Anda di halaman 1dari 34

Indiana Utility Regulatory Commission

Pipeline Safety Division

Investigation Summary and Options


Regarding MetroNets Construction Activities
As of September 12, 2017

At the request of the City of Fishers (Fishers), the City of Carmel (Carmel), and the City of
Westfield (Westfield), the Pipeline Safety Division (PSD or Division) of the Indiana Utility
Regulatory Commission (IURC or Commission) is providing this investigation summary and a
list of options to improve public safety regarding contractors working on behalf of CMN-RUS,
Inc., d/b/a MetroNet (MetroNet). All three communities have placed a halt on MetroNet
contractors excavating in public rights-of-way. The incident in Westfield that just occurred on
Friday, September 8, 2017, is under investigation at this time; therefore, only preliminary
information is being provided now, with a final investigation summary to be provided once that
investigation is completed.

This document contains the following:

A. Investigation Summary
1) Specific Case Information for Fishers
2) Specific Case Information for Carmel
3) Preliminary Information for Westfield
4) Failure to Register with Indiana Secretary of State
5) Additional Information Withheld by MetroNet
6) Safe Digging Best Practices

B. Options for Correction Action Regarding MetroNets Construction Activities

C. Attachments
1) Investigation Reports for each case
2) Letter from Chairman Atterholt to Indiana Attorney General regarding failure
to register with Indiana Secretary of State
3) Safe Digging Best Practices

Page 1 of 8
A. Investigation Summary:

This investigation summary includes a summary of the PSD findings regarding specific cases of
damaged gas lines in Fishers and Carmel and preliminary information regarding the recently
damaged gas line in Westfield, as well as other information discovered by PSD and Commission
staff during the course of the investigation. The Investigation Reports are attached and are in
order by case number.

Of the 20 cases investigated for Fishers and Carmel, the Division found that ten (10) cases were
violations by the excavators (i.e., MetroNet contractors), six (6) cases were violations by the gas
utility (i.e., Indiana Gas Company d/b/a Vectren), and four (4) cases involved no violations.

1) Specific Case Information for Fishers:

Of the 11 incidents of damage to gas lines in Fishers, six (6) were violations by the MetroNet
contractor (for using mechanized equipment within two feet of the marked gas lines and for
failure to plan when using hand tools); four (4) were violations by Indiana Gas Company d/b/a
Vectren, the operator of the gas lines (for failure to properly mark the lines); and one (1) was no
violation (as the excavator was using hand tools and there was no evidence of a failure to plan
the excavation);

Crosier Lane Consulting, Inc.


o Case #16484 6/19/2017 excavator violation (used mechanized equipment
within 2 feet of marked line)
o Case #16524 6/20/2017 excavator violation (used mechanized equipment
within 2 feet of marked line)
International, Inc.
o Case #16746 8/15/2017 excavator violation (failure to plan in use of hand
tools)
o Case #16810 8/14/2017 no violation (appropriate use of hand tools)
o Case #16811 8/17/2017 excavator violation (failure to plan in use of hand
tools)
o Case #16812 8/24/2017 excavator violation (used mechanized equipment
within 2 feet of marked line)
RC Underground, LLC
o Case #16008 4/25/2017 operator violation (failure to properly mark)
o Case #16013 4/26/2017 operator violation (failure to properly mark)
o Case #16521 6/29/2017 operator violation (failure to properly mark)
o Case #16694 8/1/2017 excavator violation (failure to plan in use of hand
tools)

Page 2 of 8
RLM Underground, LLC
o Case #16813 8/24/2017 operator violation (failure to properly mark)

2) Specific Case Information for Carmel:

Of the nine (9) incidents of damage to gas lines in Carmel, four (4) were violations by the
MetroNet contractor (for using mechanized equipment within two feet of the marked gas lines
and for failure to plan when using hand tools); two (2) were violations by Indiana Gas Company
d/b/a Vectren, the operator of the gas lines (for failure to properly mark the lines); and three
(3) were no violation (as the excavator was using hand tools and there was no evidence of a
failure to plan the excavation);

International, Inc.
o Case #16726 8/9/2017 operator violation (failure to properly mark)
Nexgen Directional, LLC
o Case #16392 5/30/2017 excavator violation (used mechanized equipment
within 2 feet of marked line)
o Case #16480 6/16/2017 no violation (appropriate use of hand tools)
o Case #16660 7/21/2017 no violation (appropriate use of hand tools)
Radical Concepts, LLC (d/b/a Palindrome Construction)
o Case #16635 7/18/2017 excavator violation (failed to call 811 to renew
marks)
o Case #16640 7/18/2017 excavator violation (digging ticket expired)
o Case #16708 8/2/2017 excavator violation (digging in area outside of ticket)
RLM Underground, LLC
o Case #16722 no violation (appropriate use of hand tools)
o Case #16727 operator violation (failure to properly mark)

