When thinking about installing pre-hung door kits there are a number of things to bear in mind. Chief
among these is the handing of the door. Stand in front of your proposed door and imagine the door
opening towards you. The door is left-handed if the hinges will be on the left and the door will be
right-handed if the hinges are on the
right. See the diagrams opposite for
clarification. If you are unsure then feel
free to contact us.
Name Door
Reference Number Door for Glass
Site Address Glass Design
Site Contact Frame
Contract Number Hardware
Ordered By Saddle
Date of Order Handle
I agree that I must and have supplied all measurements relating to this order.
I have read and understand the handling instructions. I understand that the handling instructions must be
adhered to fully and I understand that I have no grounds for complaint should I not comply with these specific
handling instructions.
I agree that should I incorrectly order items, such items may not be returned to D & S Hardware Limited for
credit and that replacement items will be at my own expense.
I the undersigned certify that the above information is true and correct.
Signed:_______________________________ Name:_______________________________
Moisture:
1. Doors should be delivered to sites after all wet trades have been completed.
2. Heating within a house should be initially turned onto a low level and then be gradually
increased.
3. After the doors are fitted and the house is occupied, the heating should be initially kept to
the minimal.
4. The house should be well ventilated in order to keep the level of humidity to a minimum.
5. Timber is a natural substance that needs to be stored in stable atmospheric conditions.
Changing weather/temperature/humidity conditions can cause doors to shrink, split or warp.