A. TIMBUNAN / GALIAN
1 Tanah timbun /Merah 52,500.00 m
2 Pasir Timbun / Urug 70,400.00 m
3 Tanah Timbun 68,300.00 m
4 Pasir pasang 94,500.00 m
5 Pasir beton 94,400.00 m
6 Sirtu 96,600.00 m
7 Tanah Humus 89,300.00 m
B. BAHAN PEREKAT
1 Portland Cement (PC) 1,400.00 Kg
2 Portland Cement (PC) 56,000.00 zak
3 Cement putih 2,700.00 Kg
4 Cement putih 108,000.00 zak
5 Lem kayu 40,700.00 Kg
6 Lem Vynil / karet 48,800.00 Kg
7 Perekat kaca 83,000.00 Kg
8 Waterfroof 57,200.00 Kg
9 Kapur 3,700.00 Kg
C. BATU / BATU CETAKAN
1 Batu kerikil/koral 3-5 cm 215,300.00 m
2 Batu kerikil/koral 5-7 cm 199,500.00 m
3 Batu kerikil/koral 7-10 cm 181,700 m
4 Batu kerikil (A) 199,500.00 m
5 Batu belah/kali 10-15 cm 165,900.00 m
6 Batu belah/kali 15-20 cm 136,500.00 m
7 Batu pecah 1-2 cm 341,300.00 m
8 Batu pecah 2-3 cm 283,500.00 m
9 Batu pecah 3-5 cm 258,300.00 m
10 Batu pecah 5-7 cm 219,500.00 m
11 Batu kacang/jagung 0,5 - 1 cm 414,800.00 m
12 Batu splyt 404,300.00 m
13 Batu bata biasa 5x10x20 cm 650 Bh
14 Batu bata mesin 5x10x20 cm 750 Bh
15 Batu bataco 6x12x24 cm 4,600.00 Bh
16 Batu krawang 10x10x20 cm 3,300.00 Bh
17 Batu krawang 10x15x15 cm 3,800.00 Bh
18 Batu krawang 10x20x20 cm 4,100.00 Bh
19 Concrete block (CB) 10 800 Bh
20 Concrete block (CB) 15 1,800.00 Bh
21 Concrete block (CB) 20 3,400.00 Bh
22 Bondbeam 40x20x20 cm 33,600.00 Bh
23 Con block warna type holland tb 6 cm 1,900.00 Bh
24 Con block warna type uni pave tb 6 cm 1,800.00 Bh
25 Con block warna type dosex six tb 6 cm 2,000 Bh
26 Con block warna type hexagon tb 6 cm 1,900.00 Bh
27 Con block K 125 1,900.00 Bh
28 Con block K 175 2,900.00 Bh
E. BESI / ALUMINIUM
1 Besi beton polos 15,700.00 Kg
2 Besi beton ulir 15,900.00 Kg
3 Besi profil WF/INP 17,400.00 Kg
4 Besi siku 14,800.00 Kg
5 Besi CNP 18,200.00 Kg
6 Besi plat strip 14,800.00 Kg
7 Besi plat polos 14,900.00 Kg
8 Kawat besi beton 18,300.00 Kg
9 Kawat licin / seng polos 24,500.00 Kg
10 Kawat duri 4,700.00 M'
11 Kawat nyamuk 13,100.00 M2
12 Kawat kasa 15,200.00 M2
13 Kawat harmonia 25,700.00 M2
14 Kawat burug 14,200.00 M2
15 Pagar kawat BRC 120 polos 256,200.00 Lbr
16 Pintu besi 887,300.00 M2
17 Pintu gulung besi 899,900.00 M2
18 Pintu lipat besi 909,300.00 M2
19 Pintu rolling door 506,100.00 M2
20 Jerajak besi bermotif 377,000.00 M2
21 Jerajak besi strip 339,200.00 M2
22 Rangka baja ringan 193,200.00 M2
23 Rangka atap twin light 309,800.00 M2
24 Kosen pintu aluminium (80x210 )coklat 440,000.00 Bh
25 Kosen pintu aluminium (80x210 )putih 403,200.00 Bh
26 Kosen jendela aluminium (120x60)coklat 311,900.00 Bh
27 Kosen jendela aluminium (120x60)putih 268,800.00 Bh
28 Pintu aluminium (80x210) coklat 772,800.00 Bh
29 Pintu aluminium (80x210) putih 662,600.00 Bh
30 Jendela aluminium + kaca 5mm (120x60)coklat 330,800.00 Bh
31 Jendela aluminium + kaca 5mm (120x60)putih 283,500.00 Bh
32 Kosen pintu /jendela aluminium coklat 83,000.00 M2
33 Kosen pintu /jendela aluminium putih 71,400.00 M2
34 Daun jendela aluminium coklat 58,800.00 M2
35 Daun jendela aluminium putih 52,500.00 M2
36 Profil aluminium T 9,500.00 M'
37 Ventions blinds 177,500.00 M2
38 Verticals blinds 190,100.00 M2
39 Bingkai naco nikl hitam 218,400.00 M2
40 Bingkai naco nikl putih 131,700.00 M2
41 Paku beton 0,5-2" 400 Bh
42 Paku beton 2"-5" 600 Bh
43 Paku biasa 0,5-2" 18,400.00 Kg
44 Paku biasa 2"-5" 16,300.00 Kg
45 Sekrup macam ukuran 22,100.00 Kg
46 Sekrup 0,5-2" 500 Bh
47 Sekrup fisher 400 Bh
48 Baut 5/8"-8" 21,500.00 Bh
49 Baut angker 3/4"-10" 49,400.00 Bh
50 Baut ramset /dina bolt 800 Bh
G. PENUTUP ATAP
1 Atap Genteng Palentong 1,800.00 Bh
2 Atap Genteng Palentong super 4,400.00 Bh
3 Atap Genteng Kodok 2,400.00 Bh
4 Atap Genteng Beton 6,500.00 Bh
5 Atap Genteng Keramik 12,400.00 Bh
6 Atap Genteng Aspal 12,300.00 Lbr
7 Atap Genteng Metal/Multi roof 35 131,600.00 M2
8 Atap Genteng Asbes cement 62,100.00 M2
9 Atap Genteng Sirap 1,300.00 Bh
10 Atap Aluminium gelombang tebal 0,55 106,700.00 M2
11 Atap seng Alumi Zinc warna 0,35 67,700.00 M2
12 Atap Genteng Twin Light 65,100.00 M2
13 Atap Seng Gelombang 3'x6' bjls 35 64,800.00 M2
14 Atap Seng Super Deck3'x6' bjls 0,30 80,000.00 M2
15 Rooflight fibreglass gelombang 55,100.00 M2
16 Atap Asbes gelombang 1,8x1,05 tbl. 4mm 64,600.00 Lbr
17 Atap Asbes gelombang 2,1x1,05 tbl. 4mm 101,300.00 Lbr
18 Atap Asbes gelombang 2,4x1,05 tbl. 4mm 117,500.00 Lbr
19 Atap Asbes gelombang 2,7x1,05 tbl. 4mm 123,200.00 Lbr
20 Atap Asbes gelombang 1,8x0,92 tbl. 5mm 77,100.00 Lbr
21 Atap Asbes gelombang 2,1x0,92 tbl. 5mm 96,500.00 Lbr
22 Atap Asbes gelombang 2,4x0,92 tbl. 5mm 105,500.00 Lbr
23 Atap Asbes gelombang 2,7x0,92 tbl. 5mm 116,100.00 Lbr
24 Atap Asbes gelombang 1,8x1,08 tbl. 6mm 112,600.00 Lbr
25 Atap Asbes gelombang 2,1x1,08 tbl. 6mm 130,900.00 Lbr
26 Atap Asbes gelombang 2,4x1,08 tbl. 6mm 139,500.00 Lbr
27 Atap Asbes gelombang 2,7x1,08 tbl. 6mm 168,900.00 Lbr
28 Atap asbes motif genteng 36,800.00 Lbr
29 Genteng Bubung palentong 10,200.00 Bh
30 Genteng Bubung palentong super 13,900.00 Bh
31 Genteng Bubung kodok 10,400.00 Bh