3) Preliminary Information for Westfield:

According to some initial information provided by employees of Citizens Gas of Westfield


(Citizens), the information indicates that a gas line was damaged at 121 S. Walnut Street in
Westfield, Indiana, on Friday, September 8, 2017, by International Inc., a subcontractor for
MetroNet. The gas leaking from the damage migrated underground to the sewer system, the
Fire Department responded, homes in the vicinity were evacuated, and electricity was turned
off by Duke Energy Indiana, LLC, until the gas line was repaired.

Citizens promptly reported this incident to the Commissions Pipeline Safety Division, and PSD
investigators were at the scene of the event immediately after being notified and they are
actively investigating the incident under Case #16872.

Page 3 of 8
Excavation damages to gas lines that result in the migration of natural gas underground
through sewer systems and into basements is extremely dangerous and often leads to
explosions, with injuries and loss of life.

4) Failure to Register with Indiana Secretary of State:

In order to assure accurate addresses for legal notices, the Commissions Office of General
Counsel researched each of the contractors under investigation, reviewing information on the
website and on-line services of the Indiana Secretary of State. That review discovered that it
appears all six (6) contractors are out-of-state entities and all but one of the contractors has not
registered with the Indiana Secretary of State as required under Indiana law.

Specifically, it appears that the following MetroNet contractors have not registered as required
by Indiana law:
Crosier Lane Consulting, Inc. (Illinois business)
International, Inc. (Michigan business)
Nexgen Directional, LLC (Illinois business)
R C Underground, LLC (Florida business)
R L M Underground, LLC (Kansas business)

This failure to comply with Indiana law makes the Pipeline Safety Divisions important public
safety function more difficult. As a result, the IURCs Chairman is referring this information to
the Indiana Office of Attorney General for review and possible fines of up to $10,000 per
company. Please see attached letter.

Note: Radical Concepts, LLC (d/b/a Palindrome Construction) is a New Jersey company and has
registered in Indiana.

5) Additional Information Withheld by MetroNet:

The Division requested that MetroNet provide a list of its contractors excavating in Indiana. To
date, the Division has not requested information on the company hiring an excavating
contractor because the Call Before You Dig law only allows enforcement against the person or
entity that caused the excavation damage, not the company who hired them. However, in
order to have a clearer understanding of what was happening with the damage cases involving
MetroNets contractors throughout the State of Indiana, the Division believed that having such
information may be helpful in determining trends or patterns of damages, which may then be
corrected. MetroNets counsel declined to provide the list, stating that it was competitively
sensitive information.

Page 4 of 8
In addition, economic or contract incentives to quickly complete a project involving excavation
can affect whether the appropriate safe digging practices are being followed. As a result, the
Division requested a copy of a sample contract between MetroNet and its contractors, with any
trade secret information appropriately redacted. Even though the Commission is required to
protect trade secret information under state law, MetroNets counsel declined to provide even
a redacted sample contract, stating that it was competitively sensitive information.

6) Safe Digging Best Practices:

The Division has attached a list of safe digging best practices from the Common Ground
Alliance, a national pipeline safety organization see attached document. A complete book of
best practices is available at: http://commongroundalliance.com/best-practices-guide )

Page 5 of 8
B. Options for Corrective Action Regarding MetroNets Construction Activities:

The following are options that each City may want to consider in its determination regarding
the conditions under which MetroNet contractors may be allowed to resume the installation of
fiber optic cable in the City:

1) Documentation that MetroNets executive leadership, project managers, and supervisors


have taken training regarding safe digging practices and understand the requirements of
Indianas Call Before You Dig law (Indiana Code chapter 8-1-26), such as:
a) Attendance (with a passing score) at one of the Underground Plant Protection
Advisory Committees (UPPACs) mandatory training classes (designed for
those previously found in violation of Indianas Call Before You Dig law);
and/or
b) Completion of the IURC sponsored online excavation damage training at
https://www.safedigindiana.com/.

2) Documentation that all of MetroNets contractor crews are trained and qualified
regarding safe digging practices and understand the requirements of Indianas Call
Before You Dig law (Indiana Code chapter 8-1-26), such as:
a) Attendance (with a passing score) at one of the Underground Plant Protection
Advisory Committees (UPPACs) mandatory training classes (designed for
those previously found in violation of Indianas Call Before You Dig law);
and/or
b) Completion of the IURC sponsored on-line excavation damage training at
https://www.safedigindiana.com/.

