Anda di halaman 1dari 11

TRANSCO P.O.No.

194/Dt:06-05-2017

By Regd. Post with Ack. Due SAP NO:5100002669


IN ORIGINAL TIN No.36580127730
Energy Saved is

SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LTD.


(PURCHASE ORDER)
Energy Produced

Phone : 040-23431362 Phone: +91 40 4000 2300


Fax : 040-23431034 Fax No: 0253-2380870, 2381247
From To
Chief General Manager (P&MM) M/s Crompton Greaves Ltd,
TSSPDCL, 4th floor, Switchgear Complex,
Corporate Office, Mint Compound, A-3, MIDC Ambad,
Hyderabad 500 004. Nasik

P.O.No.CGM/P&MM/E-11/STN-143/PM-842/Extn.PM- 1138 /17, Dt. 06-05-2017.


Dear Sirs,

Sub:- TSSPDCL P&MM wing Tender Specification No.STN-143/15-Order for


supply of 33KV 24V DC VCBs with control relay panels and CTs of
Ratio 400-200-100/1-1A - Extension Purchase Order- Issued Reg.

Ref:- 1. Specification No.STN-143/2016.


2. Your offer submitted against above specification.
3. P.O.No.CGM/P&MM/E-11/STN-143/PM-842/16, Dt.06-08-2016.
4. Lr.No.CGM/P&MM/E-11/STN-143/16/Extn.LOI/D.No.650/17,Dt.25-04-2017
5. Your Acceptance Lr.No.YS/SC-SD/15-16/S2-STN-143/PM-842/1, Dt.03-05-17.

***
1) ACCEPTANCE: I, acting for and on behalf of and by the order and direction of
Southern Power Distribution Company of Telangana Limited (TSSPDCL) accept the rates for
33KV 24V DC VCBs with control relay panels and CTs of ratio 400-200-100/1-1A as per the
schedule of materials under clause 3 below and as per the above cited correspondence.

2) PRICES: The prices noted below are FIRM in Rupees, free at destination stores,
Inclusive of Freight & Insurance, ED @ 12.5% and CST @ 2%.
3) SCHEDULE OF MATERIAL:

Sl. Description Qty. Unit Rate Amount


No. Nos. Rs. Ps. Rs. Ps.
1. 33KV, 3 pole, 50 HZ, 1250Amps, 25KA (1500 50 3,77,745.49 1,88,87,274.50
MVA) outdoor porcelain clad vacuum circuit
breakers with Outdoor control and relay Ex-works : 3,24,440.00
panels having 3 O/L & 1 E/L with following ED @ 12.5% : 40,555.00
Current Transformers ratios and control F&I : 5,450.59
voltage 24V DC, conforming to IS : 13118/ IEC- CST @ 2% : 7,299.90
62271-100 or latest version and as per
technical particulars described in Sec.V. 3
Nos. outdoor oil cooled current transformers
shall be of ratio for HV control VCBs and CT
Ratio: 400-200-100/1-1A
TOTAL : 1,88,87,274.50
(Rupees One Crore Eighty Eight Lakhs Eighty Seven Thousand Two Hundred Seventy Four and Fifty paise only)
2

4. DELIVERY: Supplies shall commence and complete as mentioned below.

Schedule Date of Quantity


Delivery (Nos.)
By 31-07-2017 50
Total : 50

However, you are requested to advance and improve the quantity to be


delivered.

Delay in delivery of materials free at destination stores due to non-availability of


transport facility or such reasons will not be considered. It is the responsibility of supplier
to make alternate arrangements for transporting the materials to the destination within
the stipulated period.

The TSSPDCL shall have the right to vary the delivery schedules mentioned in the
Purchase Order due to any operational exigencies at any time during the execution of
the order by the supplier after due notice. Un-loading of the materials at the destination
stores shall be arranged by the consignees at TSSPDCL cost.

The TSSPDCL shall have the right to vary the ordered quantity by plus or minus
50% at any time during the execution of the order.

