BC1
Proyecto "A" Ao 0 Ao 1 Ao 2 Ao 3 Total
9% 30 40 50
(1.10)1 (1.10)2 (1.10)3
30 40 50 ti= 1.1
1.10 1.210 1.331 27.2727272727 + 33.0578512397 + 37.5657400451 = 97.896318557
40 45 50
(1+ 0.10)1 (1+ 0.10)2 (1+ 0.10)3
40 45 50
(1.10)1 (1.10)2 (1.10)3
40 45 50
1.10 1.210 1.331