32 Rabung seng BJLS 35 K 39,400.00 M'
33 Nok Genteng beton 14,600.00 Bh
34 Nok Genteng keramik 16,400.00 Bh
35 Nok Genteng aspal 31,900.00 Bh
36 Nok Genteng Metal/Multiroof (decra bond) 58,800.00 Bh
37 Nok Genteng Asbes cement 0,35 36,800.00 Lbr
38 Nok Aluminium standard 40cm 18 swg22 52,100.00 M2
39 Bubung/Nok stel Gelombang 0,92 m' tbl.5 mm 21,300.00 Lbr
40 Bubung/Nok stel Gelombang 1,05 m' tbl.4 mm 28,200.00 Lbr
41 Bubung/Nok stel Gelombang 1,08 m' tbl.6 mm 31,000.00 Lbr
42 Bubung/Nok Paten 0,92 m' tbl.5 mm 40,000.00 Lbr
43 Bubung/Nok Paten 1,05 m' tbl.4 mm 33,600.00 Lbr
44 Bubung/Nok Paten 1,08 m' tbl.6 mm 46,700.00 Lbr
45 Bubung/Nok Stel Rata 0,92 m' tbl.5 mm 39,200.00 Lbr
46 Bubung/Nok Stel Rata 1,05 m' tbl.4 mm 32,900.00 Lbr
47 Bubung/Nok Stel Rata 1,08 m' tbl.6 mm 44,100.00 Lbr
48 Seng Plat 3" x 6" bjls 35 125,500.00 Lbr
49 Seng Plat 3" x 6" bjls 30 113,000.00 Lbr
50 Plastic aerator 29,900.00 Bh
51 Sisalation / aluminium foil 83,900.00 M2
52 Paku seng +Ring karet 22,200.00 Kg
53 Paku seng +Ring karet 500 Bh
54 Paku hak panjang 15 cm 33,200.00 Kg
55 Lat Asbes 8,100.00 Bh
I CAT / MINYAK
1 Cat dasar 17,100.00 Kg
2 Cat Tembok setara Vinilex (putih) 20,500.00 Kg
3 Cat Tembok setara Vinilex (warna) 41,500.00 Kg
4 Cat Minyak untuk kayu 38,800.00 Kg
5 Cat Minyak untuk besi 42,800.00 Kg
6 Cat Menie kayu 27,800 Kg
7 Cat Menie besi 28,900.00 Kg
8 Cat sending 59,200.00 Kg
9 Cat Melamix 64,500.00 Kg
10 Cat Vernis jadi 52,500.00 Kg
11 Plamir 17,100.00 Kg
12 Dempul Gypsum 11,300.00 Kg
13 Dempul Cat 12,900.00 Kg
14 Tinner 12,000.00 Ltr
15 Minyak belkisting 6,900.00 Ltr
16 Minyak Solar 5,700.00 Ltr
17 Minyak Silinder 34,100.00 Ltr
18 Minyak Gerdang 29,400.00 Ltr
19 Minyak gemuk 34,700.00 Ltr
20 Residu/kolter 7,100.00 Ltr
21 Soda Api 13,200.00 Ltr
22 Sabun 11,200.00 Kg
23 Kuas 8,600.00 Bh
24 Ampelas / kertas pasir 2,000.00 Lbr
25 Wall paper 33,300.00 m2
J. SANITASI / PIPA
1 Kloset duduk /menoblok lengkap tangki 2,099,200.00 Bh
2 Kloset duduk /menoblok tanpa tangki 1,512,300.00 Bh
3 Kloset jongkok porselin 244,900.00 Bh
4 Bakkif Porselin 3,287,400.00 Bh
5 Wastafel 572,000.00 Bh
6 Urinoir 605,900.00 Bh
7 Kran air 1/2" - 3/4" 29,800.00 Bh
8 Kran air leher angsa 1/2" 83,900.00 Bh
9 Kran shower 131,300.00 Bh
10 Kran cebok 78,500.00 Bh
11 Bak fibreglass 0,3 M3 288,800.00 Bh
12 Bak fibreglass 1 M3 577,500.00 Bh
13 Bak cuci piring stainless 2 lobang 507,200.00 Bh
14 Bak cuci piring teraso 2 lobang 295,900.00 Bh
15 Tempat sabun keramik 61,200.00 Bh
16 Floor drain 4" stainless 16,300.00 Bh
17 Stop Kran 3/4" 29,900.00 Bh
18 Tutup bak air 1" kuningan 13,600.00 Bh
19 Instalasi air bersih 109,000.00 Ttk
20 Instalasi air kotor/limbah 135,900.00 Ttk
21 Buls Beton 1/2 15 cm 12,200.00 M'
22 Buls Beton 1/2 20 cm 19,400.00 M'
23 Buls Beton 1/2 30 cm 21,800.00 M'
24 Buls Beton 15 cm 20,900.00 M'
25 Buls Beton 20 cm 29,800.00 M'
26 Buls Beton 30 cm 61,200.00 M'
27 Buls Beton 40 cm 68,900.00 M'
28 Buls Beton 50 cm 104,300.00 M'
29 Buls Beton 60 cm 147,800.00 M'
30 Buls Beton 80 cm 218,600.00 M'
31 Buls Beton 100 cm 375,800.00 M'
32 Bodeam 30x60 cm 27,500.00 Bh
33 Pipa PVC Tipe AW 1/2" 6,000.00 M'
34 Pipa PVC Tipe AW 3/4" 8,100.00 M'
35 Pipa PVC Tipe AW 1" 14,800.00 M'
36 Pipa PVC Tipe AW 1 1/2" 21,400.00 M'
37 Pipa PVC Tipe AW 2" 25,200.00 M'
38 Pipa PVC Tipe AW 2 1/2" 29,000.00 M'
39 Pipa PVC Tipe AW 3" 32,400.00 M'
40 Pipa PVC Tipe AW 4" 54,300.00 M'
41 Pipa Besi Hitam 1/2" 16,100.00 M'
42 Pipa Besi Hitam 3/4" 21,900.00 M'
43 Pipa Besi Hitam 1" 32,100.00 M'
44 Pipa Besi Hitam 1 1/2" 40,800.00 M'
45 Pipa Besi Hitam 2" 51,800.00 M'
46 Pipa Besi Hitam 2 1/2" 54,600.00 M'
47 Pipa Galvanis 1/2" 16,100.00 M'
48 Pipa Galvanis 3/4" 21,900.00 M'
49 Pipa Galvanis 1" 32,100.00 M'
50 Pipa Galvanis 1 1/4" 36,500.00 M'
51 Pipa Galvanis 1 1/2" 40,800.00 M'
52 Pipa Galvanis 2" 51,800.00 M'
53 Pipa Galvanis 2 1/2" 57,000.00 M'
54 Fitting Pipa AW 1" yg terdiri dari :
Knee AW 1" 5,700.00 Bh
Tee AW 1" 7,800.00 Bh
Souch AW 1" 5,100.00 Bh
Boucht LL-D 1" 26,900.00 Bh
Union Socht 1" 8,100.00 Bh
D-Nipple 1" 19,700.00 Bh
K. LISTRIK / ACSESORIES
1 Lampu TL 1x20 W Lengkap Kotak 59,300.00 Set
2 Lampu TL 1x40 W Lengkap Kotak 65,900.00 Set
3 Lampu TL 2x20 W Lengkap Kotak 178,000.00 Set
4 Lampu TL 2x40 W Lengkap Kotak 200,000.00 Set
5 Lampu TL Bambu 1x20 W Lengkap 118,400.00 Set
6 Lampu TL Bambu 1x40 W Lengkap 134,200.00 Set
7 Lampu XL 5 W+Fitting 27,800.00 Set
8 Lampu XL 8 W+Fitting 29,900.00 Set
9 Lampu XL 10 W+Fitting 31,500.00 Set
10 Lampu XL 14 W+Fitting 36,200.00 Set
11 Lampu XL 18 W+Fitting 36,800.00 Set
12 Lampu XL 24 W+Fitting 42,000.00 Set
13 Lampu Downlight 5 W Lengkap 59,300.00 Set
14 Lampu Pijar 5w + Fitting 9,200.00 Set
15 Lampu Pijar 10w + Fitting 9,500.00 Set
16 Lampu Pijar 15w + Fitting 10,200.00 Set
17 Lampu Pijar 20w + Fitting 11,000.00 Set
18 Lampu Pijar 25w + Fitting 11,600.00 Set
19 Lampu Pijar 40w + Fitting 12,600.00 Set
20 Stop kontak tanam 11,200.00 Bh
21 Saklar tunggal 15,800.00 Bh
22 Saklar ganda 17,100.00 Bh
23 Saklar Triple 19,700.00 Bh