5. TERMS OF PAYMENT:
100% payment will be made on or after 30 days reckoned from the date of
receipt of material/ equipment at destination/ stores (i.e., 103 entry in SAP module),
duly transferring the said amount to the Bank account of the supplier by the purchaser
Bank subject to furnishing of performance security in the form of Demand Draft/Bank
Guarantee for 10% of the contract value in the prescribed proforma covering a period
of 2 months over and above the period of performance guarantee. The supplier will
have to predefine the Bank details while entering into contract.
The performance security for an amount of 10% of contract value is to be
furnished within fifteen (15) days of receipt of the notification of contract (purchase
order) which will include the warranty period and completion of performance
obligations including warranty obligations.

i) The date of delivery would be the date on which the stores officer certifies
the receipt of materials at stores in good condition, 103 entry in SAP module
irrespective of the date of check measurement.

ii) Form 13 shall be issued subject to material taken into stock in good condition
(i.e., 105 entry in SAP module)

iii) The supplier should invariably submit test certificates as soon as despatch is
made so that the test certificates can be checked up and approved well
before it becomes due for payment. Routine Test Certificates of the entire lot
shall be submitted to the Consignee.
iv) The performance guarantee to be executed in accordance with this
specification shall be furnished on a stamp value of Rs.100/- The performance
guarantee shall be from any Nationalized/Scheduled Bank. Performance
Guarantee to the extent of 10% value of purchase order valid upto 2 months
over and above the guarantee period to draw 100% payment.
The performance guarantee has to be extended suitably by you in
accordance with the guarantee clause, so that the last consignment against
the order is covered by the guarantee.
v) If you have received any over payments by mistake or if any amounts are
due to the TSSPDCL due to any other reason, when it is not possible to recover
such amounts under the contract resulting out of the subject specification,
the TSSPDCL reserves the right to collect the same from any other amounts
and/or bank guarantee given by you due to or with the TSSPDCL.
3

vi) When you do not at any time, fulfill your obligations in replacing / rectifying
etc., of the damaged/ defective materials in part or whole promptly to the
satisfaction of the TSSPDCL officers, the TSSPDCL reserves the right not to
accept the bills against subsequent despatches made by the supplier and
only the supplier will be responsible for any demurrages, wharfages or
damages occurring to the consignment so despatched.

6) DESPATCH: Please arrange to supply the materials specified herein and despatch
them freight prepaid to the persons and stations noted separately. Despatch
Instructions will be communicated to you after due inspection and clearance by the
inspection officer.

7) LOSS OR DAMAGE:

a) Supplier is responsible for the safe delivery of the goods in good condition
at destination stores. He should acquaint himself of the conditions obtaining for
handling and transport of the goods to destination and shall include and provide for
security and protective packing of the goods so as to avoid damage in transit.

b) External damages or shortages that are prima-facie the results of rough


handling in transit or due to defective packing will be intimated within a fortnight of the
receipt of the materials. Internal defects, damages or shortages of any internal parts
which cannot ordinarily be detected on a superficial visual examination though due to
bad handling in transit or defective packing would be intimated within 3 months from
the date of receipt of these materials. In either case, the damaged or defective
materials should be replaced by you free of cost to the TSSPDCL.

c) If no steps are taken within 15 days of receipt of intimation of defects or


such other reasonable time as the TSSPDCL may deem proper to afford, the TSSPDCL
may without prejudice to its other rights and remedies arrange for repairs or rectification
of the defective materials or replace the same and recover the expenditure incurred
there for from the deposits such as BID SECURITY And PERFORMANCE SECURITY or other
monies available with TSSPDCL or by resorting to legal action and also decline to
accept further delivery of materials/equipment.

d) The defective portions or whole of the material so replaced or renewed


should give satisfactory performance till the expiration of 6 months (six) from the date of
such replacement or until the end of guarantee period whichever is later.

e) For the purpose of any legal construction, the material shall be deemed
to pass into TSSPDCLs ownership only at the destination stores where they are delivered
and accepted.

8) ACKNOWLEDGEMENT: The transport receipt should be sent to the persons noted


against each item and should be accompanied by two copies of the invoice / challan,
one of which will be returned to you directly in token of acknowledgement of receipt of
the goods.