3) Commitment that MetroNets contractor crews will follow the CGA Best Practices that
each City requires see attached list of possible related best practices.

4) Documentation that all of MetroNets contractor crews are properly registered (as
needed) to do business in Indiana with 1) Indianas Secretary of States Office, 2) Hamilton
County, or 3) the Towns of Fishers or Carmel. If such contractor crews are exempt from
registration, MetroNet should provide proof to the City that their contractors are
adequately insured and/or bonded and that accurate contact information (including
mailing addresses and telephone numbers) has been provided to the Cities and the IURC
PSD.

5) A written plan by MetroNet describing how it will demand public safety over speed of
installation of its fiber optic lines by their MetroNet contractor crews, possibly including:
a) Regular reporting of MetroNet contractor crew performance;

Page 6 of 8
b) Contract incentives and penalties between MetroNet and its contractors
designed to avoid further incidents; and/or
c) MetroNet showing that it vets its contractor crews and they know they are
expected to focus on public safety, not simply footage.

6) A written plan by Indiana Gas Company (dba Vectren Energy Services) (Vectren)
describing how it will provide accurate and timely locates of Vectrens underground
facilities, possibly including:
a) Regular reporting of Vectrens contract locator performance to each City; and
b) Contract incentives and penalties between Vectren and its contract locators
designed to avoid further mis-locates.

7) Documentation that Vectrens contract locators are trained and qualified.

8) Commitment that Vectrens contract locating company, USIC, will assign more senior and
experienced locators to the jobs where MetroNet contractor crews are working.

9) Commitment that MetroNet contractor crews will request additional information from
the underground facility owners that they might need to help them in locating and
avoiding damage to underground facilities.

10) Commitment that MetroNet will have company inspectors on-site to monitor each
contractor crew to ensure safe digging practices are being followed; OR as an alternative,
MetroNet will reimburse the City for the associated costs of having a City inspector on
site.

11) Commitment that MetroNet will ensure its contractor crews are using hydro-excavation
rather than hand tools to expose gas facilities prior to boring or trenching operations.
With hard and dry soil conditions, it is very difficult to use hand tools to expose pipeline
facilities. Hydro-excavation essentially uses a combination of high pressure water and a
vacuum to remove soil, which is the preferred method to expose buried gas lines.

12) Commitment by MetroNet and Vectren to work together, and with other underground
facility owners, to ensure all parties know well in advance of where MetroNet contractor
crews will be working to ensure adequate locating resources are made available. This
should provide the underground facility owners and their contract locators (if applicable)
with sufficient time to adequately plan and staff for the number of notices of excavation
received and allow the coordination of resources accordingly.

13) A written plan by MetroNet to achieve improved proactive communications with all of its
stakeholders, including, but not limited to, the City, the Citys citizens, all underground
Page 7 of 8
facility owners (and their locators), and MetroNets own contract crews. This plan should
focus on improved coordination of efforts and collaboration to prevent and mitigate the
risks associated with any further excavation damages.

14) Commitment by MetroNet and its contractors to participate in the Indiana Damage
Prevention Council for the area(s) in which the City is located and where MetroNet
contractors are excavating. Information for the Indiana Damage Prevention Council
Central Chapter can be found at: https://indiana811.org/idpccc.

Page 8 of 8
STATE oy INDIANA

INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Vectren Energy Delivery
Case Number: 16008
Report Date: 8/11/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 4/25/2017 12:00 AM Damage Address: 116th & Ringer Rd, Fishers

The Parties
Excavator: R C Underground
Address: 6421 Key Island Ave Apollo Beach, FL 33572

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Distribution
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: No -
Repair Cost (if known): Facility Depth (inches): 20.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1704254341

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Yes Operator: Yes

Findings: Excavator damaged a distribution main with a horizontal boring machine. They had a valid locate
request at the time of the incident. The operator failed to mark the line correctly due to locator error.

Violation: IC 8-1-26-18(h) Operator failed to locate or provided incorrect locate markings.


STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Vectren Energy Delivery
Case Number: 16013
Report Date: 8/11/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 4/26/2017 12:00 AM Damage Address: 13868 E 116th St, Fishers

The Parties
Excavator: R C Underground
Address: 6421 Key Island Ave Apollo Beach, FL 33572

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Distribution
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes - 1
Repair Cost (if known): Facility Depth (inches):

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1703211350

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Yes Operator: Yes

Findings: Excavator damaged a distribution main with a horizontal boring machine. They had a valid locate
request at the time of the incident. The operator failed to correctly mark the facility due to locator error.