24 Zekring box 1 grup 29,000.00 Unit
25 Zekring box 2 grup 34,000 Unit
26 Zekring box 3 grup 41,800.00 Unit
27 Zekring box 4 grup 50,400.00 Unit
28 MCB 2 Ampere 38,300.00 Unit
29 MCB 4 Ampere 46,700.00 Unit
30 MCB 6 Ampere 73,800.00 Unit
31 MCB 8 Ampere 107,800.00 Unit
32 Kabel listrik NYA 1,5 mm 1,300.00 M'
33 Kabel listrik NYA 2,5 mm 2,100.00 M'
34 Kabel listrik NYA 4 mm 9,000.00 M'
35 Kabel listrik NYM 2 1,5 mm 4,400.00 M'
36 Kabel listrik NYM 2 2,5 mm 10,900.00 M'
37 Kabel listrik NYM 2 4 mm 17,400.00 M'
38 Instalasi Listrik titik api / lampu nyala 110,300.00 Ttk
/
1 Anl. A.1 1 m Galian Tanah Keras :
0.7500 Pekerja
0.0250 Mandor
10 Anl. F.16 1 M2 Rangka atap (pasang usuk dan reng untuk atap genteng dan sirap)
0.1000 Pekerja
0.0050 Mandor
0.1000 Tukang
0.0100 Kepala Tukang
0.0147 M3 Kayu Meranti
0.2500 Kg Paku biasa 2"-5"
11 Anl.F.16.a 1 M2 Rangka atap genteng biasa/genteng semen (pasang usuk, reng dan gording)
0.1500 Pekerja
0.0075 Mandor
0.1000 Tukang
0.0100 Kepala Tukang
0.0250 M3 Kayu Meranti
0.1000 Kg Paku biasa 2"-5"
14 Anl.F.21 1 M2 Lystplank
0.2800 Pekerja
0.0140 Mandor
0.8000 Tukang
0.0800 Kepala Tukang
0.0240 M3 Papan Kayu Damar Laut
0.1000 Kg Paku biasa 0,5"-2"
15 Anl.F.22 1 M3 Konstruksi Kayu Kuda-Kuda
Upah :
8.0000 Pekerja
0.4000 Mandor
24.0000 Tukang
2.4000 Kepala Tukang
Bahan :
1.1000 M3 Kayu damar laut
0.0240 M3 Papan Kayu meranti batu
1.0000 Kg Paku biasa 2"-5"
18 Anl.F.28 1 M3 Kozen yang berlobang cahaya berbentuk busur
Upah :
14.0000 Pekerja
0.7000 Mandor
42.0000 Tukang
4.2000 Kepala Tukang
Bahan :
1.1000 M3 Kayu damar laut
Bahan :
0.0440 M3 Kayu meranti batu
20 Anl. F.30 1 M2 Daun Pintu triplek 4mm double rangka kayu meranti
Upah :
1.3000 Pekerja
0.0650 Mandor
4.0000 Tukang
0.4000 Kepala Tukang
Bahan :
0.0250 M3 Kayu meranti
1.0000 Lbr Triplek 4mm
0.2000 Kg Paku biasa 0,5"-2"
21 Anl.F.30a 1 M2 Daun Pintu Triplek Sungkai Double Rangka Kayu Meranti :
Upah :
1.3000 Pekerja
0.0650 Mandor
4.0000 Tukang
0.4000 Kepala Tukang
Bahan :
0.0250 M3 Kayu meranti
1.0000 Lbr Triplek sungkai
0.2500 Kg Paku biasa 0.5"-2"
Bahan :
0.0198 M3 Papan Kayu Meranti
0.2000 Kg Paku biasa 2"-5"
40 Anl G. 42 1M3 Beton cor 1:2:4 dipakai untuk lantai ubin,beton yang dicor dibawah air'
lapisan turap diatas pasangan-pasangan yang dimiringkan tebal 6 cm
6.0000 Pekerja
0.3000 Mandor
0.5000 Tukang
0.0500 Kepala Tukang
0.9600 M3 Batu kerikil (A)
0.4800 M3 Pasir pasang
7.4630 Zak Semen PC
Bahan :
3.3330 Bh Plint tegel 10x30 cm
0.0765 Zak Semen PC
0.0070 M3 Pasir pasang
1.1250 Upah
Bahan :
6.2500 Bh Keramik Essenza 40x40 cm
0.1419 Zak Semen PC
0.0020 Zak Semen Putih
2.4000 Kg Kapur
0.0230 M3 Pasir Pasang
61 Anl.G.72e 1M2 Pasang Lantai Keramik Essenza 60x60 cm
Upah :
0.5000 Pekerja
0.0250 Mandor
0.2500 Tukang
0.0250 Kepala Tukang
1.2500 Upah
Bahan :
2.7800 Bh Keramik Essenza 60x60 cm
0.1419 Zak Semen PC
0.0020 Zak Semen Putih
2.4000 Kg Kapur
0.0230 M3 Pasir Pasang
1.0000 Upah
Bahan :
11.1100 Bh Granito 30x30 cm
0.1419 Zak Semen PC
0.0020 Zak Semen Putih
2.4000 Kg Kapur
0.0230 M3 Pasir Pasang
1.2500 Upah
Bahan :
2.7800 Bh Keramik Essenza 60x60 cm
0.1419 Zak Semen PC
0.0020 Zak Semen Putih
2.4000 Kg Kapur
0.0230 M3 Pasir Pasang
Bahan :
50.0000 Bh Keramik 10x20 cm
0.0150 Perekat (G.14)
66 Anl.Supl.Iva 1M2 Pas,Keramik dinding Uk. 20x20 cm
1.0000 Pekerja
0.0500 Mandor
0.5000 Tukang
0.0500 Kepala Tukang
25.0000 Bh Keramik 20x20 cm
0.0150 Perekat (G.14)
Upah = 0.50 x
utk 10 M2 = 10 x
Himpunan Supl.V
1.Anl.G.41
2.Anl.I.2
3.Anl.F.8
103 Anl.L.4 Membongkar 1 M3 dinding tembok yang tipis berikut membersihkan batas-batasnya
2.0000 Pekerja
0.1000 Mandor
112 Anl.W.1 1 M3 Timbunan pasir timbun untuk dasar badan jalan dan digilas padat
0.3750 Pekerja
0.0190 Mandor
1.2000 M3 Pasir Urug
0.0005 0.0001 Biaya gilas
113 Anl.W.1a 1M3 Timbunan Sirtu/kerikil kotor dipadatkan dengan mesin gilas
0.3750 Pekerja
0.0190 Mandor
1.1000 M3 Pasir Urug
0.0005 0.0001 Biaya gilas
114 Anl.W.2 1M2 Memasang sub base/onderlaag batu kali tebal 15-20 cm padat
0.3750 Pekerja
0.0190 Mandor
0.2000 M3 Batu kali 15-20 cm
0.0500 M3 Pasir Urug
0.0001 Biaya gilas
untuk 1 M2 0.01
utk tbl 5 cm 0.8333
116 Anl.W.3a 100 M2 Lapisan Base course/slytlaag batu pecah tebal 6 cm dipadatkan
7.5000 Pekerja
0.3750 Mandor
8.0000 M3 Batu pecah 2-3 cm
2.0000 M3 Pasir Urug
0.0267 Biaya gilas
untuk 1 M2 0.0100
utk tbl 5 cm 0.8333
119 Anl.W.7 100 M2 Mengaspal II jalan dengan aspal 1,5Kg/M2 dan digilas padat
8.0000 Pekerja
0.4000 Mandor
150.0000 Kg Aspal AC 60/70
1.2000 M3 Splyt/kepala pasir
0.5000 M3 Kayu Api
0.3000 Tempat memasak aspal
0.0013 Biaya gilas
alat-alat mengaspal
untuk 1 M2 0.0100 x
120 Anl.W5+W.7 1 M2 Mengaspal Idan II permukaan badan jalan dengan aspal 4 Kg/ M2
(2,5 Kg/M2+1,5Kg/M2)2 kali siram
W.5 Mengaspal I
W.7 Mengaspal II
untuk 1 M2 0.0100 x
122 Anl.W.7a 100 M2 Mengaspal Iijalan dengan aspal 1 Kg/M2 dan digilas padat
8.0000 Pekerja
0.4000 Mandor
100.0000 Kg Aspal AC 60/70
1.2000 M3 Splyt/kepala pasir
0.4000 M3 Kayu api
0.3000 Tempat memasak aspal
0.0013 Biaya gilas
alat-alat mengaspal