9. GUARANTEE:

i) The material (VCB and its associated equipment, control relay panel and
its associated equipment and CTs) is guaranteed by you for satisfactory
operation for a period of 5 Years from the date of receipt at stores by the
store in-charge of TSSPDCL in good condition.

ii) During the period of guarantee, if any of the material is found defective
and or failed in test or operation except for minor defects, such materials
shall be replaced by you at free of cost to the TSSPDCL irrespective of
reimbursement from the insurance company within 15 days of receipt of
intimation of defects. If the material is not replaced within 30 days of
intimation, during the guarantee for the corrected/replaced material will
be extended to a further period of 12 months.
4

iii) Having been notified if you did not replace the materials within the
stipulated period the cost of the material will be recovered from the
existing bills/future bills/bank guarantee available with the TSSPDCL.

iv) In the event of any correction of defects or replacement of defective


material during the warranty period, the warranty for the corrected/
replaced material will be extended to a further period of 12 months and
the Performance bank guarantee for proportionate value will be
.
extended 60 days over and above the extended warranty period.

v) If the failure after erection and commissioning at site is more than 5% the
TSSPDCL reserves the right to cancel the balance quantity of the order or
take such suitable action as deemed fit. Minor defects like broken glass
during transit etc., may be permitted to attend to in Stores or at erection
site.

10. DEFECTIVE SUPPLIES:- If, during the guarantee period, any of the goods are found to
be defective in materials or workmanship, they shall be replaced by you free of cost.

11. PENALTY FOR LATE DELIVERY:

i) General: The delivery of materials as per the agreed schedule of delivery


is the essence of the contract.

ii) In case of delay in delivery of materials at destination for whatever be the


reason, the TSSPDCL may at its option demand and recover from you an
amount equivalent to half percent (1/2%) of the Ex-works value per week
of delay or part thereof on the undelivered portion, subject to a maximum
of 5% of the undelivered portion within schedule time. This right of the
TSSPDCL shall be without prejudice to its right under the law including the
right to cancel the contract, forfeit the deposit and/or recover damages
for breach of contract.
iii) Check Measurement Date i.e. the date of receipt of materials at
destination stores in good condition will be taken as Date of delivery. For
calculation of penalty the date of receipt of material at the destination
stores is the date of delivery subject to the condition that the goods/
material are received in good condition. The no. of days of delay would
be rounded off to the nearest week.

(iv) Materials which are not of acceptable quality or not conforming to


specification would be deemed to be not delivered.
(v) Any variation up or down in Excise Duty, or Sales Tax or other statutory
levies, or new levies introduced after placing of the order, under this
specification, shall be to the TSSPDCLs account, In cases, where the
delivery schedule is not adhered to by the supplier and that, if there are
increases in excise duty or sales tax or other statutory levies or new imposts
after the agreed delivery dates, the supplier shall bear the impact of
these levies and if there is downward variation/revision TSSPDCL shall be
given credit to that extent.
vi) In case of supplier who has not adhered to the delivery schedule, the
TSSPDCL reserves the right to purchase the balance quantity from the
open market and recover the extra expenditure thus incurred from the
supplier. This is in addition to the rights of the TSSPDCL mentioned in the
first para of this clause.
5

12. FORCE MAJEURE:

You shall not be liable for any liquidated damages for delay or for failure to
perform the contract for reasons of Force Majeure such as acts of God, acts of public
enemy, acts of Govt., fires, floods, epidemics, quarantine restrictions, strikes, lockouts,
riots freight embargoes and provided that you shall within ten (10) days from the
beginning of such delay notify the TSSPDCL in writing of the cause of delay. TSSPDCL
shall verify the facts and grant such extension as facts justify.

13. EXTENSION OF TIME:

If the completion of supply is delayed due to reasons beyond the control of the
supplier, the supplier shall without delay give notice to the purchaser in writing of his
claim for an extension of time. The purchaser on receipt of such notice may agree to
extend the contracted delivery to such date as may be reasonable but without
prejudice to other terms and conditions of the contract. However, such extension of
time shall be for the purpose of penalty waival only and payment of duties, taxes etc.,
shall be regulated as per P.O or as per actual supplies whichever results in lower
commitment to TSSPDCL.