Violation: IC 8-1-26-18(h) Operator failed to locate or provided incorrect locate markings.


STATE oy INDIANA

INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Nexgen Directional LLC
Case Number: 16392
Report Date: 8/29/2017 12:00 AM Investigator: Michael Neal
Damage Date: 5/30/2017 12:00 AM Damage Address: 13034 Abraham Run, Carmel

The Parties
Excavator: Nexgen Directional LLC
Address: 1712 S Whittle Ave. Olney, IL 62450

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Distribution
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes -5
Repair Cost (if known): Facility Depth (inches): 36.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1705182041

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Operator:

Findings: Both the Operator and Excavator responded to a request for more information. The Excavator was
boring within the tolerance zone when the gas line was damaged.

Violation: IC 8-1-26-20(a)(2) Failure to maintain two (2) feet clearance with mechanized equipment.
STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Nexgen Directional LLC
Case Number: 16480
Report Date: 9/6/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 6/16/2017 12:00 AM Damage Address: 12788 Double Eagle Dr, Carmel

The Parties
Excavator: Nexgen Directional LLC
Address: 1712 S Whittle Ave. Olney, IL 62450

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function:
Type of Equipment: Hand Tools Type of Work Performed: Other

Damage Impact
Product Release: Service Interruption: -
Repair Cost (if known): Facility Depth (inches):

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Indiana 811 Ticket Number:

Excavator Notify Operator: Excavator Notify 811: Excavator Notify 911:

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Operator:

Findings: Excavator requested a dig ticket and the operator accurately marked. Excavator used a shovel.
Excavator notes that the ground was hard and there were tree roots in the area. However, neither party has pictures
of the damaged line. Without that or some additional information, there is insufficient information to make a
finding of IC 8-1-26-20(a)(1), failure to plan.

Violation: Insufficient evidence to find violation.


STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Crosier Lane Consulting, Inc.
Case Number: 16484
Report Date: 8/31/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 6/19/2017 12:00 AM Damage Address: 9645 Claymore Dr, Fishers

The Parties
Excavator: Crosier Lane Consulting, Inc.
Address: 5325 N Lakewood Road Olney, IL 62450

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes -1
Repair Cost (if known): $560.78 Facility Depth (inches): 28.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1706070932

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: Yes

Findings: Excavator damaged an accurately marked service line with a horizontal boring machine. They had a
valid request at the time of the incident, but failed to expose the line in the area of the excavation and therefore
were using mechanized equipment inside the 2-foot tolerance zone.

Violation: IC 8-1-26-20(a)(2) Failure to maintain two (2) feet clearance with mechanized equipment.
STATE oy INDIANA

INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Vectren Energy Delivery
Case Number: 16521
Report Date: 8/31/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 6/29/2017 12:00 AM Damage Address: 9251 Crossing, Fishers

The Parties
Excavator: R C Underground
Address: 6421 Key Island Ave Apollo Beach, FL 33572

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes - 1
Repair Cost (if known): Facility Depth (inches): 36.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1706161192

Excavator Notify Operator: No Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: No

Findings: Excavator damaged a service line with horizontal boring machine. They had a valid locate request at
the time of the incident. The operator failed to mark the line due to locator error.

Violation: IC 8-1-26-18(h) Operator failed to locate or provided incorrect locate markings.


STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Crosier Lane Consulting, Inc.
Case Number: 16524
Report Date: 8/31/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 6/30/2017 12:00 AM Damage Address: 12630 Longleaf Ln, Fishers

The Parties
Excavator: Crosier Lane Consulting, Inc.
Address: 5325 N Lakewood Road Olney, IL 62450

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes -1
Repair Cost (if known): $1,502.36 Facility Depth (inches): 21.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1706071418

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: Yes

Findings: Excavator damaged an accurately located service line with a horizontal boring machine. The excavator
had a valid locate request at the time of the incident. The excavator made a pot hole and exposed a portion of the
line. However, the diameter of the hole was not large enough, so when the bore came through, there was not
sufficient time to stop the boring machine before it damaged the line.