untuk 1 M2 0.0100 x
41,015.00 10,253.75
Jumlah 10,253.75
di bulatkan 10,254.00
52,500.00 52,500.00
65,600.00 2,164.80
Jumlah 54,664.80
di bulatkan 54,665.00
52,500.00 17,325.00
65,600.00 656.00
Jumlah 17,981.00
di bulatkan 17,981.00
52,500.00 15,750.00
65,600.00 656.00
70,400.00 84,480.00
Jumlah 100,886.00
di bulatkan 100,886.00
52,500.00 15,750.00
65,600.00 656.00
68,300.00 81,960.00
Jumlah 98,366.00
di bulatkan 98,366.00
52,500.00 15,750.00
65,600.00 656.00
96,600.00 144,900.00
Jumlah 161,306.00
di bulatkan 161,306.00
52,500.00 262,500.00
65,600.00 16,400.00
78,800.00 1,182,000.00
91,900.00 137,850.00
1,598,750.00
1,598,750.00 799,375.00
5,678,300.00 6,246,130.00
16,300.00 3,260.00
6,249,390.00
Jumlah 7,048,765.00
di bulatkan 7,048,765.00
52,500.00 14,700.00
65,600.00 918.40
78,800.00 63,040.00
91,900.00 7,352.00
86,010.40
86,010.40 103,212.48
$ 10,188,300.00 203,766.00
16,300.00 3,260.00
Jumlah 310,238.48
di bulatkan 310,238.00
52,500.00 787.50
65,600.00 492.00
78,800.00 7,880.00
91,900.00 919.00
5,678,300.00 62,461.30
16,300.00 1,630.00
Jumlah 74,169.80
di bulatkan 74,170.00
52,500.00 14,700.00
65,600.00 918.40
78,800.00 63,040.00
91,900.00 7,352.00
10,487,100.00 251,690.40
18,400.00 1,840.00
Jumlah 339,540.80
di bulatkan 339,541.00
52,500.00 420,000.00
65,600.00 26,240.00
78,800.00 1,891,200.00
91,900.00 220,560.00
2,558,000.00
2,558,000.00 1,279,000.00
10,161,100.00 11,177,210.00
Jumlah 12,456,210.00
di bulatkan 12,456,210.00
52,500.00 630,000.00
65,600.00 39,360.00
78,800.00 2,836,800.00
91,900.00 330,840.00
3,837,000.00
3,837,000.00 1,918,500.00
10,161,100.00 11,177,210.00
Jumlah 13,095,710.00
di bulatkan 13,095,710.00
52,500.00 630,000.00
65,600.00 39,360.00
78,800.00 2,836,800.00
91,900.00 330,840.00
3,837,000.00
3,837,000.00 1,918,500.00
10,161,100.00 11,177,210.00
10,188,300.00 244,519.20
16,300.00 16,300.00
11,438,029.20
Jumlah 13,356,529.20
di bulatkan 13,356,529.00
52,500.00 735,000.00
65,600.00 45,920.00
78,800.00 3,309,600.00
91,900.00 385,980.00
4,476,500.00
4,476,500.00 2,238,250.00
10,161,100.00 11,177,210.00
Jumlah 13,415,460.00
di bulatkan 13,415,460.00
52,500.00 131,250.00
65,600.00 8,200.00
78,800.00 591,000.00
91,900.00 68,925.00
799,375.00
799,375.00 399,687.50
10,188,300.00 448,285.20
Jumlah 847,972.70
di bulatkan 847,973.00
ka kayu meranti
52,500.00 68,250.00
65,600.00 4,264.00
78,800.00 315,200.00
91,900.00 36,760.00
424,474.00
424,474.00 212,237.00
5,678,300.00 141,957.50
56,400.00 56,400.00
18,400.00 3,680.00
202,037.50
Jumlah 414,274.50
di bulatkan 414,275.00
52,500.00 68,250.00
65,600.00 4,264.00
78,800.00 315,200.00
91,900.00 36,760.00
424,474.00
424,474.00 233,460.70
5,678,300.00 141,957.50
92,900.00 92,900.00
18,400.00 4,600.00
239,457.50
Jumlah 472,918.20
di bulatkan 472,918.00
52,500.00 157,500.00
65,600.00 9,840.00
78,800.00 709,200.00
91,900.00 82,710.00
959,250.00
959,250.00 479,625.00
16,300.00 5,194.81
9,862,300.00 631,187.20
636,382.01
Jumlah 1,116,007.01
di bulatkan 1,116,007.00
52,500.00 105,000.00
65,600.00 6,560.00
78,800.00 472,800.00
91,900.00 55,140.00
639,500.00
639,500.00 319,750.00
157,800.00 157,800.00
9,862,300.00 345,180.50
502,980.50
Jumlah 822,730.50
di bulatkan 822,731.00
52,500.00 14,700.00
65,600.00 918.40
78,800.00 63,040.00
91,900.00 7,352.00
86,010.40
86,010.40 64,507.80
5,950,000.00 117,810.00
16,300.00 3,260.00
121,070.00
Jumlah 185,577.80
di bulatkan 185,578.00
52,500.00 14,700.00
65,600.00 918.40
78,800.00 63,040.00
91,900.00 7,352.00
86,010.40
86,010.40 43,005.20
5,950,000.00 111,265.00
16,300.00 3,260.00
114,525.00
Jumlah 157,530.20
di bulatkan 157,530.00
52,500.00 14,700.00
65,600.00 918.40
78,800.00 63,040.00
91,900.00 7,352.00
86,010.40
86,010.40 25,803.12
5,678,300.00 78,360.54
56,400.00 19,740.00
18,400.00 2,760.00
100,860.54
Jumlah 126,663.66
di bulatkan 126,664.00
52,500.00 14,700.00
65,600.00 918.40
78,800.00 63,040.00
91,900.00 7,352.00
86,010.40
86,010.40 34,404.16
5,678,300.00 78,360.54
56,400.00 39,480.00
18,400.00 4,600.00
122,440.54
Jumlah 156,844.70
di bulatkan 156,845.00
a kayu meranti
52,500.00 7,350.00
65,600.00 4,592.00
78,800.00 31,520.00
91,900.00 3,676.00
5,678,300.00 85,174.50
92,900.00 74,320.00
18,400.00 4,600.00
Jumlah 211,232.50
di bulatkan 211,233.00
kayu meranti
52,500.00 7,350.00
65,600.00 4,592.00
78,800.00 31,520.00
91,900.00 3,676.00
5,678,300.00 70,978.75
92,900.00 37,160.00
18,400.00 4,600.00
Jumlah 159,876.75
di bulatkan 159,877.00
njang 2,5 M
52,500.00 52,500.00
65,600.00 3,280.00
78,800.00 236400 Pekerja Pekerja
91,900.00 27570 Mandor Mandor
20,900.00 156750 Tukang Tukang
24,500.00 12250 Kepala Tuk Kepala Tuk
Jumlah 488,750.00
di bulatkan 488,750.00
52,500.00 78,750.00
65,600.00 4,920.00
215,300.00 236,830.00
Jumlah 320,500.00
di bulatkan 320,500.00
56,000.00 822,528.00
94,500.00 89,775.00
Jumlah 912,303.00
di bulatkan 912,303.00
56,000.00 629,944.00
94,500.00 102,060.00
Jumlah 732,004.00
di bulatkan 732,004.00
52,500.00 189,000.00
65,600.00 11,808.00
78,800.00 94,560.00
91,900.00 11,028.00
165,900.00 199,080.00
