Page 1 of 7
ANALISA HARGA SATUAN BAHAN DAN UPAH BERDASARKAN KONTRAK
Page 2 of 7
ANALISA HARGA SATUAN BAHAN DAN UPAH BERDASARKAN KONTRAK
Page 3 of 7
ANALISA HARGA SATUAN BAHAN DAN UPAH BERDASARKAN KONTRAK
Page 4 of 7
ANALISA HARGA SATUAN BAHAN DAN UPAH BERDASARKAN KONTRAK
7.10.(3) Gabions
Nonadjustable 0.150
Manpower Hour 1.00 80,871.00 80,871.00 0.131
Stone cu.m 1.10 119,126.00 131,039.00 0.212
Gabion cu.m 1.00 309,060.00 309,060.00 0.499
Equipments Hour 1.00 5,000.00 5,000.00 0.008
Fuel Hour 1.00 - - -
525,970.00 1.000
Page 5 of 7
ANALISA HARGA SATUAN BAHAN DAN UPAH BERDASARKAN KONTRAK
8.3.(3) Trees
Nonadjustable 0.150
Manpower Hour 1.00 11,590.00 11,590.00 0.151
Trees each 1.00 51,510.00 51,510.00 0.667
Equipments Hour 1.00 2,500.00 2,500.00 0.032
Fuel Hour 1.00 - - -
65,600.00 1.000
8.4.(3a) Road Signs with Reflector of Eng. Grade Single (Size 600)
Nonadjustable 0.150
Manpower Hour 1.00 47,325.00 47,325.00 0.032
Reflector of EngineeringEach
Grade Single1.00
(Size 600)
1,133,220.00 1,133,220.00 0.775
Equipments Hour 1.00 34,398.00 34,398.00 0.024
Fuel Hour 1.00 28,713.00 28,713.00 0.019
1,243,656.00 1.000
Page 6 of 7
ANALISA HARGA SATUAN BAHAN DAN UPAH BERDASARKAN KONTRAK
Page 7 of 7