Violation: IC 8-1-26-20(a)(2) Failure to maintain two (2) feet clearance with mechanized equipment.
STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Radical Concepts d/b/a Palindrome Construction
Case Number: 16635
Report Date: 9/11/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 7/18/2017 12:00 AM Damage Address: 13580 Brentwood Ln, Carmel

The Parties
Excavator: Radical Concepts d/b/a Palindrome Construction
Address: 6623 W 13th St Indianapolis, IN 46214

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes -1
Repair Cost (if known): Facility Depth (inches): 30.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1707064305

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911:

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: Yes

Findings: Only the Operator responded to the request for information. Excavator damaged a service line with a
horizontal boring machine. Operator properly marked the area to be excavated. The homeowner removed the flags
and excavator dug without calling 811 to renew the marks. The damaged line was on the property line between
13580 and 13596. It was damaged closer to 13580 but was the line for 13596.

Violation: IC 8-1-26-20(a)(3)(b) Failure to notify IN811 when locate markings have become illegible
STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Radical Concepts d/b/a Palindrome Construction
Case Number: 16640
Report Date: 9/11/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 7/18/2017 12:00 AM Damage Address: 1204 Smokey Row Ln, Carmel

The Parties
Excavator: Radical Concepts d/b/a Palindrome Construction
Address: 6623 W 13th St Indianapolis, IN 46214

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Distribution
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes -5
Repair Cost (if known): Facility Depth (inches): 30.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1706273510

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911:

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: Yes

Findings: Only the Operator responded to the request for information. Excavator damaged a distribution main
with a horizontal boring machine. They allowed their prior ticket to expire and were therefore digging without a
valid request.

Violation: IC 8-1-26-16(h)(expire) Failure to provide notice of excavation - expired ticket.


STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Nexgen Directional LLC
Case Number: 16660
Report Date: 9/1/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 7/21/2017 12:00 AM Damage Address: 14370 Jeremy Dr, Carmel

The Parties
Excavator: Nexgen Directional LLC
Address: 1712 S Whittle Ave. Olney, IL 62450

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Hand Tools Type of Work Performed: Cable TV

Damage Impact
Product Release: Service Interruption: -
Repair Cost (if known): Facility Depth (inches):

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Indiana 811 Ticket Number:

Excavator Notify Operator: Excavator Notify 811: Excavator Notify 911:

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Operator:

Findings: Excavator requested a dig ticket and the operator accurately marked. Excavator used a shovel. No
additional information was provided by either party that would indicate a violation of IC 8-1-26-20(a)(1).

Violation: Insufficient evidence to find violation.


STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: R C Underground
Case Number: 16694
Report Date: 9/5/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/1/2017 12:00 AM Damage Address: 9660 Overcrest Dr, Fishers

The Parties
Excavator: R C Underground
Address: 6421 Key Island Ave Apollo Beach, FL 33572

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Probing Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes -1
Repair Cost (if known): Facility Depth (inches): 25.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1707263022

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Yes Operator: Yes

Findings: Excavator damaged an accurately marked service line with a probe rod. They were attempting to
expose the line by potholing with hydro excavation, but used the probe rod when the line was not visible. The line
does not appear to be brittle or otherwise have a loss of integrity. Therefore, the excavator would have used the
probe rod with force to drive it into the line. Using a probe rod in this manner fails to avoid damage.

Violation: IC 8-1-26-20(a)(1) Failure to plan excavation to avoid damage or interference with underground
facilities.
STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Radical Concepts d/b/a Palindrome Construction
Case Number: 16708
Report Date: 9/11/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/2/2017 12:00 AM Damage Address: 490 Tulip Poplar Crest, Carmel

The Parties
Excavator: Radical Concepts d/b/a Palindrome Construction
Address: 6623 W 13th St Indianapolis, IN 46214

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Hand Tools Type of Work Performed: Other

Damage Impact
Product Release: No Service Interruption: Yes -1
Repair Cost (if known): Facility Depth (inches): 21.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1707183912

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: Yes

Findings: Only the Operator responded to the request for information. Excavator damaged a service line with a
shovel while attempting to expose the line. The area of the damage was outside the requested scope of their ticket,
therefore they were digging without a valid request in the area of the incident.

Violation: IC 8-1-26-16(h)(out) Failure to provide notice of excavation - damage occurred outside requested
locate area.
STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: R L M Underground
Case Number: 16722
Report Date: 9/8/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/8/2017 12:00 AM Damage Address: 513 Chauncy Dr, Carmel

The Parties
Excavator: R L M Underground
Address: 4902 W 57th Street Roeland Park, KS 66205

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function:
Type of Equipment: Hand Tools Type of Work Performed: Cable TV

Damage Impact
Product Release: Service Interruption: -
Repair Cost (if known): Facility Depth (inches):

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Indiana 811 Ticket Number:

Excavator Notify Operator: Excavator Notify 811: Excavator Notify 911:

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Yes Operator: Yes

Findings: Excavator requested a dig ticket and the operator accurately marked. Excavator used a shovel. No
additional information was provided by either party that would indicate a violation of IC 8-1-26-20(a)(1).

