Zone Design Load Summary for CONTROL ROOM

Project Name: 21014 BARKA MALL R4 08/01/2017


Prepared by: Amjaad 07:55AM

Zone 1 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1700 HEATING DATA AT DES HTG
COOLING OA DB / WB 45.2 C / 29.8 C HEATING OA DB / WB 12.0 C / 10.0 C
OCCUPIED T-STAT 21.0 C OCCUPIED T-STAT 20.0 C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m 0 - 0 m - -
Wall Transmission 65 m 583 - 65 m 224 -
Roof Transmission 28 m 142 - 28 m 98 -
Window Transmission 0 m 0 - 0 m 0 -
Skylight Transmission 0 m 0 - 0 m 0 -
Door Loads 0 m 0 - 0 m 0 -
Floor Transmission 0 m 0 - 0 m 0 -
Partitions 98 m 2117 - 98 m 0 -
Ceiling 0 m 0 - 0 m 0 -
Overhead Lighting 762 W 533 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1500 W 1500 - 0 0 -
People 3 259 400 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 8% / 5% 411 20 0% 0 0
>> Total Zone Loads - 5546 420 - 322 0