ODN Construction Guidelines
January 15, 2016
Cascade Nov. 8, 2016
PLDT CONFIDENTIAL
Prepared by FIXED NETWORK BUILD
QUALITY Mgmt (FNB-QM)
PLDT CONFIDENTIAL
PLDT CONFIDENTIAL
AML (Actual Measured Loss) of the Feeder cables from CO must be
ODN CONSTRUCTION METHODOLOGY
secure first prior to actual build (Link loss < 4/3 dB @ 1310/1550 . PM
3
must coordinate first to Corenet /Zone for the nearest POI).
Loop Holder for POINT of INSERTION (POI)
PLDT CONFIDENTIAL 4
FIX CLOSURE & FOC loop
PLDT CONFIDENTIAL
MAINTENANCE LOOP (Future Insertion Point)
PLDT CONFIDENTIAL 6
Install LCP
PLDT CONFIDENTIAL 7
Inside LCP Installation
Organize & fix all buffer by providing 4 or more cable tie.
Provide loose tube or small spiral tube for individual buffer,
patch cord, pig tail, that will traverse / cross to the other side.
For multiple pigtail provide spiral tube for better arrangement
PLDT CONFIDENTIAL 8
FUTURE LOOP
Future Loops are install in-between LCP & NAP and serves as
future LCP/NAP activation.
Future loop should be install in-between 2 NAPs, So put the
future loop near the houses and not on a vacant lot or rice field.
Do not install future loop on the same side of the NAP, you
dont need this loop. Additional splitter will suffice.
Place the loop on the side facing the CO (or Feeder side)
PROVIDE 5m-7m. loop @ the designated location where they
will be install (12-13 diameter or equivalent to 1m/loop).
Remove and cut the messenger wire prior to fixing the loop.
Secure the loop with electrical tape for added strength and 4
Yellow cable tie as PLDT property identifier.
Provide 2 hook with nut, since this will become a NAP later
(OPTIONAL).
PLDT CONFIDENTIAL 9
NAP Installation
All NAPs shall have 2 Hook w/ nut properly place on the left & right
side of the pole clamp parallel to FOC.
Preferably TCA type pole clamp. (Type CA)
All NAPs must be place 1-2 feet from pole clamp or 16-18 feet from
Ground level.
If more than 2 feet provide additional strap & 2 buckle for stub fixing.
INSTALL two (2) bridle rings on both sides and one (1) at the bottom.
PLACE the bottom bridle ring 5 to 6 directly under the drop cable
ports
Always route FOC stub on the side that will create the bigger arc.
Cable Stub must be inserted in between bridle ring and pole.
Yellow cable tie is optional if with PLDT Logo no more yellow tie.
DO NOT route the Figure 8 cable through the bridle ring.
All End of Aerial (EOA) NAPs must be ground.
All boxes should be properly close & lock (ensure the metallic KEY head
is NOT PROTRUDING (NAKA ANGAT YUNG TORNILYO) and safety
key cover are also lock.
PLDT CONFIDENTIAL 10
Inside NAP INSTALLATION
Organize & fix all buffer by providing 4 or more cable tie.
Provide loose tube or small spiral tube for individual buffer,
patch cord, pig tail, that will traverse / cross to the other side.
For multiple pigtail provide spiral tube for better arrangement
PLDT CONFIDENTIAL 11
Double NAP (2 Splitters/NAP box) Installn
1 2
PLDT CONFIDENTIAL 12
Double NAP (2 splitters/NAP box) Install n
Double NAP
1 2
13
PLDT CONFIDENTIAL
LCP & NAP, NAP to NAP installation on the
SAME POLE
Side by side
When the adjacent pole has
transformer
When the next pole will
cross the main road
When the # poles are less
than the boxes needed to
install
When ADD NAP will be
provision on the same pole
Only 8 bridle rings & 3
strap will be needed.
Maximum of 2 FTTH box
per pole.
PLDT CONFIDENTIAL 14
STENCILING GUIDE
FiberHome Fibercom
PLDT CONFIDENTIAL 15
STENCILLING GUIDE
Fiberhome FDC
Tyco Fujikura
16
PLDT CONFIDENTIAL
STENCILLING ACTUAL
PLDT CONFIDENTIAL 17
Proper usage of Pole Clamp & Bolt with nut
PLDT CONFIDENTIAL 18
STRAIGHT RUN FIG8 INSTALLATION
PLDT CONFIDENTIAL 19
INSTALLATION OF HOOK w/ NUT
Install two (2) hooks, one (1) facing left and the other
facing the right side of the street, regardless if End of
NAP.
PLDT CONFIDENTIAL 20
GROUNDING INSTALLATION
PLDT CONFIDENTIAL 21
GUY GRIP STANDARD
For Fig. 8 24F/48F/72F FOC, USE 1/7 Guy Grip
PLDT CONFIDENTIAL 22
FOC cable touching Power cable PROVIDE
INSULATION MATERIAS
PLDT CONFIDENTIAL 23
ODN INSTALLATION @ MECO POLE w/
TRANSFORMER
PLDT CONFIDENTIAL 24
CROSS OVER CONSTRUCTION
PLDT CONFIDENTIAL 25
PULL- OFF CONSTRUCTION
PLDT CONFIDENTIAL 26
FIG8 CONSTRUCTION ON MECO TUBULAR
27
PLDT CONFIDENTIAL
Pole NAP w/ FIG8 cable attached to Extension
arm or MECO Tubular
28
PLDT CONFIDENTIAL
l = 1310 nm l = 1310 nm
l = 1490 nm l = 1490 nm
dB
l = 1550 nm l = 1550 nm
Copy FTTU
**1490 is optional
on pre test
TESTING FOR ODN
PLDT CONFIDENTIAL
SECTIONALIZED PRE-ACCEPTANCE
29
subject to isolation test to determine the cause.
NOTE:
If more than 1 LCP, testing l = 1490 nm
requires verification of PON
port ASSIGNMENT from OLT
by disconnecting patch cord Measured power
from the OLT PON port
Copy FTTU
assignment to check LCP to -22.0 dBm (max)
PON PORT NE ID assignment
given by Sir Amboy.
PLDT CONFIDENTIAL
FINAL ACCEPTANCE TEST
30
ODN FINAL ACCEPTANCE
PLDT CONFIDENTIAL 31
MACRO BEND LOSS CAUSE BY WRONG
CABLE STUB POSITION
PLDT CONFIDENTIAL 33
FNB-QM
THANK
YOU.
PLDT CONFIDENTIAL 34
Quality Assurance findings:
1. No hose clamp provided to secure
cable stub.
Recommendation:
1. Secure cable stub with hose
clamp. To prevent from pulling
cable incident.
LOCATION: San Lorenzo Ruiz St.
Recommendation:
Secure buffer arangement w/ 4 small
plastic ties. Used buffer tube for pigtails
protection.to avoid kink cause high loss
& los.
LOCATION:Brgy. 178- kiko
Recommendation:
GOOD WORKMANSHIP
LOCATION:
Maharlika Highway
LOCATION:KATUPARAN ST. BRGY, BATASAN BATASAN Q.C
Rectified Pictures
Recommendation:
Quality Assurance Findings Secure buffer arangement w/ 4 small
QCYLP803NP7&8 INCOMPLETE SMALL plastic ties. Used buffer tube for pigtails
PLASTICTIES TO SECURE BUFFER protection.to avoid kink cause high loss
ARANGEMENT, & SHORT SPIRAL TUBE. & los.(Buffer tube and and small ties
installed)