56,000.00 216,580.00
94,500.00 45,927.00
Jumlah 767,983.00
di bulatkan 767,983.00
52,500.00 189,000.00
65,600.00 11,808.00
78,800.00 94,560.00
91,900.00 11,028.00
165,900.00 199,080.00
56,000.00 228,004.00
94,500.00 49,329.00
Jumlah 782,809.00
di bulatkan 782,809.00
52,500.00 236,250.00
65,600.00 14,760.00
78,800.00 118,200.00
91,900.00 13,785.00
650 468,000.00
56,000.00 177,312.80
94,500.00 38,367.00
Jumlah 1,066,674.80
di bulatkan 1,066,675.00
52,500.00 236,250.00
65,600.00 14,760.00
78,800.00 118,200.00
91,900.00 13,785.00
650 468,000.00
56,000.00 288,215.20
94,500.00 31,468.50
Jumlah 1,170,678.70
di bulatkan 1,170,679.00
52,500.00 315,000.00
65,600.00 19,680.00
78,800.00 78,800.00
91,900.00 9,190.00
199,500.00 165,585.00
94,500.00 51,030.00
56,000.00 476,000.00
Jumlah 1,115,285.00
di bulatkan 1,115,285.00
52,500.00 315,000.00
65,600.00 19,680.00
78,800.00 78,800.00
91,900.00 9,190.00
199,500.00 155,610.00
94,500.00 43,942.50
56,000.00 542,399.20
Jumlah 1,164,621.70
di bulatkan 1,164,622.00
52,500.00 315,000.00
65,600.00 19,680.00
78,800.00 39,400.00
91,900.00 4,595.00
199,500.00 199,500.00
94,500.00 47,250.00
56,000.00 350,095.20
Jumlah 975,520.20
di bulatkan 975,520.00
52,500.00 315,000.00
65,600.00 19,680.00
78,800.00 39,400.00
91,900.00 4,595.00
199,500.00 199,500.00
56,000.00 296,548.00
94,500.00 47,250.00
Jumlah 921,973.00
di bulatkan 921,973.00
52,500.00 21,000.00
65,600.00 1,312.00
78,800.00 11,820.00
91,900.00 1,378.50
56,000.00 9,996.00
94,500.00 1,077.30
Jumlah 46,583.80
di bulatkan 46,584.00
52,500.00 21,000.00
65,600.00 1,312.00
78,800.00 15,760.00
91,900.00 1,838.00
56,000.00 14,996.80
94,500.00 1,615.95
Jumlah 56,522.75
di bulatkan 56,523.00
52,500.00 21,000.00
65,600.00 1,312.00
78,800.00 15,760.00
91,900.00 1,838.00
56,000.00 11,424.00
94,500.00 1,833.30
Jumlah 53,167.30
di bulatkan 53,167.00
52,500.00 21,000.00
65,600.00 1,312.00
78,800.00 11,820.00
91,900.00 1,378.50
56,000.00 7,543.20
94,500.00 1,228.50
Jumlah 44,282.20
di bulatkan 44,282.00
52,500.00 21,000.00
65,600.00 1,312.00
78,800.00 11,820.00
91,900.00 1,378.50
56,000.00 6,070.40
94,500.00 1,313.55
Jumlah 42,894.45
di bulatkan 42,894.00
52,500.00 21,000.00
65,600.00 1,312.00
78,800.00 15,760.00
91,900.00 1,838.00
56,000.00 9,116.80
94,500.00 1,975.05
Jumlah 51,001.85
di bulatkan 51,002.00
52,500.00 21,000.00
78,800.00 7,880.00
1,900.00 87,400.00
94,500.00 11,340.00
Jumlah 127,620.00
di bulatkan 127,620.00
52,500.00 15,750.00
65,600.00 984.00
78,800.00 7,880.00
91,900.00 919.00
Jumlah 25,533.00
3,200.00 10,665.60
56,000.00 4,284.00
94,500.00 661.50
Jumlah 15,611.10
Jumlah U + B 41,144.10
di bulatkan 41,144.00
4,700.00 15,665.10
56,000.00 4,284.00
94,500.00 661.50
25,533.00 28,086.30
Jumlah 48,696.90
di bulatkan 48,697.00
8,900.00 22,695.00
56,000.00 4,284.00
94,500.00 661.50
25,533.00 28,086.30
Jumlah 55,726.80
di bulatkan 55,727.00
26,300.00 67,065.00
56,000.00 4,284.00
94,500.00 661.50
25,533.00 31,916.25
Jumlah 103,926.75
di bulatkan 103,927.00
28,200.00 71,910.00
56,000.00 4,284.00
94,500.00 661.50
25,533.00 31,916.25
Jumlah 108,771.75
di bulatkan 108,772.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
1,400.00 70,000.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
Jumlah 139,103.40
di bulatkan 139,103.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
2,700.00 67,500.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
Jumlah 136,603.40
di bulatkan 136,603.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
6,100.00 67,771.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
Jumlah 136,874.40
di bulatkan 136,874.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
11,800.00 73,750.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
Jumlah 142,853.40
di bulatkan 142,854.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
49,887.50
49,887.50 56,123.44
47,000.00 293,750.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
312,965.90
Jumlah 369,089.34
di bulatkan 369,090.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
49,887.50
49,887.50 62,359.38
137,800.00 383,084.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
402,299.90
Jumlah 464,659.28
di bulatkan 464,660.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
49,887.50
49,887.50 49,887.50
24,500.00 272,195.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
291,410.90
Jumlah 341,298.40
di bulatkan 341,300.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
49,887.50
49,887.50 56,123.44
43,500.00 271,875.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
291,090.90
Jumlah 347,214.34
di bulatkan 347,210.00
52,500.00 26,250.00
65,600.00 1,640.00
78,800.00 19,700.00
91,900.00 2,297.50
49,887.50
49,887.50 62,359.38
130,400.00 362,512.00
56,000.00 7,946.40
108,000.00 216.00
3,700.00 8,880.00
94,500.00 2,173.50
381,727.90
Jumlah 444,087.28
di bulatkan 444,090.00
52,500.00 52,500.00
65,600.00 3,280.00
78,800.00 39,400.00
91,900.00 4,595.00
99,775.00
1,400.00 70,000.00
912,303.00 13,684.55
83,684.55
Jumlah 183,459.55
di bulatkan 183,460.00
