Anda di halaman 1dari 4

LP_max

EJERCICIO 7 This
This spreadsheet
spreadsheet was
was created
created by
by either
either POM,
POM, QM QM oror POM-QM
POM-QM for
for Windows,
Windows, V3.
V3. Then
Then gg
TOOLS,
TOOLS, SOLVER,
SOLVER, SOLVE
SOLVE on
on the
the menu
menu bar
bar at
at the
the top.
top.
Linear, Integer or Mixed Integer Programming

Signs
< less than or equal to
= equals (You need to enter an apostrophe first.)
> greater than or equal to

Data Results Problem setup area


t c LHS Slack/Surplus
Objective 70 50 0 4100 < constraints
Constraint 1 4 3< 240 240 0 240
Constraint 2 2 1< 100 100 0 100

Results
Variables 30 40
Objective 4100

Page 1
LP_max

QM for
-QM for Windows,
Windows, V3.
V3. Then
Then go
go to
to

Problem setup area

< constraints > constraints


240 0 0
100 0 0

Page 2
7-14 Y7-15

PROBLEMAS 7-14 Y 7-15


This
This spreadsheet
spreadsheet was
was created
created by
by either
either POM,
POM, QM
QM or
or POM-QM
POM-QM for
for Windows,
Windows, V3.
V3. Then
Then
TOOLS,
TOOLS, SOLVER,
SOLVER, SOLVE
SOLVE on
on the
the menu
menu bar
bar at
at the
the top.
top.
Linear, Integer or Mixed Integer Programming

Signs
< less than or equal to
= equals (You need to enter an apostrophe first.)
> greater than or equal to

Data Results Problem setup area


A V LHS Slack/Surplus
Objective 25 15 0 1900 < constraints
CABLEADO 3 2< 240 240 0 240
PERFORACION 2 1< 140 140 0 140

Results
Variables 40 60
Objective 1900

Page 3
7-14 Y7-15

M-QM
M-QM for
for Windows,
Windows, V3.
V3. Then
Then go
go to
to

Problem setup area

< constraints > constraints


240 0 0
140 0 0

Page 4