14. INSPECTION: -

a) The accredited representative of the TSSPDCL shall have access to you or your
sub-contractors works at any time/stage during working hours for the purpose of
inspecting the materials and may select test samples from the materials going into
plant and equipment or from the materials offered for inspection. You shall provide the
facilities for testing such samples at any time. As soon as the materials are ready.

You shall duly advise the TSSPDCL and carryout the tests in the presence of
representatives of the TSSPDCL/third party agencies deputed for the purpose by
TSSPDCL.
b) In case of material, not of acceptable quality or not conforming to the
specification, the materials will be rejected. You have to re-offer the material for
inspection. In such a case, the 2nd inspection charges are to your account only. In case
the materials are rejected in the 2nd inspection also, the TSSPDCL reserves the right to
cancel the order.

c) The dispatches shall be made only after the inspection to the TSSPDCL Officers
satisfaction or such inspection is waived by this office.

15. TEST CERTIFICATES:

The latest routine test certificates containing the results of the tests as per
relevant ISS must be submitted to the Chief General Manager/P&MM, TSSPDCL,
4th floor, Corporate Office, Mint Compound, Hyderabad500 004, and got approved
by him before sending bills for payment which will not be paid unless these are
approved (vide clause-6).

16. GUARANTEED TECHNICAL PARTICULARS:

The technical particulars have been guaranteed by you as per Annexure


enclosed. They shall also confirm to IS (Latest version).
6

17. DESPATCH INSTRUCTIONS:


All the materials detailed in Clause-3 must be consigned and dispatched as per
the dispatch instructions to be issued after inspection and the bills and receipted
challans shall be sent to the paying officers through Assistant Divisional Engineer/Stores
O/o. Superintending Engineer/Operation/Circles issued in the despatch Instructions as
per the details given below.
Sl. To be sent to the Materials to be consigned and Paying Officer to whom bills
No. TSSPDCLS dispatched to & RR to be sent
Stores at ADE/ Stores/TSSPDCL
1. Mahaboobnagar Mahaboobnagar
2. Nalgonda Nalgonda Pay officer/TSSPDCL/
3. Sangareddy Sangareddy, Medak Corporate office through
4. Siddipet Siddipet Concerned ADE/ Stores
5. Ranga Reddy Ranga Reddy, Dist. Stores, Hyd
6. Hyderabad City Stores, Erragadda, Hyd

18) PACKING:
(i) The packing may be in accordance with the manufacturers standard practice
unless otherwise specified. The supplier should however, ensure that the packing
is such that the equipment reach the departmental stores without damages
after transport by rail or road. The packing should stand unloading and inter
stores transfer with reasonable care.
(ii) The supplier, whenever he dispatches material to consignees, would prepare the
following information in the form of packing slip in quadruplicate and send the
same to the consignee and obtain his acknowledgement on the same. The
consignee will return to the supplier one copy of packing slip with his remarks.
The proforma of packing slip shall be as follows.

PACKING SLIP
1. Purchase Order No. and date.
2. Quantity allotted to the stores and rate applicable.
3. Quantity so far supplied to the stores and rate applied.
4. Quantity now supplied and rate applied.
5. Total quantity supplied under the purchase order.
iii) The supplier shall invariably send to the purchasing officer, a copy of the delivery
challan whenever materials are dispatched.

19) IT MAY BE NOTED THAT:


a) Prices cited are FIRM free at destination stores and are inclusive of all
taxes and duties.
b) The ownership of the materials would rest with you till they are all received
in good condition at destination stores.
c) Railway Freight or lorry freight charges shall be prepaid at your cost.
d) The materials may be duly insured at your cost.
e) Interchangeability: All similar materials and removable parts of similar
equipment shall be interchangeable with each other.
f) Name Plate: The equipment shall be marked with your trademark and the
works SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LTD.,
Batch No., P.O.No. & Date, guarantee period and the month and year of
manufacture shall be embossed on each equipment.
20) INSURANCE
The Materials/equipment supplied under the Contract will be fully insured against
loss or damage incidental to manufacture or acquisition, transportation and
delivery and also storage for 45 days at destination stores before taking into
stock.