52,500.00 52,500.00
65,600.00 3,280.00
78,800.00 39,400.00
91,900.00 4,595.00
2,700.00 67,500.00
912,303.00 13,684.55
Jumlah 180,959.55
di bulatkan 180,960.00
52,500.00 52,500.00
65,600.00 3,280.00
78,800.00 39,400.00
91,900.00 4,595.00
3,500.00 70,000.00
912,303.00 13,684.55
Jumlah 183,459.55
di bulatkan 183,460.00
52,500.00 52,500.00
65,600.00 3,280.00
78,800.00 39,400.00
91,900.00 4,595.00
6,100.00 67,771.00
912,303.00 13,684.55
Jumlah 181,230.55
di bulatkan 181,231.00
52,500.00 52,500.00
65,600.00 3,280.00
78,800.00 39,400.00
91,900.00 4,595.00
11,800.00 73,750.00
912,303.00 13,684.55
Jumlah 187,209.55
di bulatkan 187,210.00
47,000.00 293,750.00
912,303.00 13,684.55
99,775.00 124,718.75
Jumlah 432,153.30
di bulatkan 432,153.00
137,800.00 383,084.00
912,303.00 13,684.55
99,775.00 149,662.50
Jumlah 546,431.05
di bulatkan 546,431.00
43,500.00 271,875.00
912,303.00 13,684.55
99,775.00 124,718.75
Jumlah 410,278.30
di bulatkan 410,278.00
130,400.00 362,512.00
912,303.00 13,684.55
99,775.00 149,662.50
Jumlah 525,859.05
di bulatkan 525,859.00
52,500.00 315,000.00
65,600.00 19,680.00
78,800.00 78,800.00
91,900.00 9,190.00
199,500.00 165,585.00
94,500.00 51,030.00
56,000.00 476,000.00
Jumlah 1,115,285.00
di bulatkan 1,115,285.00
15,700.00 1,727,000.00
18,300.00 36,600.00
1,763,600.00
Jumlah 2,492,300.00
apan belkisting
52,500.00 10,500.00
65,600.00 656.00
78,800.00 39,400.00
91,900.00 4,595.00
55,151.00
55,151.00 551,510.00
18,400.00 73,600.00
4,462,500.00 1,785,000.00
1,858,600.00
Jumlah 2,410,110.00
di bulatkan 2,410,110.00
1,115,285.00
3,115,375.00
2,410,110.00
Jumlah 6,640,770.00
52,500.00 26,250.00
65,600.00 1,640.00
12,600.00 12,600.00
18,400.00 368.00
8,100.00 8,100.00
Jumlah 48,958.00
di bulatkan 48,958.00
52,500.00 26,250.00
65,600.00 1,640.00
56,400.00 59,220.00
18,400.00 368.00
Jumlah 87,478.00
di bulatkan 87,478.00
78,800.00 2,758.00
91,900.00 32,165.00
7,900.00 15,010.00
8,100.00 3,402.00
7,900.00 3,318.00
400 4,800.00
Jumlah 61,453.00
di bulatkan 61,453.00
52,500.00 2,625.00
78,800.00 11,820.00
91,900.00 2,297.50
2,000.00 120.00
11,300.00 2,486.00
500 6,000.00
65,300.00 22,855.00
Jumlah 48,203.50
di bulatkan 48,204.00
52,500.00 2,625.00
78,800.00 11,820.00
91,900.00 2,297.50
2,000.00 120.00
11,300.00 2,486.00
500 6,050.00
77,900.00 27,265.00
Jumlah 52,663.50
di bulatkan 52,664.00
52,500.00 2,625.00
78,800.00 11,820.00
91,900.00 2,297.50
62,800.00 879.20
2,000.00 120.00
11,300.00 2,486.00
500.00 6,050.00
101,600.00 101,600.00
Jumlah 127,877.70
di bulatkan 127,878.00
52,500.00 5,250.00
65,600.00 328.00
78,800.00 15,760.00
91,900.00 1,838.00
64,600.00 56,202.00
500.00 3,000.00
Jumlah 82,378.00
di bulatkan 82,378.00
52,500.00 5,250.00
65,600.00 328.00
78,800.00 15,760.00
91,900.00 1,838.00
64,800.00 56,376.00
500.00 3,000.00
Jumlah 82,552.00
di bulatkan 82,552.00
52,500.00 5,250.00
65,600.00 328.00
78,800.00 15,760.00
91,900.00 1,838.00
36,800.00 40,480.00
500.00 2,000.00
Jumlah 65,656.00
di bulatkan 65,656.00
52,500.00 5,250.00
65,600.00 328.00
78,800.00 15,760.00
91,900.00 1,838.00
131,600.00 144,760.00
500.00 2,000.00
Jumlah 169,936.00
di bulatkan 169,936.00
52,500.00 1,312.50
78,800.00 5,910.00
91,900.00 689.25
39,400.00 43,340.00
500.00 2,000.00
Jumlah 53,251.75
di bulatkan 53,252.00
52,500.00 2,100.00
65,600.00 131.20
78,800.00 1,576.00
91,900.00 183.80
14,600.00 51,100.00
732,004.00 2,196.01
Jumlah 57,287.01
di bulatkan 57,287.00
52,500.00 13,125.00
65,600.00 984.00
78,800.00 31,520.00
91,900.00 3,676.00
125,500.00 31,375.00
7,900.00 7,900.00
Jumlah 88,580.00
di bulatkan 88,580.00
1/2 lingkaran
52,500.00 15,750.00
65,600.00 984.00
78,800.00 39,400.00
91,900.00 4,595.00
125,500.00 37,650.00
7,900.00 7,900.00
Jumlah 106,279.00
di bulatkan 106,279.00
52,500.00 1,312.50
65,600.00 721.60
78,800.00 29,550.00
91,900.00 3,446.25
125,500.00 26,104.00
7,900.00 7,900.00
Jumlah 69,034.35
di bulatkan 69,034.00
52,500.00 262,500.00
65,600.00 16,400.00
78,800.00 591,000.00
91,900.00 68,925.00
Jumlah 938,825.00
938,825.00 9,388.25
di bulatkan 9,388.00
9,388.00 28,164.00
20,500.00 8,712.50
Jumlah 36,876.50
di bulatkan 36,877.00
9,388.00 18,776.00
20,500.00 5,801.50
Jumlah 24,577.50
di bulatkan 24,578.00
9,388.00 28,164.00
38,800.00 16,490.00
12,000.00 1,200.00
Jumlah 45,854.00
di bulatkan 45,854.00
9,388.00 18,776.00
38,800.00 10,980.40
12,000.00 1,200.00
Jumlah 30,956.40
di bulatkan 30,956.00
9,388.00 9,388.00
27,800.00 3,936.48
Jumlah 13,324.48
di bulatkan 13,324.00
9,388.00 28,164.00
52,500.00 22,312.50
Jumlah 50,476.50
di bulatkan 50,477.00
9,388.00 18,776.00
52,500.00 14,857.50
Jumlah 33,633.50
di bulatkan 33,634.00
9,388.00 28,164.00
59,200.00 25,160.00
12,000.00 1,200.00
Jumlah 54,524.00
di bulatkan 54,524.00
9,388.00 28,164.00
64,500.00 27,412.50
12,000.00 1,200.00
Jumlah 56,776.50
di bulatkan 56,777.00
mbersihkannya
52,500.00 5250
65,600.00 656.00
Jumlah 5,906.00
di bulatkan 5,906.00
52,500.00 10500
65,600.00 164.00
Jumlah 10,664.00
di bulatkan 10,664.00
dipakai kembali)
52,500.00 10500
65,600.00 656.00
