SUMMARY

INSPECTED PADDING SURVEY WATER INJECTION


PUMP AND CONDENSER TURBINE NO # 1
AND CONDENSER TURBINE NO # 1 AND CONDENSER
NO # 2 AND CONDENSER TURBINE NO # 2

SITE PROBLEM REMIDIAL TARGET


DESCRIPTION ACTION.

1. Position 1. Condenser # 1 1. Condenser #


1. Centerline Condenser In and 1,
and Port Not Condenser Condenser #
Dimensional Centre Line. # 2 2
Of Between Position And Pump
Condenser. Condenser Still Level Perfected.
For T/G # 1 # 1 and in Center Condition.
& T/G # 2 Condenser Line.
# 2.

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

Condenser 2. Line thru Lube


#2. Must Oil Tank. Ok.
be Same. 2. Installation
3. Manual From
2. Alignment Operation and Turbine
Of Water Maintenance Generator #
Injection 2. Oil Lube Tank Equipment 1 and
Pumps. must be Had been Turbine
T/G # 1 welded Done. Generator #
Connect to 2 Thru Main
Flange and Master
Leak Off Test. Steam valve
and Oil Lube
3. Gate Valves Tank .Ok
3. The must be Ok. 3. Leak Of test.
elevation of To Test Run Pipe Line,
Top Padding for Open and Condenser
Plate of Closed Valves. and Lube Oil
Cond. Tank and
Pumps. Pumps.
Will be Test.
Ok.

4. Operator
4. Last Professional
Drawing and
Approval. Experience
Must Be
Prefect.

5. Calibrated
Had been
5. Certificated done.
Equipment
Had been
Down.

INSPECTED OF TURBINE GENERATOR NO. # 1 #


( TO ENCLOSED UPPER CASING TURBINE GENERATOR
#1).
DESCRIPTION SITE PROBLEM REMEDIAL TARGET
ACTION 1. Closed

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

1. Padding Inspected Of Unit 1. Already Cover


Survey. Front Gland Checked Turbine
Clearance. The perfected.
2. Centerline Inspected.
Survey. Grade 1 : Ok. 2. Tightening
Bolts.
3. Pre 0 to 270 Degree : 2. Compared
Alignment = 0.50 ( a and b). Last 3. Installed
Generator Drawing Pipe Line
#1. Grade 2 : and Actual from TG 1
Inspected. Thru Lube
4. Pre 0 Degree : OK. Tank,
Alignment = 0.45 ( a and b). Condenser 1
Turbine # 1. 3. All and Master
90 -270 Degree : Equipment Steam
5. Last = 0.50 ( a and b). Cleaned Valves.
Drawing Out.
Approval. Grade 3 : Ok. 4. Installed AC
Aciter and
6. Certificate 0 Degree : 4. Closed Pipe Lines.
Had been = 0.50 ( a and b). Cover
done. Turbine. 5. Flushing
90 180 Degree : Ok. Pipe Lines.
7. Calibration = 0.60 ( a and b).
Equipments 6. Air Test
and Tools. 270 Degree : Line.
Had been = 0.50 ( a and b).
done. 7. Water Test
Grade 4 : Line.
8. Manual
Instruction 0 Degree : 8. Test Welded
from = 0.60 ( a and b). In Pipe
Fabricator. Lines.
Had been 90-180 Degree.
done. = 0.45 ( a and b). 9. Individual
Test.
9. SOP. 270 Degree.
= 0.55 ( a and b). 10.Manual
10.Safety Operation
Manual Had been
Procedure. Grade 5 : done.

11.Final 0 Degree :
Inspected = 0.50 ( a and b).
Before 11.Operator
assembled 90-180 Degree : Experience
and = 0.45 ( a and b). and
enclosed Excellent..
upper 270 Degree :
casing. = 0.55 ( a and b).

Grade 6 :

0 Degree :
= 0.57 ( a and b).
Mechanical Weekly Report
Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

Name : Marsaid.Arsyad / KSO - Mechanical Engineering.

Mechanical Weekly Report

Anda mungkin juga menyukai