Violation: Insufficient evidence to find violation.


STATE oy INDIANA

INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Vectren Energy Delivery
Case Number: 16726
Report Date: 9/1/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/9/2017 12:00 AM Damage Address: 3965 Chadwick, Carmel

The Parties
Excavator: International, Inc.
Address: 9971 Woodbend Dr. Saline, MI 48176

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes - 1
Repair Cost (if known): Facility Depth (inches): 24.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1707204420

Excavator Notify Operator: No Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: No

Findings: Excavator damaged a service line with a horizontal boring machine. They had a valid request at the
time of the incident. The operator failed to mark the line due to locator error.

Violation: IC 8-1-26-18(h) Operator failed to locate or provided incorrect locate markings.


STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Vectren Energy Delivery
Case Number: 16727
Report Date: 9/1/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/9/2017 12:00 AM Damage Address: 515 Chauncy Street, Carmel

The Parties
Excavator: R L M Underground
Address: 4902 W 57th Street Roeland Park, KS 66205

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes - 1
Repair Cost (if known): Facility Depth (inches): 28.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1707313932

Excavator Notify Operator: No Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: No

Findings: Excavator damaged a service line with a horizontal boring machine. They had a valid locate request at
the time of the incident. The operator failed to mark the line due to operator's incorrect maps/records.

Violation: IC 8-1-26-18(h) Operator failed to locate or provided incorrect locate markings.


STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: International, Inc.
Case Number: 16746
Report Date: 9/1/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/15/2017 12:00 AM Damage Address: 10328 Woods Edge Dr, Fishers

The Parties
Excavator: International, Inc.
Address: 9971 Woodbend Dr. Saline, MI 48176

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Hand Tools Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes -1
Repair Cost (if known): Facility Depth (inches): 30.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1708090723

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Yes Operator: Yes

Findings: Excavator damaged an accurately marked 1-inch service line with a shovel. Rather than using the
shovel in a standard fashion, the excavator used the shovel to drive through the ground, puncturing the line.
Excavator failed to take care and precaution to avoid damage.

Violation: IC 8-1-26-20(a)(1) Failure to plan excavation to avoid damage or interference with underground
facilities.
STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: International Inc.
Case Number: 16810
Report Date: 9/1/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/14/2017 12:00 AM Damage Address: 10430 Woodsedge Drive, Fishers

The Parties
Excavator: International Inc.
Address: 5395 Cogswell St Wayne, MI 48184

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function:
Type of Equipment: Hand Tools Type of Work Performed: Cable TV

Damage Impact
Product Release: Service Interruption: -
Repair Cost (if known): Facility Depth (inches):

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Indiana 811 Ticket Number:

Excavator Notify Operator: Excavator Notify 811: Excavator Notify 911:

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Operator:

Findings: Excavator requested a dig ticket and the operator accurately marked. Excavator used a shovel.
Excavator notes that the ground was hard and there were tree roots in the area. However, neither party has pictures
of the damaged line. Without that or some additional information, there is insufficient information to make a
finding of IC 8-1-26-20(a)(1), failure to plan.

Violation: Insufficient evidence to find violation.


STATE oy INDIANA



INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: International Inc.
Case Number: 16811
Report Date: 9/1/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/17/2017 12:00 AM Damage Address: 10168 Parkway Drive, Fishers

The Parties
Excavator: International Inc.
Address: 5395 Cogswell St Wayne, MI 48184

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function:
Type of Equipment: Hand Tools Type of Work Performed: Cable TV

Damage Impact
Product Release: Service Interruption: -
Repair Cost (if known): Facility Depth (inches):

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Indiana 811 Ticket Number:

Excavator Notify Operator: Excavator Notify 811: Excavator Notify 911:

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Operator:

Findings: Excavator damaged an accurately marked 1-inch service line with a shovel. Rather than using the
shovel in a standard fashion, the excavator used the shovel to drive through the ground, puncturing the line.
Excavator failed to take care and precaution to avoid damage.