Jumlah 11,156.00
di bulatkan 11,156.00
52,500.00 2625
65,600.00 656.00
Jumlah 3,281.00
di bulatkan 3,281.00
52,500.00 10,500.00
65,600.00 328.00
78,800.00 1,970.00
91,900.00 229.75
Jumlah 13,027.75
di bulatkan 13,028.00
g dapat diabaikan
52,500.00 10,500.00
65,600.00 656.00
78,800.00 4,728.00
91,900.00 551.40
Jumlah 16,435.40
di bulatkan 16,435.00
g,selasar jembatan,dsb
52,500.00 210,000.00
65,600.00 13,120.00
78,800.00 472,800.00
91,900.00 55,140.00
Jumlah 751,060.00
di bulatkan 751,060.00
52,802.25 35,201.50
di bulatkan 35,201.00
guli 6 cm dipadatkan
52,500.00 393,750.00
65,600.00 24,600.00
199,500.00 1,596,000.00
70,400.00 140,800.00
7,862,600.00 209,669.33
Jumlah 2,364,819.33
2,364,819.33 23,648.19
23,648.19 19,706.83
di bulatkan 19,707.00
3,036,819.33 30,368.19
30,368.19 25,306.83
di bulatkan 25,307.00
50,800.00 1,270,000.00
63,000.00 1,575,000.00
42,000.00 1,260,000.00
5,700.00 2,850,000.00
34,100.00 511,500.00
29,400.00 117,600.00
34,700.00 173,500.00
105,000.00 105,000.00
Jumlah 7,862,600.00
di bulatkan 7,862,600.00
3,985,846.47 39,858.46
di bulatkan 39,858.00
1,803,213.47 18,032.13
di bulatkan 18,032.00
39,858.00
18,032.00
Jumlah 57,890.00
di bulatkan 57,890.00
G/M2 dan digilas padat
52,500.00 525,000.00
65,600.00 32,800.00
4,600.00 920,000.00
414,800.00 497,760.00
203,200.00 121,920.00
20,100.00 10,050.00
7,862,600.00 10,483.47
63,700.00 63,700.00
Jumlah 2,181,713.47
2,181,713.47 21,817.13
di bulatkan 21,817.00
1,552,893.47 15,528.93
di bulatkan 15,529.00
ma/overpainting)
21,817.00
15,529.00
Jumlah 37,346.00
di bulatkan 37,346.00
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tuk Kepala TukKepala Tuk Kepala TukKepala Tuk
Pekerja Pekerja Pekerja Pekerja Pekerja
Mandor Mandor Mandor Mandor Mandor
Tukang Tukang Tukang Tukang Tukang
Kepala TukKepala Tuk Kepala TukKepala TukKepala Tukang
No. Analisa
1 Anl.A.1
2 Anl.1/4.A.1
3 Anl.A.2
4 Anl.A.6
5 Anl.A.13
6 Anl.A.18.a
7 Anl.A.18.b
8 Anl.F.1
9 Anl.F.1.a
10 Anl.F.16
11 Anl.F.16.a
12 Anl.F.19
13 Anl.F.19.a
14 Anl.F.21
15 Anl.F.22
16 Anl.F.27
17 Anl.F.27a
18 Anl.F.28
19 Anl.F.33
20 Anl.F.30
21 Anl.F.30a
22 Anl.F.34
23 Anl.F.36
24 Anl.F.37
25 Anl.F.37a
26 Anl.F.37b
27 Anl.F.37c
28 Anl.F.37d
29 Anl.F.37e
30 Anl.F.60
31 Anl.G.2
32 Anl.G.14
33 Anl.G.16
34 Anl.G31.h
35 Anl.G31.m
36 Anl.G32.h
37 Anl.G32.m
38 Anl.G.41
39 Anl.G.41a
40 Anl.G.42
41 Anl.G.43
42 Anl.G.44
43 Anl.G.50.h
44 Anl.G.50.h1
45 Anl.G50.i
46 Anl.G50.k
47 Anl.G50.q
48 Anl.G50.q1
49 Anl.G.60
50 Anl.G.67
51 Anl.G.68
52 Anl.G.68a
53 Anl.G.68b
54 Anl.G.68c
55 Anl.G.68d
56 Anl.G.72
57 Anl.G.72a
58 Anl.G.72b
59 Anl.G.72c
60 Anl.G.72d
61 Anl.G.72e
62 Anl.G.72f
63 Anl.G.72g
64 Anl.G.72h
65 Anl.Supl.IV
66 Anl.Supl.Iva
67 Anl.Supl.Ivb
68 Anl.Supl.Ivc
69 Anl.Supl.Ivd
70 Anl.Supl.Ive
71 Anl.Supl.Ivf
72 Anl.Supl.Ivg
73 Anl.Supl.Ivh
74 Supl.V
75 Anl.G.41
76 Anl.I.2
77 Anl.F.8
78 Anl.Supl.VIII
79 Anl.Supl.VIIIa
80 Anl.Taksir (a)
81 Anl.Taksir (b)
82 Anl.Taksir (c)
83 Anl.Taksir (d)
84 Anl.Taksir (e)
85 Anl.Taksir (f)
86 Anl.Taksir (g)
87 Anl.Taksir (h)
88 Anl.H.2
89 Anl.H.2a
90 Anl.H.8
91 Anl.H.8a
92 Anl.H.8b
93 Anl.H.8c
94 Anl.H.10
95 Anl.H.10a
96 Anl.H.15
97 Anl.H.17
98 Anl.H.18
99 Anl.K.23
100 Anl.K.23a
101 Anl.K.23a1
102 Anl.K.23b
103 Anl.K.23b1
104 Anl.K.23c
105 Anl.K.23d
106 Anl.K.23d1
107 Anl.K.23e
108 Anl.K.23f
109 Anl.L.4
110 Anl.L.5
111 Anl.L.6
112 Anl.L.7
113 Anl.L.8
114 Anl.L.9
115 Anl.L.11
116 Anl.L.12
117 Anl.W.1
118 Anl.W.1a
119 Anl.W.2
120 Anl.W.3
121 Anl.W.3a
122 Anl.W.4
123 Anl.W.5
124 Anl.W.7
125 Anl.W5+W.7
126 Anl.W.5a
127 Anl.W.7a
128 Anl.W5a+W.7a
Pekerjaan Harga
1 M3 Galian tanah 41,015.00
1 M3 Urugan kembali galian tanah 10,254.00
1 M3 Galian tanah keras 54,665.00
1 M3 Angkut tanah Max.30 M' 17,981.00
1 M3 Pasir urug 100,886.00
1 M3 Urugan tanah 98,366.00
1 M3 Urugan sirtu 161,306.00
1 M3 Gantungan / Rangka Plafond 7,048,765.00
1 M2 Piyan Papan Rider (STRIP) 310,238.00
1 M2 Rangka atap (pasang usuk dan reng utk atap genteng dan sirap 101,923.00
1 M2 Rangka atap genteng biasa /genteng semen (pasang usuk,reng dan gording) 160,754.00
1 M2 Rangka atap seng dan Asbes Gelombang Kayu 74,170.00
1 M2 Rngja atap genteng metal dan Genteng asbes kayu 83,013.00
1 M2 Lypstplank 339,541.00
1 M3 Konstruksi kayu kuda - kuda 12,456,210.00
1 M3 Kozen pintu / jendela tanpa jalusi 13,095,710.00
1 M3 Kozen pintu / jendela dengan jalusi 13,356,529.00
1 M3 Kozen yang berlobang cahaya berbentuk busur 13,415,460.00
1 M2 Pintu / jendela panel 847,973.00
1 M2 Daun pintu triplek 4 mm double 414,275.00
1 M2 Daun pintu triplek sungkai double rangka kayu meranti : 472,918.00
1 M2 Pintu / jendela jalusi 1,116,007.00
1 M2 Pintu / jendela kaca 822,731.00
1 M2 Dinding papan dilidah / alur 185,578.00
1 M2 Dinding papan susun sirih 157,530.00
1 M2 Dinding triplek 4 mm rangka kayu meranti 126,664.00
1 M2 Dinding double triplek 4 mm rangka kayu meranti 156,845.00
1 M2 Dinding double triplek sungkai rangka kayu meranti 211,233.00
1 M2 Dinding single triplek sungkai rangka kayu meranti 159,877.00
1 M' Memasang cerocok kayu laut 1 btg panjang 2,5 M
