BALOK DENGAN SPAN-LOADING

P =2 ton
0,5.L2
q1=5 t/m
q2=3 t/m

A
30/60 B 30/60 C

L1=4 m L2=6 m
Data struktur & material :
L1 = 4m
L2 = 6m
2
E = 2,000,000 ton/m
Data beban :
q1 = 5 ton/m'
q2 = 3 ton/m'
P= 2 ton

Langkah 1 : Diskretisasi dan D.O.F. 3 nodes, 2 elements


DAy DBy DCy
DOF awal (sebelum reduksi),
1 2 ordo 6
RAz RBz RCz

DOF tereduksi, ordo 2


1 2
dengan urutan ditetapkan sbb :
RBz RCz RBz, RCz

2
Langkah 2 : Matriks kekakuan masing elemen (ada 2 buah elemen)

a. Elemen 1 (AB)
E = 2,000,000 ton / m 2
I = 0.0054 m4
L= 4 m
DAy RAz DBy RBz
2,025 4,050 -2,025 4,050 DAy
[k] 1 = 4,050 10,800 -4,050 5,400 RAz
-2,025 -4,050 2,025 -4,050 DBy
4,050 5,400 -4,050 10,800 RBz

b. Elemen 2 (BC)
E = 2,000,000 ton /m 2
I = 0.0054 m4
L= 6 m
DBy RBz DCy RCz
Page 1 of 3
600.00 1,800.00 -600.00 1,800.00 DBy
[k] 2 = 1,800.00 7,200.00 -1,800.00 3,600.00 RBz
-600.00 -1,800.00 600.00 -1,800.00 DCy
1,800.00 3,600.00 -1,800.00 7,200.00 RCz

Langkah 3 : PERAKITAN MATRIKS KEKAKUAN STRUKTUR TEREDUKSI

Kontribusi dari elemen 1 :


RBz RCz
[k] 1= 10,800 RBz
RCz

Kontribusi dari elemen 2 :


RBz RCz
[k] 2 = 7,200.00 3,600.00 RBz
3,600.00 7,200.00 RCz

Hasil perakitan matriks [K] struktur-tereduksi :


RBz RCz
[K] = 18,000.00 3,600.00 RBz
3,600.00 7,200.00 RCz

Langkah 4 : Menyusun vektor gaya-luar

a. Vektor "span loading" masing-masing elemen

-10.000 DAy -10.000 DBy


{fo}1 = -6.667 RAz {fo}2 = -10.500 RBz
-10.000 DBy -10.000 DCy
6.667 RBz 10.500 RCz

b. Perakitan vektor "span loading" struktur tereduksi :

-3.8333333 RBz
{Fo} = 10.5 RCz

Langkah 5 : PERSAMAAN GLOBAL STRUKTUR >> {F} + {Fo} = [K] {D}

RBz 6.1728E-05 -3.08642E-05 -3.833 -0.000561 radian


= =
RCz -3.086E-05 0.000154321 10.5 0.001739 radian

Page 2 of 3
Langkah 6 : Menyusun vektor perpindahan bagi masing-masing elemen

0 DAy 0 DBy
{d}1 = 0 RAz {d}2 = -0.000561 RBz
0 DBy 0 DCy
-0.000561 RBz 0.001739 RCz

Langkah 7 : Menghitung masing2 GAYA-ELEMEN (element forces)


dengan rumus : {f} = [k] {d} - {fo}

a. Elemen 1 (segmen AB)

f1 -2.2708 -10 7.7292 ton


f2 -3.0278 -6.666666667
- 3.6389 ton meter
= =
f3 2.2708 -10 12.2708 ton
f4 -6.0556 6.666666667 -12.7222 ton meter

b. Elemen 2 (segmen BC)

f1 2.1204 -10 12.1204 ton


f2 = 2.2222 - -10.5 = 12.7222 ton meter
f3 -2.1204 -10 7.8796 ton
f4 10.5000 10.5 0.0000 ton meter

2
Langkah 8 : Menggambar bidang gaya-dalam masing elemen

7.7292
-12.7222 12.7222

1 2
3.6389

12.2708 12.1204 7.8796

Page 3 of 3