Violation: IC 8-1-26-20(a)(1) Failure to plan excavation to avoid damage or interference with underground
facilities.
STATE oy INDIANA

INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: International Inc.
Case Number: 16812
Report Date: 9/5/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/24/2017 12:00 AM Damage Address: 10260 Night Hawk Dr, Fishers

The Parties
Excavator: International Inc.
Address: 5395 Cogswell St Wayne, MI 48184

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Distribution
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: Yes -3
Repair Cost (if known): Facility Depth (inches): 32.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1708092473

Excavator Notify Operator: Yes Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: Yes Operator: Yes

Findings: Excavator damaged a distribution main with a horizontal boring machine. They had a valid request at
the time of the incident. They damaged the line attempting a second pass with the bore head underneath the
exposed facility.

Violation: IC 8-1-26-20(a)(2) Failure to maintain two (2) feet clearance with mechanized equipment.
STATE oy INDIANA

INDIANAUTILITYREGULATORYCOMMISSION www.in.gov/iurc

101WESTWASHINGTONSTREET,SUITE1500EAST Office:(317)2322701

INDIANAPOLIS, INDIANA 462043419 Facsimile: (317) 2326758

Pipeline Safety Division Investigation Report


Investigation regarding: Vectren Energy Delivery
Case Number: 16813
Report Date: 9/1/2017 12:00 AM Investigator: Aaron Holeman
Damage Date: 8/24/2017 12:00 AM Damage Address: 10235 Bent Creek Ct, Fishers

The Parties
Excavator: R L M Underground
Address: 4902 W 57th Street Roeland Park, KS 66205

Facility Owner: Vectren Energy Delivery

Pipeline Facility
Facility Type: Natural Gas Facility Function: Service/Drop
Type of Equipment: Boring Type of Work Performed: Cable TV

Damage Impact
Product Release: Yes Service Interruption: No -
Repair Cost (if known): Facility Depth (inches): 36.0000

Excavator Activities/Cause of Damage Information:


Excavator Request Locates: Yes Indiana 811 Ticket Number: 1708093627

Excavator Notify Operator: Excavator Notify 811: Excavator Notify 911: Yes

Severity Circumstances Submitted by Excavator/Operator:


Excavator: No Operator: No

Findings: Excavator damaged a service line with a horizontal boring machine. They had a valid locate request at
the time of the incident. The operator failed to mark the line due to incorrect maps/records.

Violation: IC 8-1-26-18(h) Operator failed to locate or provided incorrect locate markings.


Common Ground Alliance Best Practice Recommendations

5.10 Locate Verification


Practice Statement: Prior to excavation, excavators verify that they are at the correct location,
verify locate markings and, to the best of their ability, check for unmarked facilities.
Practice Description: Upon arrival at the excavation site and prior to beginning the excavation,
an excavator does the following:

Verifies that the dig site matches the one call request and is timely
Verifies that all facilities have been marked and reviews color codes if in doubt
Verifies all service feeds from buildings and homes
Checks for any visible signs of underground facilities, such as pedestals, risers, meters, and
new trench lines
Checks for any facilities that are not members of the one call center and contact someone to
get them located.

Use of a pre-excavation checklist is recommended by insurers and practiced by responsible


excavating contractors.

5.12 Work Site Review with Company Personnel


Practice Statement: Prior to starting work, the excavator reviews the location of underground
facilities with site personnel.
Practice Description: Sharing information and safety issues during an on-site meeting between
the excavator and the excavating crews helps avoid confusion and needless damage to
underground facilities.

5.13 One Call Reference at Site


Practice Statement: Except in case of an emergency, the excavator at each job site has
available a complete description of the dig site, a list of the facility owner members impacted at
that dig site as identified by the one call center, and the one call center ticket number.
Practice Description: The availability of locate request details on site is useful because
excavators can easily access information about the location and extent of work, the valid start
time, and the list of operators notified. The documentation also provides an excavator with
appropriate information for daily tailgate meetings for crews; provides quick references for

Page 1 of 4
excavation equipment operators; and facilitates communications between the excavator and the
one call center with respect to that particular locate request, should it become necessary. When
multiple crews are working on the same project at separate locations or when different employers
have crews working at the same location, each crew has the information.

5.15 Facility Avoidance


Practice Statement: The excavator uses reasonable care to avoid damaging underground
facilities. The excavator plans the excavation so as to avoid damage or to minimize interference
with the underground facilities in or near the work area.
Practice Description: Foremost on any construction project is safety. Excavators using caution
around underground facilities significantly contribute to safe excavation of existing facilities.