The bidder shall a) Initiate and pursue insurance claim till settlement, and b)
Promptly arrange for repair and/or replacement of any damaged items in full
irrespective of settlement of insurance claim by the under Writers. c) All costs
because of insurance liabilities covered under the contract will be to suppliers
7

account. The supplier shall provide the Purchaser with a copy of all insurance
policies and documents taken out by him in pursuance of the Contract. Such
copies of documents shall be submitted to the purchaser immediately after such
insurance coverage. The supplier shall also inform the Purchaser in writing at least
sixty (60) days in advance, regarding the expiry, cancellation and/or change in
any of such documents and ensure revalidation/renewal etc., as may be
necessary well in time.
The risks that are to be covered under the insurance shall be comprehensive and
shall include but not limited to, the loss or damage in transit, storage, due to
theft, pilferage, riot, civil commotion, weather conditions, accident of all kinds,
fire, flood, war risk(during ocean transportation) bad or rough handling etc. The
scope of such insurance shall cover the entire contract value.

The insurance will be in an amount equal to 100% FADS value of Materials/


equipment on all risks basis. The policy will have a provision for extension to cover
further storage if necessary at destination stores/site at TSSPDCL cost.
The Insurance beneficiary shall be TSSPDCL.
21. GENERAL:
(i) Your bills in duplicate along with a duplicate copy of invoice and substantiating
vouchers for all extra claims to be made separately should be forwarded to the
paying officers mentioned in the despatch instructions.
(ii) All General and technical correspondence should be addressed to the
Chief General Manager/P&MM/TSSPDCL, 4th floor, Corporate Office, Mint
Compound, Hyderabad-04.
(iii) All correspondence regarding bills, payments, etc., should be addressed to the
Paying Officers, cited in despatch instructions with a copy to the Pay Officer,
TSSPDCL, 3rd floor, Corporate Office, Mint Compound, Hyd-04.
(iv) All and any disputes or differences arising out of or touching this order shall be
decided by courts or tribunals situated in Hyderabad/Secunderabad cities.
No suit or other legal proceedings shall be instituted elsewhere.
(v) Unless otherwise specified, you shall abide by all the terms and conditions.
(vi) Please return one copy of the Purchase Order within 7 days duly signed in token
of acceptance of all the terms and conditions of this order.
(vii) This is regularization of preliminary acceptance of Lr.No.CGM/P&MM/E.11/
STN-143/16/Extn.LOI/D.No.650/17, Dt.25-04-2017.

Encl: ANNEXURE
Yours faithfully,

(M.BALARAJU)
CHIEF GENERAL MANAGER (P&MM)
Acting for and on behalf of TSSPDCL
We accept all the terms and
Conditions of this purchase order & specification
SIGNATURE OF THE CONTRACTOR
WITH SEAL DATE
Copy to:
The Chief General Manager/Finance/TSSPDCL /Hyderabad 04.
The General Manager/SP and P&A/Corporate Office/TSSPDCL/Hyderabad
The Superintending Engineer/Operation/Ranga Reddy-North, South & East, Hyd-North,
Hyd-South, Hyd-Central.
The Superintending Engineer/Lines/Hyderabad
The Superintending Engineer/SCADA/Hyderabad.
The Asst. Divisional Engineer/Stores/ Nalgonda, Medak, Mahaboobnagar,
Ranga Reddy and City-Hyd
The General Manager/IT/TSSPDCL : Place the Scanned Purchase Order copy in
TSSPDCL website.
\\10.10.106.252\document backup\Purchase Orders\POs FY 2016-17\STN-143-33 KV 24V DC VCB With CRP &CTs\Extn-PM-1138- Crompton - (51-2669 ).doc
8

SECTION V
I.GUARANTEED TECHNICAL PARTICULARS FOR 33KV VACUUM CIRCUIT BREAKERS (porcelain clad)

