DEPARTMENT OF EDUCATION Region I Schools Division of Ilocos Sur MAGSINGAL DISTRICT
THIRD QUARTER ADOPT-A-SCHOOL REPORT
SCHOOL NMAE INFRA NON- LAST MILE TOTAL AMOUNT
INFRA LEARNERS SUPPORT PACKAGE MARATUDO / CONSTRUCTION 200, 000.00 ELEMENTARY SCHOOL AND PAINTING OF SOME SPANS OF FENCE, PAINTING OF EXTERIOR WALLS, GATES, CORE VALUES, PEACE ZONE, FIRE SAFETY, EARTHQUAKE AND TYPHOON SAFETY MURALS AND INSTALLATION OF SLIDING WINDOWS AND SKY DIRECT SIGNAL CONSTRUCTION OF 2, 500.00 LAVATORY REPAINTING OF 1, 550.00 CLASSROOM REPAINTING OF 3, 500.00 CLASSROOM ELECTRICAL 200.00 WIRINGS ELECTRIFICATION 2, 485.00 FLOOR TILES AND 2, 500.00 DOOR FOR THE CR REPAINTING OF 2, 620.00 WALLS, CHAIRS AND TABLES AND READING CORNER REPAINTING OF 3, 550.00 INTERIOR WALLS ELECTRIFICATION 1, 190.00 ELECTRIFICATION 1, 011.00 REPAIR OF 950.00 CLASSROOM BOOKSHELVES PROCUREMENT OF 7, 800.00 FLOOR TILES SUB-TOTAL 229, 856.00 / PROCUREMENT OF 4, 500.00 OFFICE TABLE TV 6, 200.00 TV 3, 400.00 TV 7, 080.00 LED TV 6, 000.00 LED TV 7, 600.00 PORTABLE SPEAKER 4, 000.00 TEACHERS TABLE 4, 500.00 STAND FAN 1, 200.00 STAND FAN 920.00 STAND FAN 2, 200.00 STAND FAN 750.00 STAND FAN 750.00 CEILING FAN 1, 200.00 FLUORESCENT LAMP 500.00 DUSTPAN AND 105.00 WASTE BIN REPAIR OF ELECTRIC 125.00 FAN DURA BOX 1, 400.00 DRINKING CUPS 300.00 PLASTIC TRAY 80.00 TOILET BRUSH 20.00 MONOBLOC CHAIR 680.00 ARM CHAIRS 6, 000.00 SUB-TOTAL 59, 510.00 OVERALL TOTAL 289, 366.00
Prepared by: Noted by:
(Sgd.) GENELYN T. TOLENTINO (Sgd.) GEOFFREY T. UNIDA