5.17 Marking Preservation


Practice Statement: The excavator protects and preserves the staking, marking, or other
designation of underground facilities until no longer required for proper and safe excavation. The
excavator stops excavating and notifies the one call center for re-marks if any facility mark is
removed or is no longer visible.
Practice Description: During long, complex projects, the marks for underground facilities may
need to be in place far longer than the locating method is durable. Painting, staking, and other
marking techniques last only as long as the weather and other variables allow. When a mark is no
longer visible, but work continues around the facility, the excavator requests a re-mark to ensure
the protection of the facility.

5.18 Excavation Observer


Practice Statement: The excavator has an observer to assist the equipment operator when
operating excavation equipment around known underground facilities.
Practice Description: The excavator designates a worker (an observer) who watches the
excavation activity and warns the equipment operator while excavating around a utility to
prevent damaging that buried facility.

Page 2 of 4
5.20 Excavation within Tolerance Zone
Practice Statement: When excavation is to take place within the specified tolerance zone, the
excavator exercises such reasonable care as may be necessary for the protection of any
underground facility in or near the excavation area. Methods to consider, based on certain
climate or geographical conditions, include hand digging when practical (pot holing), soft
digging, vacuum excavation methods, pneumatic hand tools, other mechanical methods with the
approval of the facility owner/operator, or other technical methods that may be developed. Hand
digging and non-invasive methods are not required for pavement removal.
Practice Description: Safe, prudent, non-invasive methods that require the excavator to
manually determine the actual location of a facility are considered safe excavation practices in
a majority of state/provincial laws (38 states). A majority of states outline safe excavation
practices to include hand digging or pot holing (16 states). Some states specifically allow for the
use of power excavating equipment for the removal of pavement. Each state/province must take
differing geologic conditions and weather related factors into consideration when recommending
types of excavation within the tolerance zone.

5.29 Trenchless Excavation


Practice Statement: All stakeholders comply with all best practices and the following general
guidelines prior to, during, and after any trenchless excavation (as applicable).
Practice Description:
The excavator requests the location of underground facilities at the entrance pit, trenchless
excavation path, and the exit pit by notifying the facility owner/operator through the one call
center.
The trenchless equipment operator performs a site inspection, walking the trenchless
excavation path prior to commencing work, and has a good understanding of the job.
The trenchless excavation operator confirms and maintains the path and minimum
clearances established by the project owner and design engineer by tracking and recording
the path of the trenchless excavation until complete. Means of tracking trenchless
excavations include electronic locating/guidance devices, pipe lasers, water levels, visual
inspection, etc.
When existing facilities are known to be present but cannot be potholed as a result of local
conditions, the facility owner and the excavator meet to discuss how to safely proceed with
the excavation.
The excavator stops the trenchless excavation operations if an abnormal condition, unknown
substructure, or other hidden hazard is encountered. The excavator proceeds safely only

Page 3 of 4
after making positive identification. (Refer to Practice Statements 213 and 419 for
additional information.)

5.32 Vacuum Excavation


Practice Statement: Vacuum excavation, when used appropriately, is an efficient, safe, and
effective alternative to hand digging within the designated underground facility tolerance zone.
Use of equipment also follows state/provincial laws and/or local ordinances.
Practice Description: The safe exposure of underground facilities within the tolerance zone is
essential to damage prevention. Site conditions may make the use of hand tools to expose
underground facilities difficult or even impractical. Vacuum excavation is often an appropriate
alternative. Locates must be obtained prior to the commencement of work (see Practice
Statement 51). Many underground facility owners/operators have specific criteria for safe
excavation/exposure practices around their facilities. Some underground facility
owners/operators accept vacuum excavation as equivalent to hand excavation for exposing their
facilities, and others have restrictions on its use. Vacuum excavation is an appropriate method of
excavating safely around underground facilities provided that the equipment:
has been specifically designed and built for this purpose;
is operated by a worker trained and experienced in its operation;
is operated in accordance with practices that provide appropriate levels of worker and public
safety and prevent damage to buried facilities; and
is used in compliance with state/provincial laws and/or local ordinances

5.33 Facility Owner Provides a Monitor During Excavation


Practice Statement: If a facility owner/operator considers it necessary to be on site during
excavation activities to work with the excavator in protecting their existing facilities, the facility
owner/operator makes arrangements with the excavator to be present during those excavation
activities within the time specified by state/provincial law.
Practice Description: The facility owner/operator may determine it necessary to be on site
during excavation activities taking place near their facilities to help protect them. A facility
owner/operator has access to information and resources that may not be available to the
excavator. This practice should be considered in conjunction with Practice Statement 24: Utility
Coordination.