1. RATED VALUES AND CHARACTERISTICS


As per Bidder

a) No. of Poles 3
b) Type Outdoor Porcelain Clad VCB
c) Rated Voltage 33 KV/36 KV
d) Rated Insulation-Level
i) Impulse withstand voltage 170KV (peak)
ii) One minute Power frequency withstand voltage. 70KV (rms)
iii) One minute Power frequency withstand voltage on Auxiliary 2 KV (rms)
wiring.
e) Rated Frequency 50 HZ
f) Rated Normal Current 1250 A
g) Rated Cable charging current 50A
h) Rated (Single) Capacitor breaking current 400A

i) Rated Small Inductive breaking current As per IS-13118/1991 or


IEC-62271/100-2008
j) Rated Symmetrical Short Circuit breaking Current and breaking 25 KA (1500 MVA)
capacity in MVA.
k) Rated Transient Recovery Voltage. As per IS:13118/1991/IEC-62271-100

l) Rated short Circuit making current 62.5 KA


m) Rated Operating Sequence O-0.3Sec-Co -3Min-CO

n) Rated duration of short circuit 3Sec


o) Opening time and Break time (milli Sec.) <40ms and <80ms
p) Closing Time (Milli Sec.) 100ms max
2. Whether type test certificate enclosed with tender Yes

3. a) Pressure maintained in vacuum chamber. 10-6 torr


b) Gap between the contacts in Vacuum. 17 -18 mm
c) Area of contacts. Adequate
d) The voltage to which the circuit breaker shall be capable of 36KV
withstanding indefinitely across open contacts.

4. Minimum Clearance in air


a) Between Phases 420mm
b) Between Live parts to earth 450mm
6 OPERATING MECHANISM OF CIRCUIT BREAKER AND ASSOCIATED
EQUIPMENT :
1. Type of closing mechanism. Spring-Spring, motor charged
2. Whether Circuit breaker is Fixed trip or Trip free. Trip free
3. No. and type of auxiliary contacts (No. of spare normally open 4 N/O + 4 N/C Type : BUTT type cam
contacts and No. of spare normally closed contacts are to be operated
indicated).
4. Power requirement :
i) Closing coil 200W(Max)
ii) Opening coil 200W(Max)
5. Electrical service life :
i)Rated Current (times) 10000 Nos.(Min)
ii) Rated interruption current (times) 100 Nos.(Min)
6. Periodicity of maintenance for the following : For maintaining _.
Vacuum in interrupting chamber Chamber.
1) For maintaining Vacuum in Interrupting chamber. No maintenance required. Vacuum
2) For changing contacts. Interrupter to be replaced after
contact erosion exceeds specified limit
of 3mm
3) Other maintenance schedules if any. Periodic lubrication of mechanism
moving part required.
9

II. GUARANTEED TECHNICAL PARTICULARS FOR 33 KV CURRENT TRANSFORMERS

S.No Description As per TSSPDCL Requirement


1 Type Single phase outdoor live tank oil cooled vacuum
impregnated type
2 Manufacturers Type & designation 33 KV Outdoor live tank oil cooled CT
3 Rated Voltage 33 KV
4 Rated Primary current 400-200-100
5 Rated Secondary current 1A
6 No. of cores (Secondary core details) Two
7 Rated Output in VA
Core I : 15VA
Core II : 5 VA

8 Class of Accuracy
Core I : 5P10
Core II : 0.2S

9 Accuracy Limiting factor


10 for protective core

10 Method of ratio change and secondary Secondary Tapping


connection details & connection diagram.

11 Secondary voltage Not Applicable


12 Secondary Limiting Voltage Not Applicable
13 short time current 25 KA/3Sec
14 Rated current dynamic (Peak Value) 62.5KA Peak
15 Rated continuous thermal current 1.2 times continuous
temperature rise over ambient.
16 One minute power frequency Dry/Wet
withstand voltage in KV (r.m.s) 70KV Rms

17 1/50 micro second Impulse withstand test


voltage in KV (Peak) 170KV Peak

18 One minute power frequency withstand test 3KV Rms


voltage on secondaries in KV (r.m.s)

19 Total weight of oil in KG As per approved drawing


20 Total weight of in KG As per approved drawing
21 Magnetisation curve of CT core -
22 Mounting details As per approved drawing
23 Overall dimensions As per approved drawing
10

