Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )

Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

WEEKLY REPORT. PLTU 3 BABEL ( 2 X 30 MW )


Period May 09 May 18 , 2011.
SUMMARY

INSPECTED PADDING SURVEY WATER INJECTION


PUMP AND CONDENSER TURBINE NO # 1
AND CONDENSER TURBINE NO # 1 AND CONDENSER
NO # 2 AND CONDENSER TURBINE NO # 2

SITE PROBLEM REMIDIAL TARGET


DESCRIPTION ACTION.

1. Position 1. Condenser # 1. Condenser


1. Centerline Condenser 1 and # 1,
and In Port Not Condenser Condenser
Dimensional Centre # 2 Position #2
Of Line. Still Level in And Pump
Condenser. Between Center Line. Perfected.
For T/G # 1 Condenser Condition.
& T/G # 2 # 1 and
Condenser
# 2.

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

2. Elevation 2. All
Condenser Connection 2. Installatio
#1 and Flanges from n From
2. Alignment Condenser Condenser to Turbine
Of Water #2. Must Connected Generator
Injection be Same. Pipe Line # 1 and
Pumps. thru Lube Oil Turbine
T/G # 1 Tank. Ok. Generator
# 2 Thru
3. Oil Lube 3. Manual Main
Tank must Operation Master
be welded and Steam
Connect to Maintenance valve and
3. The Flange and Equipment Oil Lube
elevation of Leak Of Had been Tank .Ok
Top Padding Test. Done. 3. Leak Of
Plate of test.
Cond. 4. Gate Pipe Line,
Pumps. Valves Condenser
must be and Lube
Ok. To Test Oil Tank
Run for and
Open and Pumps.
4. Last Closed Will be
Drawing Valves. Test. Ok.
Approval.
4. Operator
Profession
al and
Experience
Must Be
5. Certificated Prefect.
Equipment
Had been 5. Calibrated
Down. Had been
done.

INSPECTED OF TURBINE GENERATOR NO. # 1 #


( TO ENCLOSED UPPER CASING TURBINE GENERATOR
#1).
DESCRIPTION SITE PROBLEM REMEDIAL TARGET
ACTION 1. Closed Cover

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

1. Padding Inspected Of Unit 1. Already Turbine


Survey. Front Gland Checked perfected.
Clearance. The
2. Centerline Inspected. 2. Tightening
Survey. Grade 1 : Ok. Bolts.

3. Pre 0 to 270 Degree : 2. Compared 3. Installed


Alignment = 0.50 ( a and b). Last Pipe Line
Generator Drawing from TG 1
#1. Grade 2 : and Actual Thru Lube
Inspected. Tank,
4. Pre 0 Degree : OK. Condenser 1
Alignment = 0.45 ( a and b). and Master
Turbine # 1. 3. All Steam
90 -270 Degree : Equipment Valves.
5. Last = 0.50 ( a and b). Cleaned
Drawing Out. 4. Installed AC
Approval. Grade 3 : Ok. Aciter and
Pipe Lines.
6. Certificate 0 Degree : 4. Closed
Had been = 0.50 ( a and b). Cover 5. Flushing
done. Turbine. Pipe Lines.
90 180 Degree : Ok.
7. Calibration = 0.60 ( a and b). 6. Air Test Line.
Equipments
and Tools. 270 Degree : 7. Water Test
Had been = 0.50 ( a and b). Line.
done.
Grade 4 : 8. Test Welded
8. Manual In Pipe
Instruction 0 Degree : Lines.
from = 0.60 ( a and b).
Fabricator. 9. Individual
Had been 90-180 Degree. Test.
done. = 0.45 ( a and b).
10.Manual
9. SOP. 270 Degree. Operation
= 0.55 ( a and b). Had been
10.Safety done.
Manual
Procedure. Grade 5 :

11.Final 0 Degree : 11.Operator


Inspected = 0.50 ( a and b). Experience
Before and
assembled 90-180 Degree : Excellent..
and = 0.45 ( a and b).
enclosed
upper 270 Degree :
casing. = 0.55 ( a and b).

Grade 6 :

0 Degree :
= 0.57 ( a and b).
Mechanical Weekly Report
Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

Name : Marsaid.Arsyad / KSO - Mechanical Engineering.

Mechanical Weekly Report