53,824.96
03.01 TRABAJOS PRELIMINARES 1,290.36
03.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL KM 1.50 602.70 904.05
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 1.50 257.54 386.31
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.02 MOVIMIENTO DE TIERRAS 27,246.00
03.02.01 EXCAVACION ZANJA (PULSO) P/TUB. T-NORMAL DN 110 - 160 MM DE 1.26 M A 1.50 M m 1,500.00 6.25 9,375.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.02.02 REFINE Y NIVELACION DE ZANJA TERRENO NORMAL P/TUB. 110 - 160 MM. P/TODA PROFUNDIDAD m 1,500.00 3.67 5,505.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.02.03 RELLENO COMPACTADO ZANJA (PULSO) P/TUB. TERRENO NORMAL DN 110 - 160 MM DE 1.26 A 1. m 150.00 45.04 6,756.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.02.04 RETIRO Y ACOMODO DE MATERIAL DE LA EXCAV. ZANJA DN 110 - 160 MM m 1,500.00 3.74 5,610.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.03 SUMINISTRO E INSTALACION DE TUBERA PVC UF NTP ISO 1452:2011 21,150.00
03.03.01 TUBERIA PVC-U UF NTP ISO 1452 PN-7.5 DN 110 MM INCL. ANILLO+2% DESPERDICIOS m 1,500.00 10.84 16,260.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.03.02 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM INC PRUEBA HIDRAULICA m 1,500.00 3.26 4,890.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.04 SUMINISTRO E INSTALACIN DE ACCESORIOS DE PVC 4,138.60
03.04.01 SUMINISTRO CODO PVC U UR ISO 1452 DN 110 MM 45 INCL. ANILLO pza 15.00 62.64 939.60
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.04.02 SUMINISTRO CODO PVC U UR ISO 1452 DN 110 MM 2230 INCL. ANILLO pza 25.00 62.50 1,562.50
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
03.04.03 SUMINISTRO CODO PVC U UR ISO 1452 DN 110 MM 1115 INCL. ANILLO pza 30.00 54.55 1,636.50
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04 CAMARAS DE REGISTRO (03 UND) 6,057.53 6,057.53
04.01 OBRAS PRELIMINARES 1,423.83
04.01.01 TRAZO Y REPLANTEO INICIAL P/CAMARA und 4.29 124.01 532.00
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.01.02 REPLANTEO FINAL DE LA OBRA P/CAMARA und 4.29 98.20 421.28
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.02 MOVIMIENTO DE TIERRAS 0.00
EXCAVACIONES TERRENO SEMIROCOSO HASTA 1.50 M PROF. 259.65
04.02.01 m3 4.72 55.01
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.02.02 REFINE Y NIVELACION EN TERRENO SEMIROCOSO M2. 15.50 7.33 113.62
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.02.03 RELLENO C/MATERIAL PROPIO COMPACTADO m3 5.90 16.49 97.29
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.03 OBRAS DE CONCRETO 3,056.12
04.03.01 CONCRETO F'C=210 KG/CM2 PARA MURO DE BUZONES, CAMARAS, CAJAS (CEMENTO TIPO I ) M3. 2.51 501.04 1,257.61
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS m2 26.88 52.92 1,422.49
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.03.03 ACERO ESTRUCTURAL TRABAJADO PARA MUROS REFORZADOS (INC. HABILITACION) kg 68.12 5.52 376.02
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.04 REVOQUES, ENLUCIDOS Y MOLDURAS 1,103.96
04.04.01 TARRAJEO CON IMPERMEABILIZANTE P/MUROS-FONDO LOSA PISO, MUROS EN CAMARAS m2 26.88 41.07 1,103.96
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.05 CARPINTERIA METALICA Y HERRERIA 473.62
04.05.01 REJILLA METALICA DE MARCO 2"x2"x1/2" PL 2 1/2"x1/2" (CAJA DE REBOSE) m2 0.30 471.92 141.58
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
04.05.02 TAPA METALICA 0.6M X 0.6M und 3.00 110.68 332.04
#DIV/0! #DIV/0! #DIV/0! #DIV/0!

COSTO DIRECTO 505,507.94 964,745.86 #DIV/0! #DIV/0! #DIV/0!


GASTOS GENERALES (6.00%) 6.00% 30,330.48 57,884.75 #DIV/0! #DIV/0! #DIV/0!
UTILIDAD (4.00%) 4.00% 20,220.32 38,589.83 #DIV/0! #DIV/0! #DIV/0!
--------------- ---------------

SUBTOTAL 556,058.74 1,061,220.44 #DIV/0! #DIV/0! #DIV/0!

FACTOR 1.00 556,058.74 1,061,220.44 #DIV/0! #DIV/0! #DIV/0!

IMPUESTO(IGV) (18.00%) 18.00% 100,090.57 191,019.68 #DIV/0! #DIV/0! #DIV/0!

TOTAL PRESUPUESTO (*) 656,149.31 1,252,240.12 #DIV/0! #DIV/0! #DIV/0!

PORCENTAJE DE AVANCE DE OBRA 100.00% 190.85% #DIV/0! #DIV/0! #DIV/0!


13/07/16 14/07/16 15/07/16 16/07/16 17/07/16 18/07/16 19/07/16 20/07/16
1 2 3 4 5 6 7 8
21/07/16 22/07/16 23/07/16 24/07/16 25/07/16 26/07/16 27/07/16 28/07/16 29/07/16
9 10 11 12 13 14 15 16 17
30/07/16 31/07/16 01/08/16 02/08/16 03/08/16 04/08/16 05/08/16 06/08/16 07/08/16
18 19 20 21 22 23 24 25 26
08/08/16 09/08/16 10/08/16 11/08/16 12/08/16 13/08/16 14/08/16 15/08/16 16/08/16
27 28 29 30 31 32 33 34 35
17/08/16 18/08/16 19/08/16 20/08/16 21/08/16 22/08/16 23/08/16 24/08/16 25/08/16
36 37 38 39 40 41 42 43 44
26/08/16 27/08/16 28/08/16 29/08/16 30/08/16 31/08/16 01/09/16 02/09/16 03/09/16
45 46 47 48 49 50 51 52 53
04/09/16 05/09/16 06/09/16 07/09/16 08/09/16 09/09/16 10/09/16 11/09/16 12/09/16
54 55 56 57 58 59 60 61 62
13/09/16 14/09/16 15/09/16 16/09/16
63 64 65 66 67 68 69 70 71 72 73