Masuk ke dalam tanah 1,5 - 2 3"-4" 488,750.00
1 M3 Lantai kerja batu kosong 320,500.00
1 M3 Perekat 1:2 912,303.00
1 M3 Perekat 1:3 732,004.00
1 M3 Pasangan batu belah atau batu kali 1:4 767,983.00
1 M3 Pasangan batu belah atau batu kali 1:3 782,809.00
1 M3 Pasangan batu bata 1:4 1,066,675.00
1 M3 Pasangan batu bata 1:2 (Trasraam) 1,170,679.00
1 M3 Beton cor 1:2:3 1,115,285.00
1 M3 Beton cor 1 : 1,5 : 2,5 1,164,622.00
1 M3 Beton cor 1:2:4 dipakai utk lantai ubin,beton yg dicor
dibawah air,lapisan turap 1,033,483.00
1 M3 Beton cor 1:2,5:5 975,520.00
1 M3 Beton cor 1:3:5 921,973.00
1 M2 Plesteran 1:2 tebal 10 mm (Trasraam) 46,584.00
1 M2 Plesteran 1:2 tebal 15 mm (Trasraam) 56,523.00
1 M2 Plesteran 1:3 tebal 15 mm 53,167.00
1 M2 Plesteran 1:3 tebal 10mm 44,282.00
1 M2 Plesteran 1:4 tebal 10mm 42,894.00
1 M2 Plesteran 1:4 tebal 15mm 51,002.00
1 M2 Memasang Coneblock 127,620.00
1 M2 Lantai beton tebal 7 cm.1:3:6 diplester tebal 6 mm 95,626.00
1 M' Pasang Plint Tegel PC.10x30 cm 41,144.00
1 M' Pasang Plint Keramik 15x30 cm 48,697.00
1 M' Pasang Plint Keramik 15x40 cm 55,727.00
1 M' Pasang Plint Granito 15x40 cm 103,927.00
1 M' Pasang Plint Keramik Essenza 15x40 cm 108,772.00
1 M2 Lantai Keramik Uk.10x20 cm 139,103.00
1 M2 Lantai Keramik Uk.20x20 cm 136,603.00
1 M2 Lantai Keramik Uk.30x30 cm 136,874.00
1 M2 Pasang Lantai Keramik 40x40 cm 142,854.00
1 M2 Pasang Lantai Keramik Essenza 40x40 cm 369,090.00
1 M2 Pasang Lantai Keramik Essenza 60x60 cm 464,660.00
1 M2 Lantai Granito Uk. 30x30 cm 341,300.00
1 M2 Pasang Lantai Granito 40x40 cm 347,210.00
1 M2 Pasang Lantai Granito 60x60 cm 444,090.00
1 M2 Pas.Keramik dinding Uk.10x20 cm 183,460.00
1 M2 Pas.Keramik dinding Uk.20x20 cm 180,960.00
1 M2 Pas.Keramik dinding Uk.20x25 cm 183,460.00
1 M2 Pas.Keramik dinding Uk.30x30 cm 181,231.00
1 M2 Pas.Keramik dinding Uk.40x40 cm 187,210.00
1 M2 Pas.Keramik dinding Essenza Uk.40x40 cm 432,153.00
1 M2 Pas.Keramik dinding Essenza Uk.60x60 cm 546,431.00
1 M2 Pas.Keramik dinding Granito Uk.40x40 cm 410,278.00
1 M2 Pas.Keramik dinding Granito Uk.60x60 cm 525,859.00
Untuk beton bertulang 6,640,770.00
1 M3 Beton cor 1:2:3 1,115,285.00
Mengerjakan (memotong/memasang)110 kg besi untuk beton bertulang 3,115,375.00
1 M3 beton bertulang diperlukan 10 M2 papan bekisting 2,410,110.00
1 M2 Plafond Asbes 1x1 m 48,958.00
1 M2 Plafond triplek 4 mm 87,478.00
1 M2 Gypsum Rangka Partisi Metal Sistem 61,453.00
1 M2 Gypsum board 6 mm (partisi) 48,204.00
1 M2 Gypsum board 9 mm (partisi) 52,664.00
1 M2 Gypsum board 12 mm (partisi) 127,878.00
1 M2 Frame Celling Concealed 74,603.00
1 M2 Frame Celling Exposed 61,304.00
1 M2 Celling Gypsum Board 6 mm (standard) 55,528.00
1 M2 Celling Gypsum Board 9 mm (standard) 59,938.00
1 M2 Pasangan Atap Genteng beton warna 91,455.00
1 M2 Pasangan Atap Genteng Keramik 199,755.00
1 M2 Pasangan Atap Asbes Gelombang 82,378.00
1 M2 Pasangan Atap Seng BJLS 35 K 82,552.00
1 M2 Pasangan Atap Asbes Motif Genteng 65,656.00
1 M2 Pasangan Atap Genteng Metal Roof 169,936.00
1 M' Rabung seng BJLS 35 K 53,252.00
1 M' Rabung Genteng 57,287.00
1 M' Talang Patahan Seng 35 K 88,580.00
1 M' Talang Datar seng 35 K bentuk1/2 lingkaran 106,279.00
1 M' Pipa Talang Seng 35 K10 cm 69,034.00
100 M2 Upah Mengecat 9,388.00
1 M2 Cat Tembok (3 x cat) 36,877.00
1 M2 Cat Tembok (2 x cat) 24,578.00
1 M2 Cat Kilat (3 x cat) 45,854.00
1 M2 Cat Kilat (2 x cat) 30,956.00
1 M2 Cat Menie (1 x cat) 13,324.00
1 M2 Cat Vernis (3 x cat) 50,477.00
1 M2 Cat Vernis (2 x cat) 33,634.00
1 M2 Cat Sending (3 x cat) 54,524.00
1 M2 Cat Melamix (3 x cat) 56,777.00
Membongkar 1 M3 Lantai Lama berikut membersihkan
batas - batasnya 111,560.00
Membongkar 1 M2Lantai Lama berikut membersihkannya 5,906.00
Mengupas plesteran tiap 1 M2 10,664.00
Menurunkan 1 M2 atap genteng / sirap (jika dipakai kembali) 11,156.00
Menurunkan 1 M2 atap seng 3,281.00
Menurunkan Rangka Atap dari kayu 13,028.00
Membongkar 1M2 loteng,dinding luar,lantai jembatan (dari kayu)bagian
atas dihitung terpisah 16,435.00
Maembongkar 1 M3 Kuda - kuda,balok loteng,selasar jembatan dsb(kayu
bongkaran dipakai lagi) 751,060.00
1 M3 Timbunan pasir timbun untuk dasar badan jalan dan digilas padat 109,345.00
1 M3 Timbunan sirtu / kerikilkotor dipadatkan dengan mesin gilas 102,305.00
1 M2 Memasang sub base / onderlaag batu kali tebal 15-20 cm padat 35,201.00
100 M2 Lapisan Base Course / stylaag batu guli 6 cm dipadatkan 19,707.00
100 M2 Lapisan Base Course / stylaag batu pecah 6 cm dipadatkan 25,307.00
Biaya menggilas 1 bulan (25 hari) 7,862,600.00
100 M2 Mengaspal I jalan dengan aspal 2,5 kg / M2 dan digilas padat 39,858.00
100 M2 Mengaspal II jalan dengan aspal 1,5 kg / M2 dan digilas padat 18,032.00
1 M2 Mengaspal I dan II permukaan badan jalan dengan aspal 4 kg / M2 57,890.00
100 M2 Mengaspal I jalan dengan aspal 2 kg / M2 dan digilas padat 21,817.00
100 M2 Mengaspal II jalan dengan aspal 1 kg / M2 dan digilas padat 15,529.00
Untuk 1 M2 mengaspal I dan II jaln dengan aspal 3 kg / M2 37,346.00