Anda di halaman 1dari 1

Eklavya Project

Cycle Time Reduction of Separate Phase Assembly Using VSM


By- Parth D. Shah (Manufacturing)

Eklavya Project
Cycle Time Reduction of Core Building By Using VSM
By- Ajay P. Mohurle (Manufacturing)

Eklavya Project
Cycle Time Reduction of Conservator Manufacturing Using VSM
By- Roshan L. Ramdham (Fabriacation)

Eklavya Project
Evaluating Requirements For Modifying Existing Lab Into PD Free Lab
By- Mayur D. Dhande (Testing)

Anda mungkin juga menyukai