KSO AMYTHAS-ARKONIN-REKADAYA
KSO AMYTHAS-ARKONIN-REKADAYA
2. Elevation 2. All
Condenser Connection 2. Installatio
#1 and Flanges from n From
2. Alignment Condenser Condenser to Turbine
Of Water #2. Must Connected Generator
Injection be Same. Pipe Line # 1 and
Pumps. thru Lube Oil Turbine
T/G # 1 Tank. Ok. Generator
# 2 Thru
3. Oil Lube 3. Manual Main
Tank must Operation Master
be welded and Steam
Connect to Maintenance valve and
3. The Flange and Equipment Oil Lube
elevation of Leak Of Had been Tank .Ok
Top Padding Test. Done. 3. Leak Of
Plate of test.
Cond. 4. Gate Pipe Line,
Pumps. Valves Condenser
must be and Lube
Ok. To Test Oil Tank
Run for and
Open and Pumps.
4. Last Closed Will be
Drawing Valves. Test. Ok.
Approval.
4. Operator
Profession
al and
Experience
Must Be
5. Certificated Prefect.
Equipment
Had been 5. Calibrated
Down. Had been
done.
KSO AMYTHAS-ARKONIN-REKADAYA
Grade 6 :
0 Degree :
= 0.57 ( a and b).
Mechanical Weekly Report
Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008
KSO AMYTHAS-ARKONIN-REKADAYA