III.GUARANTEED TECHNICAL PARTICULARS FOR HT TRIVECTOR METERS

Sl.No Characteristics
1 Makers name and country Secure/L&T/Elster
2 Type of Meter/model Static/As per supplier make
0.2s as per IS 14697/99/
3 Accuracy class PTR : 11KV/110V
CTR : 400/1A
4 Power consumption for phase
i) Voltage Circuit 1 Watts & 8 VA per phase
ii) Current circuit Less than 1VA/Phase
5 Minimum starting current (%lb) 0.1% Ib per IS 14697/99
1. Lamp test
2. Date & Time
3. Active energy-kwh/Mwh import & Export
4. Active Energy lad-KV Arh/MV Arh import & Export
5. Active Energy lad-KV Arh/MV Arh import & Export
6. Apparent energy Kvah/Mvah import & Export
7. Max. demand (00.00-24.00hrs) (KVA)
8. Max. demand (00:00 24 hrs) occurance time
9. Inst. Avg. power factor
10.Aggregate Power factor
6 Parameters measured 11. Rising demand with Elapsed time (KVA/MVA)
import & Export
12. Cumulative MD resets
13. Cumulative MD (KVA/MVA) import/export
14. Inst. Phase Voltage R,Y, B phase
15. Inst. Phase Voltage R,Y, B phase
16. MD with 15 minutes integration
17. Real time
18. LED test
19. Power off, Powerfully On and Power partially On
Periods
7 No of digits of display and height of character 8 digits and 9mm height
8 P.F. range 0 Lag UPF 0 Lead
Variation of voltage at which meter functions
9 -30% to + 20%
normally
Particulars of read out
a) Continuous display As per Sl.No.6 of above.
1. Supply frequency
2. Present PT & CT status
3. Last occurrence tamper ID
b) manually on display
4. Time and date of last occurrence
10
5. Time & date of last tamper restoration
6. Cumulative tamper occurrence counts
c) auto display parameters
i) Scrolling period 10 Sec
ii) Display off period between two cycles 2 Sec
d) With CMRI/RMR As per technical specification
Details of Meter base and cover
1. Base : Poly Carbonate
11 a) Type of material
2. Top : Polycarbonate Transparent
b) Dimensions and weight As per the make of the meter
Non volatile memory retention time in absence
12 10 Years
of power
13 Memory capacity (kB) 32 KB
11

Details of tamper and fraud provisions


Yes, tamper & fraud status with last occurrence &
restoration tamper ID with date & time.
a) On display
Cumulative tamper occurrence count will also
14 provide on meter display.
b) With meter reading instrument and data transfer Yes Provided
Tamper information:
c) Detailed explanation how the tamper detection
R,Y,B phase CT reversal Phase sequence error
made is furnished or not?
Voltage imbalance, Magnet sense.
5 Years from the date of receipt of material at
15 Guarantee for satisfactory operation of meter destination stores by the consignee in good
condition.
16 Standards to which the meter confirms CBIP 88/IEC 687/IS-14697
a. Continuous 1 Amps
17 Overload capacity
b. B. Momentary 20 Amps (1 Second)
18 Dynamic range 0.1% Ib to 200% Ib
19 a) Meter terminal block having sailable extended Yes
terminal cover
b) connection diagram inside the terminal cover Yes
c) Maximum safe current the terminals and screws Yes
shall carry.
20 Change in errors (accuracy) due to variation in
voltage, frequency and temperature to be furnished
a) voltage
i) +20% to +10%
ii) +10% to -10%
iii) -10% to -20% Within the limits specified in relevant standards
iv) -20% to -30%
b) Frequency variation
i) 50 +10% HZ
ii) 50 +5% HZ
c)Temperature
21 Sealing of the meter (No of sales)
a)Meter cover Yes
b) Terminal Block cover Yes
c) others, if any, Nil
22 Whether meter carries any certification mark. BIS IS : 14697/1999
23 Self diagnostic features (provide details) Power on memory Integrity check
24 Principle of operation (Provide details) Provided by the supplier
25 Any additional measuring parameters Nil

\\10.10.106.252\document backup\Purchase Orders\POs FY 2016-17\STN-143-33 KV 24V DC VCB With CRP &CTs\Extn-PM-1138- Crompton - (51-2669 ).doc