West Anglia Main Line (WAML)

Overall project cost - 130 million.

ROLE
Worked as structural designer for Tottenham Hale station detail design. Responsible for delivery of the assigned packages in time,
cost tracking of packages and reporting progress to the design/project manager. Managed cad technicians to ensure the drawings
progress and quality. Supported initial bid and project setup with internal clients.

RESPONSIBILITES
Structural designer for the GRIP 5 detailed design of the Tottenham Hale station structure.
o GRIP 5 detailed design of the Tottenham Hale station structure with footbridge, entrance structure, mezzanine
structure, lift cores, stairs and escalator. Carried out 3D structure modelling using STAAD Pro software and
designs carried out complying with Eurocode and Network Rail provisions. Prepared general arrangement and
detail drawings. Multi-disciplinary coordination carried out with Architecture, MEP, Telecoms, drainage, P-way
and OLE disciplines. Carried out assessment of the existing station structure for proposed changes.
Support for initial bid to internal clients.
o Part of the team that put forward bid to the internal client. Prepared a project execution strategy document
highlighting key roles & responsibilities and quality assurance strategy to deliver the project.
SOFTWARE USED
STAAD Pro, TEDDS, Microsoft Office, MicroStation, ProjectWise