PO No. :
RFI REQUEST FOR INSPECTION
Project Name:
Reference No.: IR No.: Date:
Subject: Inspection of
TO: FROM:
POJECT STAGE/ WORKS TO BE INSPECTED (Submit One Project Stage or Type of work per form):
Building Facility:
Location: Drawing. No.: Drawing Attached:
Description:
The works involve the following trades (tick and initial as required) Contractors Authorized Signature
Surveying Civil/Structural QA/QC
MEP Architectural
Comments:
Architect
Civil Engineer
Structural Engineer
Materials Engineer
Mechanical Engineer
Electrical Engineer
Inspector/Supervisor
Surveyor
ENGINEERS COMMENTS
Signed by:
Portfolio Management | CM-FM Engineer
DOCUMENT STATUS
Code 2 Revise & resubmit for this STAGE. Work may proceed subject to
Code 1 Work may proceed to the NEXT Stage
incorporation of comments where indicated Acknowledgment
Code 3 STOP ALL Works Code 4 Practical Completion Achieved (To submit Completion Certificate) Receipt
IMPORTANT: Permission to proceed on behalf of Portfolio Management |CM-FM does not constitute acceptance or approval by Portfolio Management
Contractor
|CM-FM of design, calculations, analysis, tests, and methods of materials developed or selected by the Contractor and does not relieve him from
Stamp
compliance with his contractual obligations.
Portfolio Management |
CM-FM Stamp
Portfolio Management | CM-FM Engineer Signature Date